CN209838444U - Comprehensive trolley for laying geotextile and waterproof board - Google Patents

Comprehensive trolley for laying geotextile and waterproof board Download PDF

Info

Publication number
CN209838444U
CN209838444U CN201920457497.8U CN201920457497U CN209838444U CN 209838444 U CN209838444 U CN 209838444U CN 201920457497 U CN201920457497 U CN 201920457497U CN 209838444 U CN209838444 U CN 209838444U
Authority
CN
China
Prior art keywords
trolley
clamping
geotextile
waterproof board
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920457497.8U
Other languages
Chinese (zh)
Inventor
龚岗
龚建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fu Te Intelligent Equipment (chongqing) Co Ltd
Original Assignee
Fu Te Intelligent Equipment (chongqing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fu Te Intelligent Equipment (chongqing) Co Ltd filed Critical Fu Te Intelligent Equipment (chongqing) Co Ltd
Priority to CN201920457497.8U priority Critical patent/CN209838444U/en
Application granted granted Critical
Publication of CN209838444U publication Critical patent/CN209838444U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a comprehensive trolley for laying geotextile and waterproof board, which comprises a tunnel operation trolley which is provided with a plurality of operation platforms and can travel along the longitudinal track of a tunnel; one side of the tunnel operation trolley is provided with a space for placing the geotextile or the waterproof board coiled material, and the geotextile or the waterproof board coiled material can roll in the space; the other side of the tunnel operation trolley is provided with a furling device, the tail end of a flexible traction member of the furling device is connected with a clamping member, and the clamping member is used for being connected with the edge of a pulling-out end of the geotextile or waterproof board coiled material; the clamping member consists of a traction bar and a plurality of clamping jaws, and an obstacle crossing structure is arranged on the clamping member. The utility model has the advantages that the comprehensive trolley has simple structure, convenient maintenance and convenient construction operation; when the trolley is used for laying geotextile or waterproof board, the laying efficiency is high, and the labor intensity is low.

Description

Comprehensive trolley for laying geotextile and waterproof board
Technical Field
The utility model relates to a tunnel construction facility, in particular to geotechnique's cloth and waterproof board are laid with synthesizing platform truck.
Background
With the acceleration of the construction speed of domestic high-speed railways, the demand of high-speed railway tunnel construction facilities is rapidly increased. After the tunnel lining in tunnel construction is finished, waterproof treatment is required, and the waterproof treatment mainly comprises the laying of waterproof boards. Although the initial tunnel support is sprayed, the surface of the initial tunnel support after spraying is still uneven. In order to prevent the waterproof board from being laid on the uneven surface, therefore, geotextile is required to be arranged between the waterproof board and the spray coating layer to form a cushion layer. For a high-speed railway tunnel, the tunnel section is large due to the fact that the running speed of a vehicle is high. Therefore, large-sized geotextile and waterproof sheet are necessarily required, and the conventional method of manually laying geotextile and waterproof sheet cannot be adapted to new requirements.
Although the skilled person has made many improvements and has largely adopted the mechanical laying method which is low in labor intensity and high in construction efficiency. However, most of such paving trolleys adopt a trolley to carry the geotextile or waterproof coiled material and integrally run along the tunnel wall to unfold the coiled material, or adopt a reciprocating trolley to draw the edges of the coiled material to unfold and lay the coiled material. The two modes are provided with the circular arc-shaped track of the trolley, so that the trolley has the defects of complex structure and inconvenient laying operation. For this reason, further improvement is required.
Disclosure of Invention
The utility model aims to provide a comprehensive trolley for laying geotextile and waterproof board, which comprises a flexible traction component wound by a winding device to drag a clamping component, so that the clamping component runs from one side to the other side of the periphery of the trolley, and the clamping component connected with the edge of the pulling-out end of the geotextile or waterproof board coiled material enables the geotextile or waterproof board to be spread along the periphery of the trolley, thereby realizing the laying and spreading of the geotextile or waterproof board and wrapping the periphery of the trolley; because the clamping member is provided with the obstacle crossing structure, the clamping member can smoothly move from one side of the trolley to the other side of the trolley depending on the obstacle crossing structure. Thereby need not to set up arc guide rail, showing and simplifying platform truck structure, reducing the fault point to improve and lay the convenient operation nature.
In order to achieve the above purpose, the present invention adopts the following technical solution.
A comprehensive trolley for laying geotextiles and waterproof boards comprises a tunnel operation trolley which is provided with a plurality of operation platforms and can walk along a longitudinal track of a tunnel; one side of the tunnel operation trolley is provided with a space for placing the geotextile or the waterproof plate coiled material, and the geotextile or the waterproof plate coiled material can roll in the space; the other side of the tunnel operation trolley is provided with a furling device, the tail end of a flexible traction member of the furling device is connected with a clamping member, and the clamping member is used for being connected with the edge of a pulling-out end of the geotextile or waterproof board coiled material; and the clamping member is provided with an obstacle crossing structure.
By adopting the scheme, the geotextile or waterproof plate coiled material can be placed on one side of the trolley in a rolling manner, and the coiled material can penetrate through the reel and can be rotatably supported by the reel; or, the coiled material is lifted through a rolling support structure such as a roller or a roller; or may be placed directly on the platform or on the ground to facilitate unwinding of the coil by pulling on the pull-out end edge of the coil. The coiled material can provide a placing space through the containing tool, or can be directly supported by arranging a rotatable reel on the trolley framework, wherein the reel is arranged on the coiled material in a penetrating manner to form a coiled material mandrel for rotating support; or lifted by a roller or a roller; the winding device can adopt a winch, and the flexible traction component can adopt a traction chain of a traction cable or a chain ring structure and the like. The geotextile or waterproof board coiled material and the furling device are distributed on two sides of the trolley, a flexible traction member of the furling device is wound to the other side of the trolley from the upper part of the trolley and is connected to a clamping member, and the clamping member and the edge of the pulled-out end of the coiled material form clamping fixation. In the process of rolling the flexible traction member by the rolling device, the clamping member drags the geotextile or the waterproof board to be unfolded and is laid in a gap between the trolley on the periphery of the upper part of the trolley and the tunnel wall so as to be further laid on the side wall and the arch part of the tunnel. Since the holding member is provided with the obstacle crossing structure, the holding member can smoothly pass through the obstacle crossing structure when encountering a structural obstacle on the trolley. The structural barriers are boundary beams of the frames of the working platforms at all layers; and when the trolley is provided with the ejection device, the ejection device also comprises an ejection beam of the ejection device or an edge beam of the ejection frame and the like. The obstacle crossing structure can adopt an obstacle crossing wheel structure of a rolling member, can also adopt a structure which is the same as or similar to a sliding shoe for a coal mining machine, and the like. The trolley is simple in structure, the geotextile or the waterproof board is convenient to lay, and the laying efficiency is high. Is particularly suitable for large geotextiles or waterproof boards of large-section high-speed railway tunnels. Wherein, the geotextile or the waterproof board can be manually lifted and carried on the trolley, and placed on the ground or in the container.
Preferably, the clamping member consists of a traction bar and at least two clamping jaws distributed along the length direction of the traction bar, the traction bar is longitudinally arranged along the tunnel operation trolley and is used for wrapping the edge of the pulled end of the geotextile or waterproof board coiled material, the clamping jaws are of a clamping flap type clamping structure, the clamping jaws are used for clamping and fixing the edge of the pulled end of the geotextile or waterproof board coiled material on the traction bar, and each clamping jaw corresponds to one flexible traction member and is connected to the tail end of the flexible traction member; the obstacle crossing structure is arranged on the clamping jaw. The multi-point clamping traction structure distributed along the length direction of the clamping component is formed, the stability of the dragging operation of the clamping component is improved, and the uniformity of the spreading of the geotextile or the waterproof board is ensured. To reduce the weight of the components, the draft bar is preferably tubular.
Further preferably, a plurality of said flexible traction members are pulled by the same furling device. So as to ensure the synchronism of multi-point traction and avoid the geotextile or the waterproof board from being pulled and deformed.
Further preferably, the clamping jaw comprises two clamping flaps hinged through a hinge shaft, and the two clamping flaps are locked through a thread locking structure comprising a screw rod; the flexible traction component is connected to the hinged shaft; and two ends of the articulated shaft are respectively provided with the obstacle crossing structure. The clamping flaps are locked through the thread locking structure, so that the clamping jaws can firmly clamp the traction bar and the geotextile or the waterproof board, the loosening is avoided in the dragging process, and the laying operation reliability is improved; simultaneously, the structure of hindering more establishes can effectively increase the span that the clamping jaw supported at the articulated shaft both ends to improve stability and reliability, the two of screw thread locking structure and support span increase structure cooperate the improvement geotechnological cloth or waterproof board and lay the reliability.
Further preferably, the obstacle crossing structure consists of two rollers arranged on the clamping jaw; or the clamping jaw consists of two triangular roller groups arranged on the clamping jaw, and each triangular roller group consists of a triangular roller frame and rollers arranged at three corners of the roller frame. When the clamping component meets the obstacle, the clamping component can be in contact with the obstacle component through the roller wheel, the obstacle crossing is ensured to be smooth by utilizing the characteristic of small rolling friction coefficient, the roller wheel is used for crossing the obstacle through the independent roller wheel or the triangular roller wheel group, and the roller wheel can directly adopt a bearing or can be arranged through the bearing. The structure is simple, and the obstacle crossing function is reliable.
More preferably, the clamping flap comprises two parallel clamping jaw arms, one end of each clamping jaw arm is hinged with the hinge shaft, the other end of each clamping jaw arm is provided with an arc-shaped clamping part, and the two clamping jaw arms are connected into a whole through a connecting plate; the thread locking structure is locked through the connecting plate. The clamping coverage area of the clamping jaw is increased by arranging the clamping jaw arms in parallel, the clamping firmness is improved, the clamping force per unit area is reduced, the clamping damage or the clamping breakage of the geotextile and the waterproof board is avoided, and the laying quality is ensured. The arc-shaped clamping part is preferably formed by the inner concave surface of the tile-shaped clamping block, and the corresponding ends of the two clamping jaw arms are simultaneously welded and fixed with the tile-shaped clamping block so as to further increase the clamping contact area.
Preferably, the placing space for placing the geotextile or the waterproof board is provided by a containing tool, and the containing tool is connected with the tunnel operation trolley in a longitudinal position adjustable mode; the furling drum used for winding the flexible traction component can cover the adjusting range of the container. The coiled material position is limited through the container, and the accurate laying position is ensured; when the trolley is designed according to the length of the tunnel retaining wall in one-time pouring, two corresponding waterproof boards need to be laid to meet the length requirement, so that the two waterproof boards or the geotextile can be laid under the condition that the trolley does not move, and correspondingly, the winding drum of the winch is preferably arranged according to the range of simultaneously covering the two-time laying. Wherein, the container adopts the same structure of 'waterproof cloth and geotextile laying container' disclosed in Chinese patent publication No. CN 206987841U. When the tunnel operation trolley is provided with a symmetrical stepped framework; the container is preferably arranged on the inner wall of the lower part of the framework, and the longitudinal position adjustment is realized through the longitudinal guide rail pair structure. Compared with the containing tool arranged on a platform on the side surface, the containing tool has the advantages of no barrier below and no covering in a larger space above, and the convenience of operations such as loading, connection with a clamping component and the like is obviously improved.
Preferably, the tunnel operation trolley is provided with an ejection device, the ejection device is connected with a jacking frame, and the jacking frame extends longitudinally along the tunnel operation trolley and is adaptive to the longitudinal length of the trolley. The geotextile or the waterproof board is abutted to the wall of the tunnel through the ejection device so as to replace manual jacking or lifting, the labor intensity is reduced, and the mechanization degree and the construction efficiency are improved. The ejection device preferably adopts a worm gear lead screw lifter structure.
The utility model has the advantages of simple structure, convenient maintenance and convenient construction operation; when the trolley is used for laying geotextile or waterproof board, the laying efficiency is high, and the labor intensity is low.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a schematic side view of a part of the structure of the present invention.
Fig. 3 is a schematic layout diagram of the hoist of the present invention.
Fig. 4 is a schematic view of the structural relationship between the middle ejection device and the jacking frame of the present invention.
Figure 5 is a side view of the present invention from figure 4.
Fig. 6 is a schematic view of a structure of a clamping jaw in embodiment 1 of the present invention.
Fig. 7 is a top view of fig. 6 according to the present invention.
Fig. 8 is a schematic view of a jaw structure in embodiment 2 of the present invention.
Fig. 9 is a top view of fig. 8 in the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings, which are not intended to limit the scope of the embodiments described herein.
Embodiment 1, referring to fig. 1, 2, 3, 4, 5, 6, and 7, a geotextile and waterproof sheet laying comprehensive trolley comprises a tunnel working trolley 1 having a plurality of working platforms and capable of traveling along a longitudinal rail of a tunnel; a container 3 is arranged on one side of the tunnel operation trolley 1, a geotextile or waterproof board coiled material placing space is arranged in the container 3, and a rolling support structure is used for forming a rolling support for the geotextile or waterproof board coiled material; the other side of the tunnel operation trolley 1 is provided with a winding device 4 consisting of a winding machine, a traction cable of the winding machine forms a flexible traction member 41, the tail end of the flexible traction member 41 is connected with a clamping member, and the clamping member is used for being connected with the edge of a pulling-out end of the geotextile or waterproof board coiled material; and the clamping member is provided with an obstacle crossing structure. When the trolley is used for laying geotextile or waterproof boards, the container 3 adopts the same structure of waterproof cloth and geotextile laying container disclosed in Chinese patent publication No. CN 206987841U.
The clamping member consists of a tubular traction bar 5 and at least two clamping jaws 6 distributed along the length direction of the traction bar 5, the traction bar 5 is longitudinally arranged along the tunnel operation trolley 1 and is used for being wrapped in the edge of the pulled end of the geotextile or waterproof board coiled material, the clamping jaws 6 are of a clamping flap type holding and clamping structure, the clamping jaws 6 are used for clamping and fixing the edge of the pulled end of the geotextile or waterproof board coiled material on the traction bar 5, each clamping jaw 6 corresponds to one flexible traction member 41 and is connected to the tail end of the flexible traction member 41, and the flexible traction members 41 are pulled by the same winch 4; corresponding obstacle crossing structures are arranged on the clamping jaws 6. The clamping jaw 6 specifically comprises two clamping flaps hinged through a hinge shaft 61, and the two clamping flaps are locked through a thread locking structure comprising a screw 62; said flexible traction member 41 is connected to said articulated shaft 61; two ends of the hinge shaft 61 are respectively provided with the obstacle crossing structure. Wherein, the obstacle crossing structure consists of two rollers 7 arranged on the clamping jaw 6; the clamping jaw comprises two parallel clamping jaw arms 63, one end of each clamping jaw arm 63 is hinged to the hinge shaft 61, the other end of each clamping jaw arm 63 is provided with an arc-shaped clamping part, and the two clamping jaw arms 63 are connected into a whole through a connecting plate 64; the thread locking structure is locked by the connecting plate 64. The arc-shaped clamping portion in this embodiment is formed by the concave surfaces of the tile-shaped clamping blocks 65, and the corresponding ends of the two jaw arms 63 are welded and fixed to the tile-shaped clamping blocks 65 at the same time.
The container 3 of the embodiment is connected with the tunnel operation trolley 1 in a longitudinal position adjustable mode; the retraction device 4 can cover the adjustment range of the receptacle 3. The speed reducer 42 of the winding device 4 adopts a dual-output structure, two output ends of the speed reducer 42 are both connected with a rotating shaft 43, the rotating shaft 43 is supported by a plurality of bearing seats 44, a plurality of winding drums 45 for winding the flexible traction component 41 are fixedly connected to the rotating shaft 43, and each winding drum 45 corresponds to one flexible traction component 41. The tunnel operation trolley 1 is provided with a symmetrical stepped framework; the container 3 is arranged on the inner wall of the lower part of the framework and realizes the longitudinal position adjustment through a longitudinal guide rail pair structure.
The tunnel operation trolley 1 is provided with at least three ejection devices 2, and the ejection devices 2 are connected with an ejection frame 21; one is arranged at the top of the tunnel operation trolley 1, and the other two are distributed at two sides of the upper part of the tunnel operation trolley 1; the jacking frame 21 extends longitudinally along the tunnel operation trolley 1 and is adaptive to the longitudinal length of the tunnel operation trolley 1; ejecting end connection of ejecting device 2 is on jacking frame 21, what jacking frame 21 liftable was established on tunnel operation platform truck 1, same jacking frame 21 is lifted by a plurality of ejecting device 2 of longitudinal distribution in step, ejecting device 2 drives jacking frame 21 through the ejecting end and goes up and down to support geotechnological cloth or waterproof board or to tunnel cave wall through ejecting device 2 and lean on, replace artifical top to lift or lift, reduce intensity of labour, improve degree of mechanization and efficiency of construction. The jacking frame 21 of the operation platform positioned on the top of the trolley is T-shaped. Wherein, the ejection device 2 is a worm gear screw rod lifter structure with double input ends. A plurality of lifters 2 of the same jack-up frame 21 are driven by the same dual output shaft motor 22. The corresponding input end of the ejection device 2 adjacent to the double-output-shaft motor 22 is connected with the corresponding output shaft of the double-output-shaft motor 22 through a coupler 23; the ejection device 2 which is close to the motor 22 with the double output shafts but far away from the motor 22 with the double output shafts is connected with the corresponding output shaft of the motor 22 with the double output shafts through a coupler 23 and a transmission shaft 24; the ejection device 2 which is alternated with the double-output shaft motor 22 is connected with the other input end of the ejection device 2 which is adjacent to the double-output shaft motor 22 through a coupler 23 and a transmission shaft 24. Wherein, the ejection device 2 adopts a dual-input worm wheel screw rod lifter commodity which can be directly purchased in the current market.
In the embodiment, the length of the container 3 along the longitudinal direction of the trolley can also adopt the width of the geotextile or the waterproof board which basically covers two chapters; when the geotextile or the waterproof board is laid at two different positions, the geotextile or the waterproof board coiled material can be placed at different positions without adjusting the position of the container 3.
In this embodiment, the winding machine of the winding device 4 may also adopt a structure in which one speed reducer corresponds to one winding drum, and each speed reducer corresponds to one driving motor. The multiple winches synchronously control the driving motors through a control system in the prior art, so that the flexible traction members can be synchronously rolled, and the geotextile or waterproof board coiled material is dragged to be synchronously unfolded.
The container of the embodiment can be omitted, the coiled material can be directly arranged on the trolley framework through a rotatable reel, and the reel penetrates through the coiled material to form a coiled material supporting shaft; or lifted by a roller or a roller; the winding device can adopt a winding wheel disc or a winding drum driven by a speed reducer, and the flexible traction component can also adopt a traction chain with a chain ring structure and the like.
Example 2, see fig. 8, 9; the obstacle crossing structure consists of two triangular roller groups arranged on the clamping jaw 6, each triangular roller group consists of a triangular roller frame 71 and rollers 7 arranged on three corners of the triangular roller frame 71, the triangular roller frame 71 is rotatably arranged on the hinging shaft 61, and the three rollers 7 are rotatably arranged on the outer side of the triangular roller frame 71.
The rest of the structure of this embodiment is the same as embodiment 1, and is not described herein again. In the embodiment, obstacle crossing is realized by the rolling of the roller 7 and the rotation of the triangular roller frame 71, and the obstacle crossing capability is better than that of a single roller structure.
The hinge shaft 61 and the flexible pulling member 41 in the previous embodiment may also be connected by a pin shaft, the flexible pulling member 41 is fixed on a pin shaft, the pin shaft is rotatably inserted through the hinge shaft 61, and the axis of the pin shaft and the axis of the hinge shaft 61 are vertical.
The roller in the foregoing embodiments may be formed directly by a rolling bearing, or may be formed by a bearing and a roller sleeved on the bearing.
When the comprehensive trolley is used for laying geotextile or waterproof boards, the method comprises the following steps:
first step, paving preparation: including geotextile or waterproof board and clamping component take one's place: placing the geotextile or waterproof board coiled material to be laid in place, and specifically installing the geotextile or waterproof board coiled material in the open container 3; winding the tail end of a flexible traction member 41 of a furling device 4 at one side of the trolley from the periphery of the tunnel operation trolley 1 to the other side of the trolley, and forming clamping fixed connection with the pulling-out end of the geotextile or the waterproof board through a clamping member;
step two, unfolding the geotextile or the waterproof board: the flexible traction member 41 is rolled by the rolling device 4 to pull the clamping member, so that the geotextile or the waterproof board is gradually spread from one side of the periphery of the tunnel operation trolley 1 to the other side;
thirdly, fixing the geotextile or the waterproof board: attaching the unfolded geotextile to the tunnel wall; or, attaching the waterproof board to the laid geotextile; and fixing the geotextile and the adjacent tunnel concrete layer through the hot-melt gasket, or welding the waterproof plate on the hot-melt gasket.
After the geotextile or the waterproof board is unfolded, the geotextile or the waterproof board is abutted and attached to the tunnel wall by assistance formed by the ejection device 2.
After one geotextile or waterproof board is laid, the clamping component is taken down; the container 3 is longitudinally shifted along the trolley, and another roll of geotextile or waterproof sheet coiled material is placed in the container 3; or, another roll of geotextile or waterproof board coiled material is directly placed at another position in the container 3, and the first step to the third step are repeatedly executed until the laying of the second geotextile or waterproof board is completed. After the geotextile or the waterproof board of the same section of the tunnel wall is fully paved, the tunnel operation trolley 1 moves to the next paving section to pave the next section.
And according to the construction sequence, after the geotextile of the same section of the tunnel wall is laid, the waterproof board is laid.
The winding device 4 is a winding engine, and the flexible traction member 41 is a traction cable of a steel wire rope.
In the laying construction, the clamping jaws 6 are opened or closed and locked by tightening or loosening the nuts on the screw rods 62; the tubular traction bar 5 of the clamping member is wrapped in the edge of the pulling-out end of the geotextile or waterproof board coiled material, and the clamping jaw 6 clamps and fixes the wrapped edge part on the traction bar 5.
When the corresponding comprehensive trolley is not provided with the container 3, the geotextile or the waterproof board coiled material forms a rotatable support according to the mandrel; or lifted by a roller or a roller; or a working platform or ground bearing at the lower part of the trolley.
The foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the teachings of the present invention without undue experimentation. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.

Claims (8)

1. A comprehensive trolley for laying geotextiles and waterproof boards comprises a tunnel operation trolley (1) which is provided with a plurality of operation platforms and can walk along a longitudinal track of a tunnel; the tunnel operation trolley is characterized in that one side of the tunnel operation trolley (1) is provided with a geotextile or waterproof board coiled material placing space, and the geotextile or waterproof board coiled material can roll in the space; the other side of the tunnel operation trolley (1) is provided with a furling device (4), the tail end of a flexible traction member (41) of the furling device (4) is connected with a clamping member, and the clamping member is used for being connected with the edge of a pulling-out end of the geotextile or waterproof board coiled material; and the clamping member is provided with an obstacle crossing structure.
2. The comprehensive trolley for laying geotextile and waterproof board according to claim 1, wherein the clamping member comprises a traction bar (5) and at least two clamping jaws (6) distributed along the length direction of the traction bar (5), the traction bar (5) is longitudinally arranged along the tunnel operation trolley (1) and is used for wrapping the edge of the pulled end of the geotextile or waterproof board coiled material, the clamping jaws (6) are of a clamping flap type holding and clamping structure, the clamping jaws (6) are used for clamping and fixing the edge of the pulled end of the geotextile or waterproof board coiled material on the traction bar (5), and each clamping jaw (6) corresponds to one flexible traction member (41); the obstacle crossing structure is arranged on the clamping jaw (6).
3. Comprehensive geotextile and flashing laying trolley according to claim 2, wherein a plurality of said flexible traction members (41) are pulled by the same furling device (4).
4. The complex trolley for geotextile and waterproof board laying according to claim 2, wherein the clamping jaw (6) comprises two clamping flaps hinged by a hinge shaft (61), and the two clamping flaps are locked by a thread locking structure comprising a screw rod (62); said flexible traction means (41) being connected to said articulated shaft (61); and two ends of the articulated shaft (61) are respectively provided with the obstacle crossing structure.
5. Comprehensive vehicle for geotextile and waterproof sheet laying according to claim 4, wherein the obstacle crossing structure consists of two rollers (7) provided on the clamping jaw (6); or consists of two triangular roller groups arranged on the clamping jaw (6), wherein each triangular roller group consists of a triangular roller frame and rollers (7) arranged at three corners of the roller frame.
6. The geotextile and waterproof board laying comprehensive trolley according to claim 4, wherein the clamping flap comprises two parallel clamping jaw arms (63), the clamping jaw arms (63) are hinged to the hinge shaft (61) from one end, an arc-shaped clamping part is formed at the other end of each clamping jaw arm (63), and the two clamping jaw arms (63) are connected into a whole through a connecting plate (64); the thread locking structure is locked by the connecting plate (64).
7. The comprehensive trolley for laying geotextiles and waterproof boards as claimed in any one of claims 1 to 6, wherein a placing space for placing geotextiles or waterproof boards is provided by the container (3), and the container (3) is connected with the tunnel operation trolley (1) in a longitudinally position-adjustable manner; the winding drum for winding the flexible traction member (41) can cover the adjustment range of the container (3).
8. The comprehensive trolley for laying the geotextile and the waterproof board according to any one of claims 1 to 6, wherein the tunnel operation trolley (1) is provided with an ejection device (2), the ejection device (2) is connected with a jacking frame, and the jacking frame extends along the longitudinal direction of the tunnel operation trolley (1) and is adaptive to the longitudinal length of the trolley.
CN201920457497.8U 2019-04-04 2019-04-04 Comprehensive trolley for laying geotextile and waterproof board Active CN209838444U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920457497.8U CN209838444U (en) 2019-04-04 2019-04-04 Comprehensive trolley for laying geotextile and waterproof board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920457497.8U CN209838444U (en) 2019-04-04 2019-04-04 Comprehensive trolley for laying geotextile and waterproof board

Publications (1)

Publication Number Publication Date
CN209838444U true CN209838444U (en) 2019-12-24

Family

ID=68910033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920457497.8U Active CN209838444U (en) 2019-04-04 2019-04-04 Comprehensive trolley for laying geotextile and waterproof board

Country Status (1)

Country Link
CN (1) CN209838444U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899094A (en) * 2019-04-04 2019-06-18 涪特智能装备(重庆)有限公司 A kind of geotextiles and splash guard are laid with comprehensive trolley and mechanical laying method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899094A (en) * 2019-04-04 2019-06-18 涪特智能装备(重庆)有限公司 A kind of geotextiles and splash guard are laid with comprehensive trolley and mechanical laying method
CN109899094B (en) * 2019-04-04 2024-02-27 涪特智能装备(重庆)有限公司 Comprehensive trolley for laying geotextile and waterproof board and mechanical laying method

Similar Documents

Publication Publication Date Title
CN204905767U (en) Cable laying device
US5961271A (en) Cars for removing long rails stored on transport cars
CN209767009U (en) automatic cable laying system and cable laying device thereof
CN110803589B (en) Cable winding and unwinding and hoisting integrated combination vehicle
AU2013201258A1 (en) A cable dispensing apparatus
CN209838444U (en) Comprehensive trolley for laying geotextile and waterproof board
CN110002343B (en) Self-driven urban underground prefabricated comprehensive pipe gallery laying hoisting machine and construction method
CN209890021U (en) Cable winding and unwinding vehicle
CN115596463A (en) Arch frame installation device for repairing operated tunnel defects
CN109899094B (en) Comprehensive trolley for laying geotextile and waterproof board and mechanical laying method
CN108625881B (en) Two-lining annular reinforcing steel bar laying trolley with movable arc-shaped track and laying method
CN107882581A (en) A kind of automatic platform formula splash guard lays chassis
PL120465B1 (en) Apparatus for temporary lining a gangway or tunnel adjacent the facenelja vblizi zaboja
CN102359383A (en) Waterproof cloth laying trolley
CN117552831A (en) Transport trolley, steel pipe transport system in inclined shaft tunnel and construction method
CN210117190U (en) Small material hoister
CN206438353U (en) A kind of traveling process becomes across track-laying machine automatically
CN218493613U (en) Tunnel waterproof board paving and hanging trolley
CN208416565U (en) Tunnel double-lining circumferential reinforcement is laid with trolley
CN113788369B (en) Cable laying winding and unwinding device and using method thereof
US20090256380A1 (en) Tarping system
CN210239091U (en) Foundation pit construction operation platform
CZ181593A3 (en) Device for depositing a wire, rope or the like material
CN208416564U (en) Two grommets with mobile arc track are to reinforcing steel bar laying trolley
JPS6023079B2 (en) Main rope position adjustment device for traveling cable crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant