CN102359383A - Waterproof cloth laying trolley - Google Patents

Waterproof cloth laying trolley Download PDF

Info

Publication number
CN102359383A
CN102359383A CN2011103547350A CN201110354735A CN102359383A CN 102359383 A CN102359383 A CN 102359383A CN 2011103547350 A CN2011103547350 A CN 2011103547350A CN 201110354735 A CN201110354735 A CN 201110354735A CN 102359383 A CN102359383 A CN 102359383A
Authority
CN
China
Prior art keywords
canvas cloth
cloth laying
track support
waterproof cloth
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103547350A
Other languages
Chinese (zh)
Inventor
赵勇
高原荣之
雷军
李自力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd
Priority to CN2011103547350A priority Critical patent/CN102359383A/en
Publication of CN102359383A publication Critical patent/CN102359383A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to the technical field of accessories of tunnel excavators, in particular to a waterproof cloth laying trolley. The trolley comprises a rack, a travelling device, a track bracket, a waterproof cloth laying device, a cable drum and a hoisting device, wherein the travelling device is arranged at the bottom of the rack; the track bracket is arranged outside the rack; the waterproof cloth laying device is arranged on the track bracket; the cable drum is arranged at one end of the track bracket; and the hoisting device is arranged on one side of the track bracket. The waterproof cloth laying trolley has a simple, compact and reasonable structure, is convenient to assemble quickly, is reliably connected, greatly reduces labor intensity, improves working efficiency, improves an waterproof cloth laying effect, ensures a waterproof effect and the total construction quality of a tunnel, greatly improves the operation reliability of a tunnel excavator and is easy to use and popularize.

Description

Canvas cloth is laid chassis
Technical field
The present invention relates to a kind of technical field of tunnelling machinery accessory, especially a kind of canvas cloth is laid chassis.
Background technology
The process of deployment of existing domestic tunnel lining canvas cloth does not still have Special Equipment.Now; What mostly adopt is simple and easy stand, along the good tunnel of excavation canvas cloth is laid a week by artificial, because the construction environment in the tunnel is abominable; The construction working strength of workers is bigger; And efficient is lower, and it is relatively poor to lay the mass ratio that is shaped, and then has influence on the overall construction quality in waterproof effect and tunnel.
Summary of the invention
Big for the laying method labour intensity that overcomes existing tunnel lining canvas cloth, efficient is low and the deficiency of laying quality difference, the invention provides a kind of canvas cloth and lay chassis.
The technical solution adopted for the present invention to solve the technical problems is: a kind of canvas cloth is laid chassis; Comprise stand, running gear, track support, canvas cloth laying apparatus, cable drum and boom hoisting; The stand bottom is provided with running gear, and the stand outside is provided with track support, and track support is provided with the canvas cloth laying apparatus; Track support one end is provided with cable drum, and track support one side is provided with boom hoisting.
According to another embodiment of the invention, comprise that further canvas cloth laying apparatus one side is provided with the canvas cloth reel.
According to another embodiment of the invention, further comprise and be provided with the track adjusting lever between stand and the track support.
According to another embodiment of the invention; Comprise that further the canvas cloth laying apparatus is made up of traversing carriage, sprocket wheel, reductor, wheel, chain and stroke adjusting device; Be provided with sprocket wheel in the traversing carriage, reductor is connected with sprocket wheel, and the traversing carriage bottom is provided with wheel; Wheel is connected with chain, and traversing carriage is provided with stroke adjusting device.
According to another embodiment of the invention, comprise that further track support is provided with chain.
The invention has the beneficial effects as follows that it is simple in structure, compact and reasonable that this canvas cloth is laid chassis, easy to assembly quick; Connect reliably, greatly reduce labour intensity, improved operating efficiency; Improved the canvas cloth laying effect; Guaranteed the overall construction quality in waterproof effect and tunnel, improved the reliability of tunnel excavator work greatly, be easy to use and promote.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of canvas cloth laying apparatus of the present invention.
1. stands among the figure, 2. running gear, 3. track support, 4. canvas cloth laying apparatus, 5. cable drum; 6. boom hoisting, 7. canvas cloth reel, 8. track adjusting lever, 41. traversing carriages, 42. sprocket wheels; 43. reductor, 44. wheels, 45. chains, 46. stroke adjusting devices.
The specific embodiment
Like Fig. 1 is structural representation of the present invention, and a kind of canvas cloth is laid chassis, comprises stand 1, running gear 2, track support 3, canvas cloth laying apparatus 4, cable drum 5, boom hoisting 6, canvas cloth reel 7 and track adjusting lever 8; Stand 1 bottom is provided with running gear 2, and stand 1 outside is provided with track support 3, and track support 3 is provided with canvas cloth laying apparatus 4; Track support 3 one ends are provided with cable drum 5; Track support 3 one sides are provided with boom hoisting 6, and canvas cloth laying apparatus 4 one sides are provided with canvas cloth reel 7, are provided with track adjusting lever 8 between stand 1 and the track support 3; Improved operating efficiency, can prevent that the cable of retracting motor from twining.
Like Fig. 2 is the structural representation of canvas cloth laying apparatus of the present invention; Canvas cloth laying apparatus 4 is made up of traversing carriage 41, sprocket wheel 42, reductor 43, wheel 44, chain 45 and stroke adjusting device 46, is provided with sprocket wheel 42 in the traversing carriage 41, and reductor 43 is connected with sprocket wheel 42; Traversing carriage 41 bottoms are provided with wheel 44; Wheel 44 is connected with chain 45, and traversing carriage 41 is provided with stroke adjusting device 46, and track support 3 is provided with chain 45; Can do certain height according to the shape in tunnel and regulate, realize that canvas cloth is from the left side, tunnel or the purpose that all can lay of right side to adapt to section.
During use, stand 1 bottom is provided with running gear 2, and canvas cloth is laid hoop and can be started running gear 2 after one week and go ahead along ground rail and walk to next position and continue to lay; Canvas cloth laying apparatus 4 can move on track support 3; So that wall is laid a week along the hole, tunnel, boom hoisting 6 can lift by crane canvas cloth and other article, and track adjusting lever 8 all is connected with track support 3 with cable drum 5; Track adjusting lever 8 can carry out left and right sides folding and unfolding adjustment to track support 3; Cable drum 5 be the cable of retracting motor when canvas cloth laying apparatus 4 moves on track support 3 with antiwind, traversing carriage 41 can circumferentially move around at track support 3 through wheel mounted thereto 44, is fixed with chain 45 on the track support 3; Sprocket wheel 42 is installed on the traversing carriage 41; Drive sprocket wheel 42 rotations through reducing motor 43, can drive traversing carriage 41 and move along track support 3, canvas cloth reel 7 is placed on the traversing carriage 41 and moves thereupon; Stroke adjusting device 46 can be done certain height according to the shape in tunnel and regulate to adapt to section; Traversing carriage 41 is a symmetrical structure, all can place canvas cloth reel 7 in two grooves, can realize that canvas cloth is from tunnel left side or the purpose that all can lay of right side.It is simple in structure, compact and reasonable that this canvas cloth is laid chassis, easy to assembly quick, connects reliable; Greatly reduce labour intensity; Improve operating efficiency, improved the canvas cloth laying effect, guaranteed the overall construction quality in waterproof effect and tunnel; Improved the reliability of tunnel excavator work greatly, be easy to use and promote.

Claims (5)

1. a canvas cloth is laid chassis; Comprise stand (1), running gear (2), track support (3), canvas cloth laying apparatus (4), cable drum (5) and boom hoisting (6), it is characterized in that stand (1) bottom is provided with running gear (2); Stand (1) outside is provided with track support (3); Track support (3) is provided with canvas cloth laying apparatus (4), and track support (3) one ends are provided with cable drum (5), and track support (3) one sides are provided with boom hoisting (6).
2. canvas cloth according to claim 1 is laid chassis, it is characterized in that canvas cloth laying apparatus (4) one sides are provided with canvas cloth reel (7).
3. canvas cloth according to claim 1 is laid chassis, it is characterized in that, is provided with track adjusting lever (8) between stand (1) and the track support (3).
4. canvas cloth according to claim 1 is laid chassis; It is characterized in that; Canvas cloth laying apparatus (4) is made up of traversing carriage (41), sprocket wheel (42), reductor (43), wheel (44), chain (45) and stroke adjusting device (46); Be provided with sprocket wheel (42) in the traversing carriage (41), reductor (43) is connected with sprocket wheel (42), and traversing carriage (41) bottom is provided with wheel (44); Wheel (44) is connected with chain (45), and traversing carriage (41) is provided with stroke adjusting device (46).
5. canvas cloth according to claim 1 is laid chassis, it is characterized in that track support (3) is provided with chain (45).
CN2011103547350A 2011-11-10 2011-11-10 Waterproof cloth laying trolley Pending CN102359383A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103547350A CN102359383A (en) 2011-11-10 2011-11-10 Waterproof cloth laying trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103547350A CN102359383A (en) 2011-11-10 2011-11-10 Waterproof cloth laying trolley

Publications (1)

Publication Number Publication Date
CN102359383A true CN102359383A (en) 2012-02-22

Family

ID=45584755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103547350A Pending CN102359383A (en) 2011-11-10 2011-11-10 Waterproof cloth laying trolley

Country Status (1)

Country Link
CN (1) CN102359383A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178987A (en) * 2015-09-30 2015-12-23 中铁工程装备集团有限公司 Novel tunnel waterproof plate paving and hanging trolley
CN105484774A (en) * 2015-12-25 2016-04-13 中铁十九局集团第七工程有限公司 Automatic tunnel waterproof material laying and hanging construction trolley
CN108756919A (en) * 2018-07-27 2018-11-06 中铁工程装备集团有限公司 It is synchronous to be laid with coiled material type compound shield
CN112943317A (en) * 2021-02-26 2021-06-11 成都建工路桥建设有限公司 Full-automatic waterproof coiled material laying device and method for waterproof board trolley
CN112943316A (en) * 2021-02-26 2021-06-11 成都建工路桥建设有限公司 Waterproof board trolley waterproof coiled material laying auxiliary device and laying method thereof
CN112963180A (en) * 2021-02-26 2021-06-15 成都建工路桥建设有限公司 Semi-automatic waterproof coiled material laying device and method for waterproof board trolley

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02275300A (en) * 1989-04-14 1990-11-09 Detsuku Kogyo Kk Sound isolation device for tunnel construction work
JP2001059398A (en) * 1999-08-25 2001-03-06 Daiken Sangyo Kk Tunnel waterproof sheet laying device
WO2002016737A1 (en) * 2000-08-25 2002-02-28 Kfc Ltd. Corrosion-proof sheet installing device and installing method
CN101824995A (en) * 2009-03-05 2010-09-08 尹中华 Tunnel-dedicated trolley
CN201650310U (en) * 2010-04-30 2010-11-24 中铁十一局集团有限公司 Medium-bury type water stop mounting structure used in tunnel
CN101929341A (en) * 2010-01-12 2010-12-29 中铁隧道集团二处有限公司 Construction method for TBM synchronization lining
CN102061927A (en) * 2010-12-10 2011-05-18 中铁隧道集团有限公司 Tunnel waterproof material laying equipment and method
CN201884037U (en) * 2010-12-10 2011-06-29 中铁隧道集团有限公司 Tunnel waterproof material layering device
CN202391434U (en) * 2011-11-10 2012-08-22 川荣重工机械常州有限公司 Water-proof cloth laying trolley

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02275300A (en) * 1989-04-14 1990-11-09 Detsuku Kogyo Kk Sound isolation device for tunnel construction work
JP2001059398A (en) * 1999-08-25 2001-03-06 Daiken Sangyo Kk Tunnel waterproof sheet laying device
WO2002016737A1 (en) * 2000-08-25 2002-02-28 Kfc Ltd. Corrosion-proof sheet installing device and installing method
CN101824995A (en) * 2009-03-05 2010-09-08 尹中华 Tunnel-dedicated trolley
CN101929341A (en) * 2010-01-12 2010-12-29 中铁隧道集团二处有限公司 Construction method for TBM synchronization lining
CN201650310U (en) * 2010-04-30 2010-11-24 中铁十一局集团有限公司 Medium-bury type water stop mounting structure used in tunnel
CN102061927A (en) * 2010-12-10 2011-05-18 中铁隧道集团有限公司 Tunnel waterproof material laying equipment and method
CN201884037U (en) * 2010-12-10 2011-06-29 中铁隧道集团有限公司 Tunnel waterproof material layering device
CN202391434U (en) * 2011-11-10 2012-08-22 川荣重工机械常州有限公司 Water-proof cloth laying trolley

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178987A (en) * 2015-09-30 2015-12-23 中铁工程装备集团有限公司 Novel tunnel waterproof plate paving and hanging trolley
CN105484774A (en) * 2015-12-25 2016-04-13 中铁十九局集团第七工程有限公司 Automatic tunnel waterproof material laying and hanging construction trolley
CN105484774B (en) * 2015-12-25 2018-06-26 中铁十九局集团第七工程有限公司 Tunnel water proofing material spreads extension construction trolley automatically
CN108756919A (en) * 2018-07-27 2018-11-06 中铁工程装备集团有限公司 It is synchronous to be laid with coiled material type compound shield
CN108756919B (en) * 2018-07-27 2024-03-12 中铁工程装备集团有限公司 Synchronous laying coiled material type composite shield machine
CN112943317A (en) * 2021-02-26 2021-06-11 成都建工路桥建设有限公司 Full-automatic waterproof coiled material laying device and method for waterproof board trolley
CN112943316A (en) * 2021-02-26 2021-06-11 成都建工路桥建设有限公司 Waterproof board trolley waterproof coiled material laying auxiliary device and laying method thereof
CN112963180A (en) * 2021-02-26 2021-06-15 成都建工路桥建设有限公司 Semi-automatic waterproof coiled material laying device and method for waterproof board trolley

Similar Documents

Publication Publication Date Title
CN107842311B (en) Multifunctional tunnel rock drilling and arch erecting integrated machine
CN202808094U (en) Mining cable reel
CN102359383A (en) Waterproof cloth laying trolley
CN102061927B (en) Tunnel waterproof material laying equipment and method
CN102704929B (en) Digging and anchoring machine integrated with digging, anchoring and drilling
CN203796297U (en) Temporary supporting device of driving working face
CN104695984A (en) Multifunctional tunnel construction trolley
CN202148909U (en) Operation vehicle for mounting tunnel arch trusses
CN100564791C (en) The drilling machine shaft frame two-layer platform mechanical arm grasping drill pipe device
CN201884037U (en) Tunnel waterproof material layering device
CN104279000B (en) Automatic paving, networking temporary support device for drivage
CN105422143A (en) Intelligent trolley for tunnel construction
CN204140110U (en) Automatic paving, networking temporary support device for drivage
CN202718629U (en) Telescopic supporting mechanism for horizontal directional drilling machine
CN103758522A (en) Temporary support method of tunneling working face and equipment thereof
CN202148920U (en) Conveying mechanism for tunnel construction
CN101906878B (en) Material-distributing mechanism fixed on tower crane
CN202391434U (en) Water-proof cloth laying trolley
CN204627622U (en) The multi-functional construction trolley in a kind of tunnel
CN202882911U (en) Driving-bolting machine with integrated driving-bolting drill
CN201882805U (en) Underground self-moving type multifunctional assembling machine
CN102518396A (en) Automatic drilling machine
CN204222717U (en) A kind of rake ore deposit chassis
CN117552831A (en) Transport trolley, steel pipe transport system in inclined shaft tunnel and construction method
CN206438353U (en) A kind of traveling process becomes across track-laying machine automatically

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120222