CN206815544U - 一种干式柱梁节点 - Google Patents

一种干式柱梁节点 Download PDF

Info

Publication number
CN206815544U
CN206815544U CN201720339718.2U CN201720339718U CN206815544U CN 206815544 U CN206815544 U CN 206815544U CN 201720339718 U CN201720339718 U CN 201720339718U CN 206815544 U CN206815544 U CN 206815544U
Authority
CN
China
Prior art keywords
metal bracket
dry type
prefabricated post
connecting plate
column node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720339718.2U
Other languages
English (en)
Inventor
陈定球
刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201720339718.2U priority Critical patent/CN206815544U/zh
Application granted granted Critical
Publication of CN206815544U publication Critical patent/CN206815544U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型属于建筑工程领域,具体公开了一种干式梁柱节点,包括预制柱和至少一根预制梁,所述预制柱中预埋有连接件,所述预制柱的至少一侧通过所述连接件固定连接有金属牛腿,所述预制梁搭接在所述金属牛腿上;所述连接件包括连接板以及设置在连接板上的锚固支腿,所述连接板开设有穿接孔,所述连接板与金属牛腿通过螺栓连接。本实用新型的梁柱节点中预制柱与预制梁通过牛腿形成有效的干式连接,无湿作业,二者形成整体共同受力,增加了预制件联结拉紧能力,有利于预制件之间力的传导,满足建筑的建筑质量和技术性能,同时在装配过程中无需现浇混凝土,成本节约,施工速度快,施工周期短。

Description

一种干式柱梁节点
技术领域
本实用新型属于建筑工程领域,尤其涉及一种干式梁柱节点。
背景技术
装配式框架结构能大幅提高建造能力和建造速度,节省大量劳动力的同时保障了建造质量。装配式框架结构体系中连接方式是该结构的核心问题,同时也是该结构的薄弱环节,只要预制构件的接合部位有可靠的连接,才能保证结构的安全可靠。目前常规的梁柱连接有两种,一种采用叠合梁的方式,此种方式虽然能很好的保证节点的整体性和连接可靠性,但是存在大量的现浇工作,节点大都是现场湿作业,布筋复杂、不易操作、施工周期慢。另一种是采用预应力钢绞线穿入整根预制梁内预留孔道,但是预应力筋穿孔工作量大,较长孔道灌浆施工不便,且不便于安装,降低了装配式框架结构得建造灵活性和施工速度。
针对装配式框架结构的梁柱节点,尤其是低层装配式框架结构(如别墅),为了尽量简化连接构造和施工工艺,提高梁柱节点连接的施工效率,亟需开发新的框架梁柱连接节点,在满足承载力性能的前提下能简化现场施工中,方便现场操作,简化施工工艺,减少拼装时间。
实用新型内容
本实用新型的目的是提供一种构造简单,施工简便,可有效提高装配效率的干式梁柱节点。
上述目的是通过如下技术方案实现:一种干式梁柱节点,包括预制柱和至少一根预制梁,所述预制柱中预埋有连接件,所述预制柱的至少一侧通过所述连接件固定连接有金属牛腿,所述预制梁搭接在所述金属牛腿上;所述连接件包括连接板以及设置在连接板上的锚固支腿,所述连接板开设有穿接孔,所述连接板与金属牛腿通过螺栓连接。本实用新型在预制柱中预埋连接件,在装配过程中,根据安装需要,可通过连接件将金属牛腿连接在预制柱的侧壁,吊装预制柱,预制柱立好后,再吊装预制梁,使得预制梁搭接在所述牛腿上,优选并与牛腿形成可靠连接,上述的梁柱节点中预制柱与预制梁通过牛腿形成有效的干式连接,无湿作业,有利于预制件之间力的传导,满足建筑的建筑质量和技术性能,同时在装配过程中无需现浇混凝土,成本节约,施工速度快,施工周期短。
在实际操作过程中,当需要在预制柱的一侧或多侧均连接金属牛腿时,则需在预制柱中预埋多个连接件,通过连接件分别连接金属牛腿,然后通过牛腿与多根预制梁相连,如预制柱仅一侧连接预制梁,预制柱的相对的两侧面连接预制梁,预制柱的两相邻侧面连接预制梁,预制柱的三侧面连接预制梁,也可以是预制柱的四侧面均连接预制梁。
进一步,所述预制柱预埋连接件处开设有操作口。操作口的设置便于在预制件的装配过程中,通过操作口使用螺栓将预制柱和金属牛腿连接成整体,二者形成整体共同受力。
进一步,所述操作口中填充有浆料。如此设置,一方面可解决因预留操作口导致的不美观问题,另一方面,当操作口中的浆料凝固后,能够起到固定螺栓的作用,避免使用年限久或外力影响下螺栓松动。此时填充浆料并不影响施工进度,无需等待浆料硬化再进行下一预制件节点的安装。
进一步,所述连接板固定连接有与所述螺栓配合使用的连接套筒,所述连接套筒的一端封口,另一端固定连接在连接板开设穿接孔处的内侧面,所述螺栓连接金属牛腿后穿过所述穿接孔***所述连接套筒中。通过连接套筒将连接件与金属牛腿相连,预制梁无需开设操作口,安装金属牛腿时,仅需在将螺栓连接金属牛腿后穿过所述穿接孔***所述连接套筒中,然后拧紧即可实现连接,操作简便。应当说明的是,此处所述的内侧面是指连接板向预制柱内的那一面。
进一步,所述连接套筒为一端封口的加长螺母。将螺栓配合使用、封口的加长螺母焊接在连接板上,这样无需另外加工生产套筒,降低生产成本。
进一步,所述连接套筒包括设置连接在穿接孔处的螺母以及套接在螺母上的套筒。优选所述螺母为塑料制造并与与套筒过盈配合。
进一步,所述预制梁搭接在所述金属牛腿上的一端设有***孔,所述金属牛腿顶部设有***筋,所述***筋***所述***孔中。如此,在装配过程中,仅需在预制梁的吊装过程中将预制梁的端部搭接在设置在预制柱上的牛腿上的同时使得***件***所述预制梁中的***孔中即可,上述结构有利于预制柱与预制梁之间力的传导,同时大大提高现场安装的效率,提高了建造速度。牛腿上的***件***预制梁中的***孔的方式不仅可实现预制柱与预制梁的可靠连接,同时可有效约束预制梁的端部,确保梁端在地震作用下破坏较小甚至不破坏。
进一步,所述***孔中灌注有灌浆料。如此,通过灌浆料可将锚固件与预制梁连接成整体,进而增加牛腿与预制梁的整体性,连接更为可靠,所述灌浆料优选为砂浆。
进一步,所述金属牛腿为金属盒,所述金属盒内设有加强筋或所述金属盒的侧壁设有加强肋。如此设置,增加金属牛腿侧壁的刚度和抗拉力,提高金属牛腿的承受荷载的能力。优选,所述加强筋的两端分别连接所述金属盒的两个侧壁。优选,金属盒一面开口,这样无需另外开设操作口。应当理解,作为操作口的情况下,所述开口面与牛腿外连通。
进一步,所述金属牛腿的顶面铺设有坐浆层。如此设置,一方面有利于预制梁的调平,另一方面在预制梁落位时起到一定的缓冲作用,避免预制梁落位过程对构件造成损坏,同时在设置坐浆层的情况下,可增加牛腿与预制梁拼接面的粘结性,提高二者的整体性。
进一步,至少两根预制梁与所述预制柱的两侧面拼接,所述预制柱内至少预埋有设有两个连接件,所述两个连接件的锚固支腿错位设置。如此,便于在预制柱的多个侧面分别连接金属牛腿,然后通过金属牛腿与预制梁相连。
附图说明
构成本实用新型的一部分的附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。
图1为本实用新型一种实施方式所涉及的干式梁柱节点的正面剖视图;
图2为图1中所涉及的干式梁柱节点的A-A面剖视图;
图3为图1中所涉及的连接件的结构示意图;
图4为本实用新型另一种实施方式所涉及的干式梁柱节点的正面剖视图。
图中:
1 预制柱 2 预制梁 3 金属牛腿 4 连接件
5 螺栓 6 螺母 7 套筒 8 连接板
9 锚固支腿 10 穿接孔 11 ***孔 12 ***筋
13 灌浆料
具体实施方式
下面结合附图对本实用新型进行详细描述,本部分的描述仅是示范性和解释性,不应对本实用新型的保护范围有任何的限制作用。此外,本领域技术人员根据本文件的描述,可以对本文件中实施例中以及不同实施例中的特征进行相应组合。
本实用新型实施例如下,参照图1~3,一种干式梁柱节点,包括预制柱1和至少一根预制梁2,所述预制柱1中预埋有连接件4,所述预制柱1的至少一侧通过所述连接件4固定连接有金属牛腿3,所述预制梁2搭接在所述金属牛腿3上;所述连接件4包括连接板8以及设置在连接板8上的锚固支腿9,所述连接板8开设有穿接孔10,所述连接板8与金属牛腿3通过螺栓5连接。本实用新型在预制柱1中预埋连接件4,在装配过程中,根据安装需要,可通过连接件4将金属牛腿3连接在预制柱1的侧壁,吊装预制柱1,预制柱1立好后,再吊装预制梁2,使得预制梁2搭接在所述牛腿上,优选并与牛腿形成可靠连接,上述的梁柱节点中预制柱1与预制梁2通过牛腿形成有效的干式连接,无湿作业,有利于预制件之间力的传导,满足建筑的建筑质量和技术性能,同时在装配过程中无需现浇混凝土,成本节约,施工速度快,施工周期短。
在实际操作过程中,如图1和图4,当需要在预制柱1的一侧或多侧均连接金属牛腿3时,则需在预制柱1中预埋多个连接件4,通过连接件4分别连接金属牛腿3,然后通过牛腿与多根预制梁2相连,如预制柱1仅一侧连接预制梁2,预制柱1的相对的两侧面连接预制梁2,预制柱1的两相邻侧面连接预制梁2,预制柱1的三侧面连接预制梁2,也可以是预制柱1的四侧面均连接预制梁2。
上述实施例的基础上,本实用新型另一实施例中,所述预制柱1预埋连接件4处开设有操作口。操作口的设置便于在预制件的装配过程中,通过操作口使用螺栓5将预制柱1和金属牛腿3连接成整体,二者形成整体共同受力。
上述实施例的基础上,本实用新型另一实施例中,所述操作口中填充有浆料。如此设置,一方面可解决因预留操作口导致的不美观问题,另一方面,当操作口中的浆料凝固后,能够起到固定螺栓5的作用,避免使用年限久或外力影响下螺栓5松动。此时填充浆料并不影响施工进度,无需等待浆料硬化再进行下一预制件节点的安装。
上述实施例的基础上,本实用新型另一实施例中,如图1,所述连接板8固定连接有与所述螺栓5配合使用的连接套筒,所述连接套筒的一端封口,另一端固定连接在连接板8开设穿接孔10处的内侧面,所述螺栓5连接金属牛腿3后穿过所述穿接孔10***所述连接套筒中。通过连接套筒将连接件4与金属牛腿3相连,预制梁2无需开设操作口,安装金属牛腿3时,仅需在将螺栓5连接金属牛腿3后穿过所述穿接孔10***所述连接套筒中,然后拧紧即可实现连接,操作简便。应当说明的是,此处所述的内侧面是指连接板8向预制柱1内的那一面。
上述实施例的基础上,本实用新型另一实施例中,所述连接套筒为一端封口的加长螺母6。将螺栓5配合使用、封口的加长螺母6焊接在连接板8上,这样无需另外加工生产套筒7,降低生产成本。
上述实施例的基础上,本实用新型另一实施例中,如图1,所述连接套筒包括设置连接在穿接孔10处的螺母6以及套接在螺母6上的套筒7。优选所述螺母6与套筒7过盈配合。
上述实施例的基础上,本实用新型另一实施例中,如图1和图2,所述预制梁2搭接在所述金属牛腿3上的一端设有***孔11,所述金属牛腿3顶部设有***筋12,所述***筋12***所述***孔11中。如此,在装配过程中,仅需在预制梁2的吊装过程中将预制梁2的端部搭接在设置在预制柱1上的牛腿上的同时使得***件***所述预制梁2中的***孔11中即可,上述结构有利于预制柱1与预制梁2之间力的传导,同时大大提高现场安装的效率,提高了建造速度。牛腿上的***件***预制梁2中的***孔11的方式不仅可实现预制柱1与预制梁2的可靠连接,同时可有效约束预制梁2的端部,确保梁端在地震作用下破坏较小甚至不破坏。
上述实施例的基础上,本实用新型另一实施例中,如图1,所述***孔11中灌注有灌浆料13。如此,通过灌浆料13可将锚固件与预制梁2连接成整体,进而增加牛腿与预制梁2的整体性,连接更为可靠,所述灌浆料13优选为砂浆。
上述实施例的基础上,本实用新型另一实施例中,所述金属牛腿3为金属盒,所述金属盒内设有加强筋或所述金属盒的侧壁设有加强肋。如此设置,增加金属牛腿3侧壁的刚度和抗拉力,提高金属牛腿3的承受荷载的能力。优选,所述加强筋的两端分别连接所述金属盒的两个侧壁。优选,金属盒一面开口,这样无需另外开设操作口。应当理解,作为操作口的情况下,所述开口面与牛腿外连通。
上述实施例的基础上,本实用新型另一实施例中,所述金属牛腿3的顶面铺设有坐浆层。如此设置,一方面有利于预制梁2的调平,另一方面在预制梁2落位时起到一定的缓冲作用,避免预制梁2落位过程对构件造成损坏,同时在设置坐浆层的情况下,可增加牛腿与预制梁2拼接面的粘结性,提高二者的整体性。
上述实施例的基础上,本实用新型另一实施例中,至少两根预制梁2与所述预制柱1的两侧面拼接,所述预制柱1内至少预埋有设有两个连接件4,所述两个连接件4的锚固支腿9错位设置。如此,便于在预制柱1的多个侧面分别连接金属牛腿3,然后通过金属牛腿3与预制梁2相连。
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。

Claims (10)

1.一种干式梁柱节点,包括预制柱和至少一根预制梁,其特征在于,所述预制柱中预埋有连接件,所述预制柱的至少一侧通过所述连接件固定连接有金属牛腿,所述预制梁搭接在所述金属牛腿上;所述连接件包括连接板以及设置在连接板上的锚固支腿,所述连接板开设有穿接孔,所述连接板与金属牛腿通过螺栓连接。
2.根据权利要求1所述的干式梁柱节点,其特征在于,所述预制柱预埋连接件处开设有操作口。
3.根据权利要求2所述的干式梁柱节点,其特征在于,所述操作口中填充有浆料。
4.根据权利要求1所述的干式梁柱节点,其特征在于,所述连接板固定连接有与所述螺栓配合使用的连接套筒,所述连接套筒的一端封口,另一端固定连接在连接板开设穿接孔处的内侧面,所述螺栓连接金属牛腿后穿过所述穿接孔***所述连接套筒中。
5.根据权利要求4所述的干式梁柱节点,其特征在于,所述连接套筒为一端封口的加长螺母;或所述连接套筒包括设置连接在穿接孔处的螺母以及套接在螺母上的套筒。
6.根据权利要求1~5任意一项所述的干式梁柱节点,其特征在于,所述预制梁搭接在所述金属牛腿上的一端设有***孔,所述金属牛腿顶部设有***筋,所述***筋***所述***孔中。
7.根据权利要求6所述的干式梁柱节点,其特征在于,所述***孔中灌注有灌浆料。
8.根据权利要求7所述的干式梁柱节点,其特征在于,所述金属牛腿为金属盒,所述金属盒内设有加强筋或所述金属盒的侧壁设有加强肋。
9.根据权利要求7所述的干式梁柱节点,其特征在于,所述金属牛腿的顶面铺设有坐浆层。
10.根据权利要求1~5任意一项所述的干式梁柱节点,其特征在于,至少两根预制梁与所述预制柱的两侧面拼接,所述预制柱内至少预埋有设有两个连接件,所述两个连接件的锚固支腿错位设置。
CN201720339718.2U 2017-03-31 2017-03-31 一种干式柱梁节点 Active CN206815544U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720339718.2U CN206815544U (zh) 2017-03-31 2017-03-31 一种干式柱梁节点

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720339718.2U CN206815544U (zh) 2017-03-31 2017-03-31 一种干式柱梁节点

Publications (1)

Publication Number Publication Date
CN206815544U true CN206815544U (zh) 2017-12-29

Family

ID=60753075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720339718.2U Active CN206815544U (zh) 2017-03-31 2017-03-31 一种干式柱梁节点

Country Status (1)

Country Link
CN (1) CN206815544U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104281A (zh) * 2018-01-12 2018-06-01 上海城乡建筑设计院有限公司 一种用于装配式结构外墙无企口叠合梁的侧模做法
CN112177153A (zh) * 2020-08-10 2021-01-05 锦萧建筑科技有限公司 框架节点的连接机构与连接方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104281A (zh) * 2018-01-12 2018-06-01 上海城乡建筑设计院有限公司 一种用于装配式结构外墙无企口叠合梁的侧模做法
CN112177153A (zh) * 2020-08-10 2021-01-05 锦萧建筑科技有限公司 框架节点的连接机构与连接方法

Similar Documents

Publication Publication Date Title
CN207003643U (zh) 一种装配式梁柱节点
CN206815520U (zh) 一种预制柱与预制梁的连接节点
CN206815547U (zh) 一种框架式梁柱节点
CN105756202A (zh) 结合叠合楼板的装配式剪力墙齿槽式连接结构
CN105926766B (zh) 装配式剪力墙齿槽式连接结构拼装工法
CN107023121A (zh) 一种用于装配式混凝土结构延性连接的钢筋灌浆套筒
CN208441231U (zh) 一种混凝土梁柱干法连接节点
CN206034631U (zh) 一种墙板与楼板的连接节点
CN206815666U (zh) 一种多层墙板以及墙板与楼板的连接节点
CN209179247U (zh) 一种新型预制钢筋混凝土剪切力墙连接结构
CN206873767U (zh) 一种用于装配式混凝土结构延性连接的钢筋灌浆套筒
CN109339344A (zh) 一种高层装配式混凝土剪力墙结构盒式连接结构及方法
CN207003634U (zh) 一种阳台板安装节点
CN206815544U (zh) 一种干式柱梁节点
CN207003644U (zh) 一种低层装配式梁柱节点
CN108505647A (zh) 一种预制装配式压型钢板混凝土剪力墙及其施工方法
CN105350641B (zh) 适用于预制装配建筑的框架柱连接节点及其施工工艺
CN207003713U (zh) 一种部分现浇剪力墙
CN206815521U (zh) 一种装配式框架梁柱节点
CN206815539U (zh) 一种墙板与梁的连接节点
CN207003673U (zh) 一种梁与墙板的连接节点
CN206815519U (zh) 一种预制柱与预制梁的连接节点
CN110107023A (zh) 一种用于装配式建筑的刚性连接预制框架梁
CN207003645U (zh) 一种预制柱与预制梁的连接节点
CN212836854U (zh) 一种房屋建筑加固墙体结构

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Dry -type post girder segment point

Granted publication date: 20171229

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Dry -type post girder segment point

Granted publication date: 20171229

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Dry -type post girder segment point

Granted publication date: 20171229

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 2005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hantai Construction Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980009995

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210929

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shangyi Engineering Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010464

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20211011

EE01 Entry into force of recordation of patent licensing contract