CN213174631U - Building rubbish discharging equipment in construction - Google Patents

Building rubbish discharging equipment in construction Download PDF

Info

Publication number
CN213174631U
CN213174631U CN202021460229.0U CN202021460229U CN213174631U CN 213174631 U CN213174631 U CN 213174631U CN 202021460229 U CN202021460229 U CN 202021460229U CN 213174631 U CN213174631 U CN 213174631U
Authority
CN
China
Prior art keywords
pipe
discharge pipe
fixedly connected
discharging
discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021460229.0U
Other languages
Chinese (zh)
Inventor
何雪雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shoujian Construction Development Co ltd
Original Assignee
Shoujian Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shoujian Construction Development Co ltd filed Critical Shoujian Construction Development Co ltd
Priority to CN202021460229.0U priority Critical patent/CN213174631U/en
Application granted granted Critical
Publication of CN213174631U publication Critical patent/CN213174631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model relates to a construction waste retrieves technical field, and discloses a construction waste discharging device in construction, including last emission pipe, well delivery pipe and lower emission pipe, go up emission pipe bottom and well delivery pipe top can dismantle and be connected, lower emission pipe can dismantle with well delivery pipe bottom and be connected. This building rubbish discharging equipment in construction through arranging discharge tube, lower discharge tube and well delivery pipe on floor one side sets up, and the cooperation is put in mouthful and fixed subassembly and is made building rubbish can be directly put in from last discharge tube, utilizes gravity to make building rubbish retrieve to the dustbin fast, improves building rubbish discharge efficiency to solve current elevating gear inefficiency, lead to the slow problem of building rubbish clearance operation progress.

