CN210068184U - Tunnel center escape canal construction template - Google Patents

Tunnel center escape canal construction template Download PDF

Info

Publication number
CN210068184U
CN210068184U CN201920206611.XU CN201920206611U CN210068184U CN 210068184 U CN210068184 U CN 210068184U CN 201920206611 U CN201920206611 U CN 201920206611U CN 210068184 U CN210068184 U CN 210068184U
Authority
CN
China
Prior art keywords
template
construction
shaped steel
formwork
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920206611.XU
Other languages
Chinese (zh)
Inventor
何润
肖广生
谭宁波
刘开鑫
刘洋
徐锁军
徐云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Xiamen Engineering Co Ltd
Priority to CN201920206611.XU priority Critical patent/CN210068184U/en
Application granted granted Critical
Publication of CN210068184U publication Critical patent/CN210068184U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A construction template for a central drainage ditch of a tunnel comprises a first template and a second template, wherein a second I-shaped steel is arranged between the first template and the second template, supporting rods are arranged at equal intervals at the upper ends of the first template and the second I-shaped steel, the second template is connected with the middle part of the second I-shaped steel through a first connecting rod, and the second template is connected with the bottom end of the second I-shaped steel through a second connecting rod; the utility model has the advantages of the template is light, and the formwork is simple, and more convenient, safe more complete, pleasing to the eye characteristics have that construction period is short, the simple operation, save material, circulated use, anti construction risk ability reinforce, the quality easily guarantees, the construction drops into economy rationally, pour the ditch more pleasing to the eye.

Description

Tunnel center escape canal construction template
Technical Field
The utility model belongs to the technical field of the tunnel construction equipment, concretely relates to tunnel center drainage construction template.
Background
At present, according to the development planning of the state 'five longitudinal directions and seven transverse directions', the highway construction in China enters a rapid development period, the investment of provinces in inland mountains is more and more large, the number of tunnels is large in mountainous regions, the water prevention and drainage in the tunnel construction process are particularly important, the central drainage ditch is more important, the construction process mostly adopts on-site assembly templates and concrete pouring, and the construction method has the following problems:
1. the construction period is long, a large amount of time is spent for assembling the template before and after concrete pouring each time, and the construction time and the construction progress are seriously delayed;
2. the cost is high, a large amount of manual and mechanical template assembly is needed before concrete pouring each time, the template is difficult to disassemble, the template is easy to damage, and the template needs to be frequently replaced;
3. the safety quality assurance coefficient is low, and its wholeness is difficult to guarantee to the template of on-the-spot equipment, pours the easy mould that explodes of in-process, leads to the escape canal to warp, influences its function.
SUMMERY OF THE UTILITY MODEL
The to-be-solved problem of the utility model is to overcome above-mentioned prior art not enough, aim at provides an economical reasonable, convenient to use's tunnel center escape canal construction templates.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a tunnel center escape canal steel template, includes first template and second template, be equipped with the second I-steel between first template and the second template, first template and second I-steel upper end equidistant be provided with the bracing piece, the second template is connected through the head rod with second I-steel middle part, and the second template is connected through the second connecting rod with second I-steel bottom.
Furthermore, first I-shaped steel is fixedly arranged at the top end and the lower end of the first template and the second template.
Compared with the prior art, the utility model has the advantages that:
1. the utility model has the advantages of light template, simple formwork support, and capability of hoisting by using an excavator and a loader;
2. the utility model has the advantages that in the concrete pouring process, the periphery of the central drainage ditch is vibrated more conveniently and safely;
3. the utility model discloses it can not damage the ditch inner wall to have template dismantlement process use jack, makes it more complete, pleasing to the eye.
Drawings
FIG. 1 is a schematic structural view of a steel formwork of the present invention;
FIG. 2 is a schematic structural view of the present invention with the jack horizontally placed;
fig. 3 is a schematic structural view of the vertical placement of the jack of the present invention.
Detailed Description
Referring to fig. 1, the steel formwork for the tunnel central drainage ditch comprises a first formwork 1 and a second formwork 2, wherein first I-shaped steel 4 is fixedly arranged at the upper end and the lower end of the inner portion of the first formwork 1 and the inner portion of the lower end of the inner portion of the second formwork 2, second I-shaped steel 5 is arranged between the first formwork 1 and the second formwork 2, supporting rods 3 are arranged at equal intervals at the upper ends of the first formwork 1 and the second I-shaped steel 5, the second formwork 2 is connected with the middle portion of the second I-shaped steel 5 through a first connecting rod 6, and the bottom ends of the second formwork 2 and the second I-shaped steel 5 are connected with each other through a second connecting rod 7.

Claims (2)

1. The utility model provides a tunnel center escape canal construction formwork, its characterized in that, includes first template and second template, be equipped with the second I-steel between first template and the second template, first template and second I-steel upper end equidistant setting have the bracing piece, and the second template is connected through the head rod with second I-steel middle part, and the second template is connected through the second connecting rod with second I-steel bottom.
2. The tunnel center drain construction formwork according to claim 1, wherein first i-beams are fixedly arranged at the top ends and the lower ends of the first formwork and the second formwork.
CN201920206611.XU 2019-02-18 2019-02-18 Tunnel center escape canal construction template Active CN210068184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920206611.XU CN210068184U (en) 2019-02-18 2019-02-18 Tunnel center escape canal construction template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920206611.XU CN210068184U (en) 2019-02-18 2019-02-18 Tunnel center escape canal construction template

Publications (1)

Publication Number Publication Date
CN210068184U true CN210068184U (en) 2020-02-14

Family

ID=69432492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920206611.XU Active CN210068184U (en) 2019-02-18 2019-02-18 Tunnel center escape canal construction template

Country Status (1)

Country Link
CN (1) CN210068184U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109630161A (en) * 2019-02-18 2019-04-16 中交公局厦门工程有限公司 A kind of tunnel center gutter construction formwork and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109630161A (en) * 2019-02-18 2019-04-16 中交公局厦门工程有限公司 A kind of tunnel center gutter construction formwork and construction method

Similar Documents

Publication Publication Date Title
CN104631706B (en) One kind exempts from form removal concrete column and its construction method
CN105220619A (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN110206144A (en) A kind of construction method of reinforced concrete column bean column node
CN211369536U (en) Cast-in-place box girder template system
CN210068184U (en) Tunnel center escape canal construction template
CN111101715A (en) Concrete windowsill coping combined construction method and structure
CN102493480B (en) Reusable die for equipment foundation reserved square hole
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN203049588U (en) Pit-in-pit cylindrical mould
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind
CN213440251U (en) Prefabricated template of 30t twisted Chinese character 'wang' block
CN204679074U (en) Novel surface observation pier structure
CN210002697U (en) mould-supporting-free constructional column device
CN210507298U (en) Integrated template for wave dissipation hole breast wall
CN208473293U (en) Narrow deformation joint easy-dismount template system
CN211250565U (en) Pouring die for beam
CN206655471U (en) A kind of beam column node core area concrete construction joint stays raft mould
CN209082534U (en) Hanging operating platform sets up device in a kind of more piece open caisson
CN207033471U (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN207685879U (en) A kind of lift stake reinforcing bearing platform construction platform
CN102493482B (en) Construction method of equipment foundation reserved square hole
CN109630161A (en) A kind of tunnel center gutter construction formwork and construction method
CN215714992U (en) Forming device for river dyke wall body
CN204492001U (en) A kind of concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant