CN207685863U - A kind of prefabricated pipe gallery joint connecting structure - Google Patents
A kind of prefabricated pipe gallery joint connecting structure Download PDFInfo
- Publication number
- CN207685863U CN207685863U CN201721817067.XU CN201721817067U CN207685863U CN 207685863 U CN207685863 U CN 207685863U CN 201721817067 U CN201721817067 U CN 201721817067U CN 207685863 U CN207685863 U CN 207685863U
- Authority
- CN
- China
- Prior art keywords
- groutnick
- pipe gallery
- connecting structure
- prefabricated pipe
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Abstract
The utility model provides a kind of prefabricated pipe gallery joint connecting structure.The connection structure is specially:Annular groutnick, grout hole and air discharge duct are equipped on piping lane connector end face, annular groutnick forms closed grouting cavity after tip side face is docked;Fluid sealant bar groove is respectively equipped with inside and outside groutnick;Grout hole is arranged in the inside of connector end bottom, is communicated with groutnick;The top in connector end face is arranged in air discharge duct, is communicated with groutnick;The inner side edge and outer side edges of connector end face are chamfering.The structure type of the utility model solves between existing prefabricated pipe gallery segmentation, the technical problems such as the waterstop that is brought using article rubber water stop band connection is fragile, later period maintenance is difficult have the advantages that waterproof, water-stagnating effect are good, are connected firmly, service life is long, install convenient.
Description
Technical field
The utility model is related to urban construction more particularly to a kind of prefabricated pipe gallery joint connecting structures.
Background technology
City integrated piping lane (also referred to as " common trench ", " municipal piping lane " etc.) can preferably solve Urban Underground basis and set
The existing many disadvantages of construction are applied, are widely approved at home, and it builds have begun to take shape, the mode of construction is main
Using cast-in-place and prefabrication.Compared to cast in situs mode, the prefabricated mode of batch production has quality controllable, overall cost
Low, applied widely, economic and environment-friendly, short construction period has substantially no effect on road, and can be carried out according to the engineering scale of construction whole
Body is prefabricated or the prefabricated on-site consolidation of branch, the advantages that flexible form is various, is the main trend of Future Projects construction.
Prefabricated pipe gallery connects into corridor using segment, and connector is the weak link of precast assembly pipe gallery waterproof.Mesh
It is preceding that waterproof adhesive tape two kinds of forms of band are generally coordinated using reserved post-cast strip or post-tensioned prestressing, but the former prefabricated components need
Reserved steel bar, carries out the processes such as live assembling reinforcement, formwork, casting concrete, maintenance, and construction is complicated;Although the latter constructs just
Victory, but since condition of construction and underground environment are complicated, connected using article rubber water stop band waterproof, it is uneven heavy to occur in interface ground
When drop, waterstop is yielding, or even by drawing crack, is extremely difficult to use centenary index;Simultaneously as when pouring, all it is
Rubber fastening band is directly enclosed in joint, when damaged, can not be replaced, maintenance difficult.
Invention content
In order to solve the above the technical problems existing in the prior art, the utility model provides a kind of waterproof water-stagnating effect
It gets well, be connected firmly, service life is long, install convenient prefabricated pipe gallery joint connecting structure.
The technical solution adopted in the utility model is as follows:
A kind of prefabricated pipe gallery joint connecting structure is equipped with annular groutnick, grout hole on piping lane connector end face
And air discharge duct, annular groutnick form closed grouting cavity after tip side face is docked;Inside and outside the two of the groutnick
Side is respectively equipped with fluid sealant bar groove;The grout hole is arranged in the inside of connector end bottom, is communicated with groutnick;The row
The top in connector end face is arranged in air drain, is communicated with groutnick;The inner side edge and outer side edges of the connector end face are chamfering
Side.
Further, the groutnick is arranged at the middle part of piping lane end face.
Further, the groutnick is in inverted trapezoidal, rectangle or arc, and maximum open width is 50mm-200mm, deep
Degree is 60mm-210mm.
Further, the groove of the fluid sealant bar groove be in inverted trapezoidal, rectangle or arc, opening width 20mm-40mm,
Depth is 5mm-10mm.
Further, the fluid sealant bar groove is higher by piping lane end face 10mm-20mm.
Further, the aperture of the grout hole is 30mm-60mm.
Further, the inflatable rubber ring of annular is placed in the groutnick, the inflating port setting of rubber ring is filling
It starches in hole.
Further, the water-swellable adhesive tape of ring seal is equipped in the fluid sealant bar groove.
Further, the size of the chamfering is 20mm*20mm.
Further, the piping lane is Dan Cang, double storehouses or more storehouses, and cross sectional shape is rectangle, round or ellipse.
The beneficial effects of the utility model are:
(1) fluid sealant bar groove is equipped with twice, substantially increases the waterproof effect of connector, while the chance water in fluid sealant bar groove
The seal of grouting cavity has been effectively ensured in expansion adhesive tape.
(2) the inside and outside edge of end face is set as bevel edge, can effectively eliminate the mistake of the 2-section pipe corridor joint surfaces externally and internally fissure of displacement
Difference.
(3) waterproof material floating can be used in bevel edge edge joint position, forms inside and outside twice waterproof grommet, it is anti-to increase connector
The reliability of water.
(4) aerated rubber loop is placed in grouting cavity, after piping lane connector deforms the changing of the relative positions because of extraneous factor, past can filled
Supplement air or powder waterproof material or slightly expanded concrete (mortar) etc. in gas expanded rubber band, carry out secondary seal, effectively
Solve the problems, such as that the repairing of piping lane joint waterproofing is difficult in Practical Project.
Description of the drawings
Fig. 1 is the stereoscopic schematic diagram of the utility model joint connecting structure, wherein 1- pipe galleries, 2- groutnicks, 3-
Grout hole, 4- air discharge ducts, 5- external seal adhesive tape grooves, 6- interior sealing adhesive tape grooves, 7- outer chamfers side, 8- inner chamfers side, 9- prestressing force
Stretch-draw anchor body.
Fig. 2 is the front schematic view of the utility model joint connecting structure.
Fig. 3 is the front schematic view of the utility model joint connecting structure, wherein 10- presstressed reinforcing steels.
Specific implementation mode
The preferred embodiment that according to the present invention will be described in detail below with reference to the accompanying drawings.
A kind of prefabricated pipe gallery joint connecting structure of the present embodiment is as shown in Figure 1, 2, in the tip side of pipe gallery 1
Face is equipped with annular groutnick 2, grout hole 3 and air discharge duct 4.The middle part in piping lane end face is arranged in groutnick 2, along piping lane end
Face is circular layout, and groove is in inverted trapezoidal, rectangle or arc, and maximum open width is 50mm-200mm, depth 60mm-210mm.
It is respectively equipped with interior sealing adhesive tape groove 6 and external seal adhesive tape groove 5 inside and outside groutnick 2, forms the sealing of two rings, sealing joint strip
The groove of slot is higher by inverted trapezoidal, rectangle or arc, opening width 20mm-40mm, depth 5mm-10mm, fluid sealant bar groove
Piping lane end face 10mm-20mm.Grout hole 3 is arranged in the inside of connector end bottom, aperture 30mm-60mm, and with grouting
Groove 2 communicates.Air discharge duct 4 is arranged the top in connector end face, symmetrical each one, and is communicated with groutnick 2.Piping lane end
Corner angle do chamfered inside and outside the surrounding of face, and the size of chamfering is 20mm*20mm.1 connector of pipe gallery is additionally provided with prestressing force
Stretch-draw anchor body 9 is arranged at the corner location in piping lane.Prestressed stretch-draw anchor body 9 is triangular in shape, in the centre of triangle
Be reserved with presstressed reinforcing steel 10 wears muscle hole.
Pipe gallery 1 can be Dan Cang, double storehouses or more storehouses, and section form is rectangle, round or ellipse.2-section pipe corridor
Docking a kind of embodiment be:First cleaning connector end face, in the interior sealing adhesive tape groove 6 and external seal adhesive tape groove 5 of both ends of the surface
Paste water-swellable adhesive tape.Then 2-section pipe corridor docking, the air discharge duct 4 of both ends of the surface is opposite two-by-two at this time, forms exhaust outlet,
The groutnick 2 of both ends of the surface forms a closed grouting ring cavity.By the tensioning on prestressed stretch-draw anchor body 9 of presstressed reinforcing steel 10
2-section pipe corridor is anchored, the intensity of piping lane connector can so be effectively ensured, reduces the joint distortion problem caused by extraneous factor.It connects
After head is fixed, on the inside of the connector below grout hole 3 in be pumped into microdilatancy water-proof concrete, observation upper air vent works as top
When two exhaust outlets have concrete to emerge, pump concrete is customized, extra coagulation around exhaust outlet is cleared up in plugging grouting hole 3
Soil is simultaneously closed flat plastering;While pumping grouting, using microdilatancy waterproof mortar or marine glue by the chamfering of surrounding inside and outside joint
Piece smoothes out, and completes the connector connection of 2-section pipe corridor.Inside and outside bevel edge smears seam, two seals adhesive tape groove and grouting ring cavity sealing,
5 waterproof sealings construction is formed altogether in the joint area of piping lane.The cavity that is in the milk is interior to fill microdilatancy water-proof concrete, anti-for connector
While water provides safeguard, the intensity of itself is also resistant against the internal force that connector is generated by deformation, ensures the intensity of connector.
2-section pipe corridor docking another embodiment be:First cleaning connector end face, in the interior sealing adhesive tape groove 6 of both ends of the surface
With paste water-swellable adhesive tape in external seal adhesive tape groove 5, and the inflatable rubber ring of annular is placed in groutnick 2, by rubber
The inflating port of circle is fixed in the grout hole 3 of connector bottom.Then 2-section pipe corridor is docked, and by presstressed reinforcing steel 10 in prestressing force
Stretch-draw anchor 2-section pipe corridor on stretch-draw anchor body 9.After connector is fixed, on the inside of the connector below grout hole 3 in be pumped into air (powder
Body waterproof material, microdilatancy water-proof concrete), whether observation exhaust ports are filled by rubber ring, while observing pumping pressure table,
Ensure that rubber ring intumescent filler is entirely in the milk cavity, then blocks inflating port, grout hole 3 is blocked with Interal fixation, uses cement bonded sand
Slurry smoothes out exhaust outlet;While pumping, using microdilatancy waterproof mortar or marine glue by the chamfering piece of surrounding inside and outside joint
Floating is tamped, the connector connection of 2-section pipe corridor is completed.After because of extraneous factor sliding deformation occurs for piping lane connector, grouting can be opened
Sealing steel plate at hole 3, into rubber ring secondary pumped air or powder waterproof material fill up generating in time because of joint distortion
Crack.
Claims (10)
1. a kind of prefabricated pipe gallery joint connecting structure, which is characterized in that it is recessed to be equipped with annular grouting on piping lane connector end face
Slot, grout hole and air discharge duct, annular groutnick form closed grouting cavity after tip side face is docked;The groutnick
Inside and outside be respectively equipped with fluid sealant bar groove;The grout hole is arranged in the inside of connector end bottom, with groutnick phase
It is logical;The top in connector end face is arranged in the air discharge duct, is communicated with groutnick;The inner side edge and outer side edges of the connector end face
It is chamfering.
2. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the groutnick
Middle part in piping lane end face is set.
3. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the groutnick
In inverted trapezoidal, rectangle or arc, maximum open width is 50mm-200mm, depth 60mm-210mm.
4. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the sealing joint strip
The groove of slot is in inverted trapezoidal, rectangle or arc, opening width 20mm-40mm, depth 5mm-10mm.
5. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the sealing joint strip
Slot is higher by piping lane end face 10mm-20mm.
6. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the grout hole
Aperture is 30mm-60mm.
7. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the groutnick
It is inside placed with the inflatable rubber ring of annular, the inflating port of rubber ring is arranged in grout hole.
8. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the sealing joint strip
The water-swellable adhesive tape of ring seal is equipped in slot.
9. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the ruler of the chamfering
Very little is 20mm*20mm.
10. a kind of prefabricated pipe gallery joint connecting structure according to claim 1, which is characterized in that the piping lane is
Dan Cang, double storehouses or more storehouses, cross sectional shape are rectangle, round or ellipse.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721817067.XU CN207685863U (en) | 2017-12-22 | 2017-12-22 | A kind of prefabricated pipe gallery joint connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721817067.XU CN207685863U (en) | 2017-12-22 | 2017-12-22 | A kind of prefabricated pipe gallery joint connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207685863U true CN207685863U (en) | 2018-08-03 |
Family
ID=62994984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721817067.XU Active CN207685863U (en) | 2017-12-22 | 2017-12-22 | A kind of prefabricated pipe gallery joint connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207685863U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867697A (en) * | 2018-08-31 | 2018-11-23 | 江苏金贸科技发展有限公司 | A kind of concrete prefabricated piping lane with antiseep preset structure |
CN109944279A (en) * | 2019-03-22 | 2019-06-28 | 中铁第四勘察设计院集团有限公司 | A kind of assembled pipe gallery waterproof connector connection structure and construction method |
CN110016937A (en) * | 2019-05-06 | 2019-07-16 | 南京工业大学 | Prefabricated utility tunnel shock attenuation waterproof system |
CN111173034A (en) * | 2020-02-22 | 2020-05-19 | 辽宁龙星环保科技有限公司 | Underground is with waterproof prefabricated utility tunnel of piecing together soon |
CN111364517A (en) * | 2020-04-21 | 2020-07-03 | 中铁第四勘察设计院集团有限公司 | Waterproof connection structure for prefabricated comprehensive pipe gallery connector |
-
2017
- 2017-12-22 CN CN201721817067.XU patent/CN207685863U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867697A (en) * | 2018-08-31 | 2018-11-23 | 江苏金贸科技发展有限公司 | A kind of concrete prefabricated piping lane with antiseep preset structure |
CN109944279A (en) * | 2019-03-22 | 2019-06-28 | 中铁第四勘察设计院集团有限公司 | A kind of assembled pipe gallery waterproof connector connection structure and construction method |
CN110016937A (en) * | 2019-05-06 | 2019-07-16 | 南京工业大学 | Prefabricated utility tunnel shock attenuation waterproof system |
CN111173034A (en) * | 2020-02-22 | 2020-05-19 | 辽宁龙星环保科技有限公司 | Underground is with waterproof prefabricated utility tunnel of piecing together soon |
CN111364517A (en) * | 2020-04-21 | 2020-07-03 | 中铁第四勘察设计院集团有限公司 | Waterproof connection structure for prefabricated comprehensive pipe gallery connector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207685863U (en) | A kind of prefabricated pipe gallery joint connecting structure | |
CN108517899A (en) | Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall | |
CN106703084A (en) | Waterproofing treatment method and system of construction joint structure of plane and elevation structure junction areas of basement | |
CN107859064B (en) | Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method | |
CN109944279A (en) | A kind of assembled pipe gallery waterproof connector connection structure and construction method | |
CN208363127U (en) | A kind of retaining wall structure of combined type high-speed rail platform | |
CN105019404B (en) | A kind of construction method of sealing rod and its water sealing structure and water sealing structure | |
CN110878700A (en) | Tunnel waterproof structure and construction method thereof | |
CN206916753U (en) | A kind of water sealing structure of diaphram wall and its seam crossing | |
CN211174142U (en) | Waterproof structure of shield tunnel and station interface | |
CN110984160B (en) | Underwater repair method for water seepage crack of concrete panel | |
CN111364517A (en) | Waterproof connection structure for prefabricated comprehensive pipe gallery connector | |
CN218757629U (en) | Waterproof structure of plugging into of new and old basement structure under narrow and small space | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN107780437A (en) | Prefabricated assembled pipe joint of utility tunnel | |
CN108612547A (en) | A kind of tunnel repair system with underground pipe gallery percolating water | |
CN109268031A (en) | Tube coupling can fill the plugging structure and construction method of bag type paste at service channel hole | |
CN107524174A (en) | A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop | |
CN108867699A (en) | A kind of interface structure of pipe gallery | |
CN209837324U (en) | Tooth-groove type waterproof connecting structure for prefabricated wallboard of prefabricated building by vertical joint grouting method | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN209162909U (en) | A kind of interface waterproof construction of new-old concrete | |
CN212248356U (en) | Waterproof connection structure for prefabricated comprehensive pipe gallery connector | |
CN109235668A (en) | Residential building curtain wall and wall crack plugging structure | |
CN208763072U (en) | A kind of submerged tunnel side wall waterproof structure for deformation seams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |