CN206753085U - A kind of sliding platform for being used to install high-altitude wire frame steel construction - Google Patents

A kind of sliding platform for being used to install high-altitude wire frame steel construction Download PDF

Info

Publication number
CN206753085U
CN206753085U CN201720416244.7U CN201720416244U CN206753085U CN 206753085 U CN206753085 U CN 206753085U CN 201720416244 U CN201720416244 U CN 201720416244U CN 206753085 U CN206753085 U CN 206753085U
Authority
CN
China
Prior art keywords
truss
wire frame
altitude wire
steel construction
sliding platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720416244.7U
Other languages
Chinese (zh)
Inventor
陆汉时
茅春风
王燕
鲁加龙
王康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING NINTH BUILDING INSTALLATION ENGINEERING Co Ltd
Jiangsu Nantong No 2 Construction Group Co Ltd
Original Assignee
NANJING NINTH BUILDING INSTALLATION ENGINEERING Co Ltd
Jiangsu Nantong No 2 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING NINTH BUILDING INSTALLATION ENGINEERING Co Ltd, Jiangsu Nantong No 2 Construction Group Co Ltd filed Critical NANJING NINTH BUILDING INSTALLATION ENGINEERING Co Ltd
Priority to CN201720416244.7U priority Critical patent/CN206753085U/en
Application granted granted Critical
Publication of CN206753085U publication Critical patent/CN206753085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

A kind of sliding platform for being used to install high-altitude wire frame steel construction is the utility model is related to, there are some truss parallel to each other, truss has upper and lower two square steel tubes parallel to each other, and truss is provided with pulley mechanism below both ends;The ball node that the spacing of adjacent truss is equal to high-altitude wire frame steel construction is longitudinally spaced;Reinforced between the truss and adjacent truss of front and rear sides by the scissors support structure at end and middle part;Truss is fixed as one by being arranged at the horizontal transmission rod and horizontal brace rod at both ends, and the lower square steel tube of horizontal transmission rod and truss is fixed, and the upper square steel tube of horizontal brace rod and truss is fixed.Carry out that high-altitude wire frame Steel Structure Installation is installed using this sliding platform, can efficiently solve that rack span is big, live Large-scale Hoisting equipment is difficult to the difficulty into installation;The timbering cost of slipping and assembling platform saves more than 40% than all round victory scaffold Assembly in pieces at height;And occupancy building periphery place is few, side construction passage place is only needed.

Description

A kind of sliding platform for being used to install high-altitude wire frame steel construction
Technical field
A kind of sliding platform for being used to install high-altitude wire frame steel construction is the utility model is related to, belongs to high-altitude steel structure installation Technical field.
Background technology
The thousands of all types of steel grid structure of 20th century, world many countries and regional Construction, is people The production and living of class provide Space, Place more easily, more healthy, such as sport field, hangar, all kinds of plays Theater, various conference and exhibition centers etc..Grid structure is a kind of one of form of large-span space structure, has good stress Can, larger rigidity and preferable globality, in a sense better than planar structure, various load actions can be effectively born, Structure fabrication installation is also relatively convenient.China creates many simple and effective installation methods in rack installation.
Domestic ripe fairly simple rack mounting process has following several:
1st, all round victory scaffold roofing group is to technique:This technique is to make room up to eaves under roofing from ground scaffolding Face forms a large platform, and roof grid structure is just assembled on platform.
The advantages of this technique:Safety, large-scale hoisting machinery uses less, group is fast to speed, quality is guaranteed.Shortcoming is pin hand Frame sets up that workload is big, and scaffold dosage is big, is not suitable for top-bottom cross construction.
2nd, distribution on ground group pair, aerial butt-joint process:This technique be on ground by rack group in sectional rack, By two lift it is aerial carry out piecemeal group pair, rack is from one toward other end iterative method.
This technique is a little:The use of scaffold is saved, construction site is few in occupancy shop, without large-tonnage lifting appliance. Can effectively solve the contradiction of roofing construction scaffold and ground grandstand civil engineering.Shortcoming is:Two step crane times length is taken, it is high Idle job is more, aerial group big to difficulty, dangerous big.
3rd, ground junior unit group pair, aerial group to technique:The method is exactly that the bar of one ball three is hung aerial in ground group Assembled, it is necessary to which prop coordinates installation.
This technological advantage:Speed is fast, without large tonnage crane coordinate, occupied ground is few, can effectively solve roofing operation with See civil engineering while the contradiction of construction.Shortcoming is:Work high above the ground, it is dangerous high.
The content of the invention
The purpose of this utility model is:The defects of overcoming above-mentioned prior art, propose a kind of for installing high-altitude wire frame The sliding platform of steel construction, the installation of high-altitude wire frame steel construction is carried out by the platform, reduce the danger of work high above the ground.
In order to achieve the above object, the utility model proposes be used for the sliding platform of high-altitude wire frame steel construction is installed, its It is characterised by:With some truss parallel to each other, the truss has upper and lower two square steel tubes parallel to each other, two square steel tubes Between be welded with vertical rod and brace, truss is provided with pulley mechanism below both ends;The spacing of adjacent truss is equal to high-altitude wire frame The ball node of steel construction is longitudinally spaced;Pass through the scissors support structure of end and middle part between the truss and adjacent truss of front and rear sides Reinforced;Truss is fixed as one by being arranged at the horizontal transmission rod and horizontal brace rod at both ends, the horizontal transmission rod Fixed with the lower square steel tube of truss, the upper square steel tube of horizontal brace rod and truss is fixed.
The utility model is used for the sliding platform for installing high-altitude wire frame steel construction, and further improve is:
1st, sliding platform also has the purlin bicycle beam being arranged on the inside of structural frames trestle, and sliding rail is provided with the bicycle beam of purlin, The pulley mechanism is engaged with sliding rail.
2nd, the pulley mechanism has the downward opening semi-shaped turning rolls being fixed on below truss end, the rolling Wheel carrier lateral opening, fall inserted with roller shaft, roller shaft on sliding rail in hole, the turning rolls both sides are provided with two and exchanged Bolt is saved, for propping up sliding rail from both sides respectively, realizes the regulation of angle and truss between truss and sliding rail Positioning on sliding rail.
3rd, the top of truss is disposed with support frame mounting seat corresponding with high-altitude wire frame ball node along truss longitudinal direction.
4th, it is equipped with pedal above the truss.
The utility model is used for the sliding platform for installing high-altitude wire frame steel construction, and clever structure, mechanical property meets actual Need, reduce the danger of work high above the ground.Carry out that high-altitude wire frame Steel Structure Installation is installed using this sliding platform, can be effectively Solution rack span is big, and live Large-scale Hoisting equipment is difficult to the difficulty into installation;In roof grid structure construction period, bottom civil engineering Operation can be carried out staggeredly;The timbering cost of slipping and assembling platform saves more than 40% than all round victory scaffold Assembly in pieces at height;And It is few to take building periphery place, only needs side construction passage place.
Brief description of the drawings
The utility model is further described below in conjunction with the accompanying drawings.
Fig. 1 is sliding platform structural representation.
Fig. 2 is the side view of sliding platform.
Fig. 3 is sliding rail and pulley mechanism schematic diagram.
In figure under label schematic diagram:
The upper ball nodes of 1-;1 '-lower ball node;4- pulley mechanisms;41- turning rolls;42- roller shafts;43- regulation positioning spiral shells Bolt;5- sliding rails;51- sliding rail fixtures;6- truss;7- purlins bicycle beam;8- structural frames trestles;The horizontal transmission rods of 61-; 62- scissors support structures;63- horizontal brace rods;The upper square steel tubes of 64-;Square steel tube under 65-;66- vertical rods;67- braces.
Embodiment
The utility model is described further with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, high-altitude wire frame steel construction is connected to one by upper ball node 1, the ' of lower ball node 1 and by ball node The connecting rod risen is formed.The present embodiment is used for the sliding platform for installing high-altitude wire frame steel construction, and composition includes:It is arranged at structural frames The purlin bicycle beam 7 of the inner side of trestle 8, the sliding rail 8 being arranged in purlin bicycle beam 7 and by some parallel to each other by horizontal power transmission Bar links together truss 6.Truss 6 has upper and lower two square steel tubes parallel to each other(Upper square steel tube 64 and lower square steel tube 65), Vertical rod 66 and brace 67 are welded between two square steel tubes, truss 6 is provided with the pulley being engaged with sliding rail below both ends Mechanism 4.The ball node that the spacing of adjacent truss is equal to high-altitude wire frame steel construction is longitudinally spaced;The top of truss is along truss longitudinal direction side To being disposed with support frame mounting seat corresponding with high-altitude wire frame ball node(It is to mark in figure), for the support for installing ball node Device provides anchor point.By this sliding platform, after a section high-altitude wire frame installation of having constructed, next station is slid onto again Carry out the installation of next section high-altitude wire frame.As shown in Fig. 2 between the truss and adjacent truss of front and rear sides by end and in The scissors support structure 62 in portion is reinforced;Truss 6 is fixed by the horizontal transmission rod 61 and horizontal brace rod 63 for being arranged at both ends It is integrated, the lower square steel tube of horizontal transmission rod 62 and truss 6 is fixed, and the upper square steel tube of horizontal brace rod 63 and truss 6 is fixed.One More truss structures 6 are connected as an entirety by aspect, horizontal transmission rod 61 and horizontal brace rod 63, on the other hand horizontal transmission rod 61 For the mobile transmission tractive force of sliding platform(Using puller system --- such as chain block is drawn).In order to improve peace Quan Xing, pedal is equipped with above truss, is trampled for workmen.
As shown in figure 3, pulley mechanism has the downward opening semi-shaped turning rolls 41 being fixed on below truss end, The lateral opening of turning rolls 41, fall inserted with roller shaft 42, roller shaft 42 on sliding rail 5 in hole, the both sides of turning rolls 41 are set There are two pairs of regulation bolts 43, for propping up sliding rail 5 from both sides respectively, realize angle between truss and sliding rail Regulation and positioning of the truss on sliding rail.
In addition to the implementation, the utility model can also have other embodiment.It is all to use equivalent substitution or equivalent change The technical scheme to be formed is changed, all falls within the protection domain of the requires of the utility model.

Claims (5)

  1. A kind of 1. sliding platform for being used to install high-altitude wire frame steel construction, it is characterised in that:With some truss parallel to each other, The truss has upper and lower two square steel tubes parallel to each other, and vertical rod and brace are welded between two square steel tubes, truss both ends Lower section is provided with pulley mechanism;The ball node that the spacing of adjacent truss is equal to high-altitude wire frame steel construction is longitudinally spaced;Front and rear sides Truss and adjacent truss between reinforced by the scissors support structure at end and middle part;Truss is by being arranged at the water at both ends Flat transmission rod and horizontal brace rod are fixed as one, and the lower square steel tube of the horizontal transmission rod and truss is fixed, horizontal brace rod Fixed with the upper square steel tube of truss.
  2. 2. the sliding platform according to claim 1 for being used to install high-altitude wire frame steel construction, it is characterised in that:Also have and set The purlin bicycle beam being placed on the inside of structural frames trestle, sliding rail is provided with the bicycle beam of purlin, and the pulley mechanism matches with sliding rail Close.
  3. 3. the sliding platform according to claim 2 for being used to install high-altitude wire frame steel construction, it is characterised in that:The pulley Mechanism, which has, is fixed on downward opening semi-shaped turning rolls below truss end, the turning rolls lateral opening, in hole Inserted with roller shaft, roller shaft falls on sliding rail, and the turning rolls both sides are provided with two pairs of regulation bolts, for dividing Sliding rail is not propped up from both sides, realizes that the regulation of angle and truss are determined on sliding rail between truss and sliding rail Position.
  4. 4. the sliding platform according to claim 1 for being used to install high-altitude wire frame steel construction, it is characterised in that:Truss it is upper Side is disposed with support frame mounting seat corresponding with high-altitude wire frame ball node along truss longitudinal direction.
  5. 5. the sliding platform according to claim 1 for being used to install high-altitude wire frame steel construction, it is characterised in that:The truss Top is equipped with pedal.
CN201720416244.7U 2017-04-20 2017-04-20 A kind of sliding platform for being used to install high-altitude wire frame steel construction Active CN206753085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720416244.7U CN206753085U (en) 2017-04-20 2017-04-20 A kind of sliding platform for being used to install high-altitude wire frame steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720416244.7U CN206753085U (en) 2017-04-20 2017-04-20 A kind of sliding platform for being used to install high-altitude wire frame steel construction

Publications (1)

Publication Number Publication Date
CN206753085U true CN206753085U (en) 2017-12-15

Family

ID=60614341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720416244.7U Active CN206753085U (en) 2017-04-20 2017-04-20 A kind of sliding platform for being used to install high-altitude wire frame steel construction

Country Status (1)

Country Link
CN (1) CN206753085U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306676A (en) * 2019-07-04 2019-10-08 广西天正钢结构有限公司 A kind of steel truss arch stand and its construction method
CN113882643A (en) * 2021-09-28 2022-01-04 中建八局第一建设有限公司 Mounting device for welded ball steel net rack
CN116378432A (en) * 2023-05-23 2023-07-04 北京城建集团有限责任公司 High-level sliding construction and track setting method for flat net rack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306676A (en) * 2019-07-04 2019-10-08 广西天正钢结构有限公司 A kind of steel truss arch stand and its construction method
CN113882643A (en) * 2021-09-28 2022-01-04 中建八局第一建设有限公司 Mounting device for welded ball steel net rack
CN116378432A (en) * 2023-05-23 2023-07-04 北京城建集团有限责任公司 High-level sliding construction and track setting method for flat net rack

Similar Documents

Publication Publication Date Title
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN101775907A (en) Space truss structure aerial pairing integral slide installation method
CN107060098A (en) A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform
CN103526949A (en) Lifting and slipping device for wall-attached vertical structure and construction method thereof
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN206513004U (en) A kind of movable hanger for being easy to roof inner slab to install
CN107090968B (en) Lifting method of integrated attached lifting scaffold
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN201297036Y (en) Discharging platform
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN206707237U (en) Cable-stayed type top layer construction platform for elevator installation
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN207194419U (en) It may span across the aerial work platform of landing beam
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN104790644A (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN204754150U (en) Dish -type node formula scaffold
CN107217912A (en) It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction
CN218912194U (en) Portable safe operation platform for elevator shaft of high-rise building
CN207377096U (en) Overlength large girder scaffold building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant