CN206829586U - Overhanging type steel pipe scaffold vertical rod base stand location buckle - Google Patents

Overhanging type steel pipe scaffold vertical rod base stand location buckle Download PDF

Info

Publication number
CN206829586U
CN206829586U CN201720509939.XU CN201720509939U CN206829586U CN 206829586 U CN206829586 U CN 206829586U CN 201720509939 U CN201720509939 U CN 201720509939U CN 206829586 U CN206829586 U CN 206829586U
Authority
CN
China
Prior art keywords
vertical rod
cutting ferrule
model
utility
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720509939.XU
Other languages
Chinese (zh)
Inventor
顾瑶
李隽�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Greenland Construction Group Co Ltd filed Critical Shanghai Greenland Construction Group Co Ltd
Priority to CN201720509939.XU priority Critical patent/CN206829586U/en
Application granted granted Critical
Publication of CN206829586U publication Critical patent/CN206829586U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of overhanging type steel pipe scaffold vertical rod base stand location buckle, it is characterised in that the I-steel that can be slided is provided with including cutting ferrule, in cutting ferrule, positioning steel tube is fixed with the top of cutting ferrule, cutting ferrule is provided with the fastener for being used for fastening I-steel.The utility model is simple in construction, cost is low, by using buckle of the present utility model, the adjustment more flexible and convenient of vertical rod position when making overhanging scaffold erection, greatly improve the facility of construction, it first can directly fix the position of Cantilever Beams, the position that vertical rod position need to only adjust substrate latch fastener just can easily be established, and make overhanging scaffold erection operation more easy.Buckle of the present utility model can adapt to installation requirement on the Cantilever Beams of different length by adjustment position simultaneously, and wide usage is strong, and Cantilever Beams can be achieved and reuse, and practical and beneficial to promoting.

Description

Overhanging type steel pipe scaffold vertical rod base stand location buckle
Technical field
A kind of overhanging type steel pipe scaffold vertical rod base stand location buckle is the utility model is related to, belongs to overhanging scaffold erection Technical field of construction.
Background technology
In overhanging scaffold erection construction, the I-steel of different model is selected as Cantilever Beams by conceptual design requirements, Upper falsework vertical rod is stood on thereon, due to building structure and sets up the limitation and particularity at position, shaped steel is stretched out and built The anchoring section encorbelmented in section and building of thing has different design requirements.Former form of construction work is preset on Cantilever Beams Vertical rod position, then welds positioning steel tube in this place, and such vertical rod position can not adjust after fixed, can only be adjusted in construction The encorbelment position of section and anchoring section of integer steel adjusts the position of scaffold upright rod, and certain difficulty is brought to set up operation, It is complex for operation step.Especially structure angle position or reserved opening etc. privileged sites, due to the length to Cantilever Beams not With requirement, influence can be brought on the accuracy of setting up of its upper pright stanchion position, there is any discrepancy will adjust again once discovery vertical rod position is set It is whole to bother very much.
The content of the invention
The technical problems to be solved in the utility model is:Provide it is a kind of it is simple in construction, cost is low, reusable outstanding Formula steel pipe scaffold vertical rod base stand location buckle is chosen, solving vertical rod position can not adjust after fixed, can only be in construction Adjustment shaped steel encorbelment section and anchoring section position to adjust scaffold upright rod position the problem of.
In order to solve the above-mentioned technical problem, the technical solution of the utility model there is provided a kind of overhanging type steel pipe scaffold Vertical rod base stand location buckle, it is characterised in that the I-steel that can be slided is provided with including cutting ferrule, in cutting ferrule, the top of cutting ferrule is consolidated Surely there is positioning steel tube, cutting ferrule is provided with the fastener for being used for fastening I-steel.
Preferably, for described positioning steel tube in vertical rod, positioning steel tube matches connection with vertical rod.
Preferably, the lower end of described I-steel matches with Cantilever Beams.
The utility model is simple in construction, cost is low, by using buckle of the present utility model, when making overhanging scaffold erection The adjustment of vertical rod position more flexible and convenient, the facility of construction is greatly improved, first can directly fix the position of Cantilever Beams, vertical rod position Putting a position that need to adjust substrate latch fastener just can easily establish, and make overhanging scaffold erection operation more easy.Due to pin of encorbelmenting It is work high above the ground that hand cradle, which is set up, and easy operation can directly reduce the job safety risk of workmen, can avoid because of construction Solder skip positioning steel tube on personnel's Cantilever Beams off one's guard and cause the unstable of scaffold upright rod.Buckle of the present utility model simultaneously The installation requirement on the Cantilever Beams of different length can be adapted to by adjustment position, wide usage is strong, and Cantilever Beams can be achieved and repeat to make With, and it is practical and beneficial to promoting.
Brief description of the drawings
Fig. 1 is a kind of component detail drawing of overhanging type steel pipe scaffold vertical rod base stand location buckle;
Fig. 2 is a kind of elevation of overhanging type steel pipe scaffold vertical rod base stand location buckle;
Fig. 3 is a kind of plan of overhanging type steel pipe scaffold vertical rod base stand location buckle.
Embodiment
To become apparent the utility model, hereby with preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
The utility model is a kind of overhanging type steel pipe scaffold vertical rod base stand location buckle, available for raising overhanging type pin hand Frame square bar stability, improve the convenience of vertical rod positioning and adjustment.As shown in Figure 1-Figure 3, it includes cutting ferrule 7, is provided with cutting ferrule 7 The I-steel 4 that can be slided, the top of cutting ferrule 7 are fixed with positioning steel tube 1, and cutting ferrule 7 is provided with the fastening for being used for fastening I-steel 4 Part 3.For positioning steel tube 1 in vertical rod 2, positioning steel tube 1 matches connection with vertical rod 2.The lower end of I-steel 4 is with being fixed on wall 6 On Cantilever Beams 5 match.
Buckle of the present utility model can be directly sleeved on Cantilever Beams 5, the position for the adjustment vertical rod 2 that horizontally slipped along Cantilever Beams 5, The fastening bolt (i.e. fastener 3) of bottom is tightened after positioning can fix the position of vertical rod 2.Positioning steel tube 1 at the top of pedestal with Vertical rod 2 is socketed, and can prevent vertical rod 2 from offseting well, increases stability.The utility model can meet overhanging type exterior wall scaffold and Elevator scaffold sets up demand.The specific physical dimension designed at present can be matched with Cantilever Beams different model as needed It is adjusted during production.
The utility model is easy to by the way that the vertical rod 2 of moveable steel pipe scaffold is combined with Cantilever Beams 5 with click on fashion Position of the vertical rod 2 on Cantilever Beams 5 is adjusted, it is fixed to tighten fastening bolt (i.e. fastener 3) after the base positioning of vertical rod 2.
In the present embodiment, the supporting buckle for being adapted to 16# or 18# shaped steel Cantilever Beams can be selected as needed.In at the top of buckle Full weld length 200mm diameters 25mm positioning steel tube 1 is entreated, is easy to diameter 48mm vertical rod 2 to be inserted in, plays the bottom of vertical rod 2 and fix Effect, make vertical rod 2 that sidesway will not occur.

Claims (3)

1. a kind of overhanging type steel pipe scaffold vertical rod base stand location buckle, it is characterised in that including cutting ferrule (7), set in cutting ferrule (7) There is the I-steel (4) that can be slided, positioning steel tube (1) is fixed with the top of cutting ferrule (7), cutting ferrule (7), which is provided with, to be used to fasten work The fastener (3) of word steel (4).
2. a kind of overhanging type steel pipe scaffold vertical rod base stand location buckle as claimed in claim 1, it is characterised in that described For positioning steel tube (1) in vertical rod (2), positioning steel tube (1) matches connection with vertical rod (2).
3. a kind of overhanging type steel pipe scaffold vertical rod base stand location buckle as claimed in claim 1, it is characterised in that described The lower end of I-steel (4) matches with Cantilever Beams (5).
CN201720509939.XU 2017-05-09 2017-05-09 Overhanging type steel pipe scaffold vertical rod base stand location buckle Expired - Fee Related CN206829586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720509939.XU CN206829586U (en) 2017-05-09 2017-05-09 Overhanging type steel pipe scaffold vertical rod base stand location buckle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720509939.XU CN206829586U (en) 2017-05-09 2017-05-09 Overhanging type steel pipe scaffold vertical rod base stand location buckle

Publications (1)

Publication Number Publication Date
CN206829586U true CN206829586U (en) 2018-01-02

Family

ID=60770728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720509939.XU Expired - Fee Related CN206829586U (en) 2017-05-09 2017-05-09 Overhanging type steel pipe scaffold vertical rod base stand location buckle

Country Status (1)

Country Link
CN (1) CN206829586U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612296A (en) * 2018-05-31 2018-10-02 中国二十冶集团有限公司 Builder's jack steel pipe locating support and its application method
CN110017415A (en) * 2018-01-08 2019-07-16 启碁科技股份有限公司 Suspension type fixing seat
CN111622483A (en) * 2020-05-20 2020-09-04 湖南省第四工程有限公司 Method for erecting reverse-construction type overhanging scaffold
CN112177311A (en) * 2020-09-04 2021-01-05 中国建筑第二工程局有限公司 Steel pipe fixing end device for fixing I-shaped steel end of overhanging outer frame and construction method
CN114319831A (en) * 2021-11-18 2022-04-12 中建八局第二建设有限公司 Vertical rod positioning device of overhanging bearing frame
CN115506572A (en) * 2022-10-17 2022-12-23 上海建工四建集团有限公司 Section steel cantilever frame upright rod restraint device and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110017415A (en) * 2018-01-08 2019-07-16 启碁科技股份有限公司 Suspension type fixing seat
CN110017415B (en) * 2018-01-08 2023-09-15 启碁科技股份有限公司 Suspension type fixing seat
CN108612296A (en) * 2018-05-31 2018-10-02 中国二十冶集团有限公司 Builder's jack steel pipe locating support and its application method
CN111622483A (en) * 2020-05-20 2020-09-04 湖南省第四工程有限公司 Method for erecting reverse-construction type overhanging scaffold
CN112177311A (en) * 2020-09-04 2021-01-05 中国建筑第二工程局有限公司 Steel pipe fixing end device for fixing I-shaped steel end of overhanging outer frame and construction method
CN114319831A (en) * 2021-11-18 2022-04-12 中建八局第二建设有限公司 Vertical rod positioning device of overhanging bearing frame
CN115506572A (en) * 2022-10-17 2022-12-23 上海建工四建集团有限公司 Section steel cantilever frame upright rod restraint device and construction method

Similar Documents

Publication Publication Date Title
CN206829586U (en) Overhanging type steel pipe scaffold vertical rod base stand location buckle
CN204212399U (en) Flip-shell is to clasp
CN206233531U (en) Door-type scaffold and the attachment means for the door-type scaffold
CN207453859U (en) A kind of constructing tunnel foldable lifting Operation Van
US2201608A (en) Scaffolding
KR200381397Y1 (en) Foot plate safety guardrail device of mold
CN104372923B (en) Scaffolding
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
JP6220141B2 (en) A device for constructing a support base for a scaffold in a furnace
CN214834640U (en) Telescopic coiling and buckling type scaffold cross rod
CN205243068U (en) Support arrangement for be used for floor template
CN206299102U (en) A kind of adjustable for height safety scaffold
JP6220140B2 (en) Construction method of in-furnace scaffold and apparatus for constructing foundation deck of in-furnace scaffold
CN205688797U (en) A kind of support fire-fighting vestibule module
CN205502549U (en) Split type scaffold of hanging
CN216431163U (en) Super high-rise quick mounting and dismounting type measurement support capable of being turned over
CN205259558U (en) Novel scaffold for fitment
CN211597674U (en) Pole setting bearing structure of adjustable height
CN216239602U (en) Lapping operation frame
CN221077649U (en) Detachable suspension steel wire device based on subway station enclosure wall
CN218541471U (en) Outer scaffold is wall system even
CN219045297U (en) Scaffold upright rod supporting and fixing device for stair template inclined plane
CN209293802U (en) Tunnel construction formwork support
CN214575703U (en) Adjustable jacking for conversion layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

CF01 Termination of patent right due to non-payment of annual fee