CN221168982U - Matched falling-stone-preventing bent for expressway construction - Google Patents

Matched falling-stone-preventing bent for expressway construction Download PDF

Info

Publication number
CN221168982U
CN221168982U CN202322743576.4U CN202322743576U CN221168982U CN 221168982 U CN221168982 U CN 221168982U CN 202322743576 U CN202322743576 U CN 202322743576U CN 221168982 U CN221168982 U CN 221168982U
Authority
CN
China
Prior art keywords
shaped steel
falling
section steel
highway construction
bent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322743576.4U
Other languages
Chinese (zh)
Inventor
杜江
周鸿�
张�浩
张明强
潘华成
陶超
黄静
周丽蓉
陈剑
袁杰
周晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University Traffic Safety Technology Research Institute Co ltd
Original Assignee
Chongqing Jiaotong University Traffic Safety Technology Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University Traffic Safety Technology Research Institute Co ltd filed Critical Chongqing Jiaotong University Traffic Safety Technology Research Institute Co ltd
Priority to CN202322743576.4U priority Critical patent/CN221168982U/en
Application granted granted Critical
Publication of CN221168982U publication Critical patent/CN221168982U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a supporting anti-falling stone bent frame of highway construction, including prefabricated cement mound group, prefabricated cement mound group is including two at least prefabricated cement mounds, all is provided with the shaped steel pole setting on prefabricated cement mound, evenly is provided with the shaped steel horizontal pole in the shaped steel pole setting, through shaped steel horizontal pole is fixed with bamboo springboard bent frame top, shaped steel pole setting top or the last cable rope that evenly is provided with of top shaped steel horizontal pole, cable rope other end fixed connection is in ground. The utility model has simple structure, can realize omnibearing protection and has high protection capability.

Description

Matched falling-stone-preventing bent for expressway construction
Technical Field
The utility model belongs to the technical field of construction safety protection, and particularly relates to an anti-falling bent matched with expressway construction.
Background
Along with the high-speed development of infrastructure, the reconstruction and expansion construction of highways is increased, and the construction of cutting highways close to the highways is not provided with unified and effective protection facility products. At present, a sand bag wall or a bamboo raft frame and the like are mainly adopted for enclosing and blocking near the high-speed cut high slope construction, but the bamboo raft frame has insufficient protective capability, the sand bag occupies a large high-speed space range, weight gain hardening possibly occurs when rainfall occurs, and the dual guarantee requirements of smoothness and construction safety of the expressway are inconvenient.
In the prior art, patent document with the application number 202210216983.7 discloses a safety protection device and a system for expressway construction, comprising an identification unit, a protection device and a construction unit, wherein the identification unit is connected with the protection device, and the protection device acts on the construction unit. According to the scheme, the danger in the expressway is identified by the identification unit, then the expressway is directionally protected, the protection force is concentrated, and the more effective protection can be obtained, but the judgment of the identification unit cannot be completely accurate, the danger can be greatly hidden in the case of no omnibearing protection, and the danger in the mountain road section of the expressway can be only protected by the scheme, other dangerous sources on the road surface cannot be protected, and other protection equipment is possibly needed.
Disclosure of utility model
1. Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides the anti-falling bent which has the advantages of simple structure, small occupied area, capability of realizing omnibearing protection and high protection capacity and is matched with expressway construction.
2. Specific technical scheme
The utility model provides a supporting anti-falling stone bent frame of highway construction, including prefabricated cement mound group, prefabricated cement mound group is including two at least prefabricated cement mounds, all is provided with the shaped steel pole setting on prefabricated cement mound, evenly is provided with the shaped steel horizontal pole in the shaped steel pole setting, through shaped steel horizontal pole is fixed with bamboo springboard bent frame top, shaped steel pole setting top or the last cable rope that evenly is provided with of top shaped steel horizontal pole, cable rope other end fixed connection is in ground.
As preferable: the cable rope is fixedly connected in the ground through a basket bolt with a ground anchor.
As preferable: the section steel cross bars and the section steel vertical rods are vertically staggered.
As preferable: the prefabricated cement piers of the prefabricated cement pier group are made of c20 cement concrete.
As preferable: the section steel vertical rods are I18I-shaped steel, the material is Q345, and the transverse distance between two adjacent section steel vertical rods is 3+/-1 m.
As preferable: the section steel cross bars are I14I-shaped steel, the material is Q235, and the vertical distance between two adjacent section steel cross bars is 0.53+/-0.1 m.
As preferable: the middle part of the upper surface of the precast cement pier set is provided with a reserved section steel inserting notch for installing a section steel vertical rod.
As preferable: and an anti-collision water horse is arranged on one side of the precast cement pier group, which is close to the high-speed driving direction.
The beneficial effects of the utility model are as follows: the prefabricated cement pier set is used for stably installing and supporting the steel upright posts, the steel cross bars, the bamboo springboard bent frames and the like to carry out protection, so that dangers such as falling rocks can be effectively prevented, the protection capability is high, the protection is comprehensive, the occupied area is smaller, and the cable wind ropes are arranged, so that the integral anti-overturning capability is further improved; the prefabricated cement pier group and the installation section steel vertical rod are detachably mounted, and the detachable mounting is convenient to transfer and use before and after construction.
Drawings
Fig. 1 is a schematic perspective view of the whole structure of the present utility model.
Fig. 2 is a schematic front view of the whole of the present utility model.
Fig. 3 is a schematic top view of the whole of the present utility model.
Fig. 4 is a schematic side view of the entire present utility model.
In the figure: prefabricating a cement pier set 1; a section steel upright rod 2; a section steel cross bar 3; a bamboo springboard bent 4; a guy rope 5.
Detailed Description
The preferred embodiments of the present utility model will be described in detail below with reference to the accompanying drawings so that the advantages and features of the present utility model can be more easily understood by those skilled in the art, thereby making clear and defining the scope of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the azimuth or positional relationship indicated by the terms "vertical", "lateral", "upper", "lower", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of description of the present utility model and for simplification of description, and do not indicate or imply that the apparatus or element in question must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, integrally connected, mechanically connected, electrically connected, directly connected, connected via an intermediary, or connected by communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
As shown in fig. 1, 2, 3 and 4: the utility model provides a supporting anti-falling stone bent of highway construction, is provided with precast cement mound group 1, and precast cement mound group 1 is including five precast cement mounds, and the size of precast cement mound is long 1m, and wide 0.6m, high 0.6m, and precast cement mound is c20 cement concrete and makes.
All be provided with a shaped steel pole setting 2 on every precast cement mound, also can be a plurality of shaped steel pole setting 2, but the necessity is little under the sufficient condition of intensity, through being provided with the reservation shaped steel at precast cement mound upper surface middle part of precast cement mound group 1 and inserting the notch, installation shaped steel pole setting 2 inserts and reserves in the shaped steel inserting the notch and carry out demountable installation to be convenient for dismantle after the construction is accomplished and take away.
The steel cross bars 3 are uniformly arranged on the steel upright bars 2, the intersections of the steel cross bars are welded together, and all the steel cross bars 3 are vertically staggered with all the steel upright bars 2.
The section steel upright posts 2 are I18I-shaped steel, the material is Q345, the length of a single section steel upright post is 3.1m, and the transverse distance between two adjacent section steel upright posts 2 is 3+/-1 m.
The section steel cross bars 3 are I14I-shaped steel, the material is Q235, and the vertical distance between two adjacent section steel cross bars 3 is 0.53+/-0.1 m.
A bamboo springboard bent 4 is fixed on the steel cross rod 3, and the thickness of the bamboo springboard bent 4 is 20+/-5 mm to form a fence.
Evenly be provided with cable rope 5 on bamboo springboard bent 4 top, shaped steel pole setting 2 top or top shaped steel horizontal pole 3 all shaped steel poles 2 are vertical evenly to have seted up the round hole, and the bamboo springboard bent 4 of being convenient for and cable rope 5 are fixed, and cable rope 5 other end adopts drilling on the basis through the basket bolt fixed connection that has the earth anchor in ground, and the hole degree of depth is not less than 1400mm (A level guardrail stand buries deep standard) to carry out fixed connection with screw rod + double nut, in order to increase bent anti-overturning ability.
The other end of the guy rope 5 may also be fixedly connected to the ground by other means, such as by directly punching expansion screws or pegs, but the anti-capsizing effect is relatively poor.
The cable 5 is a 6×7 steel wire rope, i.e. the steel wire rope has 6 strands, each strand has 7 steel wires.
An anti-collision water horse is arranged on one side of the prefabricated cement pier group 1 in the high-speed driving direction, meanwhile, process protection is arranged at the position of each grade of slope platform, soil and stone isolation is carried out by adopting a passive protection net, and the cement pier group is prevented from falling to a high-speed driving area.
The main load of the falling-stone-preventing bent frame considers dead weight, wind load and falling-stone impact load, and load combination is carried out according to the permanent load and the variable load. Through calculation, the stress, deformation and the like of the upright rod, the cross rod and the cable rope of the falling-proof bent frame all meet the standard requirements.
The falling-stone-preventing bent frame can effectively prevent falling stones (or about 50kg objects) from falling from a cutting side slope under construction, the slope rate of the side slope is 1:0.75, the vertical distance between a falling point and the falling-stone-preventing bent frame is 10m, and a passive protection net is arranged at a platform position for protecting a higher side slope.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (8)

1. The utility model provides a supporting anti-falling stone bent of highway construction which characterized in that: including prefabricated cement mound group (1), prefabricated cement mound group (1) is including two at least prefabricated cement mounds, all is provided with shaped steel pole setting (2) on prefabricated cement mound, evenly is provided with shaped steel horizontal pole (3) on shaped steel pole setting (2), through shaped steel horizontal pole (3) are fixed with bamboo springboard bent frame (4) evenly be provided with cable rope (5) on bamboo springboard bent frame (4) top, shaped steel pole setting (2) top or top shaped steel horizontal pole (3), cable rope (5) other end fixed connection is in ground.
2. The highway construction kit falling rock-preventing bent according to claim 1, wherein: the cable rope (5) is fixedly connected in the ground through a turnbuckle with a ground anchor.
3. The highway construction kit falling rock-preventing bent according to claim 1, wherein: the section steel cross bars (3) and the section steel vertical rods (2) are vertically staggered.
4. The highway construction kit falling rock-preventing bent according to claim 1, wherein: the prefabricated cement piers of the prefabricated cement pier group (1) are made of c20 cement concrete.
5. The highway construction kit falling rock-preventing bent according to claim 1, wherein: the section steel vertical rods (2) are I18I-shaped steel, the material is Q345, and the transverse distance between two adjacent section steel vertical rods (2) is 3+/-1 m.
6. The highway construction kit falling rock-preventing bent according to claim 1, wherein: the section steel cross bars (3) are I14I-shaped steel, the material is Q235, and the vertical distance between two adjacent section steel cross bars (3) is 0.53+/-0.1 m.
7. The anti-falling bent for highway construction kit according to any one of claims 1 to 6, wherein: the middle part of the upper surface of the precast cement pier group (1) is provided with a reserved section steel inserting notch for installing a section steel vertical rod (2).
8. The highway construction kit falling rock-preventing bent according to claim 1, wherein: an anti-collision water horse is arranged on one side of the precast cement pier group (1) close to the high-speed driving direction.
CN202322743576.4U 2023-10-12 2023-10-12 Matched falling-stone-preventing bent for expressway construction Active CN221168982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322743576.4U CN221168982U (en) 2023-10-12 2023-10-12 Matched falling-stone-preventing bent for expressway construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322743576.4U CN221168982U (en) 2023-10-12 2023-10-12 Matched falling-stone-preventing bent for expressway construction

Publications (1)

Publication Number Publication Date
CN221168982U true CN221168982U (en) 2024-06-18

Family

ID=91533787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322743576.4U Active CN221168982U (en) 2023-10-12 2023-10-12 Matched falling-stone-preventing bent for expressway construction

Country Status (1)

Country Link
CN (1) CN221168982U (en)

Similar Documents

Publication Publication Date Title
CN205046926U (en) Join in marriage net overhead line and prevent wind draw off mechanism
CN110158497A (en) A kind of high cantilever rock-fall protection structure and construction method
CN113006106A (en) Existing side slope secondary excavation safety protection device and construction method
CN210482097U (en) High cantilever rockfall protective structure
CN204551491U (en) A kind of side slope protection greening structure
CN221168982U (en) Matched falling-stone-preventing bent for expressway construction
CN109281260B (en) But cyclic utilization keeps off husky wall and keeps off husky wall system
CN219261097U (en) Variable cross-section type rock anchor rod foundation for overhead transmission line
CN112681347A (en) Combined supporting structure for treating dangerous rock mass and construction method thereof
CN214939446U (en) Road side slope multi-stage protection system
CN209798565U (en) Combined stone blocking wall structure for protecting high and steep slope dangerous rock falling
CN109281259B (en) Sliding type sand blocking wall and sand blocking wall system
CN113931093B (en) Defeated formula of leading is empty reed bundle formula sand barrier down
CN104631474B (en) A kind of side slope protection greening structure
CN210104765U (en) High and large retaining structure of soft geological side slope
CN111244825A (en) Road-crossing cable laying structure and construction method thereof
CN218596961U (en) Temporary simple enclosing structure for sloping field
CN115450234B (en) Blocking protection structure suitable for high-energy impact and construction method thereof
CN214883741U (en) Safety protection device for secondary excavation of existing side slope
CN218759196U (en) Steep slope section light high strength steel rectangular pipe railway protective fence
CN218970043U (en) High and steep dangerous rock slope greening structure
CN221052417U (en) Slope falling stone protection structure
CN216866072U (en) High-voltage wire protection safety frame for sea engineering
CN219412118U (en) Cast-in-situ beam body site protection device
CN216663875U (en) Be used for anti-avalanche device along road

Legal Events

Date Code Title Description
GR01 Patent grant