CN207608932U - A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction - Google Patents

A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction Download PDF

Info

Publication number
CN207608932U
CN207608932U CN201721648211.1U CN201721648211U CN207608932U CN 207608932 U CN207608932 U CN 207608932U CN 201721648211 U CN201721648211 U CN 201721648211U CN 207608932 U CN207608932 U CN 207608932U
Authority
CN
China
Prior art keywords
rim
post
cup base
high strength
terrace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721648211.1U
Other languages
Chinese (zh)
Inventor
王占山
郭颖
余流
窦卫
王鑫堃
刘太联
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co ltd Of China Construction Sixth Engineering Bureau
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201721648211.1U priority Critical patent/CN207608932U/en
Application granted granted Critical
Publication of CN207608932U publication Critical patent/CN207608932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of assembled rim of a cup base for posts and floor construction to stitch stereotyped structure, including the multiple high strength plastics templates being arranged around rim of a cup base for post, all high strength plastics templates surround the straight tetragonous rod structure that a section is diamond shape, the top mark height of the straight tetragonous rod structure is consistent with terrace finished surface absolute altitude, the cross central line and longitudinal centre line in the diagonal line section corresponding with rim of a cup base for post of the straight quadrangular structural section overlap, in the high strength plastics template steel bracket is equipped with close to the side of rim of a cup base for post, the steel bracket is fixed in terrace base, two pieces of adjacent high strength plastics templates positioned at the straight quadrangular structural corner are using sizing steel gusset connection.The utility model is not only able to realize the function of rim of a cup base for post subsiding crack and terrace construction technique seam, reaches the requirement of terrace Forming Quality, moreover it is possible to realize that terrace one-time-concreting is molded, reduce technology intermission, it shortens the construction period, avoids cold seam, ensure the globality of assembled rim of a cup base for post and floor structure.

Description

A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction
Technical field
The utility model is related to a kind of construction joint, especially a kind of assembled rim of a cup base for post stitches formed-knot with floor construction Structure.
Background technology
Along with the continuous development of national economy and making rapid progress for social production technology, prefabricated assembled component construction is got over To be more concerned by people and pay attention to.Rim of a cup base for post is the type in prefabricated assembled basis, with relatively broad, Rim of a cup basis belongs to prefabricated construction at the construction field (site), and surrounding floor terrace surface is cast-in-place construction, because of two kinds of forms of construction work The sedimentation of different and rim of a cup base for post, therefore construction joint need to be set in its junction, first, meeting construction process requirement, second is that preventing from constructing The setting of the generation in object differential settlement crack, construction joint is particularly important on the molding effect of terrace, quality influence.
Currently, two methods of such construction joint of domestic generally use indwelling, first, being carried out at construction joint using plank sheathing Supporting is isolated, and plank sheathing selection is convenient, convenient for disassembly and assembly, but isolation plank sheathing generally is and disposably comes into operation, turnover effect Fruit is poor.Second is that using channel steel to carrying out supporting isolation at construction joint, channel steel is although reusable, but is molded floor construction seam Edge is not straight, needs later stage trimming to handle, while can just carry out next stage floor construction after the completion of trimming, the duration is caused to prolong It is long, labour cost increase, the requirement that site safety civilization environmental protection construction cannot be met.Therefore, the construction method of existing construction joint, Cannot meet the needs of currently constructing.
Invention content
The utility model provides a kind of assembled rim of a cup base for post and ground to solve technical problem present in known technology Level ground construction joint stereotyped structure, the structure are not only able to realize the function of rim of a cup base for post subsiding crack and terrace construction technique seam, reach The requirement of terrace Forming Quality, additionally it is possible to accelerate construction progress, save construction cost.
The utility model is adopted the technical scheme that solve technical problem present in known technology:A kind of assembled Rim of a cup base for post stitches stereotyped structure with floor construction, including the multiple high strength plastics templates being arranged around rim of a cup base for post, Suo Yousuo It states high strength plastics template and surrounds the straight tetragonous rod structure that a section is diamond shape, the top mark height and terrace of the straight tetragonous rod structure are complete It is consistent at face absolute altitude, the cross central line in the diagonal line section corresponding with rim of a cup base for post of the straight quadrangular structural section and longitudinal direction Center line overlaps, and is equipped with steel bracket close to the side of rim of a cup base for post in the high strength plastics template, the steel bracket is fixed on ground In the base of level ground, two pieces of adjacent high strength plastics templates for being located at the straight quadrangular structural corner are connected using sizing steel gusset It connects.
The utility model has the advantages and positive effects of:Using high-strength polyethylene template sizing cup column foundation and ground Level ground construction joint, high-strength polyethylene template have plastic deformation ability, make construction joint that can do horizontal extension;High-strength polyethylene template will Terrace is divided into two independent sectors, avoids the crack caused by rim of a cup column settlement of foundation;The height of sizing is set in construction joint Strength polyethylene template eliminates construction joint formwork and the processes such as sets up and support, and the fixing-stable of high-strength polyethylene template can It leans on, is not necessarily to form removal, construction joint is straight, ensure that the quality for staying seam, no rotten side phenomenon of arrisdefect, saves duration and artificial, terrace is flat Whole to spend, no irregular cracks occurs, and solves general terrace and is commonly present that dividing joint is not straight, and dividing joint is wide, corner is damaged, Obviously there are the common quality defects such as faulting of slab ends on the adjacent ground of alice, construction joint, and the flatness of terrace is made to be effectively ensured.It is prior It is that the stereotyped structure can not only reach the requirement of terrace Forming Quality, moreover it is possible to realize that terrace one-time-concreting is molded, it is unnecessary to reduce Technology intermission, shorten the duration, avoid the possibility that concrete generates cold seam in construction, ensure that assembled rim of a cup base for post With the globality of floor structure, reduce construction link, has saved manually, reduced construction cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the utility model high strength plastics template and its structural schematic diagram that steel bracket connects;
Fig. 3 is that the utility model is located at two pieces of adjacent high strength plastics templates of straight quadrangular structural corner using sizing steel The schematic diagram of gusset connection.
In figure:4-1, high strength plastics template;4-2, steel bracket;4-3, sizing steel gusset;5, rim of a cup base for post.
Specific implementation mode
For that can further appreciate that the invention, features and effects of the utility model, the following examples are hereby given, and coordinates Detailed description are as follows for attached drawing:
Please refer to Fig.1~Fig. 3, a kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction, including is arranged in rim of a cup Multiple high strength plastics template 4-1 around base for post 5, all high strength plastics template 4-1 surround straight four that a section is diamond shape The top mark height of prism structure, the straight tetragonous rod structure is consistent with terrace finished surface absolute altitude, the straight quadrangular structural section The cross central line and longitudinal centre line in diagonal line section corresponding with rim of a cup base for post 5 overlap, and are leaned in the high strength plastics template 4-1 The side of nearly rim of a cup base for post 5 is equipped with steel bracket 4-2, and the steel bracket 4-2 is fixed in terrace base, positioned at the straight quadrangular Two pieces of adjacent high strength plastics template 4-1 of structural corner are using sizing steel gusset 4-3 connections.
The construction method of the utility model:
The connection of high strength plastics template and steel bracket is completed before installation.When construction, in the base of terrace, theodolite is used Or total powerstation is determining according to the design position of construction joint and marks the position of high strength plastics template;Then by high strength plastics template It is placed on the position of label, the top mark height of high strength plastics template is adjusted according to datum mark and terrace finished surface absolute altitude It is whole, until when the top mark height of high strength plastics template is consistent with terrace finished surface absolute altitude, steel bracket is fixed in the base of terrace, Then the one-time-concreting of terrace facing concrete is completed.
Although the preferred embodiment of the utility model is described above in conjunction with attached drawing, the utility model is not It is confined to above-mentioned specific implementation mode, the above mentioned embodiment is only schematical, is not restrictive, ability The those of ordinary skill in domain is not departing from the utility model aims and claimed under the enlightenment of the utility model In the case of range, many forms can also be made, these are belonged within the scope of protection of the utility model.

Claims (1)

1. a kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction, which is characterized in that including setting in rim of a cup base for post week The multiple high strength plastics templates enclosed, all high strength plastics templates surround the straight tetragonous rod structure that a section is diamond shape, described The top mark height of straight tetragonous rod structure is consistent with terrace finished surface absolute altitude, diagonal line and the rim of a cup column of the straight quadrangular structural section Base corresponds to the cross central line in section and longitudinal centre line overlaps, and is set close to the side of rim of a cup base for post in the high strength plastics template There is steel bracket, the steel bracket to be fixed in terrace base, be located at two pieces of the straight quadrangular structural corner it is adjacent described High strength plastics template is using sizing steel gusset connection.
CN201721648211.1U 2017-11-30 2017-11-30 A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction Active CN207608932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721648211.1U CN207608932U (en) 2017-11-30 2017-11-30 A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721648211.1U CN207608932U (en) 2017-11-30 2017-11-30 A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction

Publications (1)

Publication Number Publication Date
CN207608932U true CN207608932U (en) 2018-07-13

Family

ID=62796859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721648211.1U Active CN207608932U (en) 2017-11-30 2017-11-30 A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction

Country Status (1)

Country Link
CN (1) CN207608932U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282294A (en) * 2020-10-23 2021-01-29 安徽四建控股集团有限公司 Construction method of steel fiber wear-resistant terrace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282294A (en) * 2020-10-23 2021-01-29 安徽四建控股集团有限公司 Construction method of steel fiber wear-resistant terrace

Similar Documents

Publication Publication Date Title
CN101864744B (en) Construction method of novel wall fence for highway
CN103669562A (en) Cantilever bay window board concrete overall pouring structure and construction method thereof
CN202441060U (en) Construction structure of reinforced concrete frame beam columns
CN105908889B (en) Building in the style of the ancients cornice concrete decoration element is prefabricated and reverse construction method of installation
CN109519004A (en) A kind of prefabricated assembled pond and its assembly method
CN207608932U (en) A kind of assembled rim of a cup base for post stitches stereotyped structure with floor construction
CN207829012U (en) A kind of foundation pit support post is constructed with basement bottom board connecting node
CN109707052A (en) Assembled beam and plate connecting node
CN102888894B (en) Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN206189279U (en) Structure is assembled with bent cap to stand
CN103216102A (en) Construction method for tremie guiding pouring inside steel pipe column
CN202577571U (en) Structure of inner barrel-outer frame clip-shaped steel framework building
CN204662742U (en) The movable surface construction structure of a kind of pitched roof
CN203654993U (en) Concrete structure cantilever bay window board
CN207110172U (en) A kind of assembling type steel structure cast-in-place concrete floor side mould node
CN209523509U (en) A kind of prefabricated assembled pond
CN111730726A (en) Method for manufacturing precast concrete column forming die
CN207608931U (en) A kind of assembled cold chain library board wall side column foot contracting seam stereotyped structure
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN102758519B (en) Building numerical control rendering motor machine
CN101550726B (en) Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof
CN102121312A (en) Construction process for concrete bargeboard in pseudo-classic architecture
CN108571068A (en) The insertion of steel fabric sheet cross section carries out high-strength concrete pouring construction engineering method
CN207244964U (en) A kind of difference of height floor constructing structure for steel building
CN204401907U (en) prefabricated balcony cornice

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200413

Address after: 300451 No. 72, Hangzhou Road, Binhai New Area, Tianjin

Co-patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

Address before: 300456 No. 75 Xingang Road, Binhai New Area, Tianjin, Tanggu, China

Co-patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION NO.3 CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: No. 72 Hangzhou Road, Tianjin Binhai New Area, 300451

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CP01 Change in the name or title of a patent holder