CN211714770U - Enclose fender braced system with face electric pipeline support and combine together near water - Google Patents

Enclose fender braced system with face electric pipeline support and combine together near water Download PDF

Info

Publication number
CN211714770U
CN211714770U CN202020038176.7U CN202020038176U CN211714770U CN 211714770 U CN211714770 U CN 211714770U CN 202020038176 U CN202020038176 U CN 202020038176U CN 211714770 U CN211714770 U CN 211714770U
Authority
CN
China
Prior art keywords
enclosure
fender
hole
dismantle
scaffold frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020038176.7U
Other languages
Chinese (zh)
Inventor
王增辉
徐泽远
温龙
王琨
狄勇
张兴林
谢振民
江歌
张锟
胡延立
王森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Contracting Department Of Beijing Construction Engineering Group Co ltd
Beijing Construction Engineering Group Co Ltd
Original Assignee
General Contracting Department Of Beijing Construction Engineering Group Co ltd
Beijing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Contracting Department Of Beijing Construction Engineering Group Co ltd, Beijing Construction Engineering Group Co Ltd filed Critical General Contracting Department Of Beijing Construction Engineering Group Co ltd
Priority to CN202020038176.7U priority Critical patent/CN211714770U/en
Application granted granted Critical
Publication of CN211714770U publication Critical patent/CN211714770U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a with face fender support system that encloses that electric pipeline support combined together near water relates to construction auxiliary facilities's technical field, including the scaffold frame and can dismantle the fender of enclosing of connecting on the scaffold frame, the scaffold frame is coiled knot formula scaffold frame, the scaffold frame is including pre-buried a plurality of bases in the concrete foundation, with the pole setting of base looks adaptation and can dismantle the horizontal pole of connecting in the pole setting, the horizontal pole sets up between two adjacent rows of pole settings, can dismantle on the scaffold frame and be connected with the main joist, enclose to keep off and can dismantle with the main joist and be connected. It has the advantage of making things convenient for the dismouting.

Description

Enclose fender braced system with face electric pipeline support and combine together near water
Technical Field
The utility model belongs to the technical field of the technique of construction auxiliary facilities and specifically relates to a with face fender support system that encloses that electric pipeline support combined together near water.
Background
When the traffic engineering, civil engineering and urban municipal engineering such as roads, railways and the like are constructed, a closed enclosure is needed to isolate a construction area from all open traffic lines and adjacent plots on site, which is an important means for civilized construction and can ensure the safety of personnel. The fender is enclosed by various steel tile or PVC and encloses fender, steel pipe support, square pipe bracing welding and form to present construction site, and concrete reinforcement is pour to vertical steel pipe bottom.
The prior art refers to a Chinese utility model patent with an authorization notice number of CN208564169U, which discloses an enclosure, comprising a plurality of sub-enclosures, wherein each sub-enclosure comprises an enclosure and a supporting frame, the supporting frame is shaped like a Chinese character 'tian', the enclosure is composed of a first enclosure and a second enclosure, and the first enclosure and the second enclosure are both fixed in front of the supporting frame; the left side and the right side of the back of the supporting frame are respectively provided with a first inclined support and a second inclined support; horizontal cushion blocks are fixed at the bottoms of the first diagonal brace and the second diagonal brace, and the area of the lower bottom surface of each horizontal cushion block is at least twice of the cross sectional area of the first diagonal brace/the second diagonal brace. The utility model discloses a practice thrift public space, left more spaces for public road.
The above prior art solutions have the following drawbacks: the support frame is fixed in a welding mode, and is inconvenient to disassemble and assemble.
SUMMERY OF THE UTILITY MODEL
To the not enough of prior art existence, one of the purposes of the utility model is to provide one kind with face enclosing that electric pipeline support combined together and keep off the support system near water, it has the advantage of making things convenient for the dismouting.
The above object of the present invention can be achieved by the following technical solutions:
the utility model provides a with face fender support system that encloses that electric pipeline support combined together near water, includes the scaffold frame and can dismantle the fender that encloses of connecting on the scaffold frame, the scaffold frame is coiled knot formula scaffold frame, the scaffold frame includes pre-buried a plurality of bases in the concrete foundation, with the pole setting of base looks adaptation and can dismantle the horizontal pole of connecting in the pole setting, the horizontal pole sets up between two adjacent rows of pole settings, can dismantle on the scaffold frame and be connected with the main joist, enclose the fender and can dismantle with the main joist and be connected.
Through adopting above-mentioned technical scheme, with the base according to design interval pre-buried in going into the concrete foundation of newly-pouring, treat that the concrete maintenance after certain time and reaching certain intensity, the pole setting inserts in pre-buried base and installs the horizontal pole between double pole setting, then install the main joist on the scaffold frame, enclose the fender and can choose the general material preparation of job site for use, need not to advance the material alone, reduce the produced carbon emission of material transportation. The upright stanchion, the cross rod, the main keel and the enclosure are detachably connected, so that the assembly and disassembly are convenient.
The present invention may be further configured in a preferred embodiment as: and an inclined rod is detachably connected between the two adjacent rows of upright rods.
Through adopting above-mentioned technical scheme, can strengthen the support intensity of scaffold frame.
The present invention may be further configured in a preferred embodiment as: the vertical rod is fixed with a disc, a through hole is formed in the disc, a hole is formed in the position, corresponding to the through hole, of the main keel, and the main keel is connected with the vertical rod in an inserting mode through a fixing piece.
Through adopting above-mentioned technical scheme, align the hole of main joist with the through-hole on the disc, then peg graft the mounting in hole and the through-hole and fixed main joist and pole setting, fixed mode is simple, easy dismounting.
The present invention may be further configured in a preferred embodiment as: the fixing piece is a wedge-shaped bolt, a through hole is formed in the small end of the fixing piece, and an accessory used for limiting the fixing piece to be separated upwards is inserted in the through hole.
Through adopting above-mentioned technical scheme, insert the hole and the through-hole with the tip of mounting in, then insert the accessory in the perforation of mounting, reduce the circumstances that the mounting upwards deviate from and take place.
The present invention may be further configured in a preferred embodiment as: the main keel is a strip-shaped angle steel.
Through adopting above-mentioned technical scheme, the angle steel has mutually perpendicular's both sides, conveniently sets up the hole on the main joist, and the angle steel is the material that obtains on the building site easily simultaneously.
The present invention may be further configured in a preferred embodiment as: enclose to keep off and to dismantle to be connected with on keeping off and enclose fender fossil fragments, it is fixed with the pendant to enclose on keeping off the fossil fragments, the pendant is hung and is established on the main joist.
Through adopting above-mentioned technical scheme, enclose and keep off fossil fragments can support fixed fender that encloses, make to enclose the fender more firm, hang the pendant on main joist's a limit, can will enclose the fender and install on the scaffold frame, simple to operate, it is also convenient to dismantle, can also reuse many times.
The present invention may be further configured in a preferred embodiment as: the hanging piece is an angle steel.
Through adopting above-mentioned technical scheme, the pendant can be for L40X 40X 2 mm's angle steel, and length can be 100mm, and the pendant easily obtains, hangs to enclose the fender convenience, hangs one side of pendant and establishes on one side of main joist, can will enclose fender installation scaffold frame on, simple to operate.
The present invention may be further configured in a preferred embodiment as: and a galvanized anti-splash wire groove, a temporary water supply pipe, a fire fighting pipeline and a drainage pipeline are erected on the cross rod.
Through adopting above-mentioned technical scheme, install zinc-plated splashproof water wire casing, interim feed pipe, fire pipeline and drainage pipe on the scaffold frame, can top-down arrange zinc-plated splashproof water wire casing, interim feed pipe, fire pipeline, drainage pipe, and is pleasing to the eye neat, reduces the site space and occupies, wholly possesses the characteristics of aesthetic property, economic nature, high efficiency and security. The enclosure and the on-site near-water electric pipeline laying are organically combined, and reliable guarantee is provided for the internal construction of the enclosure.
The present invention may be further configured in a preferred embodiment as: the part of the enclosure above 1m is made of transparent materials.
By adopting the technical scheme, the driving sight distance at the traffic intersection cannot be influenced.
To sum up, the utility model discloses a following at least one useful technological effect:
1. the enclosure and the main keel are connected in an articulated manner, and the main keel and the upright stanchion are connected and fixed in a bolt manner, so that the enclosure is detachable, convenient to disassemble and assemble and can be repeatedly used;
2. materials of the enclosure can be selected nearby, so that carbon emission generated by material transportation is reduced; the enclosure materials are all construction site general material components, and separate materials are not needed;
3. the water supply pipeline, the fire pipeline, the drain pipe, the galvanized anti-splash wire casing and the like are laid and installed by utilizing the enclosure support, so that the space can be effectively saved, the pipeline support is saved, the pipeline can be effectively protected, and branches can be added according to the field requirement.
Drawings
FIG. 1 is a side elevational skeletal view of a surround;
FIG. 2 is a cross-sectional view taken along plane A-A of FIG. 1;
fig. 3 is an enlarged view of a portion B in fig. 2.
Reference numerals: 1. scaffold frame, 11, base, 12, pole setting, 121, disc, 13, horizontal pole, 14, down tube, 2, main joist, 3, enclose fender, 4, enclose fender fossil fragments, 5, pendant, 6, mounting, 7, zinc-plated splashproof water wire casing, 8, interim feed pipe, 9, fire-fighting pipeline, 10, drainage pipe.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for utility model discloses a with face fence support system that encloses that electric pipeline support combined together near water, including scaffold 1, can dismantle the main joist 2 of connecting on scaffold 1 and hang and establish and enclose fender 3 on main joist 2. Main joist 2 and enclose fender 3 all can pull down, make things convenient for the dismouting.
Referring to fig. 1 and 2, the scaffold 1 includes a base 11, vertical rods 12, cross rods 13 and diagonal rods 14, the scaffold 1 is a disc buckling type scaffold, the base 11 is embedded into a newly poured concrete foundation according to a designed interval, and an upper end surface of the base 11 is flush with the concrete foundation. The base 11 can be the steel pipe, treats that the concrete reaches maintenance intensity after, inserts pole setting 12 in the pre-buried base 11, and horizontal pole 13 and down tube 14 are connected between the pole setting 12 of two adjacent rows according to the inherent connected mode of dish knot formula scaffold frame. The upright 12 may be rectangular, and a disc 121 is fixed on the upright 12.
Referring to fig. 2 and 3, a hole is formed in the main keel 2, the main keel can be made of L70 × 70 × 6mm angle steel, a single angle steel is 6m in length, a plurality of through holes are formed in the disc 121, the main keel 2 is fixed in the hole of the disc 121 through the fixing piece 6, the fixing piece 6 can be a wedge-shaped bolt, a through hole is formed in the small end of the fixing piece 6, the hole of the main keel 2 is aligned with the hole of the disc 121, then the small end of the fixing piece 6 is inserted into the hole and penetrates through the hole in the disc 121, then the through hole is penetrated through by an accessory, the fixing piece 6 is prevented from being separated upwards, and the accessory can be a. The through hole can be a threaded hole, and the round rod can be a threaded rod matched with the through hole. One side of the main keel 2 is perpendicular to the upper surface of the disc 121, and the other side is vertically placed upward. A groove is formed between both edges of the main runner 2, and the main runner 2 is fixed on the disc 121 of the outermost row.
Referring to fig. 2 and 3, the outer row of the circular discs 121 are fixed with the enclosure keel 4 in a fastener socket mode, the enclosure keel 4 can also be fixed on the circular discs 121 through bolts, then the enclosure 3 is fixed on the enclosure keel 4 in a fastener socket mode, and the enclosure 3 can also be fixed on the enclosure keel 4 through bolts. Hanging pieces 5 are fixed at two ends of the enclosure keel 4 at the upper end and the lower end of the enclosure 3, the hanging pieces 5 can be L40 multiplied by 40 multiplied by 2mm angle steel, and the length can be 100 mm. The enclosure 3 can be made of a profiled steel sheet with the thickness of 1mm, the width of a single sheet is 1m, and the height above the ground is ensured to be 20mm when the enclosure is installed. The construction enclosure 3 is arranged within the range of 20m from the traffic intersection, and the part above 1m of the enclosure 3 is made of transparent materials, so that the driving sight distance of the traffic intersection cannot be influenced; when the construction pavements of the barriers 3 are uneven, the top height of the concrete bottom plate can be leveled, and the vertical rods 12 in a multi-span range are ensured to be even as far as possible. The enclosure 3 fixed with the hanging piece 5 is hung on the main keel 2.
Referring to fig. 2, after the enclosure 3 is mounted on the scaffold 1, a galvanized splashproof trunking 7 is erected on a cross bar 13 at the topmost end of the scaffold 1, and the galvanized splashproof trunking 7 can be fixed to the cross bar 13 by bolts. The zinc-plating anti-splash wire slot 7 can adopt a copper braided wire to cross the ground wire, and can adopt a steel chisel to be connected into the ground bottom at intervals of 30m for repeated grounding. The wire can be installed in the galvanized anti-splash wire slot 7, and the top end of the galvanized anti-splash wire slot 7 is covered with a top cover.
Referring to fig. 2, a temporary water supply pipe 8 is erected on a cross bar 13 in the middle of the scaffold 1, a fire fighting pipeline 9 and a drainage pipeline 10 are erected on the cross bar 13 at the bottom, and the temporary water supply pipe 8, the fire fighting pipeline 9 and the drainage pipeline 10 can be fixed to the cross bar by fixing clips.
The manufacturing process of the enclosure supporting system combined with the temporary water and temporary electric pipeline support is as follows:
the base 11 is embedded into a newly poured concrete foundation according to a designed interval, after the concrete is cured for a certain time and reaches a certain strength, the upright posts 12 are inserted into the embedded base 11, and the cross rods 13 and the inclined rods 14 are arranged between the double rows of upright posts 12. After the enclosure keels 4 are fixed on the circular discs 121 of the outer row of upright rods 12 in a socket mode through fasteners, the enclosure 3 welded with the hanging pieces 5 in advance is fixed on the main keel 2 in a socket mode through the fasteners. After the enclosure 3 is installed, the on-site water-approaching electric pipelines are arranged according to the arrangement principle of the upper-layer electric lower-layer water, the wire grooves are covered with cover plates, and the wire grooves are connected with each other in a crossing mode through grounding wires.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (9)

1. The utility model provides an it faces fender support system to enclose that electric pipeline support combined together with being close to water, includes scaffold (1) and can dismantle and connect fender (3) of enclosing on scaffold (1), its characterized in that: scaffold frame (1) is coiled knot formula scaffold frame, scaffold frame (1) including pre-buried a plurality of bases (11) in the concrete foundation, with pole setting (12) of base looks adaptation and can dismantle horizontal pole (13) of connecting on pole setting (12), horizontal pole (13) set up between two adjacent rows of pole settings (12), can dismantle on scaffold frame (1) and be connected with main joist (2), enclose fender (3) and can dismantle with main joist (2) and be connected.
2. The enclosure support system in combination with the in-water temporary pipeline support of claim 1, wherein: and an inclined rod (14) is detachably connected between the two adjacent rows of upright rods (12).
3. The enclosure support system in combination with the in-water temporary pipeline support of claim 1, wherein: be fixed with disc (121) on pole setting (12), the through-hole has been seted up on disc (121), the hole has been seted up on the position that main joist (2) correspond the through-hole, main joist (2) are pegged graft through mounting (6) and are fixed main joist (2) and pole setting (12) in through-hole and hole.
4. The enclosure support system in combination with the in-water temporary pipeline support of claim 3, wherein: the fixing piece (6) is a wedge-shaped bolt, a through hole is formed in the small end of the fixing piece (6), and an accessory used for limiting the fixing piece (6) to be separated upwards is inserted in the through hole.
5. The enclosure support system in combination with the in-water temporary pipeline support of claim 1, wherein: the main keel (2) is a long-strip-shaped angle steel.
6. The enclosure support system in combination with the in-water temporary pipeline support of claim 5, wherein: enclose to dismantle on fender (3) and be connected with and enclose fender fossil fragments (4), it is fixed with pendant (5) on fender fossil fragments (4) to enclose, pendant (5) are hung and are established on main joist (2).
7. The enclosure support system in combination with the in-water temporary pipeline support of claim 6, wherein: the hanging piece (5) is angle steel.
8. The enclosure support system in combination with the in-water temporary pipeline support of claim 1, wherein: the galvanized anti-splash wire chase (7), the temporary water supply pipe (8), the fire fighting pipeline (9) and the drainage pipeline (10) are erected on the cross rod (13).
9. The enclosure support system in combination with the in-water temporary pipeline support of claim 1, wherein: the part of the enclosure (3) above 1m in height is made of transparent materials.
CN202020038176.7U 2020-01-08 2020-01-08 Enclose fender braced system with face electric pipeline support and combine together near water Active CN211714770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020038176.7U CN211714770U (en) 2020-01-08 2020-01-08 Enclose fender braced system with face electric pipeline support and combine together near water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020038176.7U CN211714770U (en) 2020-01-08 2020-01-08 Enclose fender braced system with face electric pipeline support and combine together near water

Publications (1)

Publication Number Publication Date
CN211714770U true CN211714770U (en) 2020-10-20

Family

ID=72822667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020038176.7U Active CN211714770U (en) 2020-01-08 2020-01-08 Enclose fender braced system with face electric pipeline support and combine together near water

Country Status (1)

Country Link
CN (1) CN211714770U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293562A (en) * 2021-12-31 2022-04-08 天津二建建筑工程有限公司 Enclosed construction enclosure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293562A (en) * 2021-12-31 2022-04-08 天津二建建筑工程有限公司 Enclosed construction enclosure

Similar Documents

Publication Publication Date Title
US20220186520A1 (en) Bollard Fence
US8197156B2 (en) Shallow mounted fixed vehicle barrier device
KR101090400B1 (en) Construction method of road for extending breadth of road on slope face
JP5701435B1 (en) Temporary partition structure that can be diverted to a permanent partition structure or a structure having other functions
CN211714770U (en) Enclose fender braced system with face electric pipeline support and combine together near water
CN201786036U (en) Temporary protective barrier for building construction
KR101632840B1 (en) Construction method of underground road way having drain structure of temporary and permanent wall
US20180371789A1 (en) Fence Assembly and Method of Installing the Same
CN211498507U (en) Whole reassembling type protection rack
JP3012551B2 (en) Overhanging sidewalk structure
RU85492U1 (en) Sidewalk
RU2396404C2 (en) Method for installation of fence (versions)
RU116548U1 (en) FENCE "BASTION"
KR20130047096A (en) A multipurpose molding assembly for a construction
KR20220001271A (en) Noise barrier construction system using block module
CN201649003U (en) Active powder concrete column and steel pipe combination rail structure
RU210097U1 (en) fencing section
KR102592016B1 (en) Fixing bracke plate upside buried integral concrete foundation block for fixing steel square pipe pole of landscape facilities
RU202142U1 (en) Fencing
CN211498542U (en) Static crushing and dismantling construction structure of upper-span existing line arch bridge
CN216921453U (en) Novel safe passage around construction area
CN216076615U (en) Enclose fender device fast
CN221168982U (en) Matched falling-stone-preventing bent for expressway construction
CN212027270U (en) Environment-friendly timber structure vestibule
KR101333843B1 (en) Constructing device of install mount for street facility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant