CN211846859U - Integral binding and hoisting device for cylindrical reinforcement cage - Google Patents

Integral binding and hoisting device for cylindrical reinforcement cage Download PDF

Info

Publication number
CN211846859U
CN211846859U CN201922472450.1U CN201922472450U CN211846859U CN 211846859 U CN211846859 U CN 211846859U CN 201922472450 U CN201922472450 U CN 201922472450U CN 211846859 U CN211846859 U CN 211846859U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
positioning plate
frame
lug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922472450.1U
Other languages
Chinese (zh)
Inventor
郭志鹏
王飞
赵刚
何学平
刘鹏
杜洪浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Branch Of Cccc Shanghai Port Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
Jiangsu Branch Of Cccc Shanghai Port Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Branch Of Cccc Shanghai Port Engineering Co ltd filed Critical Jiangsu Branch Of Cccc Shanghai Port Engineering Co ltd
Priority to CN201922472450.1U priority Critical patent/CN211846859U/en
Application granted granted Critical
Publication of CN211846859U publication Critical patent/CN211846859U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an integral ligature hoist device of cylinder steel reinforcement cage, including the locating plate that is used for the whole ligature of steel reinforcement cage and the hoist and mount frame that is used for the cooperation to lift by crane steel reinforcement cage, be equipped with the locating hole that is used for the vertical reinforcement of location installation steel reinforcement cage on the locating plate, the locating hole sets up with the vertical reinforcement one-to-one of steel reinforcement cage, thereby can transfer to the levelling device that the horizontality was in the perpendicular to locating plate state after guaranteeing steel reinforcement cage ligature completion before locating plate below fixed mounting is under the assurance locating plate construction, hoist and mount frame includes the support body, be equipped with the lower lug that sets up downwards on the support body, be equipped with the last lug that is used for being connected with the portal crane that upwards sets up on the support. The utility model discloses a locating plate and the cooperation of hoist and mount frame are used, can accomplish the ligature of cylinder steel reinforcement cage on ground, increase the efficiency of construction, reduce high altitude construction, reduce the construction risk.

Description

Integral binding and hoisting device for cylindrical reinforcement cage
Technical Field
The utility model relates to a construction technical field of breakwater component, especially a whole ligature hoist device of cylinder steel reinforcement cage.
Background
The vertical breakwater structure without the bottom barrel type prefabricated part is a novel breakwater structure made of materials such as concrete, steel bars and steel structures, and each group of the barrel type foundation structure consists of a foundation barrel body and 2 upper barrel bodies. The basic barrel body is of a single-barrel multi-bin structure, and the single-barrel multi-bin structure can be used as engineering foundations or main structures of wharfs, bridges, breakwaters, docks and the like when being inserted into soil. According to the engineering prospect, the barrel type foundation structure has large prefabrication demand and is suitable for industrial production.
According to construction process in the past, barrel intensity after lower staving concrete placement completion satisfies the requirement after not only can make the efficiency of construction greatly reduced going up the barrel ligature, going up barrel steel reinforcement cage on the staving on the lower staving in addition and on-the-spot ligature also can greatly increased potential safety hazard, the construction face is little, high altitude construction operation time is long, dangerous high.
SUMMERY OF THE UTILITY MODEL
The invention aims to solve the technical problem of providing a cylindrical reinforcement cage integral binding and hoisting device which can reduce the construction safety risk and increase the construction efficiency aiming at the defects of the prior art.
The technical problem to be solved by the utility model is realized by the following technical proposal, which comprises a positioning plate for binding the whole reinforcement cage and a hoisting frame for matching with the hoisting reinforcement cage;
the positioning plate is provided with a positioning hole for positioning and installing the vertical steel bar of the steel bar cage; the positioning holes are arranged in one-to-one correspondence with the vertical steel bars of the steel reinforcement cage;
a leveling device which can ensure that the positioning plate can be adjusted to a horizontal state before construction so as to ensure that the steel reinforcement cage is in a state of being vertical to the positioning plate after binding is finished is fixedly arranged below the positioning plate;
the hoisting frame comprises a frame body, a lower lifting lug which is arranged downwards is arranged on the frame body, an upper lifting lug which is arranged upwards and is used for being connected with the gantry crane is arranged on the frame body, and a lifting ring which is arranged corresponding to the lower lifting lug on the frame body is fixed at the upper end of the vertical steel bar of the steel reinforcement cage.
The utility model discloses the technical problem that will solve can also further realize through following technical scheme, above a whole ligature hoist device of cylinder steel reinforcement cage, the support body includes outer frame and sets up the internal frame in the inside cavity of outer frame, and connecting rod fixed connection through a plurality of even settings is whole between outer frame and the internal frame, lug fixed mounting goes up lug fixed mounting on the connecting rod on outer frame down.
The utility model discloses the technical problem that will solve can also further realize through following technical scheme, above a whole ligature hoist device of cylinder steel reinforcement cage, last lug be provided with four.
The utility model discloses the technical problem that will solve can also further realize through following technical scheme, above a whole ligature hoist device of cylinder steel reinforcement cage, fixed mounting has the stabilizer bar between adjacent connecting rod.
The utility model discloses the technical problem that solve can also further realize through following technical scheme, above a whole ligature hoist device of cylinder steel reinforcement cage, the locating plate be cyclic annular locating plate.
The utility model discloses the technical problem that solve can also further realize through following technical scheme, above a whole ligature hoist device of cylinder steel reinforcement cage, leveling device is eight leveling lift lead screws of evenly installing under the locating plate.
The utility model discloses the technical problem that will solve can also further realize through following technical scheme, above a whole ligature hoist device of cylinder steel reinforcement cage, rings evenly be provided with eight along the steel reinforcement cage round, the support body on lower lug and the setting of rings one-to-one.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a setting of locating plate can reduce high altitude construction operation, reduces the construction risk subaerial ligature cylinder steel reinforcement cage in advance.
2. The utility model discloses a cooperation of hoist and mount frame and locating plate is used, realizes the whole hoist and mount of cylinder steel reinforcement cage, increases the efficiency of construction.
Drawings
FIG. 1 is a top view of the positioning plate;
FIG. 2 is a side view of the positioning plate;
figure 3 is a top view of the hoist frame;
figure 4 is a side view of the sling.
In the figure: 1. positioning a plate; 2. positioning holes; 3. leveling a lifting screw rod; 4. an upper lifting lug; 5. a lower lifting lug; 6. an outer frame; 7. an inner frame; 8. a connecting rod; 9. a stabilizer bar.
Detailed Description
The following further describes embodiments of the present invention in order to facilitate further understanding of the present invention by those skilled in the art, and does not constitute a limitation to the right thereof.
Referring to fig. 1-4, a whole ligature hoist device of cylinder steel reinforcement cage, including the locating plate 1 that is used for the whole ligature of steel reinforcement cage and the hoist and mount frame that is used for the cooperation to lift by crane the steel reinforcement cage, locating plate 1 is cyclic annular locating plate.
A positioning hole 2 for positioning and installing a vertical steel bar of the steel bar cage is arranged on the positioning plate 1; the positioning holes 2 are arranged in one-to-one correspondence with the vertical steel bars of the steel reinforcement cage, the positioning plates 1 are fixedly provided with leveling lifting screw rods 3 which can be adjusted to a horizontal state before construction of the positioning plates, so that the steel reinforcement cage is guaranteed to be in a state perpendicular to the positioning plates after binding is completed, and the eight leveling lifting screw rods 3 are uniformly arranged below the positioning plates.
The hoisting frame comprises a frame body, wherein lower lifting lugs 5 which are arranged downwards are arranged on the frame body, upper lifting lugs 4 which are arranged upwards and are connected with the gantry crane are arranged on the frame body, lifting rings which are arranged in a one-to-one correspondence with the lower lifting lugs 5 on the frame body are fixed at the upper ends of vertical steel bars of the steel reinforcement cage, and eight lifting rings are uniformly arranged along the circle of the steel reinforcement cage.
The support body includes outer frame 6 and sets up at the inner frame 7 of 6 inside cavities of outer frame, and 8 fixed connection through a plurality of even connecting rods that set up are whole between outer frame 6 and the inner frame 7, and fixed mounting has stabilizer bar 9 between the connecting rod 8, and 5 fixed mounting of lower lug are on outer frame 6, go up 4 fixed mounting of lug on connecting rod 8, go up lug 4 and be provided with four.
The working process of the utility model is as follows:
ground is arranged in to locating plate 1, adjust locating plate 1 to the horizontality through leveling lift lead screw 3, install the vertical reinforcement of steel reinforcement cage through locating hole 2, ligature steel reinforcement cage afterwards, evenly set up eight rings along the steel reinforcement cage round in the upper end of the vertical reinforcement of steel reinforcement cage, all go up barrel reinforcement completion backs, adopt the portal crane to lift by crane the hoist and mount frame through last lug 4, 5 cooperation of lower lug through the hoist and mount shelf location reserve rings on the steel reinforcement cage with steel reinforcement cage integral hoisting, the handling is welded the installation to appointed last barrel.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides an integral ligature hoist device of cylinder steel reinforcement cage which characterized in that:
the hoisting device comprises a positioning plate for integrally binding the reinforcement cage and a hoisting frame for hoisting the reinforcement cage in a matching manner;
the positioning plate is provided with a positioning hole for positioning and installing the vertical steel bar of the steel bar cage; the positioning holes are arranged in one-to-one correspondence with the vertical steel bars of the steel reinforcement cage;
a leveling device which can ensure that the positioning plate can be adjusted to a horizontal state before construction so as to ensure that the steel reinforcement cage is in a state of being vertical to the positioning plate after binding is finished is fixedly arranged below the positioning plate;
the hoisting frame comprises a frame body, a lower lifting lug which is arranged downwards is arranged on the frame body, an upper lifting lug which is arranged upwards and is used for being connected with the gantry crane is arranged on the frame body, and a lifting ring which is arranged corresponding to the lower lifting lug on the frame body is fixed at the upper end of the vertical steel bar of the steel reinforcement cage.
2. The integral binding and hoisting device for the cylindrical reinforcement cage according to claim 1, wherein: the support body includes outer frame and the inner frame that sets up the inside cavity of outer frame, and the connecting rod fixed connection through a plurality of even settings is whole between outer frame and the inner frame, lug fixed mounting goes up lug fixed mounting on the connecting rod down on outer frame.
3. The integral binding and hoisting device for the cylindrical reinforcement cage according to claim 1 or 2, wherein: the upper lifting lug is provided with four.
4. The integral binding and hoisting device for the cylindrical reinforcement cage according to claim 1 or 2, wherein: and a stabilizer bar is fixedly arranged between the adjacent connecting rods.
5. The integral binding and hoisting device for the cylindrical reinforcement cage according to claim 1, wherein: the positioning plate is an annular positioning plate.
6. The integral binding and hoisting device for the cylindrical reinforcement cage according to claim 1, wherein: the leveling device is eight leveling lifting screw rods which are uniformly arranged below the positioning plate.
7. The integral binding and hoisting device for the cylindrical reinforcement cage according to claim 1, wherein: the rings evenly are provided with eight along the steel reinforcement cage round, the support body on lower lug and rings one-to-one setting.
CN201922472450.1U 2019-12-31 2019-12-31 Integral binding and hoisting device for cylindrical reinforcement cage Active CN211846859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922472450.1U CN211846859U (en) 2019-12-31 2019-12-31 Integral binding and hoisting device for cylindrical reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922472450.1U CN211846859U (en) 2019-12-31 2019-12-31 Integral binding and hoisting device for cylindrical reinforcement cage

Publications (1)

Publication Number Publication Date
CN211846859U true CN211846859U (en) 2020-11-03

Family

ID=73209746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922472450.1U Active CN211846859U (en) 2019-12-31 2019-12-31 Integral binding and hoisting device for cylindrical reinforcement cage

Country Status (1)

Country Link
CN (1) CN211846859U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045852A (en) * 2021-12-09 2022-02-15 中交一航局第五工程有限公司 Integral binding and hoisting process for large round caisson steel bars
WO2023213068A1 (en) * 2022-07-29 2023-11-09 中国路桥工程有限责任公司 Hoisting method for entire large diameter variable circular cross section steel bar segment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045852A (en) * 2021-12-09 2022-02-15 中交一航局第五工程有限公司 Integral binding and hoisting process for large round caisson steel bars
CN114045852B (en) * 2021-12-09 2024-05-24 中交一航局第五工程有限公司 Integral binding and hoisting process for large round caisson steel bars
WO2023213068A1 (en) * 2022-07-29 2023-11-09 中国路桥工程有限责任公司 Hoisting method for entire large diameter variable circular cross section steel bar segment

Similar Documents

Publication Publication Date Title
CN211846859U (en) Integral binding and hoisting device for cylindrical reinforcement cage
CN206233576U (en) For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney
CN111996920A (en) Cable tower column segment reinforcement cage block hoisting construction method and structure
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN110424394A (en) A kind of mobile surely stake platform and its construction technology
CN211141282U (en) Steel reinforcement cage installation hoist device
DE102005023488A1 (en) Tower frame for a suspended coal-burning boiler, giving steam for electricity generation, is erected in segments by raising each installed segment assembly for the next prepared segment to be pushed in and secured below
CN210151723U (en) Pile foundation steel reinforcement cage elevation positioner
CN103434933A (en) Large member hoisting in-position device and in-position method
CN214363503U (en) Lattice formula stand manhole construction is with supplementary lattice post
CN214061632U (en) Positioning device arranged below reinforcement cage
CN212478488U (en) Construction work platform is built by laying bricks or stones to chimney inside lining
CN210457157U (en) Curtain type hoisting structure for quickly positioning and installing main reinforcement of square concrete pier column
CN103388336B (en) Main purline part for inner support
CN204198329U (en) Anchor pole hanging device
CN206376615U (en) Inner steel cylinder of chimney lifting device
CN113738156A (en) Temporary support structure in limited space and dismantling method thereof
CN216948382U (en) Single-lifting-point lifting structure arranged on inner wall of double-wall steel cofferdam
CN101723240A (en) Special fixture for hoisting rectangular section steel column and hoisting method by using same
CN109505304A (en) A kind of permafrost soil area assembled type base for power transmission line iron tower prefab-form
CN217150235U (en) Device for construction of manual hole digging cast-in-place pile
CN211991570U (en) Tank deck supporting device
CN214270021U (en) Operation radius lengthening device for tower crane
CN110526153B (en) Jack-assisted pile foundation reinforcement cage hoisting structure and construction method thereof
CN217601414U (en) Be used for pile foundation arrangement of reinforcement connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230925

Address after: No. 147, Zhongshan Middle Road, Lianyun District, Lianyungang City, Jiangsu Province

Patentee after: JIANGSU BRANCH OF CCCC SHANGHAI PORT ENGINEERING Co.,Ltd.

Patentee after: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Address before: No. 147, Zhongshan Middle Road, Lianyun District, Lianyungang City, Jiangsu Province

Patentee before: JIANGSU BRANCH OF CCCC SHANGHAI PORT ENGINEERING Co.,Ltd.

TR01 Transfer of patent right