Description

Building rubbish discharging equipment in construction
Technical Field
The utility model relates to a construction waste retrieves technical field, specifically is a construction waste discharging equipment in construction.
Background
In the building work progress, can produce more concrete or grit rubbish, along with increasing of building floor, the clearance of rubbish is more and more difficult, long among the prior art adopts elevating gear to go up and down to the rubbish of higher floor and clear, the inefficiency thereof, lead to building rubbish clearance operation progress slow.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction waste discharging device in construction has solved the current elevating gear inefficiency that provides in the above-mentioned background art, leads to the slow problem of construction waste clearance operation progress.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a building garbage discharging device in building construction comprises an upper discharging pipe, a middle discharging pipe and a lower discharging pipe, wherein the bottom of the upper discharging pipe is detachably connected with the top of the middle discharging pipe, and the lower discharging pipe is detachably connected with the bottom of the middle discharging pipe;
the outer side walls of the upper discharge pipe, the middle discharge pipe and the lower discharge pipe are respectively provided with a fixing assembly, each fixing assembly comprises an annular hoop, a connecting rod and a clamping plate, the annular hoops are respectively and fixedly arranged on the outer side walls of the upper discharge pipe, the middle discharge pipe and the lower discharge pipe, the connecting rods are fixedly connected to the outer side walls of the annular hoops, one side wall of each clamping plate is fixedly connected with one end, far away from the annular hoops, of the connecting rod, and one side, far away from the connecting rods;
the upper discharging pipe, the middle discharging pipe and the lower discharging pipe are all internally and alternately provided with buffering assemblies, each buffering assembly comprises a fixed block, a buffering plate and a spring, the fixed blocks are fixedly connected with the inner walls of the upper discharging pipe, the middle discharging pipe and the lower discharging pipe, the buffering plates are hinged to the fixed blocks through rotating shafts, one ends of the fixing blocks, far away from the bottom of the buffering plates, are fixedly connected with one ends of the springs, and the other ends of the springs are fixedly connected with the inner walls of the upper discharging pipe, the middle discharging pipe and the lower discharging pipe.
Further, a throwing groove is formed in the outer side wall of the upper discharge pipe, the middle discharge pipe and the lower discharge pipe, and an arc-shaped baffle plate is arranged on the outer side of the throwing groove.
Further, the clamping plate is characterized in that the annular hoops comprise a first annular hoop and a second annular hoop, the first annular hoop and the second annular hoop are fixedly installed on the outer side walls of the upper discharge pipe, the middle discharge pipe and the lower discharge pipe through bolts, a plurality of threaded holes are formed in the top of the clamping plate, and the bottoms of the threaded holes are fixedly communicated with the U-shaped grooves.
Further, the improved sewage treatment device is characterized in that an ear plate is fixedly connected to the bottom of the upper discharging pipe, the top and the bottom of the middle discharging pipe are fixedly connected with the ear plate, the top of the lower discharging pipe is fixedly connected with the ear plate, a plurality of threaded holes are formed in the ear plate, and the upper discharging pipe and the middle discharging pipe, and the middle discharging pipe and the lower discharging pipe are detachably connected through bolts.
Furthermore, a garbage can is arranged at the bottom of the lower discharge pipe, and the bottom of the lower discharge pipe is fixedly communicated with the garbage can.
Further, the number of the connecting rods is at least three.
Further, the intermediate discharge pipe is provided in plurality.
(III) advantageous effects
The utility model provides a construction waste discharging device in construction possesses following beneficial effect:
(1) this building rubbish discharging equipment in construction through discharge tube, lower discharge tube and well delivery pipe on floor one side sets up, and the cooperation is put in mouthful and fixed subassembly makes building rubbish can directly put in from last discharge tube, utilizes gravity to make building rubbish retrieve to the dustbin fast, improves building rubbish discharge efficiency to solve current elevating gear inefficiency, lead to the slow problem of building rubbish clearance operation progress.
(2) According to the building garbage discharging device in building construction, the buffer assemblies are arranged in the discharging pipe in a staggered mode, so that high-rise garbage can be buffered to a certain extent after being thrown in, and can fall down stably; by arranging the arc-shaped baffle, the building garbage is prevented from being scattered when being thrown; through setting up a plurality of connecting rods, make the utility model discloses it is fixed more firm when using.
Drawings
Fig. 1 is a schematic structural view of a construction waste discharge device in the construction of the utility model;
fig. 2 is a schematic structural view of a middle discharge pipe of the construction waste discharge device in the construction of the utility model;
FIG. 3 is an enlarged schematic structural view of the construction waste discharging device at the position A in the construction of the utility model;
fig. 4 is the inside schematic structure diagram of the discharge pipe of the construction waste discharge device in the building construction of the utility model.
In the figure: go up discharge pipe 1, well discharge pipe 2, lower discharge pipe 3, dustbin 5, buffering subassembly 7, fixed block 701, buffer board 702, spring 703, input groove 8, cowl 9, annular hoop 11, first annular hoop 1101, second annular hoop 1102, 12, connecting rod 13, splint 14, U type groove 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides a technical solution:
a construction waste discharge device in building construction comprises an upper discharge pipe 1, a middle discharge pipe 2 and a lower discharge pipe 3, wherein the bottom of the upper discharge pipe 1 is detachably connected with the top of the middle discharge pipe 2, the lower discharge pipe 3 is detachably connected with the bottom of the middle discharge pipe 2, and a plurality of middle discharge pipes 2 are arranged;
the outer side walls of the upper discharge pipe 1, the middle discharge pipe 2 and the lower discharge pipe 3 are respectively provided with a fixing assembly, each fixing assembly comprises an annular hoop 11, a connecting rod 13 and clamping plates 14, the annular hoops 11 are respectively and fixedly arranged on the outer side walls of the upper discharge pipe 1, the middle discharge pipe 2 and the lower discharge pipe 3, the connecting rods 13 are fixedly connected to the outer side walls of the annular hoops 11, at least three connecting rods 13 are arranged, one side wall of each clamping plate 14 is fixedly connected with one end, far away from the annular hoop 11, of each connecting rod 13, and one side, far away from the connecting;
go up discharge tube 1, well discharge tube 2 and the inside crisscross buffering subassembly 7 that is equipped with of discharge tube 3 down, buffering subassembly 7 includes fixed block 701, buffer board 702 and spring 703, fixed block 701 fixed connection is at last discharge tube 1, the inner wall of well discharge tube 2 and discharge tube 3 down, buffer board 702 is articulated through the axis of rotation with fixed block 701, the one end of fixed block 701 and the one end fixed connection of spring 703 are kept away from to buffer board 702 bottom, the spring 703 other end and last discharge tube 1, the inner wall fixed connection of well discharge tube 2 and discharge tube 3 down. Go up discharge pipe 1, well delivery pipe 2 and 3 lateral walls of lower discharge pipe and all seted up and put in groove 8, put in the groove 8 outside and be provided with cowl 9. The annular hoop 11 comprises a first annular hoop 1101 and a second annular hoop 1102, the first annular hoop 1101 and the second annular hoop 1102 are fixedly mounted on the outer side walls of the upper discharge pipe 1, the middle discharge pipe 2 and the lower discharge pipe 3 through bolts, a plurality of threaded holes are formed in the top of the clamping plate 14, and the bottoms of the threaded holes are fixedly communicated with the U-shaped grooves 15. Go up 1 bottom fixedly connected with otic placode 12 of exhaust pipe, the equal fixedly connected with otic placode 12 in 2 tops of well delivery pipe and bottom, 3 top fixedly connected with otic placodes 12 of lower delivery pipe have seted up a plurality of screw holes on the otic placode 12, go up exhaust pipe 1 and well delivery pipe 2, well delivery pipe 2 and all can dismantle through the bolt and be connected with lower delivery pipe 3. The bottom of the lower discharging pipe 3 is provided with a garbage can 5, and the bottom of the lower discharging pipe 3 is fixedly communicated with the garbage can 5.
The theory of operation, this construction waste discharging device in construction, at first bring the quantity of centering delivery pipe 2 to adjust according to the floor height, then with the U type groove 15 joint of splint 14 on the floor, fix it with the bolt through the screw hole at splint 14 top, then link together each delivery pipe through otic placode 12, construction worker throws into the delivery pipe through input port 8 during the use construction waste, and construction waste discharges into garbage bin 5 after buffering it via buffer board 702.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise. In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; or indirectly through an intermediary. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The building garbage discharging device in building construction comprises an upper discharging pipe (1), a middle discharging pipe (2) and a lower discharging pipe (3), and is characterized in that the bottom of the upper discharging pipe (1) is detachably connected with the top of the middle discharging pipe (2), and the lower discharging pipe (3) is detachably connected with the bottom of the middle discharging pipe (2);
the outer side walls of the upper discharge pipe (1), the middle discharge pipe (2) and the lower discharge pipe (3) are respectively provided with a fixing assembly, each fixing assembly comprises an annular hoop (11), a connecting rod (13) and a clamping plate (14), the annular hoops (11) are respectively and fixedly arranged on the outer side walls of the upper discharge pipe (1), the middle discharge pipe (2) and the lower discharge pipe (3), the connecting rods (13) are fixedly connected to the outer side walls of the annular hoops (11), one side wall of each clamping plate (14) is fixedly connected with one end, far away from the annular hoops (11), of each connecting rod (13), and one side, far away from the connecting rods (13), of each clamping plate (14) is provided with;
the improved drainage pipe comprises an upper drainage pipe (1), a middle drainage pipe (2) and a lower drainage pipe (3), wherein buffering components (7) are arranged inside the upper drainage pipe (1), the middle drainage pipe (2) and the lower drainage pipe (3) in a staggered mode, each buffering component (7) comprises a fixing block (701), a buffering plate (702) and a spring (703), the fixing blocks (701) are fixedly connected to the inner walls of the upper drainage pipe (1), the middle drainage pipe (2) and the lower drainage pipe (3), the buffering plates (702) are hinged to the fixing blocks (701) through rotating shafts, one end, far away from the fixing blocks (701), of the bottom of each buffering plate (702) is fixedly connected with one end of each spring (703), and the other end of each spring (703) is fixedly connected with the inner walls of the.
2. The construction waste discharge device in building construction according to claim 1, wherein the outer side walls of the upper discharge pipe (1), the middle discharge pipe (2) and the lower discharge pipe (3) are provided with a throwing groove (8), and an arc-shaped baffle (9) is arranged outside the throwing groove (8).
3. The construction waste discharge device in building construction according to claim 1, wherein the annular hoop (11) comprises a first annular hoop (1101) and a second annular hoop (1102), the first annular hoop (1101) and the second annular hoop (1102) are fixedly installed on the outer side walls of the upper discharge pipe (1), the middle discharge pipe (2) and the lower discharge pipe (3) through bolts, a plurality of threaded holes are formed in the top of the clamping plate (14), and the bottoms of the threaded holes are fixedly communicated with the U-shaped groove (15).
4. The construction waste discharge device in building construction according to claim 1, wherein the bottom of the upper discharge pipe (1) is fixedly connected with an ear plate (12), the top and the bottom of the middle discharge pipe (2) are fixedly connected with ear plates (12), the top of the lower discharge pipe (3) is fixedly connected with an ear plate (12), the ear plate (12) is provided with a plurality of threaded holes, and the upper discharge pipe (1) and the middle discharge pipe (2), and the middle discharge pipe (2) and the lower discharge pipe (3) are detachably connected through bolts.
5. The construction waste discharge device in building construction according to claim 1, wherein the bottom of the lower discharge pipe (3) is provided with a waste bin (5), and the bottom of the lower discharge pipe (3) is fixedly communicated with the waste bin (5).
6. A construction waste discharge device in building construction according to claim 1, wherein said connecting rods (13) are provided in at least three numbers.
7. A construction waste discharge device in building construction according to claim 1, wherein said intermediate discharge pipe (2) is provided in plurality.
CN202021460229.0U 2020-07-22 2020-07-22 Building rubbish discharging equipment in construction Active CN213174631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021460229.0U CN213174631U (en) 2020-07-22 2020-07-22 Building rubbish discharging equipment in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021460229.0U CN213174631U (en) 2020-07-22 2020-07-22 Building rubbish discharging equipment in construction

Publications (1)

Publication Number Publication Date
CN213174631U true CN213174631U (en) 2021-05-11

Family

ID=75794589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021460229.0U Active CN213174631U (en) 2020-07-22 2020-07-22 Building rubbish discharging equipment in construction

Country Status (1)

Country Link
CN (1) CN213174631U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775954A (en) * 2022-05-06 2022-07-22 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building thing
CN114772099A (en) * 2022-04-29 2022-07-22 江苏中之栋房屋建设工程有限公司 Building rubbish discharging equipment in construction
CN114892919A (en) * 2022-06-09 2022-08-12 无锡久业建设有限公司 Building rubbish discharging equipment in building construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114772099A (en) * 2022-04-29 2022-07-22 江苏中之栋房屋建设工程有限公司 Building rubbish discharging equipment in construction
CN114772099B (en) * 2022-04-29 2023-02-03 江苏中之栋房屋建设工程有限公司 Building rubbish discharging equipment in building construction
CN114775954A (en) * 2022-05-06 2022-07-22 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building thing
CN114892919A (en) * 2022-06-09 2022-08-12 无锡久业建设有限公司 Building rubbish discharging equipment in building construction
CN114892919B (en) * 2022-06-09 2023-09-22 无锡久业建设有限公司 Construction waste discharging device in construction

Similar Documents

Publication Publication Date Title
CN213174631U (en) Building rubbish discharging equipment in construction
CN208918337U (en) A kind of building assembly support device convenient for adjusting height
CN214975652U (en) Civil engineering construction waste's preliminary screening plant in earlier stage
CN206050657U (en) Buckling device and the refuse bin with buckling device
CN108856246A (en) A kind of refuse disposal installation
CN213618488U (en) Charging equipment for municipal solid waste treatment
CN214182007U (en) Environment-friendly floor construction waste conveyor
CN115569964A (en) Be used for building solid useless refuse treatment device
CN212405943U (en) Novel be convenient for clear up building rubbish device
CN208152486U (en) Multi-rise building refuse collection pipe-line system
CN218668342U (en) Building rubbish cleaning device
CN218668533U (en) Combined steel net cage
CN220868884U (en) Slurry spreading device for bricked wall masonry
CN220159385U (en) Sewage pretreatment equipment
CN109573359A (en) A kind of material flat-bottom bin broken arch collecting device
CN219211047U (en) Civil engineering construction waste processor
CN206265684U (en) Refuse treatment plant
CN218834784U (en) Civil engineering construction waste treatment device
CN216964760U (en) Concrete processingequipment suitable for building rubbish is used multipurposely
CN219116291U (en) Garbage disposal compression equipment
CN217796645U (en) Water method sorting unit
CN214695962U (en) Concrete core filling tool for module inspection well
CN219278438U (en) Garbage clearing device
CN215709008U (en) Be used for villages and small towns construction engineering residue conveyor
CN214644744U (en) Efficient feeding equipment for concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No. 1703, 17 / F, block B, Changhe international, Fengcheng seventh Road, Xi'an Economic and Technological Development Zone, Shaanxi 710000

Patentee after: Shoujian Construction Development Co.,Ltd.

Address before: Room 11703, 17th floor, unit 1, building 13, Changhe shangshangjun, economic and Technological Development Zone, Xi'an City, Shaanxi Province, 710000

Patentee before: Shoujian Construction Development Co.,Ltd.