CN101550726B - Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof - Google Patents

Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof Download PDF

Info

Publication number
CN101550726B
CN101550726B CN200910098202A CN200910098202A CN101550726B CN 101550726 B CN101550726 B CN 101550726B CN 200910098202 A CN200910098202 A CN 200910098202A CN 200910098202 A CN200910098202 A CN 200910098202A CN 101550726 B CN101550726 B CN 101550726B
Authority
CN
China
Prior art keywords
stone
pillar
flag
base
drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200910098202A
Other languages
Chinese (zh)
Other versions
CN101550726A (en
Inventor
金义勇
程建平
顾亦农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG BADA CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG BADA CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG BADA CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG BADA CONSTRUCTION GROUP CO Ltd
Priority to CN200910098202A priority Critical patent/CN101550726B/en
Publication of CN101550726A publication Critical patent/CN101550726A/en
Application granted granted Critical
Publication of CN101550726B publication Critical patent/CN101550726B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a core-through type pillar base slate, drum step stone, reinforced concrete upright column structure, which comprises a pillar base slate, a drum step stone and a reinforced concrete column body. The utility model is characterized in: the pillar base slate and the drum step stone are formed with a core through hole; the reinforced concrete column is passed through the core through hole, and is combined with the plinth to form an integrated structure. The construction method comprise includes forming core though holes on the pillar base slate and the drum step stone, hasthe following construction processes: measuring and setting line, forming the core through hole on the pillar base slate, positioning the drum step stone and fixing, binding column steel bars, suppor ting moulds, pouring column concrete, removing moulds, maintaining, and machining and modifying the reinforced concrete column surface, the pillar base slate and the drum step stone. By integrating the column body, the drum step stone and the pillar base slate, the invention improves the integrity and spatial aesthetic feeling of the great wooden framework in archaize building, achieves great environment benefit, increases machining efficiency greatly, saves material, and protects environment.

Description

Punching type base of a pillar flag, drum stone steps stone, reinforced concrete upright column structure and job practices thereof
Technical field
The present invention relates to a kind of building construction technology, particularly a kind of punching type base of a pillar flag, drum stone steps stone, reinforced concrete upright column structure and job practices thereof.
Background technology
China's building in the style of the ancients is appealed to both the more and the less cultured owing to its dense historical inside information contained and perfect profile over the past thousands of years.Present the diversified epoch in architectural design, building in the style of the ancients is especially because its unique features has obtained further development.And in building in the style of the ancients, reinforced concrete post is being undertaken the light effect of lumping weight of lifting as one of main supporting member of building itself in building in the style of the ancients is moulded.But, also bring certain influence for antique effect because often there are problems such as surperficial pitted skin, crack, cavity in reinforced concrete post in the building in the style of the ancients.In order to guarantee construction quality, can reach antique effect again, how selecting rational building in the style of the ancients column job practices is an important task.
Traditional building in the style of the ancients steel concrete column bottom drum stone steps stone adopted for two semicircle splicing made usually, be difficult to avoid the glue-line flavescence and adhesive material year season cracking of a specified duration and do not reach the defective of antique effect, and can not guarantee the integrality of pillar and drum stone steps stone.
Summary of the invention
The objective of the invention is provides a kind of construction quality that can guarantee for the deficiency that solves above-mentioned technology; Antique effect be can reach again, and punching type base of a pillar flag, drum stone steps stone, reinforced concrete upright column structure and the job practices thereof of the globality of the big timber frame of building in the style of the ancients increased.
In order to achieve the above object; A kind of punching type base of a pillar flag that the present invention designed, drum stone steps stone, reinforced concrete upright column structure; It comprises base of a pillar flag, drum stone steps stone and steel concrete cylinder, it is characterized in that on base of a pillar flag, drum stone steps stone, having the serial core through hole, and the steel concrete cylinder runs through and digs the core through hole; And integrally combine with base for post, form cylinder and base for post and be linked to be overall structure.Be provided with one deck adhesive material at drum stone steps stone serial core through-hole wall.
The job practices of a kind of punching type base of a pillar flag provided by the invention, drum stone steps stone, reinforced concrete upright column; It comprises base of a pillar flag, drum stone steps stone open string core through hole; It is characterized in that work progress is: measure unwrapping wire, dig core base of a pillar flag, drum stone steps stone sleeve column is in place and fixing, post binding reinforcing bars, formwork, build post concrete, form removal, maintenance, at last reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone are modified.
Described measurement unwrapping wire is: at first eject each axis cross centre line in base of a pillar flag, drum stone steps stone leveling layer zone with black mark-line, misalignment of axe must be controlled in the 3mm; Eject cross central axis and side lead-in wire thereof at base of a pillar flag, drum stone steps stone male and female face with black mark-line respectively simultaneously; The side lead-in wire should be clear; And the cross central axis of male and female face should be on same vertical plane; On every post reinforcing bar, mark base of a pillar flag end face absolute altitude control line at last, base of a pillar flag face absolute altitude is ground level, and snap the line absolute altitude deviation will be controlled in the 1mm.
Describedly dig core base of a pillar flag, drum stone steps stone sleeve column is in place and fixedly be that base of a pillar flag wears when installing; According to the actinomere point location; Base of a pillar flag cross hairs and the dead in line of leveling layer cross, and the end face absolute altitude control line of strict control base of a pillar flag, alignment error is controlled in the 1mm; Install and fix with cement mortar after the contraposition of base of a pillar flag; When mortar strength reach design strength percent 15 the time to wear bulging stone steps stone more in place; Bulging stone steps stone cross hairs is overlapped with base of a pillar flag cross hairs, and fix, wait to reach fixed leg reinforcing bar behind the prescribed strength with adhesive material.
Described formwork is: template construct at first: prefabricated wall thickness 5mm PVC column-form; The PVC column-form is built the pillar diameter according to plan and highly processed two semicircle monoblock templates, and edge joint position is provided with the edge of a wing, and the edge of a wing glueds joint to become the height piece with homogeneity with the diameter pvc pipe; In the post mould outside band iron tie should be set; Jointing positions connects with bolt, and in the post mould outside three road 5cm thick multiple wood in upper, middle and lower should be set, and is used for steel pipe and fixes; Template is installed then: elder generation's center line on bullet on the multiple wood in three roads, upper, middle and lower before the mounting template, template is stood vertically, and put tie then, tighten tie interface bolt from top to bottom one by one.
So described maintenance is to adopt the method for spray-coated film maintenance to carry out maintenance.
Described reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone modify be the shaft concrete reach through maintenance design strength more than 70 percent after; Should clean bulging stone steps stone, residual concrete and the fixing pollution of base of a pillar flag external surface with mortar; Steel concrete shaft form joint place and answer sanding of flat suitable with drum stone steps stone seam crossing; Concrete unnecessary or that overflow is ground off, and the artificial chip-axe of shaft becomes hair side, criticizes brush coating water cement slurry then and waits to do; Completely criticize decoration cement putty, brush the cylinder coating at last again.
The present invention adopts bulging stone steps stone, base of a pillar flag punching integrated construction technology, digs core at base of a pillar flag, drum stone steps stone after processing finished product by design size, and coring is of a size of the Reinforced Concrete Circular Cylinder design size.With fix again behind base of a pillar flag, the drum stone steps stone sleeve column, colligation (welding) reinforcing bar, formwork erection, concreting, make post and base of a pillar flag, bulging stone steps stone be linked to be integral body.Fundamentally solve the problem of bulging stone steps stone season cracking, made drum stone steps stone and pillar be connected as a single entity in appearance, more attractive in appearance, reach imitative timber frame effect.
The present invention adopts pvc pipe as reinforced concrete upright column post mould: for reaching the design specifications requirement, the design section size of general cylinder is bigger than normal, and it is not enough and directly influence antique effect to produce the cylinder cross dimensions.The present invention adopts 5mm wall thickness PVC plastic pipe as the post mould, according to design size customization molding, disposable shaping.Because pvc pipe itself has characteristics such as inner wall smooth, verticality are good, can exempt traditional reinforced concrete post common quality defect problems such as pitted skin, cavity after the pillar moulding, also can save this one procedure of post surface plastering.Directly criticize putty on the post surface, disposal molding has overcome the common quality defects such as hollowing cracking that caused by floated coat, also leaves the design space for designing unit.
The present invention adopts bulging stone steps stone punching technology; Criticize one deck adhesive material at drum stone steps stone punching inwall; So both can increase the caking property of bulging stone steps stone and pillar, and can make pillar that certain expansion space is arranged again, thereby solve the inconsistent and bulging stone steps stone that produce of stone material and the concrete coefficient of expansion problem that ftractures.The present invention adopts glass cement as adhesive material, and glass cement is a kind of adhesive, and oil resistivity is good; Very strong glue-joint strength is arranged, and raw material is easy to get when socket, cheap; Easy to use, be easy to heating and melting, in the engineering practical application, obtained good effect.
Pillar of the present invention can adopt dense concrete to build; Dense concrete has than ordinary concrete excellent characteristics more, the function of have load-bearing concurrently, going along with sb. to guard him, and water/binder ratio is strict; Can effectively prevent and treat cylinder steam abscess phenomenon, favourable for post surface smooth degree and ten minutes attractive in appearance thereof.
Set up 1 threedimensional model, 3 two dimensional models carry out base of a pillar flag, drum stone steps stone and pillar central space structural orientation.Its principle is to do 3 horizontal cutting planes along drum stone steps stone up-down structure plane, is followed successively by first, second, third tangent plane from the bottom to top, and as shown in Figure 1, first cutting plane is established X 1, Y 1Coordinate, the circle central vertical is to establishing Z coordinate, i.e. X 1Y 1The Z threedimensional model.Set up X respectively for same two layers, three layers 2Y 2And X 3Y 3Two dimensional model makes the complex spatial location become 3 horizontal coordinates location and absolute altitude control, the central point O of the first, two, three tangent planes 1, O 2, O 3Promptly be respectively the center of base of a pillar flag, drum stone steps stone and pillar, utilize the computer cad technique to make three central spot on same vertical line, the central spot that can guarantee base of a pillar flag, drum stone steps stone and pillar three cross section fully is on same vertical line.Compare with conventional job practices, the precision of setting up threedimensional model control is higher, and operability is also stronger.
The resulting a kind of punching type base of a pillar flag of the present invention, drum stone steps stone, reinforced concrete upright column structure and job practices thereof are applicable to the Reinforced Concrete Circular Cylinder construction of various forms of building in the style of the ancientss such as Langfang building, landscape hardwork, temple, Chinese style villa.
The present invention has good economic benefits: the one, and pvc pipe turnover utilization rate is high, and the conventional wooden form number of turnover is 7~10 times, and PVC post mould can have enough to meet the need 20~30 times; With certain engineering is example, and the form work engineering Master Cost can be practiced thrift 100,000 yuan, and the expense of its saving can account for about 10% of form work engineering total cost.The 2nd, drum stone steps stone, base of a pillar flag machining efficient improve greatly.If adopt traditional artificial method, circular arc was got core in the processing of drum stone steps stone cylindrical camber line reached, and can only produce 0.5 1 work day respectively; Base of a pillar flag is got core and is produced 21 work day; But because operate miss, reasons such as fatigue cause extra material unaccounted-for (MUF) easily, and labour cost is also not within minority; And the present invention's drum stone steps stone cylindrical camber line adopts mechanical machined into, can produce 200 1 work day, and circular arc adopts corning machine processing to get core in the drum stone steps stone, can produce 20 1 work day; Base of a pillar flag adopts corning machine to get core can produce 60 1 work day, and not only efficiency far is higher than traditional method, has also almost stopped extra material unaccounted-for (MUF), has practiced thrift labour cost and cost of materials greatly, has huge economic benefit.
The present invention has good social benefit: under the current background of building a conservation-minded society of China, the application of building energy conservation certainly leads to the huge social benefit.The present invention adopts pvc pipe, and resource utilization is high and practiced thrift timber.General reinforced concrete post can use wooden form when concreting, wooden form is not only wasted resource, and recycling rate of waterused is low.Though the price of pvc pipe own is suitable with wooden form, owing to himself smooth surface, be beneficial to the Surface Machining of concrete post, the saving of work and time material-saving has very high social benefit; And the PVC template is because characteristics such as self smooth surface, verticality height; Make reinforced concrete upright column smooth surface and have very high verticality; Almost has no problem of appearance; Build a vision, acoustics and the comfortable space environment of psychology, promoted the environmental construction of harmonious society, produced the huge social benefit.
The present invention has produced good environmental benefit: adopt hollow bulging stone steps stone of mechanical machined into and base of a pillar flag, improved efficiency of construction, and reduced unnecessary waste of material to a great extent, practiced thrift material, protected environment.The on-the-spot strict quality management of production work has reduced the number of times of doing over again, and has in time reclaimed building debris, avoids waste of material, has further reduced the pollution to environment.On the overall appearance of building; The marshalling of pillar is consistent, and shaft links into an integrated entity with drum stone steps stone, base of a pillar flag, has increased the globality and the space aesthetic feeling thereof of the big timber frame of building in the style of the ancients; People are in the environment of a good health when ornamental and playing, have very big environmental benefit.
Description of drawings
Fig. 1 base of a pillar flag leveling layer bullet cross hairs;
Fig. 2 drum stone steps stone male and female face bullet cross hairs;
Fig. 3 digs core base of a pillar flag, drum stone steps stone sleeve column with regard to bitmap;
Fig. 4 PVC template and the edge of a wing thereof are provided with;
The band iron iron hoop of Fig. 5 post mould arranged outside;
The multiple wood in 3 roads, Fig. 6 PVC post mould outside is provided with sketch map;
Fig. 7 PVC template is installed verticality and is fixed;
Fig. 8 is a construction flow chart of the present invention.
Wherein: base of a pillar flag 1, drum stone steps stone 2, steel concrete cylinder 3, serial core through hole 4, base for post 5, adhesive material 6, lead-in wire 7, PVC column-form 8, bed course 9, cement mortar 10, the edge of a wing 11, glue junction 12, band iron tie 13, multiple wood 14, steel pipe 15, height piece 16.
The specific embodiment
Combine accompanying drawing that the present invention is done further description through embodiment below.
Embodiment:
A kind of punching type base of a pillar flag that present embodiment is described, drum stone steps stone, reinforced concrete upright column structure; It comprises base of a pillar flag 1, drum stone steps stone 2 and steel concrete cylinder 3; It is characterized in that on base of a pillar flag 1, drum stone steps stone 2, having serial core through hole 4; Steel concrete cylinder 3 runs through and digs core through hole 4, and integrally combines with base for post 5, forms cylinder and base for post and is linked to be overall structure.Be provided with one deck adhesive material 6 at drum stone steps stone 2 serial core through holes 4 inwalls.
The job practices of a kind of punching type base of a pillar flag provided by the invention, drum stone steps stone, reinforced concrete upright column; It comprises base of a pillar flag 1, drum stone steps stone 2 open string core through holes 3; It is characterized in that work progress is: measure unwrapping wire, dig core base of a pillar flag, drum stone steps stone sleeve column is in place and fixing, post binding reinforcing bars, formwork, build post concrete, form removal, maintenance, at last reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone are modified.
Measure unwrapping wire: at first eject each axis cross centre line in base of a pillar flag 1, drum stone steps stone 2 leveling layer zones with black mark-line, misalignment of axe must be controlled in the 3mm; Eject cross central axis and side lead-in wire 7 thereof at base of a pillar flag 1, drum stone steps stone 2 male and female faces with black mark-line respectively simultaneously, the side lead-in wire should be clear, and the cross central axis of male and female face should be on same vertical plane.Like Fig. 1, shown in Figure 2.On every post reinforcing bar, mark base of a pillar flag end face absolute altitude control line at last, base of a pillar flag face absolute altitude is ground level, and snap the line absolute altitude deviation will be controlled in the 1mm.
Dig core base of a pillar flag, drum stone steps stone sleeve column is in place and fixing: base of a pillar flag 1 wears when installing; According to the actinomere point location; Base of a pillar flag cross hairs and the dead in line of leveling layer cross, and the end face absolute altitude control line of strict control base of a pillar flag 1, alignment error is controlled in the 1mm.Install and fix with 1: 1 cement mortar 10 after 1 contraposition of base of a pillar flag; When cement mortar 10 intensity reach design strength 1 15 the time to wear bulging stone steps stone 2 more in place; Bulging stone steps stone 2 cross hairs are overlapped with base of a pillar flag cross hairs; And fixing with adhesive material 6, to wait to reach after certain intensity colligation and weld the fixed leg reinforcing bar, sketch map is seen Fig. 3.
Colligation (welding) post reinforcing bar: be transported to the job site after the reinforcing bar processing and carry out colligation, installation, should cooperate with the template installation.Reinforcing bar binding generally adopts iron wire, should notice during colligation that reinforcement location is accurate, and colligation is firm.Compliant and designing requirement are answered in lap length and colligation position.The steel bar stress joint location should stagger each other.When adopting welding point, the quantity of welding point and welding point account for the percentage of reinforcing bar total cross-sectional area and should control according to standard is strict.
Formwork: 1: template construct: prefabricated wall thickness 5mm PVC column-form 8, the tensile strength of PVC column-form 8 and flexural strength should meet the design specifications requirement; With diameter 300mmPVC post mould is example, and the template ultimate tensile strength is 194N/mm 2, ultimate bending strength is 178N/mm 2PVC column-form 8 is built the pillar diameter according to plan and highly processed two semicircle monoblock templates, and edge joint position is provided with the edge of a wing 11, and the edge of a wing 11 usefulness homogeneities glued joint to become height piece 16 with the diameter pvc pipe, and are as shown in Figure 4.For guaranteeing formwork integral rigidity and stability, in the post mould outside 40 * 4 or 56 * 6 band iron ties should be set, spacing 300mm is set together; Jointing positions connects with bolt, and is as shown in Figure 5, and in the post mould outside three road 5cm thick multiple wood in upper, middle and lower should be set; Be used for steel pipe and fix, as shown in Figure 6.2: template is installed: elder generation's center line on bullet on the multiple wood in three roads, upper, middle and lower before the mounting template.For preventing that template produces distortion in rectify perpendicular, need 2 people during installation template is lifted the side to the post reinforcing bar, template is stood vertically, put tie then, tighten tie interface bolt from top to bottom one by one.Fixing as shown in Figure 7 for tubular steel post.Proofread and correct the verticality of pillar, if organ timbering then should lead to the line correction suitable for reading the drawing of organ timbering; If single-column is then proofreaied and correct one by one.To note carrying out base of a pillar flag and the protection of drum stone steps stone finished surface bedding simultaneously, in case weight falls or swipe and cause the damage of bulging stone steps stone and base of a pillar flag.
Build the post concrete: concrete adopts mechanical agitation, and mixing time was greater than 2 minutes.Before building, should remove the rubbish foreign material in the template, the template inwall waters moistening and the brushing interleaving agent.During concreting; Seat is starched earlier; Promptly post mould bottom build the thick cement mortar of one deck 50~100mm (match ratio should with concrete in to remove the mix ratio of mortar of stone identical); The free height of concreting must not be greater than 2 meters, otherwise should adopt tumbling barrel, chute to build, in case concrete produces laminated segregation.When concreting to capital; Because post height concrete vibrating returns the slurry effect; Cause the pop-up of the plain slurry of concrete to capital, the way that adopts capital to increase a part of post mould, hold out capital more than mortar after; To have more part post mould and remove and cut the trabeation concrete mortar, problem of cracks occur owing to the top mortar too much shrinks to solve to build in the process at concrete column.For the concrete that guarantees the depths obtains tamping, the thickness of at every turn building can not be too big, builds thickness and get 25~35cm.
Form removal: the form removal program is propped up for the back and is torn open earlier, and prop up afterwards earlier and tear open: bearing form is torn open earlier, and the non-bearing template is torn open after supporting.The non-bearing template should guarantee not can to remove because of form removal when impaired at concrete strength.
Maintenance: because pillar is a vertical structure, so adopt the method for spray-coated film maintenance to carry out maintenance.To be main plastic solution curing agent, and do the spray tool with paint gun or Pesticide spray gun and be sprayed at concrete surface that pressure can not be too small or excessive during sprinkling with the superchlorinated polyvinyl chloride resin after concreting is intact.Spraying time should be decided according to concrete water evaporation, swims when concrete surface loses, and when pressing no finger mark with light finger, can spray.During sprinkling, nozzle is advisable with 50cm from the concrete surface distance, sprays thickness and wants uniformity, and thickness is suitable, generally with per kilogram solution spray 2.5m 2Area is as the suitable control index of thickness.Form plastic sheeting very soon behind the spray solution and play maintenance action.In maintenance processes, must guarantee the integrality of film, must not damage rupture.
Reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone are modified: the shaft concrete through maintenance reach design strength 70% or more after, should clean the residual concrete of bulging stone steps stone, base of a pillar flag external surface and fix pollution with mortar.Steel concrete shaft form joint place and answer sanding of flat suitable with drum stone steps stone seam crossing grinds off concrete unnecessary or that overflow, and the artificial chip-axe of shaft becomes hair side, criticizes brush coating water cement slurry then and waits to do, and completely criticizes decoration cement putty, brushes the cylinder coating at last again.

Claims (10)

1. a punching type base of a pillar flag, drum stone steps stone, reinforced concrete upright column structure; It comprises base of a pillar flag, drum stone steps stone and steel concrete cylinder; It is characterized in that on base of a pillar flag, drum stone steps stone, having the serial core through hole; The steel concrete cylinder runs through and digs the core through hole, and integrally combines with base for post, forms cylinder and base for post and is linked to be overall structure.
2. a kind of punching type base of a pillar flag according to claim 1, drum stone steps stone, reinforced concrete upright column structure is characterized in that being provided with one deck adhesive material at drum stone steps stone serial core through-hole wall.
3. the job practices of a punching type base of a pillar flag, drum stone steps stone, reinforced concrete upright column; It comprises base of a pillar flag, drum stone steps stone open string core through hole; It is characterized in that work progress is: measure unwrapping wire, dig core base of a pillar flag, drum stone steps stone sleeve column is in place and fixing, post binding reinforcing bars, formwork, build post concrete, form removal, maintenance, at last reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone are modified.
4. the job practices of a kind of punching type base of a pillar flag according to claim 3, drum stone steps stone, reinforced concrete upright column; It is characterized in that described measurement unwrapping wire is: at first eject each axis cross centre line in base of a pillar flag, drum stone steps stone leveling layer zone with black mark-line, misalignment of axe must be controlled in the 3mm; Eject cross central axis and side lead-in wire thereof at base of a pillar flag, drum stone steps stone male and female face with black mark-line respectively simultaneously; The side lead-in wire should be clear; And the cross central axis of male and female face should be on same vertical plane; On every post reinforcing bar, mark base of a pillar flag end face absolute altitude control line at last, base of a pillar flag face absolute altitude is ground level, and snap the line absolute altitude deviation will be controlled in the 1mm.
5. according to the job practices of claim 3 or 4 described a kind of punching type base of a pillar flags, drum stone steps stone, reinforced concrete upright column; It is characterized in that describedly digging core base of a pillar flag, drum stone steps stone sleeve column is in place and fixedly be that base of a pillar flag wears when installing; According to the actinomere point location; Base of a pillar flag cross hairs and the dead in line of leveling layer cross, and the end face absolute altitude control line of strict control base of a pillar flag, alignment error is controlled in the 1mm; Install and fix with cement mortar after the contraposition of base of a pillar flag; When mortar strength reach design strength 1 15 the time to wear bulging stone steps stone more in place; Bulging stone steps stone cross hairs is overlapped with base of a pillar flag cross hairs, and fix, wait to reach fixed leg reinforcing bar behind the prescribed strength with adhesive material.
6. according to the job practices of claim 3 or 4 described a kind of punching type base of a pillar flags, drum stone steps stone, reinforced concrete upright column; It is characterized in that described formwork is: template construct at first: prefabricated wall thickness 5mm PVC column-form; The PVC column-form is built the pillar diameter according to plan and highly processed two semicircle monoblock templates, and edge joint position is provided with the edge of a wing, and the edge of a wing glueds joint to become the height piece with homogeneity with the diameter pvc pipe; In the post mould outside band iron tie should be set; Jointing positions connects with bolt, and in the post mould outside three road 5cm thick multiple wood in upper, middle and lower should be set, and is used for steel pipe and fixes; Template is installed then: elder generation's center line on bullet on the multiple wood in three roads, upper, middle and lower before the mounting template, template is stood vertically, and put tie then, tighten tie interface bolt from top to bottom one by one.
7. the job practices of a kind of punching type base of a pillar flag according to claim 5, drum stone steps stone, reinforced concrete upright column; It is characterized in that described formwork is: template construct at first: prefabricated wall thickness 5mm PVC column-form; The PVC column-form is built the pillar diameter according to plan and highly processed two semicircle monoblock templates, and edge joint position is provided with the edge of a wing, and the edge of a wing glueds joint to become the height piece with homogeneity with the diameter pvc pipe; In the post mould outside band iron tie should be set; Jointing positions connects with bolt, and in the post mould outside three road 5cm thick multiple wood in upper, middle and lower should be set, and is used for steel pipe and fixes; Template is installed then: elder generation's center line on bullet on the multiple wood in three roads, upper, middle and lower before the mounting template, template is stood vertically, and put tie then, tighten tie interface bolt from top to bottom one by one.
8. the job practices of a kind of punching type base of a pillar flag according to claim 7, drum stone steps stone, reinforced concrete upright column is characterized in that described maintenance is to adopt the method for spray-coated film maintenance to carry out maintenance.
9. the job practices of a kind of punching type base of a pillar flag according to claim 7, drum stone steps stone, reinforced concrete upright column; It is characterized in that described reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone modify be the shaft concrete reach through maintenance design strength more than 70 percent after; Should clean residual concrete of bulging stone steps stone, base of a pillar flag external surface and fixing pollution with mortar, steel concrete shaft form joint place and answer sanding of flat suitable with bulging stone steps stone seam crossing grinds off concrete unnecessary or that overflow; The artificial chip-axe of shaft becomes hair side; Criticize brush coating water cement slurry then and wait to do, completely criticize decoration cement putty, brush the cylinder coating at last again.
10. the job practices of a kind of punching type base of a pillar flag according to claim 8, drum stone steps stone, reinforced concrete upright column; It is characterized in that described reinforced concrete post surface and base of a pillar flag, the processing of drum stone steps stone modify be the shaft concrete reach through maintenance design strength more than 70 percent after; Should clean residual concrete of bulging stone steps stone, base of a pillar flag external surface and fixing pollution with mortar, steel concrete shaft form joint place and answer sanding of flat suitable with bulging stone steps stone seam crossing grinds off concrete unnecessary or that overflow; The artificial chip-axe of shaft becomes hair side; Criticize brush coating water cement slurry then and wait to do, completely criticize decoration cement putty, brush the cylinder coating at last again.
CN200910098202A 2009-04-30 2009-04-30 Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof Expired - Fee Related CN101550726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910098202A CN101550726B (en) 2009-04-30 2009-04-30 Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910098202A CN101550726B (en) 2009-04-30 2009-04-30 Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN101550726A CN101550726A (en) 2009-10-07
CN101550726B true CN101550726B (en) 2012-09-05

Family

ID=41155195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910098202A Expired - Fee Related CN101550726B (en) 2009-04-30 2009-04-30 Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN101550726B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442641B (en) * 2015-12-02 2017-11-03 梁海森 A kind of building in the style of the ancients pillar interconnects anti-seismic structure
CN107675834A (en) * 2017-10-20 2018-02-09 重庆建工住宅建设有限公司 A kind of construction method for building in the style of the ancients concrete bearing component
CN108673718A (en) * 2018-06-21 2018-10-19 孙语遥 The gate spool that prefabricated struts manufacture in a kind of civil construction project

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2361746Y (en) * 1998-01-23 2000-02-02 王建国 Combined pseudo-classic style pavilion
CN1616254A (en) * 2003-11-14 2005-05-18 孟繁华 Micro antique pavilion, terrace and tower structure system
CN200992814Y (en) * 2006-12-20 2007-12-19 赵迎辉 Spliced combined type archaized building
CN201071621Y (en) * 2007-08-20 2008-06-11 石毓忠 Full folding type hand pushing movable archaizing pavilion
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN201460028U (en) * 2009-04-30 2010-05-12 浙江八达建设集团有限公司 Core-through plinth slate and drum stone reinforced concrete upright column structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2361746Y (en) * 1998-01-23 2000-02-02 王建国 Combined pseudo-classic style pavilion
CN1616254A (en) * 2003-11-14 2005-05-18 孟繁华 Micro antique pavilion, terrace and tower structure system
CN200992814Y (en) * 2006-12-20 2007-12-19 赵迎辉 Spliced combined type archaized building
CN201071621Y (en) * 2007-08-20 2008-06-11 石毓忠 Full folding type hand pushing movable archaizing pavilion
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN201460028U (en) * 2009-04-30 2010-05-12 浙江八达建设集团有限公司 Core-through plinth slate and drum stone reinforced concrete upright column structure

Also Published As

Publication number Publication date
CN101550726A (en) 2009-10-07

Similar Documents

Publication Publication Date Title
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN201391088Y (en) As-cast-finish concrete section steel outside collar reinforcing column mold
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN110107085A (en) Superelevation fair-faced concrete column construction method
CN202265937U (en) Decorative roman column structure
CN104532987A (en) Construction method of bare concrete wall internally provided with heat insulation layer
CN105908889A (en) Construction method for prefabrication and reverse installation of cornice concrete decoration members of archaistic building
CN101446073A (en) Reinforced concrete pier stud with capping beam or irregular Y-shaped reinforced concrete pier stud once-forming construction method
CN101550726B (en) Core-through type pillar base slate, drum step stone, reinforced concrete upright column structure and construction method thereof
CN212613903U (en) Brick-concrete structure old building body composite reinforcement structure
CN201460028U (en) Core-through plinth slate and drum stone reinforced concrete upright column structure
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN101654926A (en) Building free-formwork and one-time compound forming construction method and structure of decorative cover
CN102561607A (en) Reverse construction method of reversely nailed wood rafter roof boarding of concrete eave of pseudo-classic architecture
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN112982879A (en) Facing concrete construction structure and construction method
CN113202181A (en) Simple and accurate manufacturing method of arc-shaped edge-sealing template
CN104612343A (en) Method for constructing extruded polystyrene board molding of building outer wall
CN110331795B (en) Reverse construction method for arch coupon structure
CN112081493A (en) Water-stopping anti-ridge component of bathroom shower room and construction method thereof
CN108457444B (en) Outer wall PU decorative structure and construction method thereof
CN1279250C (en) Method for constructing assembled type archaized buildings
CN202596045U (en) Pseudo-classic architectural concrete eave with reversely nailed wooden rafter and reversely constructed roof boarding
CN113266091A (en) Construction process of space torsional curved-surface wood grain fair-faced concrete wall
CN101845895A (en) Precast and cast-in-place combined exposed concrete construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20161103

Granted publication date: 20120905

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20170503

Granted publication date: 20120905

PD01 Discharge of preservation of patent
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20170430

CF01 Termination of patent right due to non-payment of annual fee