CN207672389U - Roadbed concrete curb cast-in-place mould - Google Patents

Roadbed concrete curb cast-in-place mould Download PDF

Info

Publication number
CN207672389U
CN207672389U CN201721758864.5U CN201721758864U CN207672389U CN 207672389 U CN207672389 U CN 207672389U CN 201721758864 U CN201721758864 U CN 201721758864U CN 207672389 U CN207672389 U CN 207672389U
Authority
CN
China
Prior art keywords
partition board
place mould
roadbed concrete
rectangular slab
subsiding crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721758864.5U
Other languages
Chinese (zh)
Inventor
谢同强
麻松松
张建立
闫明
王鹏飞
韩宇龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201721758864.5U priority Critical patent/CN207672389U/en
Application granted granted Critical
Publication of CN207672389U publication Critical patent/CN207672389U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of roadbed concrete curb cast-in-place mould of the utility model, belongs to roadbed technical field of concrete construction;The technical problem to be solved is that provide a kind of roadbed concrete curb cast-in-place mould for accelerating construction progress, reducing working procedure that construction site is now built;Solve the technical solution that the technical problem uses for:Including side template, subsiding crack partition board and reinforce stull, side template includes two rectangular slabs parallel to each other, the top and outside of rectangular slab are provided with reinforcing stull, stull is reinforced to be weldingly connected with rectangular slab, slideway and pvc pipe fixed steel bars are provided on the inside of rectangular slab, subsiding crack partition board is connected with slideway sliding, and subsiding crack partition board top is provided with handle;The utility model can be widely applied to roadbed concrete construction field.

Description

Roadbed concrete curb cast-in-place mould
Technical field
The utility model roadbed concrete curb cast-in-place mould, belongs to roadbed technical field of concrete construction.
Background technology
Conventional concrete shoulder work method is as follows:In precasting yard mold concentration pre-casting customized, through long-term after prefabricated completion Maintenance, concrete strength reaches the 75% of design strength, then is had bad luck to road bed using minitype carrier vehicle, then by worker into Row installation.This traditional construction method drawback is as follows:1. precasting yard concentration pre-casting, maintenance and in-site installation construction period are too It is long, increase operating expenses;Due to construction period anxiety, traditional handicraft cannot be satisfied the requirement of construction production;2. prefabricated is mixed Solidifying earth shoulder, have bad luck and installation process in be easy to collide with, damage, influence presentation quality, the need of well damage are again prefabricated, both It influences the duration and increases cost;3. concrete earth shoulder weight is big, monolithic weight reaches 300kg, operating personnel carry and its Inconvenience causes installation cost to increase, and construction efficiency reduces.
Utility model content
The utility model roadbed concrete curb cast-in-place mould, overcomes the shortcomings of the prior art, provides one kind What construction site was now built accelerates construction progress, reduces the roadbed concrete curb cast-in-place mould of working procedure.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of roadbed concrete curb is existing Mold, including side template, subsiding crack partition board and reinforcing stull are poured, side template includes two pieces of rectangular slabs parallel to each other, rectangular The top and outside of shape plate are provided with reinforcing stull, reinforce stull and are weldingly connected with rectangular slab, the inside setting of rectangular slab There are slideway and pvc pipe fixed steel bars, subsiding crack partition board to be connected with slideway sliding, subsiding crack partition board top is provided with handle.
Further, the length of the slideway is identical as the height of subsiding crack partition board.
Further, the pvc pipe fixed steel bars include the identical steel bar of three length scales, the head welding of three steel bars Together.
Further, the rectangular slab is I-steel.
Further, the both sides for reinforcing stull are provided with triangle robust structure, and triangle robust structure is arranged in institute State the outside of rectangular slab.
Further, the quantity of the subsiding crack partition board is two.
Further, the quantity for reinforcing stull is three.
Compared with prior art, the utility model have the advantage that for:The utility model can make concrete curb It is changed to now build by prefabricated, can accelerate construction progress, reduce working procedure, save operating expenses, also ensuring construction quality, together When also roadbed geomembrane is not destroyed.
Description of the drawings
The utility model is described further below in conjunction with the accompanying drawings.
Fig. 1 is the stereoscopic schematic diagram of the utility model.
Fig. 2 is the vertical view of the utility model.
Fig. 3 is the side view of the utility model.
In figure, 1- side templates, 2- subsiding crack partition boards, 3- reinforcing stulls, 4-PVC pipe fixed steel bars, 5- slideways, 6- handles.
Specific implementation mode
As shown in Figure 1 to Figure 3, a kind of roadbed concrete curb cast-in-place mould of the utility model, including side template 1, sedimentation It stitches partition board 2 and reinforces stull 3, side template 1 includes two pieces of rectangular slabs parallel to each other, the top of rectangular slab and outside setting Have and reinforce stull 3, reinforces stull 3 and be weldingly connected with rectangular slab, slideway 5 is provided on the inside of rectangular slab and pvc pipe is fixed Reinforcing bar 4, the both sides for reinforcing stull 3 are provided with triangle robust structure, and triangle robust structure is arranged in the outside of rectangular slab, Pvc pipe fixed steel bars 4 include the identical steel bar of three length scales, and the head of three steel bars welds together, the length of slideway 5 Identical as the height of subsiding crack partition board 2, subsiding crack partition board 2 is connected with the sliding of slideway 5, and 2 top of subsiding crack partition board is provided with handle 6。
Preferably, rectangular slab is I-steel, and subsiding crack is two every 2 quantity, and the quantity for reinforcing stull 3 is three. The length for reinforcing stull 3 is 1610mm, and the height of slideway 5 is 200mm, and I-steel spacing is 900mm, two subsiding crack partition boards 2 Spacing be 1000mm.
The course of work of the utility model is described further:Geomembrane is laid with first when shoulder work and is completed, base Bed surface layer adjusted value provides absolute altitude, installs the I-steel of side, installs pre-buried PVC overflow pipes afterwards, then install the I-shaped of the other side Steel pays attention to ensureing pvc pipe installation in correct position, and checks the elevation at pvc pipe both ends, and guarantee is consistent with design, and flowing water is smooth It is logical.Slideway 5 is welded on I-steel specified position, subsiding crack partition board 2 is directly inserted in slideway 5, while installation form is reinforced Integral reinforcing process is completed in stull 3.After the completion of shoulder concrete construction, subsiding crack partition board 2 is removed after ensureing concrete initial set, Subsiding crack partition board 2 is unremovable too early or too late, and concrete does not solidify when removing too early, after subsiding crack partition board 2 is removed, sedimentation Seam does not play a role, and concrete connects into an entirety;Remove too late when concrete setting it is thorough, reach intensity, in this way sink Drop seam partition board 2 is not easy to remove.After concrete strength has form removal condition, then removes and reinforce stull 3 and I-steel.
The embodiments of the utility model have been described in detail above with reference to the accompanying drawings, but the utility model is not limited to Embodiment is stated, within the knowledge of a person skilled in the art, the utility model aims can also not departed from Under the premise of various changes can be made.

Claims (7)

1. a kind of roadbed concrete curb cast-in-place mould, it is characterised in that:Including side template(1), subsiding crack partition board(2)And reinforcing Stull(3), side template(1)Including two pieces of rectangular slabs parallel to each other, the top and outside of rectangular slab are provided with reinforcing cross Support(3), reinforce stull(3)It is weldingly connected with rectangular slab, slideway is provided on the inside of rectangular slab(5)Steel is fixed with pvc pipe Muscle(4), subsiding crack partition board(2)With slideway(5)Sliding is connected, subsiding crack partition board(2)Top is provided with handle(6).
2. roadbed concrete curb cast-in-place mould according to claim 1, it is characterised in that:The slideway(5)Length With the subsiding crack partition board(2)Height it is identical.
3. roadbed concrete curb cast-in-place mould according to claim 1, it is characterised in that:The pvc pipe fixed steel bars (4)Including the identical steel bar of three length scales, the head of three steel bars welds together.
4. roadbed concrete curb cast-in-place mould according to claim 1, it is characterised in that:The rectangular slab is I-shaped Steel.
5. roadbed concrete curb cast-in-place mould according to claim 1, it is characterised in that:The reinforcing stull(3)'s Both sides are provided with triangle robust structure, and triangle robust structure is arranged in the outside of the rectangular slab.
6. roadbed concrete curb cast-in-place mould according to claim 1, it is characterised in that:The subsiding crack partition board(2) Quantity be two.
7. according to any roadbed concrete curb cast-in-place mould of claim 1~6, it is characterised in that:The reinforcing is horizontal Support(3)Quantity be three.
CN201721758864.5U 2017-12-16 2017-12-16 Roadbed concrete curb cast-in-place mould Active CN207672389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721758864.5U CN207672389U (en) 2017-12-16 2017-12-16 Roadbed concrete curb cast-in-place mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721758864.5U CN207672389U (en) 2017-12-16 2017-12-16 Roadbed concrete curb cast-in-place mould

Publications (1)

Publication Number Publication Date
CN207672389U true CN207672389U (en) 2018-07-31

Family

ID=62967644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721758864.5U Active CN207672389U (en) 2017-12-16 2017-12-16 Roadbed concrete curb cast-in-place mould

Country Status (1)

Country Link
CN (1) CN207672389U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676780A (en) * 2020-05-28 2020-09-18 中铁十局集团青岛工程有限公司 Template of slip form forming machine
CN115262338A (en) * 2022-07-14 2022-11-01 中国一冶集团有限公司 Anti-expansion ground steel formwork with easy loading and unloading and cross slope control functions and working method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676780A (en) * 2020-05-28 2020-09-18 中铁十局集团青岛工程有限公司 Template of slip form forming machine
CN111676780B (en) * 2020-05-28 2022-03-15 中铁十局集团青岛工程有限公司 Template of slip form forming machine
CN115262338A (en) * 2022-07-14 2022-11-01 中国一冶集团有限公司 Anti-expansion ground steel formwork with easy loading and unloading and cross slope control functions and working method thereof
CN115262338B (en) * 2022-07-14 2023-07-18 中国一冶集团有限公司 Ground steel template with anti-expansion die easy to assemble and disassemble and capable of controlling transverse slope and working method thereof

Similar Documents

Publication Publication Date Title
CN105298020B (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN107059920B (en) Loess formation piping lane construction technology
CN107268348B (en) Subway column check pit construction method
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN101289866A (en) Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation
CN108818919A (en) Precast T-Beam reinforcing bar is bound in advance and the construction method of integral installation
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN103774561A (en) Streamline operation construction method of precast small box girders for highway in assembling mode
CN104831932A (en) Construction technology for high-grade concrete column base
CN105201204B (en) A kind of method and structure of rotten when preventing pouring reinforcement concrete column suspension column
CN106087671A (en) A kind of concreting template
CN108277777A (en) Wave wall substep pouring construction process
CN110344844A (en) A kind of track engineering section of track well construction method
CN206173899U (en) Trapezoidal ditch of slipform method template
CN109356185A (en) A kind of prefabricated pier foundation of regeneration monolith and its construction method
CN101929245A (en) Thin webbed girder vertical construction method
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN205999730U (en) A kind of non-fragment orbit base pours uses template
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN108442503A (en) A kind of building basement bottom plate catch pit and construction method
CN106049205A (en) Formwork for ballast-less track base casting
CN107558606A (en) A kind of prefabricated construction construction method
CN101818501B (en) Construction method of reinforced concrete foundation on top of large-scale trenched pipe culvert
CN209636834U (en) A kind of prefabricated pier foundation of regeneration monolith

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant