CN206928328U - Pipe gallery - Google Patents

Pipe gallery Download PDF

Info

Publication number
CN206928328U
CN206928328U CN201720895814.5U CN201720895814U CN206928328U CN 206928328 U CN206928328 U CN 206928328U CN 201720895814 U CN201720895814 U CN 201720895814U CN 206928328 U CN206928328 U CN 206928328U
Authority
CN
China
Prior art keywords
adhesive tape
cabin
pipe
cavity
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720895814.5U
Other languages
Chinese (zh)
Inventor
吴靖云
朱安静
余永强
郭俊
秦黎泉
许侃
王金龙
黄玖梅
陈立江
胡立明
谭华清
张楠琦
高波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC BIAM NEW MATERIAL TECHNOLOGY ENGINEERING Co Ltd
North China Municipal Engineering Design and Research Institute Co Ltd
CSCEC Aecom Consultant Co Ltd
Original Assignee
AVIC BIAM NEW MATERIAL TECHNOLOGY ENGINEERING Co Ltd
North China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC BIAM NEW MATERIAL TECHNOLOGY ENGINEERING Co Ltd, North China Municipal Engineering Design and Research Institute Co Ltd filed Critical AVIC BIAM NEW MATERIAL TECHNOLOGY ENGINEERING Co Ltd
Priority to CN201720895814.5U priority Critical patent/CN206928328U/en
Application granted granted Critical
Publication of CN206928328U publication Critical patent/CN206928328U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

A kind of pipe gallery is disclosed, it includes:Multiple piping lane units, inside have a cabin, have gap between adjacent piping lane unit in multiple piping lane units, include at least one partition wall in each piping lane unit, cabin is divided into at least two cabin units;Waterstop, at gap, and around the outline in cabin;And sealing structure, in gap, set corresponding at least one of at least one partition wall, wherein, sealing structure includes:First adhesive tape and the second adhesive tape, respectively between the front and rear partition wall for extending adjacent piping lane unit, between extending waterstop up and down, the first adhesive tape is separated by with second adhesive tape, to form cavity;And sealing compound, it is filled in cavity.First adhesive tape is separated by with second adhesive tape, and so as to form cavity, the sealing compound service life in closed cavity is longer so that while the sealing of sealing structure is stronger, has better environmental suitability and durability.

Description

Pipe gallery
Technical field
Municipal engineering pipeline field is the utility model is related to, relates more specifically to a kind of pipe gallery.
Background technology
City integrated piping lane typically accommodates the utilities pipelines such as feedwater, sewage, recycled water, natural gas, heating power, electric power, communication, Wherein natural gas line should be set in independent cabin (abbreviation combustion gas cabin), and all kinds of apertures in combustion gas cabin must not be with other cabins Connection.Pipe gallery is typically constructed using cast-in-place or precast assembly, one of movement joint is set at interval of preset distance, in movement joint Waterstop is set, outline arrangement of the waterstop along whole cabins, Groundwater infiltration pipe gallery is prevented, between cabin and cabin Partition wall in waterstop need not be set.Communicate, combustion gas cabin need to be carried out close for space between preventing combustion gas cabin and closing on cabin Envelope processing, isolation gas circulation.
Prior art is the sealing problem in solution combustion gas cabin, the method that generally use elastomeric material is filled, this skill Art mainly has following defect:Poor durability;During temperature change, piping lane body is flexible to destroy filler;Air-tightness is poor.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of pipe gallery, to improve wherein at least one cabin The sealing property of unit and the durability of pipe gallery and telescopic resilience.
According to a kind of pipe gallery provided by the utility model, including:Multiple piping lane units, inside has cabin, described There is gap in multiple piping lane units between adjacent piping lane unit, at least one partition wall is included in each piping lane unit, will The cabin is divided at least two cabin units;Waterstop, at the gap, and around the outline in the cabin; And sealing structure, in the gap, set corresponding at least one of described at least one partition wall, wherein, it is described Sealing structure includes:First adhesive tape and the second adhesive tape, are separately positioned on the position corresponding with two surfaces of the partition wall, prolong Between stretching in the waterstop, first adhesive tape is separated by with second adhesive tape, to form cavity;And sealing compound, filling In in the cavity.
Preferably, the sealing structure also includes:Sealant, it is arranged on the remote of first adhesive tape and second adhesive tape From the side of the cavity.
Preferably, the pipe gallery also includes:First pipe and the second pipe, all connect in the cabin with the cavity, In first pipe and second pipe one of be used to inject the sealing compound to the cavity, it is another be used to discharging it is described close Seal cream.
Preferably, first pipe and second pipe are connected to the top of the cavity.
Preferably, the partition wall is provided with the passage that the cavity is extended to from the cabin, for accommodating described first Pipe or second pipe.
Preferably, the pipe gallery also includes:First hole and the second hole, positioned at first adhesive tape and/or described In two adhesive tape, in first hole and second hole one of be used to inject the sealing compound to the cavity, it is another to be used for Discharge the sealing compound.
Preferably, at least two cabin unit includes the first cabin unit and multiple second cabin units, and described One cabin unit is used to accommodate gas pipeline, and first cabin unit is located at the multiple second cabin unit side, described The partition wall that sealing structure corresponds between first cabin unit and the multiple second cabin unit is set.
Preferably, each length in the multiple piping lane unit is less than or equal to 30 meters.
Preferably, the width in the gap is more than or equal to 30 millimeters.
Preferably, the thickness of the partition wall is more than or equal to 250 millimeters.
According to pipe gallery of the present utility model, at least one of partition wall is provided with sealing structure, it is described close Seal structure includes the first adhesive tape and the second adhesive tape, and first adhesive tape is separated by with second adhesive tape, so as to form cavity, cavity Interior filling sealing compound, so as to form sealing structure.Service life of the sealing compound under enclosed environment, can up to 80~100 years It is long-term keep flexibility state, it is non-sclerous, be not cracked, do not go mouldy, there is good environmental suitability and durability.First glue Bar and the second adhesive tape are separated by, form cavity with partition wall, waterstop, and the environment of closing is provided for sealing compound.First adhesive tape and second Adhesive tape can be water-proof sealing rubber strip, there is good adhesion property, sealing compound resistant of high or low temperature to various metals, nonmetallic materials Can be good, under 40 DEG C~80 DEG C environment of ﹣, low temperature does not ftracture, and high temperature does not trickle, and adhesion rate is not less than 90, and the two is used cooperatively, can To improve sealing property.First adhesive tape and the second adhesive tape and sealing compound can follow the size in gap between multiple piping lane units Change and change, will not be pulled off, extrude destruction.
In a preferred embodiment, sealing structure also includes sealant, is arranged on first adhesive tape and second glue The side of the remote cavity of bar, sealant have high bond strength, to the weak seal position of the first adhesive tape and the second adhesive tape Further reinforcement is put, further improves sealing property.
In a preferred embodiment, the pipe gallery can include the first pipe connected with the cavity and the second pipe, Can also include being located at first adhesive tape and/or the first hole and the second hole in second adhesive tape, first pipe/hole With in second pipe/hole one of be used to inject the sealing compound to the cavity, it is another to be used to discharge the sealing compound, from And solve the problems, such as to inject sealing compound into the cavity of closing.
Brief description of the drawings
By the description to the utility model embodiment referring to the drawings, of the present utility model above-mentioned and other mesh , feature and advantage will be apparent from.
Fig. 1 shows the stereogram of the pipe gallery according to the utility model embodiment;
Fig. 2 shows the three-dimensional exploded view of the pipe gallery according to the utility model embodiment;
Fig. 3 shows the top view of the pipe gallery according to the utility model embodiment;
Fig. 4 shows the front view of the pipe gallery according to the utility model embodiment;
Fig. 5 shows the sectional view shown in AA lines in Fig. 3;
Fig. 6 shows the sectional view shown in BB lines in Fig. 3;
Fig. 7 shows the sectional view shown in CC lines in Fig. 4;
Fig. 8 shows the partial enlarged drawing in D regions in Fig. 7.
Embodiment
The utility model is more fully described hereinafter with reference to accompanying drawing.In various figures, identical element is using similar Reference represent.For the sake of clarity, the various pieces in accompanying drawing are not necessarily to scale.In addition, may in figure Some known parts are not shown.
It describe hereinafter many specific details of the present utility model, such as the structure of part, material, size, place Science and engineering skill and technology, to be more clearly understood that the utility model.But just as the skilled person will understand, The utility model can not be realized according to these specific details.
It should be appreciated that when describing the structure of part, it is referred to as when by a floor, a region positioned at another floor, another area When domain " above " or " top ", can refer to above another layer, another region, or its with another layer, it is another Other layers or region are also included between individual region.Also, if by part turnover, this layer, a region will be located at it is another Layer, another region " following " or " lower section ".
The stereogram and three-dimensional exploded view of the pipe gallery according to the utility model embodiment is shown respectively in Fig. 1 and Fig. 2, figure The top view and front view of the pipe gallery according to the utility model embodiment is shown respectively in 3 and Fig. 4, and Fig. 5, Fig. 6 and Fig. 7 divide The sectional view of pipe gallery according to the utility model embodiment is not shown, AA lines show the interception position of sectional view 5 in wherein Fig. 3 Put, BB lines show the interception position of sectional view 6 in Fig. 3, and CC lines show the interception position of sectional view 7 in Fig. 4, and Fig. 8 is shown in Fig. 7 The partial enlarged drawing in D regions.The pipe gallery 1000 of the present embodiment includes multiple piping lane units, and multiple piping lane lists are shown in accompanying drawing The the first piping lane unit 100a and the second piping lane unit 100b that member includes are illustrated.Multiple piping lane units can use it is cast-in-place or The mode of precast assembly construction forms a whole piece pipe gallery 1000, and inside has cabin 110.Adjacent tubes in multiple piping lane units There is gap 130 between corridor unit, normally referred to as movement joint in this neighborhood, include in each piping lane unit it is at least one every Wall 120, cabin 120 is divided at least two cabin units.
In the present embodiment, partition wall 120 is, for example, two, and at least two cabin unit includes the first cabin unit 111 With multiple second cabin units 112, the first cabin unit 111 can be used for accommodating gas pipeline, e.g. natural gas line, because This first cabin unit 111 can be described as combustion gas cabin, and multiple second cabin units 112 can be used for arranging feedwater piping, sewage pipe The utilities pipelines such as road, regeneration waterpipe, heat distribution pipeline, electric wire, order wire.
Each length in multiple piping lane units can be less than or equal to 30 meters, and the width in gap 130 can be more than or equal to 30 millimeters, the thickness of partition wall 120 can be more than or equal to 250 millimeters.
Pipe gallery 1000 includes waterstop 140, at the gap 130, and around the foreign steamer in the cabin 110 It is wide.
Pipe gallery 1000 also includes sealing structure 150, and it is located in gap 130, corresponding to above-mentioned at least one partition wall At least one of 120 are set.Such as Fig. 2, in the present embodiment, the first cabin unit 111 is located at multiple second cabin units 112 1 Side, the partition wall 120 that sealing structure 150 corresponds between the first cabin unit 111 and multiple second cabin units 112 are set.
Sealing structure 150 can include the first adhesive tape 151 and the second adhesive tape 152 and sealing compound 153.First adhesive tape 151 The position corresponding with two surfaces of partition wall 120 is separately positioned on the second adhesive tape 152, between extending waterstop 140, First adhesive tape 151 is separated by with the second adhesive tape 152, and so as to form cavity, sealing compound 153 is filled in the cavity.
In the partial enlarged drawing of sectional view shown in Fig. 8, part the first piping lane unit 100a parting wall is shown 120a and the second piping lane unit 100b parting wall 120b.First adhesive tape 151 and the second adhesive tape 152 is front and rear respectively extends phase Between the partition wall 120a and the second piping lane unit 100b of the first adjacent piping lane unit 100a partition wall 120b, sealing is extended up and down Between two parts up and down with 140.First piping lane unit 100a partition wall 120a, the second piping lane unit 100b partition wall 120b, Two parts up and down of waterstop 140 and the first adhesive tape 151 and the second adhesive tape 152 surround the cavity of relative closure, sealing compound 153 When in the cavity of above-mentioned closing, can keep for a long time flexibility state, it is non-sclerous, be not cracked, do not go mouldy, service life is reachable 80~100 years.
Sealing structure 150 can also include sealant 154, and sealant 154 is arranged on the first adhesive tape 151 and the second adhesive tape The side of the 152 remote cavity.
Sealant 154 can be polysulfur type high-strength and waterproofing sealant, and it has high bond strength, comprehensive ageing properties life-span Up to more than 40 years, elongation at break was not less than 150, and actual measurement representative value is 180~350.First adhesive tape 151 and the second adhesive tape 152 Can be polysulfur type high-strength and waterproofing XM55 sealing joint strips, it has good adhesion property to various metals, nonmetallic materials, certainly Non-drying can be kept under right environment, be not cracked.Sealing compound 153 can be 9501B non-drying corrosion inhibiting sealants, resistant of high or low temperature Can be good, in the case where 40 DEG C~80 DEG C of ﹣, low temperature does not ftracture, and high temperature does not trickle, and adhesion rate is not less than 90, can keep soft character for a long time State, it is non-sclerous, be not cracked, do not go mouldy.Polysulfur type high-strength and waterproofing XM55 sealing joint strips and 9501B non-drying corrosion inhibiting sealants exist Service life is up to 80~100 years in confined space, can follow the size variation in gap between adjacent piping lane unit and become To change, will not be pulled off, extrude destruction, above-mentioned three kinds of combinations of materials use so that air-tightness, the durability of pipe gallery are stronger, The change of use environment condition can be well adapted for.
The pipe gallery 1000 of the present embodiment also includes the first pipe 161 and the second pipe 162, the first pipe 161 and the second pipe 162 All cabin 110 is connected with above-mentioned cavity, in the first pipe 161 and the second pipe 162 one of be used for the cavity inject it is close Cream 153 is sealed, it is another to be used to discharge sealing compound 153.The passage that cavity is extended to from cabin 110 can be provided with partition wall 120, is used for The first pipe 161 and the second pipe 162 are accommodated, in the present embodiment, partition wall 120a is communicated with the first cabin unit 111 and the chamber The first passage 121a of body, the first pipe 161 penetrate first passage 121a, and partition wall 120b is communicated with the He of the second cabin unit 112 The second channel 121b of the cavity, the first pipe 162 penetrate second channel 121b.First pipe 161 and the second pipe 162 are connected to The top of the cavity.
The forming step of the sealing structure 150 of the pipe gallery 1000 of the present embodiment can be in the cast-in-place of pipe gallery 1000 Or carried out after precast assembly construction procedure, preferably wait the low temperature period to implement in the winter time.Below to having preset as madjack pipe Illustrated with the forming step of the first pipe 161 of grout outlet and the sealing structure 150 of the pipe gallery 1000 of the second pipe 162. The debris cleared up first in gap 130, and rinsed well with clear water, make to keep interface to dry without greasy dirt, debris etc. inside it, The first pipe 161 and the second pipe 162 are cleared up, holding pipeline is unimpeded, clean, no-sundries.Then, in the gap 130 of corresponding partition wall 120 Spaced the first adhesive tape 151 and the second adhesive tape 152 are clogged in both sides, the cavity are formed, in the first adhesive tape 151 and the second glue The side of the remote cavity of bar 152 sets sealant 154, preferably makes the both sides of sealant 154 and partition wall 120 smooth.Deng The scheduled time is, for example, that sealant 154 solidifies after 24 hours, according to the size in the inside cavity space, calculates sealing compound 153 material usage, sealant 154 is injected in the cavity by the first pipe 161 using grouting equipment.The pipe of observation second 162, after the sealant 154 that the second pipe 162 has stable and uniform persistently flows out, illustrate that the sealant 154 in the cavity has been noted It is full, reach compactness requirement.
The pipe gallery 1000 of above-described embodiment has preset the first pipe 161 and the second pipe 162 is used to inject sealant 154, The first pipe and second may not be preset in other alternative embodiments, in the cast-in-place or precast assembly construction procedure of pipe gallery Pipe.The forming step of the structure of such alternate embodiment and sealing structure 150 will be illustrated below.
In alternate embodiments, pipe gallery can include the first hole and the second hole, and the first hole and the second hole position are in In one adhesive tape and/or the second adhesive tape, wherein in the first hole and the second hole one of be used for the cavity inject sealing compound, it is another For discharging sealing compound.When the side of first adhesive tape and the second adhesive tape away from the cavity is provided with sealant, the first hole and second Hole also extends through sealant in correspondence position.
Pipe gallery carries out the forming step of sealing structure after cast-in-place or precast assembly construction procedure is completed.
The debris cleared up first in gap, and rinsed well with clear water, make to keep interface without greasy dirt, debris etc. inside it Dry.Then, spaced the first adhesive tape and the second adhesive tape are clogged on the gap both sides of corresponding partition wall, form the cavity, Sealant is set in the side of the first adhesive tape and the remote cavity of the second adhesive tape, preferably makes the both sides of sealant and partition wall It is smooth.It should be noted that in the above-mentioned adhesive tape of formation first, the second adhesive tape and sealant, set respectively at respective top Apart from the vacancy of waterstop upper part preset distance, such as reserved 5 centimetres vacancy, as slip casting passage.Wait the scheduled time After e.g. 24 hours, sealant cures, according to the size in the inside cavity space, the material usage of sealing compound is calculated, it is sharp Sealant is injected in the cavity by above-mentioned slip casting passage with grouting equipment.When injecting sealing compound, small vibrating rod can be used Vibration, to reach compactness, cream to be sealed continuously forms the first adhesive tape close to when filling up in above-mentioned reserved 5 centimetres vacancy And/or second adhesive tape and sealant, while the first hole and the second hole are formed as mud jacking hole and slurry outlet at top.Then, Sealing compound is persistently injected into the first hole, after the sealing compound that there is stable and uniform in the second hole persistently flows out, it was demonstrated that in the cavity Sealing compound has filled, and reaches compactness requirement.
According to pipe gallery of the present utility model, at least one of partition wall is provided with sealing structure, sealing knot The first adhesive tape that structure includes is separated by with the second adhesive tape, so as to form cavity, sealing compound is filled in cavity, so as to form sealing knot Structure.Service life of the sealing compound under enclosed environment can keep flexibility state, non-sclerous, no for a long time up to 80~100 years Cracking, do not go mouldy, there is good environmental suitability and durability.First adhesive tape is separated by with the second adhesive tape and partition wall, sealing Band forms cavity, and the environment of closing is provided for sealing compound.First adhesive tape and the second adhesive tape can be water-proof sealing rubber strips, to various Metal, nonmetallic materials have good adhesion property, and sealing compound high and low temperature resistance is good, under 40 DEG C~80 DEG C environment of ﹣, low temperature Do not ftracture, high temperature does not trickle, and adhesion rate is not less than 90, and the two is used cooperatively, and can improve sealing property.First adhesive tape and second Adhesive tape and sealing compound can follow the size variation in gap between multiple piping lane units and change, will not be pulled off, extrude it is broken It is bad.Sealing structure can also include sealant, be arranged on the side of the remote cavity of the first adhesive tape and the second adhesive tape, sealing Agent has high bond strength, and the weak seal position of the first adhesive tape and the second adhesive tape is further strengthened, and further improves sealing Performance.
Pipe gallery of the present utility model, better seal effect can not only be provided for wherein at least one cabin unit Fruit, there is more preferable durability and environmental suitability, embodiment is also more convenient, in addition to special grouting equipment, it is not necessary to Other special tool(s)s, 2 to 3 people's coordinative constructions can be completed.In addition, pipe gallery maintenance of the present utility model is simpler, if There is breakage in outermost sealant, cut away damaged part with blade, scratch sealant again;If inner chamber Internal sealing compound is leaked, and new sealing compound is refilled by default first hole.
Pipe gallery can include the first pipe connect with the cavity and second and manage or including positioned at described the One adhesive tape and/or the first hole and the second hole in second adhesive tape, in the first pipe/hole and the second pipe/hole one of be used for The cavity injects sealing compound, another to be used to discharge sealing compound, so as to solve the problems, such as that sealing compound is injected into the cavity of closing.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
According to embodiment of the present utility model as described above, these embodiments do not have all details of detailed descriptionthe, Also it is only described specific embodiment not limit the utility model.Obviously, as described above, many modification and change can be made Change.This specification is chosen and specifically describes these embodiments, is to preferably explain that principle of the present utility model and reality should With so that skilled artisan can repairing using the utility model and on the basis of the utility model well Change use.The utility model is only limited by claims and its four corner and equivalent.

Claims (10)

  1. A kind of 1. pipe gallery, it is characterised in that including:
    Multiple piping lane units, inside have a cabin, have gap between adjacent piping lane unit in the multiple piping lane unit, each Include at least one partition wall in piping lane unit, the cabin is divided at least two cabin units;
    Waterstop, at the gap, and around the outline in the cabin;And
    Sealing structure, in the gap, set corresponding at least one of described at least one partition wall,
    Wherein, the sealing structure includes:
    First adhesive tape and the second adhesive tape, are separately positioned on the position corresponding with two surfaces of the partition wall, extend described Between waterstop, first adhesive tape is separated by with second adhesive tape, to form cavity;And
    Sealing compound, it is filled in the cavity.
  2. 2. pipe gallery according to claim 1, it is characterised in that the sealing structure also includes:
    Sealant, it is arranged on the side of the remote cavity of first adhesive tape and second adhesive tape.
  3. 3. pipe gallery according to claim 1, it is characterised in that also include:
    One of first pipe and the second pipe, all connect in the cabin with the cavity, in first pipe and second pipe It is another to be used to discharge the sealing compound for injecting the sealing compound to the cavity.
  4. 4. pipe gallery according to claim 3, it is characterised in that first pipe is connected to described with second pipe The top of cavity.
  5. 5. pipe gallery according to claim 3, it is characterised in that the partition wall is provided with from the cabin and extends to institute The passage of cavity is stated, for accommodating first pipe or second pipe.
  6. 6. pipe gallery according to claim 1, it is characterised in that also include:
    First hole and the second hole, in first adhesive tape and/or second adhesive tape, first hole and second hole In one of be used to inject the sealing compound to the cavity, it is another to be used to discharge the sealing compound.
  7. 7. pipe gallery according to claim 1, it is characterised in that at least two cabin unit includes the first cabin Unit and multiple second cabin units, first cabin unit are used to accommodate gas pipeline, and first cabin unit is located at The multiple second cabin unit side, the sealing structure correspond to first cabin unit and the multiple second cabin The partition wall between unit is set.
  8. 8. pipe gallery according to claim 1, it is characterised in that each length in the multiple piping lane unit is small In equal to 30 meters.
  9. 9. pipe gallery according to claim 1, it is characterised in that the width in the gap is more than or equal to 30 millimeters.
  10. 10. pipe gallery according to claim 1, it is characterised in that the thickness of the partition wall is more than or equal to 250 millimeters.
CN201720895814.5U 2017-07-21 2017-07-21 Pipe gallery Expired - Fee Related CN206928328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720895814.5U CN206928328U (en) 2017-07-21 2017-07-21 Pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720895814.5U CN206928328U (en) 2017-07-21 2017-07-21 Pipe gallery

Publications (1)

Publication Number Publication Date
CN206928328U true CN206928328U (en) 2018-01-26

Family

ID=61355905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720895814.5U Expired - Fee Related CN206928328U (en) 2017-07-21 2017-07-21 Pipe gallery

Country Status (1)

Country Link
CN (1) CN206928328U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700327A (en) * 2018-07-09 2020-01-17 青岛中科坤泰管廊有限公司 Waterproof rubber strip for prefabricated comprehensive pipe gallery rabbet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700327A (en) * 2018-07-09 2020-01-17 青岛中科坤泰管廊有限公司 Waterproof rubber strip for prefabricated comprehensive pipe gallery rabbet

Similar Documents

Publication Publication Date Title
KR101372749B1 (en) Multi-performance functional water stop plate with composite structure
JP3823029B2 (en) Steel sheet pile joints water-stop structure and impermeable structure and construction method
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN207685863U (en) A kind of prefabricated pipe gallery joint connecting structure
CN206928328U (en) Pipe gallery
CN106287001A (en) Penstock reinforcing bar composite concrete pipe and the pipeline being made from and manufacture method
CN201705369U (en) Waterproof structure for tunnels in frozen soil on plateau
CN204418231U (en) A kind of underground concrete exterior wall shrinkage joint water-tight device
JP4576636B2 (en) Repair method of waterway
CN206054970U (en) Framework of steel reinforcement steel pipe concrete pipe and the pipeline being made from it
CN212003223U (en) Construction joint waterproof construction suitable for reconstructed tunnel lining
CN111271097A (en) Construction joint waterproof structure suitable for reconstructing tunnel lining and construction method thereof
CN205295927U (en) Bridge longitudinal seam waterproof seal structure
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN205637360U (en) Waterproof roof is planted to underground garage
CN116556959A (en) Frozen curtain construction device and method applied to broken well wall repair
CN110924261A (en) Honeycomb-shaped water storage, irrigation and vibration reduction periodic structure for city
CN110500123A (en) The leakage plugging method of duct pieces of shield tunnel bolt hole
CN212318012U (en) Lining structure for tunnel and tunnel
CN212154232U (en) Wall body reinforced structure
CN111927494B (en) Subway tunnel ballast bed and drainage ditch structure reinforcing method
CN211816030U (en) Water stop structure for expansion joint surface layer of hydraulic building
CN208472795U (en) A kind of tunnel and underground pipe gallery percolating water repair system
CN206956791U (en) A kind of new-old concrete interface waterproof sealing structure
CN113565274A (en) Drainage system is planted on dangerization article storage tank soil top

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180126

Termination date: 20180721