CN207194419U - It may span across the aerial work platform of landing beam - Google Patents

It may span across the aerial work platform of landing beam Download PDF

Info

Publication number
CN207194419U
CN207194419U CN201720853891.4U CN201720853891U CN207194419U CN 207194419 U CN207194419 U CN 207194419U CN 201720853891 U CN201720853891 U CN 201720853891U CN 207194419 U CN207194419 U CN 207194419U
Authority
CN
China
Prior art keywords
platform
landing beam
span
framework
aerial work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720853891.4U
Other languages
Chinese (zh)
Inventor
陈玉华
李鹏
杨佳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201720853891.4U priority Critical patent/CN207194419U/en
Application granted granted Critical
Publication of CN207194419U publication Critical patent/CN207194419U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses a kind of aerial work platform that may span across landing beam, including platform framework, connecting rod, roller devices, platform bed board and draw-gear, wherein, platform bed board is installed on the bottom of platform framework so that user stands, roller devices are located at the top of platform framework and are detachably connected by connecting rod and platform framework, roller devices are installed on landing beam and may move relative to it, draw-gear is installed on platform framework to drive its movement, when platform bed board is moved to the junction of landing beam, its change bit is postponed after dismounting roller devices and reinstalled to realize that roller devices continue to move to.The utility model proposes the aerial work platform that may span across landing beam, facilitate to after installation girder steel carry out subsequent construction.

Description

It may span across the aerial work platform of landing beam
Technical field
Technical field of high-altitude operation equipment is the utility model is related to, more particularly to a kind of work high above the ground that may span across landing beam Platform.
Background technology
In metallurgical engineering design, factory building is generally steel structural form, many steel structure platforms be present, and landing beam is mostly H Section steel beam, in steel structure platform installation process, the connection of the connection of unavoidable girder steel and steel column, girder and secondary beam.In steel After beam is installed in place, there are a large amount of welding, derusting, mopping need of work to complete, and be all work high above the ground.
Common practices is to make an interim cage or a movable scaffold is set up from ground in the prior art, Because every layer of steel platform tie point is more, it is necessary to which several workmens move cage repeatedly in high-altitude(Or movable Scaffold), deposit In very big potential safety hazard, compare and lose time.
Utility model content
Main purpose of the present utility model is to provide a kind of aerial work platform that may span across landing beam, it is intended to convenient pair Girder steel after installation carries out subsequent construction.
To achieve the above object, the utility model provides a kind of aerial work platform that may span across landing beam, including platform Framework, connecting rod, roller devices, platform bed board and draw-gear, wherein,
The platform bed board is installed on the bottom of platform framework so that user stands, and roller devices are located at the upper of platform framework It is detachably connected just and by connecting rod and platform framework, the roller devices are installed on landing beam and removable relative to its Dynamic, the draw-gear is installed on platform framework to drive its movement, when platform bed board is moved to the junction of landing beam, Its change bit is postponed after dismounting roller devices and reinstalled to realize that roller devices continue to move to.
Preferably, the roller devices are provided with more sets.
Preferably, each roller devices include two rollers being oppositely arranged and the roller branch for installing the roller Frame, the both ends of the connecting rod are connected with rolling wheel support and platform framework respectively.
Preferably, the roller devices also include anti-deviation device, and the anti-deviation device is included positioned at landing beam both sides Two rollers and the roller support for installing the roller, the roller support are fixedly connected with rolling wheel support.
Preferably, the platform rail for protection is additionally provided with the platform framework side wall.
Preferably, the aerial work platform that may span across landing beam also includes the instrument being installed on the platform framework Case.
Preferably, the aerial work platform that may span across landing beam also includes being installed on directly climbing on the platform framework Ladder.
Preferably, the platform framework is the cross platform framework that square tube is fabricated to, and is additionally provided with and hangs on the platform framework Ear.
Preferably, the link position of the connecting rod and roller devices and platform framework can adjust.
The utility model proposes the aerial work platform that may span across landing beam, its advantage is as follows:
(1)Its low manufacture cost of this job platform, it can meet that high-altitude is worked continuously requirement and safe and reliable;
(2)The roller devices, connecting rod, platform framework of this job platform can be connected by screw bolts, flat by adjusting The link position of table frame and roller devices can meet various sizes of H types landing beam requirement, repeatedly can make repeatedly With;
(3)Platform need not be moved repeatedly, by the link position for changing connecting rod and platform framework, you can by operation The landing beam of platform across infall enters on other one cross-platform beam, can also move on the landing beam in square crossing direction, Convenient working personnel carry out welding, derusting, the mopping work of whole steel platform, are greatly enhanced operating efficiency and have saved construction Cost.
Brief description of the drawings
Fig. 1 is that the utility model may span across structural representation when the aerial work platform of landing beam is connected with girder steel;
Fig. 2 is that the structure for amplifying that the utility model may span across when the aerial work platform of landing beam is connected with girder steel is illustrated Figure;
Fig. 3 is the cross section structure diagram in the A-A directions shown in Fig. 2.
In figure, 1 platform framework, 2 tool boxes, 3 platform rails, 4 bolts, 5 connecting rods, 6 anti-deviation devices, 7 roller branch Frame, 9 rollers, 10 hangers, 11 platform bed boards, 12 vertical ladders, 13 draw-gears, 14 first tie points, 15 second tie points, 16 Three tie points, 17 the 4th tie points, 18 the 5th tie points, 19 the 6th tie points, 20 girder steels, 21 steel columns, 22 first girder steels, 23 Two girder steels, 24 the 3rd girder steels.
Realization, functional characteristics and the advantage of the utility model purpose will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that specific embodiment described herein is not used to limit this only to explain the utility model Utility model.
It should be noted that in description of the present utility model, term " transverse direction ", " longitudinal direction ", " on ", " under ", " preceding ", The orientation or position relationship of the instruction such as " rear ", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " be based on Orientation shown in the drawings or position relationship, are for only for ease of description the utility model and simplify and describe, and are not instruction or dark Show that the device of meaning or element there must be specific orientation, with specific azimuth configuration and operation, thus it is it is not intended that right Limitation of the present utility model.
Referring to figs. 1 to Fig. 3, in this preferred embodiment, a kind of aerial work platform that may span across landing beam, including platform frame Frame 1, connecting rod 5, roller devices, platform bed board 11 and draw-gear 13, wherein,
Platform bed board 11 is installed on the bottom of platform framework 1 so that user stands, and roller devices are located at the upper of platform framework 1 It is detachably connected just and by connecting rod 5 and platform framework 1(Connecting rod 5 passes through the connecting platform frame of bolt 4 in the present embodiment Frame 1), roller devices are installed on girder steel and removable relative to it, and draw-gear 13 is installed on platform framework 1 to drive it It is mobile, when platform bed board 11 is moved to the junction of girder steel, dismantle its change bit is postponed after roller devices reinstall with Realize that roller devices continue to move to.
Specifically, in the present embodiment, platform framework 1 is furnished with 4 sets of draw-gears 13, therefore workmen station is in platform framework Mobile job platform can be voluntarily controlled in 1.Platform bed board 11 is checkered steel plate.Platform framework 1 is the cross that square tube is fabricated to Platform framework 1, hanger 10 is additionally provided with the platform framework 1 to facilitate lifting.Connecting rod 5 is made using square tube, platform The vertical rod of framework 1 and connecting rod 5 are furnished with bolt hole, by bolt 4 by platform framework 1 and connecting rod 5 connect into one it is whole Body.
Further, roller devices are provided with more sets, are moved so as to realize that platform framework 1 is stable.In the present embodiment, roller Device is provided with four sets, and dual-purpose two is standby.
Specifically, each roller devices include two rollers 9 being oppositely arranged and the rolling wheel support 7 for installing roller 9, The both ends of connecting rod 5 are connected with rolling wheel support 7 and platform framework 1 respectively(Connected in the present embodiment by bolt 4).
Further, roller devices also include anti-deviation device 6, and the anti-deviation device 6 includes two positioned at girder steel both sides Roller and the roller support for installing roller, the roller support are fixedly connected with rolling wheel support 7.Anti-deviation device 6 is in steel The both sides of beam are arranged symmetrically.Roller is installed on roller support and can rolled.
Further, the platform rail 3 for protection is additionally provided with the side wall of platform framework 1, so as to ensure that operating personnel Construction safety.
Further, it originally may span across the tool box that the aerial work platform of landing beam also includes being installed on platform framework 1 2.Respectively one tool box 2 of configuration, construction tool can be placed in tool box 2 both sides of platform framework 1.
Further, it originally may span across the vertical ladder that the aerial work platform of landing beam also includes being installed on platform framework 1 12.Vertical ladder 12 is connected by bolt 4 with platform framework 1, so that workmen enters safely job platform.
Further, the link position of connecting rod 5 and roller devices and platform framework 1 can adjust.On connecting rod 5 It can be set multiple bolts hole, roller devices and platform framework 1 is supporting is also provided with multiple bolts hole pass through connecting rod 5 and roller Different bolts hole coordinates to adjust installation site on device and platform framework 1, so as to meet different girder steel requirements, carries The versatility of the high aerial work platform that originally may span across landing beam.
Originally the workflow that may span across the aerial work platform of landing beam is as follows.
1st, on the ground required for job platform is moved to below installation steel platform(Or in following one layer of steel platform), utilize Rope hitches the hanger 10 on job platform, job platform is pulled to below the girder steel for needing to construct, by roller devices, connecting rod Part 5 connects into an entirety with platform framework 1, ensures that platform framework 1 can be to move freely on H profile steel beam, workmen passes through Vertical ladder 12 is constructed into job platform;
2nd, when certain girder steel construction after the completion of, it is necessary to move to it is another across the construction of girder steel when, using change connecting rod 5 With the link position of platform framework 1, platform framework 1 shares 6 tie points, respectively the first tie point 14, the second tie point 15, 3rd tie point 16, the 4th tie point 17, the 5th tie point 18 and the 6th tie point 19,(Fig. 2), it is assumed that job platform is in The position of one girder steel 22, first connection point is the first tie point 14, the 3rd tie point 16, when job platform is needed across infall It is another across the second 23 operation of girder steel when, by mobile job platform, remove the first tie point 14, the 3rd tie point 16 successively, Connect the second tie point 15, the 4th tie point 17;When job platform needs to move to the 3rd 24 operation of girder steel of vertical direction, lead to Cross and move job platform, remove the first tie point 14, the 3rd tie point 16, the 5th tie point 18 of connection, the second tie point successively 15, whole movement and transfer process, workmen need not leave job platform, stand in job platform by operating traction dress Putting 13 voluntarily controls job platform to complete.
The aerial work platform proposed by the present invention that may span across landing beam, its advantage are as follows:
(1)Its low manufacture cost of this job platform, it can meet that high-altitude is worked continuously requirement and safe and reliable;
(2)The roller devices, connecting rod 5, platform framework 1 of this job platform can be connected by screw bolts, and pass through regulation The link position of platform framework 1 and roller devices can meet various sizes of H types landing beam requirement, can repeatedly repeatedly Use;
(3)Platform need not be moved repeatedly, by the link position for changing connecting rod 5 and platform framework 1, you can will make The girder steel of industry platform across infall enters other one across on girder steel, can also move on the girder steel in square crossing direction, convenient Operating personnel carries out welding, derusting, the mopping work of whole steel platform, is greatly enhanced operating efficiency and has saved and is constructed into This.
Preferred embodiment of the present utility model is these are only, not thereby limits the scope of the claims of the present utility model, it is every The equivalent structure transformation made using the utility model specification and accompanying drawing content, or directly or indirectly it is used in other correlations Technical field, similarly it is included in scope of patent protection of the present utility model.

Claims (9)

1. a kind of aerial work platform that may span across landing beam, it is characterised in that including platform framework, connecting rod, roller dress Put, platform bed board and draw-gear, wherein,
The platform bed board is installed on the bottom of platform framework so that user stands, roller devices be located at the top of platform framework and It is detachably connected by connecting rod and platform framework, the roller devices are installed on landing beam and may move relative to it, The draw-gear is installed on platform framework to drive its movement, when platform bed board is moved to the junction of landing beam, is torn open Unload to postpone its change bit after roller devices and reinstall to realize that roller devices continue to move to.
2. the aerial work platform as claimed in claim 1 that may span across landing beam, it is characterised in that the roller devices are set There are more sets.
3. the aerial work platform as claimed in claim 2 that may span across landing beam, it is characterised in that each roller devices include Two rollers being oppositely arranged and the rolling wheel support for installing the roller, the both ends of the connecting rod respectively with roller branch Frame connects with platform framework.
4. the aerial work platform as claimed in claim 3 that may span across landing beam, it is characterised in that the roller devices also wrap Anti-deviation device is included, the anti-deviation device includes positioned at two rollers of landing beam both sides and the roller for installing the roller Support, the roller support are fixedly connected with rolling wheel support.
5. the aerial work platform as claimed in claim 1 that may span across landing beam, it is characterised in that the platform framework side wall On be additionally provided with platform rail for protection.
6. the aerial work platform as claimed in claim 1 that may span across landing beam, it is characterised in that also described including being installed on Tool box on platform framework.
7. the aerial work platform as claimed in claim 1 that may span across landing beam, it is characterised in that also described including being installed on Vertical ladder on platform framework.
8. the aerial work platform as claimed in claim 1 that may span across landing beam, it is characterised in that the platform framework is side The cross platform framework that control is made, hanger is additionally provided with the platform framework.
9. the aerial work platform of landing beam is may span across as claimed in any of claims 1 to 8 in one of claims, it is characterised in that institute The link position for stating connecting rod and roller devices and platform framework can adjust.
CN201720853891.4U 2017-07-14 2017-07-14 It may span across the aerial work platform of landing beam Active CN207194419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720853891.4U CN207194419U (en) 2017-07-14 2017-07-14 It may span across the aerial work platform of landing beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720853891.4U CN207194419U (en) 2017-07-14 2017-07-14 It may span across the aerial work platform of landing beam

Publications (1)

Publication Number Publication Date
CN207194419U true CN207194419U (en) 2018-04-06

Family

ID=61785722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720853891.4U Active CN207194419U (en) 2017-07-14 2017-07-14 It may span across the aerial work platform of landing beam

Country Status (1)

Country Link
CN (1) CN207194419U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468433A (en) * 2018-04-12 2018-08-31 陈年康 A kind of construction tool of workshop metal Roof inner panel
CN111395731A (en) * 2020-04-25 2020-07-10 五冶集团上海有限公司 Hanging cage and method for implementing overhead steel beam connection operation by using hanging cage
CN114046031A (en) * 2021-11-17 2022-02-15 北京市第三建筑工程有限公司 Movable construction operation platform erected on steel beam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468433A (en) * 2018-04-12 2018-08-31 陈年康 A kind of construction tool of workshop metal Roof inner panel
CN111395731A (en) * 2020-04-25 2020-07-10 五冶集团上海有限公司 Hanging cage and method for implementing overhead steel beam connection operation by using hanging cage
CN114046031A (en) * 2021-11-17 2022-02-15 北京市第三建筑工程有限公司 Movable construction operation platform erected on steel beam
CN114046031B (en) * 2021-11-17 2023-03-10 北京市第三建筑工程有限公司 Movable construction operation platform erected on steel beam

Similar Documents

Publication Publication Date Title
CN106348188B (en) The manufacture method of planer-type building-construction lifting device
CN207194419U (en) It may span across the aerial work platform of landing beam
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN104594642A (en) Large-span net rack aloft pairing, installing and overall horizontal moving method
CN201417657Y (en) Installation device of indoor transformer
CN107268969A (en) A kind of scaffold structure for work high above the ground
CN103912128B (en) The construction method of high-altitude disjunctor steel truss
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN105442853B (en) A kind of long-span deformed Elements of Space Grid Truss and landing Steel Structure Installation construction method
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN103510718B (en) Automatic lifting Emergency Ladder is used in super high rise structure construction
CN205259559U (en) Four -wheel removes scaffold combination operation platform
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN106522541A (en) Steel platform formwork lifting point bearing beams and lifting method for formwork system
US12012311B2 (en) Construction system
CN207063484U (en) Movable operation platform for corridor construction
CN203129581U (en) Slip form system
CN104912339B (en) Long-distance multi-span welding H-section steel roof beam installation method
CN205293909U (en) Mobilizable assembled transport auxiliary device
CN204823738U (en) Two roof beam electric hoist formula hoist girder orthotic devices
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant