CN104847108A - Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure - Google Patents

Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure Download PDF

Info

Publication number
CN104847108A
CN104847108A CN201510098823.7A CN201510098823A CN104847108A CN 104847108 A CN104847108 A CN 104847108A CN 201510098823 A CN201510098823 A CN 201510098823A CN 104847108 A CN104847108 A CN 104847108A
Authority
CN
China
Prior art keywords
hydraulic climbing
construction
construction space
semi
girder truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510098823.7A
Other languages
Chinese (zh)
Inventor
郗锦乐
杨学兵
张洪建
李磊
曹海良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201510098823.7A priority Critical patent/CN104847108A/en
Publication of CN104847108A publication Critical patent/CN104847108A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a hydraulic climbing formwork structure and a construction method of the hydraulic climbing formwork structure. A main body structure at least comprises first construction spaces and second construction spaces, wherein a hydraulic climbing device is arranged in each first construction space. A construction method of the second spaces comprises the following steps that: hydraulic climbing frames are arranged on the hydraulic climbing devices arranged in the first construction spaces; outrigger trusses crossing over the second construction spaces are built on the tops of the hydraulic climbing frames; and construction equipment used for constructing the second construction spaces is hung on the outrigger trusses. The outrigger trusses are erected through the hydraulic climbing devices arranged in the first construction spaces in the main body structure; the construction equipment such as structure formwork and operation platforms for constructing the second construction spaces are hung on the outrigger trusses; the hydraulic climbing devices arranged in the first construction spaces are used for synchronously lifting the construction equipment in the second construction spaces; the implementation of hydraulic climbing formwork construction in the second construction spaces in which the hydraulic climbing devices cannot be installed can be achieved; and the synchronous climbing of inner and outer structure formwork of the second construction spaces is achieved.

Description

Hydraulic climbing formwork structure and construction method thereof
Technical field
The present invention relates to the field of engineering construction, particularly relate to a kind of hydraulic climbing formwork structure and construction method thereof.
Background technology
Conventional hydraulic climbing formwork for construction method is: install hydraulic climbing device in construction space to be onstructed inside, hydraulic climbing device is installed the construction equipment for this construction space of constructing, as operating platform and stay in place formwork etc., utilize the wall body structure etc. of successively constructing in this construction space that climbs of hydraulic climbing device.
But, in SRC frame-RC core wall structure construction, because Core Walls Structure inside exists area less vertical tube well, elevator shaft etc., hydraulic climbing device cannot be arranged in inside, thus, cannot hydraulic climbing mould construction be implemented, synchronously climbing of inner and outer template cannot be realized.
Summary of the invention
Technical problem to be solved by this invention be to provide a kind of can realize hydraulic climbing mould construction in the construction area not having hydraulic climbing device hydraulic climbing formwork structure and construction method.
For realizing above-mentioned technique effect, the invention discloses a kind of hydraulic climbing mould construction method, at least comprise the first construction space and the second construction space in agent structure, be provided with hydraulic climbing device in described first construction space, described second construction space of constructing comprises step:
Described hydraulic climbing device in described first construction space installs hydraulic climbing scaffold;
The semi-girder truss be across above described second construction space is set up in the top of described hydraulic climbing scaffold;
The construction equipment for described second construction space of constructing is hung on described semi-girder truss;
Utilize described second construction space of described construction equipment construction.
Described hydraulic climbing mould construction method is further improved and is, described agent structure comprises one second construction space and is positioned at two the first construction spaces of described second construction space both sides, and described second construction space of constructing comprises step:
Side in described two the first construction spaces installs hydraulic climbing device respectively,
On described hydraulic climbing device, hydraulic climbing scaffold is installed;
The described semi-girder truss be across above described first construction space and described second construction space is set up in the top of described hydraulic climbing scaffold;
The operating platform for described second construction space of constructing and stay in place formwork is hung on described semi-girder truss;
Utilize described operating platform and described second construction space of stay in place formwork construction.
Described hydraulic climbing mould construction method is further improved and is, described agent structure comprises one first construction space and is positioned at two the second construction spaces of described first construction space both sides, and described second construction space of constructing comprises step:
Both sides in described first construction space install hydraulic climbing device respectively;
On described hydraulic climbing device, hydraulic climbing scaffold is installed;
The described semi-girder truss be across above described first construction space and described second construction space is set up in the top of described hydraulic climbing scaffold;
The operating platform for described second construction space of constructing and stay in place formwork is hung on described semi-girder truss;
Utilize described operating platform and described second construction space of stay in place formwork construction.
Described hydraulic climbing mould construction method is further improved and is, it is characterized in that, hangs and comprise for the construct described operating platform of the second construction space and the step of stay in place formwork on described semi-girder truss:
In the bottom of described semi-girder truss, described operating platform is installed;
In the bottom installation activity hanging head of described semi-girder truss, and hoist cable is utilized to be hung on described movable hanging head by described stay in place formwork.
Described hydraulic climbing mould construction method is further improved and is, on described movable hanging head, install roll wheel assembly, on the i beam that described roll wheel assembly is rolled bottom described semi-girder truss.
The invention also discloses a kind of hydraulic climbing formwork structure, the first construction space and the second construction space is at least comprised in agent structure, hydraulic climbing device is provided with in described first construction space, described hydraulic climbing device is provided with hydraulic climbing scaffold, the top of described hydraulic climbing scaffold is erected with the semi-girder truss be across above described second construction space, described semi-girder truss is linked with the construction equipment for described second construction space of constructing.
Described hydraulic climbing formwork structure is further improved and is, described agent structure comprises one second construction space and is positioned at two the first construction spaces of described second construction space both sides, side in described two the first construction spaces is separately installed with described hydraulic climbing device, described hydraulic climbing device is provided with described hydraulic climbing scaffold, described semi-girder truss is erected on the top of described hydraulic climbing scaffold, and described semi-girder truss is across the top of described first construction space and described second construction space.
Described hydraulic climbing formwork structure is further improved and is, described agent structure comprises one first construction space and is positioned at two the second construction spaces of described first construction space both sides, both sides in described first construction space are separately installed with hydraulic climbing device, described hydraulic climbing device is provided with described hydraulic climbing scaffold, described semi-girder truss is erected on the top of described hydraulic climbing scaffold, and described semi-girder truss is across the top of described first construction space and described second construction space.
Described hydraulic climbing formwork structure is further improved and is, described hydraulic climbing device comprises hydraulic jack and the attached wall be located on described hydraulic jack climbs rail, and described hydraulic climbing scaffold is located at described attached wall and is climbed on rail.
Described hydraulic climbing formwork structure is further improved and is, the bottom of described semi-girder truss is provided with i beam, described i beam is set up in the top of described hydraulic climbing scaffold, described movable hanging head comprises hanging head body and is located at the roll wheel assembly on described hanging head body, and described roll wheel assembly rolls on the upper surface of the lower wing plate of described i beam.
Described hydraulic climbing formwork structure is further improved and is, described hanging head body is also provided with depression bar, and the position below the lower wing plate of the described i beam of corresponding described roll wheel assembly is located at by described depression bar.
The present invention, owing to have employed above technical scheme, makes it have following beneficial effect:
Semi-girder truss is set up by the hydraulic climbing device installed in the first construction space in agent structure, make semi-girder truss across the second construction space be covered in agent structure, and the construction equipment such as operating platform and stay in place formwork hung on semi-girder truss for the second construction space of constructing, thus utilize and be arranged on hydraulic climbing device in the first construction space and carry out the construction equipment of Synchronous lifting second construction space, realize implementing hydraulic climbing mould construction in the second construction space cannot installing hydraulic climbing device, realize synchronously climbing of the external and internal compositions template of the second construction space,
Cannot install hydraulic climbing device the second construction space both sides the first construction space in hydraulic climbing device is installed, and utilize the hydraulic climbing device be installed in the first construction space to set up semi-girder truss, make semi-girder truss across and be covered in the top of the second construction space, form " seat in the plane, both sides lifting zone line " outer climb in put forward hydraulic climbing system;
Both sides in the first construction space between the second construction space that two cannot be installed hydraulic climbing device install hydraulic climbing device respectively, and utilize the hydraulic climbing device being installed on both sides in the first construction space to set up semi-girder truss, make semi-girder truss across and be covered in the top of the second construction space, form " middle seat in the plane is chosen and risen two side areas " outer climb in put forward hydraulic climbing system;
By installation activity hanging head on semi-girder truss, movable hanging head installs roll wheel assembly, roll wheel assembly is made to roll on the bottom i beam of semi-girder truss, utilize hoist cable to be hung by stay in place formwork to be located on movable hanging head, thus the matched moulds of the roll wheel assembly adjustment structure template of movable hanging head can be utilized and move back mould.
Accompanying drawing explanation
Fig. 1 is the plane distribution schematic diagram of the agent structure of hydraulic climbing mould construction method of the present invention.
Fig. 2 is the plane enlarged diagram of region a in Fig. 1.
Fig. 3 is the plane enlarged diagram of region b in Fig. 1.
Fig. 4 ~ Fig. 6 is the working drawing of the region a of hydraulic climbing mould construction method of the present invention.
Fig. 7 is the mounting structure schematic diagram of movable hanging head of the present invention.
The working drawing of the region b of Fig. 8 ~ Figure 10 hydraulic climbing mould construction method of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and the specific embodiments, the present invention is further detailed explanation.
First consult shown in Fig. 1 ~ Fig. 3, hydraulic climbing formwork structure of the present invention and construction method thereof be mainly used at least comprise the first construction space 201 and the second construction space 202 agent structure 21 in.
Fig. 1 is the plan view of agent structure 21 of the present invention, in this agent structure 21, there is more construction space, at least include the first construction space 201 and the second construction space 202, Fig. 2 and Fig. 3 is the node amplification view of region a in this agent structure 21 and region b part respectively, as shown in Figures 2 and 3, be provided with hydraulic climbing device 11 in first construction space 201, and due to causes such as narrow spaces, hydraulic climbing device 11 cannot be installed in the second construction space 202.
Again shown in composition graphs 4 ~ Fig. 6, hydraulic climbing formwork structure of the present invention adopts and arrange hydraulic climbing device 11 in the first construction space 201, as shown in Figure 4, this hydraulic climbing device 11 mainly comprises hydraulic jack 111 and the attached wall be located on hydraulic jack 111 climbs rail 112, climb on rail 112 at attached wall and set up hydraulic climbing scaffold 113, set up semi-girder truss 12 at the top of hydraulic climbing scaffold 113, and make this semi-girder truss 12 across and be covered in the top of the second construction space 202 cannot installing hydraulic climbing device 11, as shown in Figure 5, then by the construction equipment of second construction space 202 that is used for constructing, as operating platform 14 and stay in place formwork 13 etc., hang on semi-girder truss 12, the hydraulic climbing device 11 of the first construction space 201 just can be utilized to carry out the structure that Synchronous lifting is constructed in the second construction space 202, as shown in Figure 6, easy construction and safe and reliable, greatly save the usage quantity of hydraulic climbing device 11, reduce construction cost, improve efficiency of construction, especially, also efficiently solve the problem cannot implementing hydraulic climbing mould construction due to hydraulic climbing device cannot be arranged in the second construction space 202, realize synchronously climbing of the external and internal compositions template of the second construction space.
Construction equipment for the second construction space 202 of constructing comprises operating platform 14 and stay in place formwork 13 etc., operating platform 14 is directly fixed on the i beam 121 bottom semi-girder truss 12, to construct the structure in the second construction space 202 for worker stands Rob Roy, coordinate again shown in Fig. 7, i beam 121 bottom semi-girder truss 12 is set up in the top of hydraulic climbing scaffold 113, installation activity hanging head 15 on i beam 121, movable hanging head 15 is provided with roll wheel assembly, this movable hanging head 15 can be moved along i beam 121 by this roll wheel assembly, movable hanging head 15 is arranged for hanging the hoist cable 16 establishing stay in place formwork 13, thus utilization activity hanging head 15 and hoist cable 16 realize hanging the stay in place formwork 13 for the second construction space 202 of constructing on semi-girder truss 12, workman can install the operations such as installation by what stand on that operating platform 14 carries out stay in place formwork 13.
As shown in Figure 7, movable hanging head 15 comprises hanging head body 151, and is located at roll wheel assembly, depression bar 153 and the peg 154 on hanging head body 151.Roll wheel assembly is located at the top of hanging head body 151, the roller 152 rolled respectively on the lower wing plate 1211 both sides upper surface of i beam 121 by two forms, utilize roller 152 to roll on the upper surface of lower wing plate 1211 both sides of i beam 121, movable hanging head 15 can be moved along i beam 121.Realize regulating the matched moulds of the stay in place formwork 13 be hung on movable hanging head 15 and moving back mould, easy construction, solve the difficult problem that in small space, hydraulic climbing device cannot be installed, realize inner and outer template Synchronous lifting, improve construction speed.
Further, weld baffle plate respectively at lower wing plate 1211 two ends of i beam 121, to limit the rolling scope of roll wheel assembly, prevent roll wheel assembly from falling from i beam 121 in moving process.
The position below the lower wing plate 1211 of the i beam 121 of corresponding roll wheel assembly is located at by depression bar 153, the lower wing plate 1211 of i beam 121 is used for be limited between depression bar 153 and roll wheel assembly, prevent in roll wheel assembly rolling process and beat between i beam 121 lower wing plate 1211 and fall, depression bar 153 can also be arranged to rolling bearing, ensure to can be movable relatively between depression bar 153 and lower wing plate 1211, avoid depression bar 153 to hinder the movement of arriving movable hanging head 15.
Peg 154 is located at the bottom of hanging head body 151, peg 154 is provided with suspension centre 155, suspension centre 155 is provided with for hanging the hoist cable 16 establishing template, one end of hoist cable 16 is located on suspension centre 155, the other end of hoist cable 16 connects template 13 and operating platform 14, by hoist cable 16, stay in place formwork 13 and operating platform 14 are hung on movable hanging head 15, afterwards by movable hanging head 15 and the connection of semi-girder truss 12, template 13 and operating platform 14 are hung on semi-girder truss 12.
According to the requirement of actual working condition of site operation, The present invention gives hydraulic climbing formwork structure and the construction method thereof of two kinds of forms, adopt in a of region form outer of " seat in the plane, both sides lifting zone line " climb in put forward hydraulic climbing system; And adopt in the b of region form outer of " middle seat in the plane is chosen and risen two side areas " climb in put forward hydraulic climbing system, specific as follows:
" seat in the plane, the both sides lifting zone line " of embodiment 1 region a:
Coordinate shown in Fig. 2 and Fig. 4 ~ 6, the four walls body of existing side by side adjacent in construction agent structure 21, this four stifled existing side by side between adjacent body of wall forms three construction spaces, the hydraulic jack 111 and the attached wall that the body of wall 101 of having constructed of the side in two construction spaces of both sides are arranged hydraulic climbing device 11 climb rail 112, as the first construction area 201 being provided with hydraulic climbing device 11; And will the construction space being positioned at centre of hydraulic climbing device 11 be installed as the second construction space 202, above-mentioned hydraulic climbing device 11 be installed in four walls body be positioned at outermost two wall bodies corresponding inside wall on, the second construction space 202 of constructing comprises step:
As shown in Figure 5, climb on rail 112 in the attached wall of hydraulic climbing device 11 hydraulic climbing scaffold 113 is installed;
The semi-girder truss 12 be across above the first construction space 201 and the second construction space 202 is set up in the top of hydraulic climbing scaffold 113;
The operating platform 14 for the second construction space 202 of constructing and stay in place formwork 13 is hung on semi-girder truss 12;
To be onstructed complete the second construction space 202 be positioned at the bar construction of the body of wall to be onstructed 102 above body of wall 101 of constructing after, carry out the formwork erection that operating platform 14 and stay in place formwork 13 carry out body of wall 102 to be onstructed to install, to construct body of wall 102 to be onstructed, as shown in Figure 6;
After body of wall 102 has been constructed, operating platform 14 and stay in place formwork 13 is utilized to construct the second construction space 202, and the wall body structure of the second construction space 202 of successively constructing with the lifting of the hydraulic climbing device 11 in the first construction space 201 of both sides, utilize the hydraulic climbing device 11 installed in the first construction space 201 to realize implementing hydraulic climbing mould construction in the second construction space 202 cannot installing hydraulic climbing device 11, realize synchronously climbing and installing of the external and internal compositions template 13 of the second construction space 202;
Complete the form of " seat in the plane, both sides lifting zone line " outer climb in propose the construction of hydraulic climbing system.
" middle seat in the plane is chosen and is risen two side areas " of embodiment 2 region b:
Coordinate shown in Fig. 3 and Fig. 8 ~ 10, the four walls body of existing side by side adjacent in construction agent structure 21, this four stifled existing side by side between adjacent body of wall forms three construction spaces, hydraulic jack 111 and attached wall that the body of wall 101 of having constructed of both sides being positioned at middle construction space arranges hydraulic climbing device 11 climb rail 112, as the first construction area 201 being provided with hydraulic climbing device 11; And will the construction space being positioned at both sides of hydraulic climbing device 11 be installed as the second construction space 202, above-mentioned hydraulic climbing device 11 is installed in four walls body on the corresponding inside wall of the two wall bodies being positioned at centre, and the second construction space 202 of constructing comprises step:
As shown in Figure 9, climb on rail 112 in the attached wall of hydraulic climbing device 11 hydraulic climbing scaffold 113 is installed;
The semi-girder truss 12 be across above the first construction space 201 and the second construction space 202 is set up in the top of hydraulic climbing scaffold 113;
The operating platform 14 for the second construction space 202 of constructing and stay in place formwork 13 is hung on semi-girder truss 12;
To be onstructed complete the second construction space 202 be positioned at the bar construction of the body of wall to be onstructed 102 above body of wall 101 of constructing after, carry out the formwork erection that operating platform 14 and stay in place formwork 13 carry out body of wall 102 to be onstructed to install, to construct body of wall 102 to be onstructed, as shown in Figure 6;
After body of wall 102 has been constructed, operating platform 14 and stay in place formwork 13 is utilized to construct the second construction space 202, and the wall body structure of the second construction space 202 of successively constructing with the lifting of the hydraulic climbing device 11 in the first construction space 201 of both sides, utilize the hydraulic climbing device 11 installed in the first construction space 201 to realize implementing hydraulic climbing mould construction in the second construction space 202 cannot installing hydraulic climbing device 11, realize synchronously climbing and installing of the external and internal compositions template 13 of the second construction space 202;
Complete the form of " middle seat in the plane is chosen and risen two side areas " outer climb in propose the construction of hydraulic climbing system.
Hydraulic climbing formwork structure of the present invention and construction method set up semi-girder truss 12 by the hydraulic climbing device 11 installed in the first construction space 201 in agent structure 21, make semi-girder truss 12 across the second construction space 202 be covered in agent structure 21, and the construction equipment such as operating platform 14 and stay in place formwork 13 hung on semi-girder truss 12 for the second construction space 202 of constructing, thus utilize and be arranged on hydraulic climbing device 11 in the first construction space 201 and carry out the construction equipment of Synchronous lifting second construction space 202, realize implementing hydraulic climbing mould construction in the second construction space 202 cannot installing hydraulic climbing device 11, realize synchronously climbing of the external and internal compositions template of the second construction space,
Cannot install hydraulic climbing device 11 the second construction space 202 both sides the first construction space 201 in hydraulic climbing device is installed, and utilize the hydraulic climbing device 11 be installed in the first construction space 201 to set up semi-girder truss 12, make semi-girder truss 12 across and be covered in the top of the second construction space 202, form " seat in the plane, both sides lifting zone line " outer climb in put forward hydraulic climbing system;
Both sides in the first construction space 201 between the second construction space 202 that two cannot be installed hydraulic climbing device 11 install hydraulic climbing device 11 respectively, and utilize the hydraulic climbing device 11 being installed on both sides in the first construction space 201 to set up semi-girder truss 12, make semi-girder truss 12 across and be covered in the top of the second construction space 202, form " middle seat in the plane is chosen and risen two side areas " outer climb in put forward hydraulic climbing system;
By installation activity hanging head 15 on semi-girder truss 11, movable hanging head 15 installs roll wheel assembly, roll wheel assembly is made to roll on the bottom i beam 121 of semi-girder truss 12, utilize hoist cable to be hung by stay in place formwork 13 to be located on movable hanging head, thus the matched moulds of the roll wheel assembly adjustment structure template 13 of movable hanging head 15 can be utilized and move back mould.
Below by reference to the accompanying drawings and embodiment to invention has been detailed description, those skilled in the art can make many variations example to the present invention according to the above description.Thus, some details in embodiment should not form limitation of the invention, the present invention by the scope that defines using appended claims as protection scope of the present invention.

Claims (11)

1. a hydraulic climbing mould construction method, is characterized in that, at least comprises the first construction space and the second construction space in agent structure, is provided with hydraulic climbing device in described first construction space, and described second construction space of constructing comprises step:
Described hydraulic climbing device in described first construction space installs hydraulic climbing scaffold;
The semi-girder truss be across above described second construction space is set up in the top of described hydraulic climbing scaffold;
The construction equipment for described second construction space of constructing is hung on described semi-girder truss;
Utilize described second construction space of described construction equipment construction.
2. hydraulic climbing mould construction method as claimed in claim 1, is characterized in that, described agent structure comprises one second construction space and is positioned at two the first construction spaces of described second construction space both sides, and described second construction space of constructing comprises step:
Side in described two the first construction spaces installs hydraulic climbing device respectively,
On described hydraulic climbing device, hydraulic climbing scaffold is installed;
The described semi-girder truss be across above described first construction space and described second construction space is set up in the top of described hydraulic climbing scaffold;
The operating platform for described second construction space of constructing and stay in place formwork is hung on described semi-girder truss;
Utilize described operating platform and described second construction space of stay in place formwork construction.
3. hydraulic climbing mould construction method as claimed in claim 1, is characterized in that, described agent structure comprises one first construction space and is positioned at two the second construction spaces of described first construction space both sides, and described second construction space of constructing comprises step:
Both sides in described first construction space install hydraulic climbing device respectively;
On described hydraulic climbing device, hydraulic climbing scaffold is installed;
The described semi-girder truss be across above described first construction space and described second construction space is set up in the top of described hydraulic climbing scaffold;
The operating platform for described second construction space of constructing and stay in place formwork is hung on described semi-girder truss;
Utilize described operating platform and described second construction space of stay in place formwork construction.
4. the hydraulic climbing mould construction method according to any one of Claims 2 or 3, is characterized in that, hangs and comprise for the construct described operating platform of the second construction space and the step of stay in place formwork on described semi-girder truss:
In the bottom of described semi-girder truss, described operating platform is installed;
In the bottom installation activity hanging head of described semi-girder truss, and hoist cable is utilized to be hung on described movable hanging head by described stay in place formwork.
5. hydraulic climbing mould construction method as claimed in claim 4, is characterized in that, on described movable hanging head, install roll wheel assembly, on the i beam that described roll wheel assembly is rolled bottom described semi-girder truss.
6. a hydraulic climbing formwork structure, it is characterized in that: in agent structure, at least comprise the first construction space and the second construction space, hydraulic climbing device is provided with in described first construction space, described hydraulic climbing device is provided with hydraulic climbing scaffold, the top of described hydraulic climbing scaffold is erected with the semi-girder truss be across above described second construction space, described semi-girder truss is linked with the construction equipment for described second construction space of constructing.
7. hydraulic climbing formwork structure as claimed in claim 6, it is characterized in that: described agent structure comprises one second construction space and is positioned at two the first construction spaces of described second construction space both sides, side in described two the first construction spaces is separately installed with described hydraulic climbing device, described hydraulic climbing device is provided with described hydraulic climbing scaffold, described semi-girder truss is erected on the top of described hydraulic climbing scaffold, and described semi-girder truss is across the top of described first construction space and described second construction space.
8. hydraulic climbing formwork structure as claimed in claim 6, it is characterized in that: described agent structure comprises one first construction space and is positioned at two the second construction spaces of described first construction space both sides, both sides in described first construction space are separately installed with hydraulic climbing device, described hydraulic climbing device is provided with described hydraulic climbing scaffold, described semi-girder truss is erected on the top of described hydraulic climbing scaffold, and described semi-girder truss is across the top of described first construction space and described second construction space.
9. the hydraulic climbing formwork structure according to any one of claim 7 or 8, is characterized in that: described hydraulic climbing device comprises hydraulic jack and the attached wall be located on described hydraulic jack climbs rail, and described hydraulic climbing scaffold is located at described attached wall and is climbed on rail.
10. hydraulic climbing formwork structure as claimed in claim 9, it is characterized in that: the bottom of described semi-girder truss is provided with i beam, described i beam is set up in the top of described hydraulic climbing scaffold, described movable hanging head comprises hanging head body and is located at the roll wheel assembly on described hanging head body, and described roll wheel assembly rolls on the upper surface of the lower wing plate of described i beam.
11. hydraulic climbing formwork structures as claimed in claim 10, it is characterized in that: described hanging head body is also provided with depression bar, the position below the lower wing plate of the described i beam of corresponding described roll wheel assembly is located at by described depression bar.
CN201510098823.7A 2015-03-06 2015-03-06 Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure Pending CN104847108A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510098823.7A CN104847108A (en) 2015-03-06 2015-03-06 Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510098823.7A CN104847108A (en) 2015-03-06 2015-03-06 Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure

Publications (1)

Publication Number Publication Date
CN104847108A true CN104847108A (en) 2015-08-19

Family

ID=53847046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510098823.7A Pending CN104847108A (en) 2015-03-06 2015-03-06 Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure

Country Status (1)

Country Link
CN (1) CN104847108A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400951A (en) * 2016-10-10 2017-02-15 中国建筑第八工程局有限公司 Synchronous construction method for horizontal and vertical structures of super high-rise building
CN108286332A (en) * 2018-03-12 2018-07-17 上海建工建集团有限公司 A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN109267748A (en) * 2018-09-26 2019-01-25 中国建筑局(集团)有限公司 It is a kind of to cross long arm truss climbing form frame body construction method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001193278A (en) * 2000-01-07 2001-07-17 Kajima Corp Construction method for structure having inside space, and climbing scaffolding
CN201339308Y (en) * 2008-12-23 2009-11-04 中国建筑第四工程局有限公司 Pylon guide device
CN203531377U (en) * 2013-11-13 2014-04-09 湖州市千金宝云机械铸件有限公司 Lifting mould base for building
CN203934696U (en) * 2014-04-02 2014-11-12 郝雅楠 Be convenient to double-ended and dual-plug zipper the disease clothes that peripheral catheters is disposed
CN204645604U (en) * 2015-03-06 2015-09-16 中国建筑第八工程局有限公司 Hydraulic climbing formwork structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001193278A (en) * 2000-01-07 2001-07-17 Kajima Corp Construction method for structure having inside space, and climbing scaffolding
CN201339308Y (en) * 2008-12-23 2009-11-04 中国建筑第四工程局有限公司 Pylon guide device
CN203531377U (en) * 2013-11-13 2014-04-09 湖州市千金宝云机械铸件有限公司 Lifting mould base for building
CN203934696U (en) * 2014-04-02 2014-11-12 郝雅楠 Be convenient to double-ended and dual-plug zipper the disease clothes that peripheral catheters is disposed
CN204645604U (en) * 2015-03-06 2015-09-16 中国建筑第八工程局有限公司 Hydraulic climbing formwork structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400951A (en) * 2016-10-10 2017-02-15 中国建筑第八工程局有限公司 Synchronous construction method for horizontal and vertical structures of super high-rise building
CN106400951B (en) * 2016-10-10 2019-04-30 中国建筑第八工程局有限公司 A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN108286332A (en) * 2018-03-12 2018-07-17 上海建工建集团有限公司 A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN109267748A (en) * 2018-09-26 2019-01-25 中国建筑局(集团)有限公司 It is a kind of to cross long arm truss climbing form frame body construction method and device

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN202023360U (en) Hydraulic climbing die plate for building construction
CN206233576U (en) For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN205077885U (en) Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN204126230U (en) Assembly scaffold unit
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
CN205348727U (en) A promote formula operation platform for in shaft
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN105442853A (en) Long-span deformed steel truss and floor steel structure installation and construction method
CN110565937A (en) Door type integral lifting steel platform
CN207194419U (en) It may span across the aerial work platform of landing beam
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN204645604U (en) Hydraulic climbing formwork structure
CN204754150U (en) Dish -type node formula scaffold
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN211257773U (en) Door type integral lifting steel platform
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN204282788U (en) Shaping type scaffold can be assembled

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150819