CN206625528U - A kind of saddle climbing type Work platform system - Google Patents

A kind of saddle climbing type Work platform system Download PDF

Info

Publication number
CN206625528U
CN206625528U CN201720219361.4U CN201720219361U CN206625528U CN 206625528 U CN206625528 U CN 206625528U CN 201720219361 U CN201720219361 U CN 201720219361U CN 206625528 U CN206625528 U CN 206625528U
Authority
CN
China
Prior art keywords
saddle
platform
seat
frame
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720219361.4U
Other languages
Chinese (zh)
Inventor
龚剑
黄跃申
黄玉林
周虹
潘曦
吴联定
扶新立
顾国明
刘鑫
朱亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201720219361.4U priority Critical patent/CN206625528U/en
Application granted granted Critical
Publication of CN206625528U publication Critical patent/CN206625528U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of saddle climbing type Work platform system, and for the construction of assembled arthitecutral structure, the system includes:At least two groups of lift drive systems, every group of lift drive system includes saddle, drive device and seat in the plane frame, seat in the plane frame is sheathed on saddle, drive device is fixed on the frame of seat in the plane, composition integral lifting platform is connected by operating platform between the seat in the plane frame of adjacent lift drive system, operating platform between the seat in the plane frame of adjacent lift drive system is that two upper lateral parts of intermediary operation platform are hinged with corresponding seat in the plane frame, two side lower parts of intermediary operation platform are connected with corresponding seat in the plane frame by sliding laterally attachment means, the lateral displacement constraint of low connection point of the intermediary operation platform caused by frame operation in both sides seat in the plane is asynchronous can be discharged, it ensure that the constraint of vertical and horizontal both direction is still effective simultaneously, so as to reach release internal stress and ensure platform stabilization and the double effectses of security.

Description

A kind of saddle climbing type Work platform system
Technical field
It the utility model is related to assembled architecture construction field, more particularly to a kind of saddle climbing type Work platform system.
Background technology
Under the key strategy driving for accelerating propulsion building industrialization in China, novel fabricated building is rapidly developed, State Council's issue《On greatly developing the instruction of assembled architecture》, even more specify that made assembling with 10 years or so time Formula building account for new building area ratio reach 30% objectives.As novel fabricated construction project is increasing, Corresponding industrialized production process technology is also in continuous transition and upgrade, but domestic assembled architecture agent structure building course at present In still continue to use the mode of production of cast-in-place structural mostly, such as in main body construction and decoration of exterior wall stage using traditional scaffold, whole The operating type such as body hoisting scaffold and driven hanging basket, it is high etc. there is high material consumption, low construction efficiency, cost Problem.
Thus, saddle climbing type workbench is applied and given birth to.Saddle climbing type workbench is a kind of large-scale from lift Aerial work platform, for high-altitude engineering construction, solve traditional scaffold there is using material it is more, set up that the time is long, behaviour Constructing operation is not easy to as podium level, the problems such as construction material is not easy to transmission, safe construction hidden danger is more, be especially suitable for With skin decorations operation.
According to saddle number can be divided into single saddle and more saddles, wherein double saddles because its have concurrently each side's advantage turn into it is most normal Saddle climbing type workbench.Intermediary operation platform between double saddles, it is the main of saddle climbing type workbench Part, it is formed according to construction requirement by the connection of multiple standard platform modules, and the both ends of intermediary operation platform are connected to both sides machine On the frame of position.Because both sides seat in the plane frame can not operationally accomplish Complete Synchronization, this will result in intermediary operation platform operationally Have situation about being slightly tilted to occur, as intermediary operation platform will become one using being all hinged with both sides seat in the plane frame up and down Individual redundant structure and produce larger internal stress;And then in stability and security if only using top hinged lower portion connectionless It is upper to be weak again.
In addition, common saddle climbing type Work platform system is generally individual layer, and triangular truss is generally used, and it is single Layer operation platform carry out prefabricated components pose adjustment, reinforcing bar arranges and colligation, the work such as pour when, can not meet efficiently to construct It is required that.
Utility model content
The purpose of this utility model is to provide a kind of saddle climbing type Work platform system solve existing saddle climbing type Operating platform in Work platform system between the seat in the plane frame of adjacent lift drive system is intermediary operation platform and adjacent seat in the plane The problem of internal stresses release demand present in frame connection is with stability, security contradiction.
As this in order to solve the above technical problems, the utility model provides following technical scheme:
A kind of saddle climbing type Work platform system, for the construction of assembled arthitecutral structure, including:At least two groups of liftings Drive system, lift drive system described in every group include saddle, drive device and seat in the plane frame, and seat in the plane frame is sheathed on saddle, Drive device is fixed on the frame of seat in the plane, and the overall liter of composition is connected by operating platform between the seat in the plane frame of adjacent lift drive system Platform drops, and the integral lifting platform can move under the drive of drive device along saddle as vertical lifting, adjacent lifting Two upper lateral parts of the operating platform between the seat in the plane frame of drive system are hinged with corresponding seat in the plane frame, adjacent lift drive system Two side lower parts of the operating platform between the frame of seat in the plane are connected with corresponding seat in the plane frame by sliding laterally attachment means.
Preferably, it is described to slide laterally attachment means, including fixation in above-mentioned saddle climbing type Work platform system The horizontal cross sleeve pipe of the lower side for the operating platform being installed between the seat in the plane frame of the adjacent lift drive system, extension Bar and spacer pin, one end of the extension rod are hinged with corresponding seat in the plane frame, and the other end of the extension rod passes the water It is fixedly connected after putting down horizontal sleeve pipe with the spacer pin, the length of the extension rod is more than the length of the horizontal cross sleeve pipe, The extension rod can move relative to the horizontal cross sleeve pipe.
Preferably, in above-mentioned saddle climbing type Work platform system, the integral lifting platform is double-deck operation horizontal Platform, the operating platform are formed by connecting by some console modules, and the console module includes a rectangle truss structure, rectangle truss The top surface laying upper strata platen of structure is as upper strata job platform, and the bottom surface laying lower floor platen of rectangle truss structure is as lower floor Job platform, the periphery of the integral lifting platform install protection network additional.
Preferably, in above-mentioned saddle climbing type Work platform system, between the upper strata platen and lower floor's platen Distance is 1.8m-3.1m.
Preferably, in above-mentioned saddle climbing type Work platform system, the rectangle truss structure by crossbeam, longeron, Vertical connection forms column two-by-two, and the crossbeam is horizontally disposed with the longeron, and the longeron is perpendicular to building structure wall Face, the console module also include flexible rod and bridging piece, the flexible rod be arranged on longeron towards building that End and can opposing side rails movement, when the flexible rod stretches out longeron, bridging piece is layed on flexible rod, and corresponding lower floor makees The bridging piece of industry platform is hinged with a turnover panel, width and the integral lifting platform and building of the turnover panel close to that side of building Between spacing match.
Preferably, in above-mentioned saddle climbing type Work platform system, being additionally included in when integral lifting platform stops makes Rack locking device, the drive device include motor and by motor-driven gears, and the saddle is by some saddles Standard knot is formed by connecting, and the correspondence position of the saddle standard knot is provided with stationary rack, the gear and the stationary rack phase Engagement, the rack locking device include be used for be meshed with the stationary rack on saddle locking rack, be installed on seat in the plane frame On locking base, caging bolt and the limit switch for cutting off dynamical system, it is described locking base include one vertically every The locking base is separated into two parts by plate, the vertical baffle, and one is for housing the rack for locking rack Installing frame, another is the switch attachment member for setting limit switch, is opened up on the vertical baffle for the caging bolt The bolt hole worn, when the nut of the caging bolt cuts off dynamical system by triggering limit switch, the locking rack It could be embedded in the rack installing frame and be meshed with the stationary rack on the saddle.
Preferably, in above-mentioned saddle climbing type Work platform system, in addition to some groups of laser sensors, it is adjacent As intermediary operation platform, the integral lifting platform also includes setting operating platform between the seat in the plane frame of lift drive system Outside operating platform on the outside of the seat in the plane frame of outside lift drive system, each laser sensor include transmitter and reception Device, the transmitter and receiver are respectively arranged at the down either side of intermediary operation platform and outside operating platform.
Preferably, in above-mentioned saddle climbing type Work platform system, in addition to some tool-type wall-attaching equipments, it is described Saddle is fixed on construction floor exterior wall by the tool-type wall-attaching equipment interval, the tool-type wall-attaching equipment, including One is arranged in attached wall framework, three expansion links and a connector on building structure window, and one end of the attached wall framework is consolidated Surely there is a limited block, the other end of the attached wall framework is provided with the adjustable fastening assembly in position, the limited block and described tight Gu component is located at the inside and outside both sides of exterior wall respectively;One end of the expansion link and the attached wall frame articulation, the expansion link The other end is connected by connector with the saddle, and the fastening assembly includes positioning rod member and transverse screw, the attached wall On framework along the direction of vertical wall be provided with a row be used for set positioning rod member the first screwed hole, it is described positioning rod member on it is remote One end of attached wall framework is provided with the second screwed hole for the transverse screw that is spirally connected, the transverse screw and the limited block The first supporting steel plate of the first flexible cushion block of band is equipped with towards the side of exterior wall.
Preferably, in above-mentioned saddle climbing type Work platform system, the expansion link, including big sleeve pipe, middle sleeve, Adjusting screw rod and connecting seat, one end of the big sleeve pipe and the attached wall frame articulation, institute is stretched into one end of the middle sleeve The other end of big sleeve pipe is stated, the threaded one end of the adjusting screw rod is connected in the other end of the middle sleeve, the regulation spiral shell The other end of bar is threadedly coupled with connecting seat, and the connecting seat is hinged with the connector, the equal edge of big sleeve pipe and middle sleeve Itself is axially arranged with row's bolt hole, and by selecting the different bolts hole on the big sleeve pipe and middle sleeve to realize, expansion link is grown The coarse adjustment of degree, the accurate adjustment section of length of telescopic bar is realized by being threadedly coupled between middle sleeve and adjusting screw rod.
Preferably, it is symmetrical on the attached wall framework to be provided with one in above-mentioned saddle climbing type Work platform system To the top bracing mechanism for supporting window vertical side walls, the top bracing mechanism include a shore for being provided with some bolts hole and Positioning screw, the shore is threadedly coupled by one in the bolt hole with the attached wall framework, on the shore That one end away from attached wall framework sets a connection protrusive board, and the connection protrusive board and the shore are perpendicular, and the connection is convex The screwed hole for being threadedly coupled the positioning screw is opened up on plate, the positioning screw is parallel with the shore, described That one end away from attached wall framework on positioning screw is provided with the second supporting steel plate of the second flexible cushion block of band.
Preferably, in above-mentioned saddle climbing type Work platform system, a combined type is fixed in the bottom of each saddle In support base, the Combined support base includes steel framework, four flexible support legs, some return pulleys, saddle underframe and passage Ladder, the return pulley are arranged at the lower section of the steel framework, and the saddle underframe is fixedly installed in institute's steel framework, and the access ladder is set In the side of the steel framework, the steel framework includes a pair of both ends and is provided with bolt locking holes and the horizontal steel pipe being parallel to each other, described Bolt locking holes are located on four Angle Positions of the steel framework, are axially arranged with row's spiral shell along flexible support leg in every flexible support leg Keyhole, one end of every flexible support leg be can extend into the corresponding end of corresponding horizontal steel pipe, and the other end of every flexible support leg is set Spike is put, steel framework can be fixed on by the bolt locking holes on steel framework and bolt on ground, or by steel framework Bolt locking holes and bolt fix every flexible support leg.
Preferably, in above-mentioned saddle climbing type Work platform system, the quantity of the integral lifting platform is at least There are two, be arranged at intervals on the saddle.
From techniques disclosed above scheme, compared with prior art, the beneficial effects of the utility model are as follows:
First, saddle climbing type Work platform system provided by the utility model, solves existing saddle climbing type workbench Operating platform in system between the seat in the plane frame of adjacent lift drive system is during intermediary operation platform couples with corresponding seat in the plane frame The problem of existing internal stresses release and stability, security contradiction, the utility model is by by the both sides of intermediary operation platform Top is connected using be hinged connecting mode, two side lower parts with corresponding seat in the plane frame with corresponding seat in the plane frame using transverse slide Connect, release transverse direction (i.e. X to) position of low connection point of the intermediary operation platform caused by frame operation in both sides seat in the plane is asynchronous Constraint is moved, while ensure that vertical and laterally (i.e. Y-direction and Z-direction) both direction constraint is still effective, so as to reach release Internal stress and guarantee platform stabilization and the double effectses of security.
2nd, saddle climbing type Work platform system provided by the utility model, the triangular truss generally used is changed to Rectangle truss structure, and truss structure is highly drawn high, develop into double-decked platform, rectangle truss structure using truss structure itself Top surface laying upper strata platen be used as upper strata job platform, rectangle truss structure bottom surface laying lower floor's platen as lower floor's operation Platform, it is not only simple in construction, stress force transfer system is clear and definite, stability is good, furthermore, it is possible to meet that some needs are flat at upper and lower two The face demand constructed simultaneously, especially in the pose adjustment of precast facade of assembling structure, reinforcing bar colligation, the construction such as pour When, it can simultaneously carry out up and down, substantially increase the efficiency of assembling of precast facade, meet the requirement of safe efficient construction.This Outside, the utility model can be easily combined into variously-shaped whole by using flexible rod and bridging piece according to construction requirement Body hoistable platform.In addition, using coupling type connecting mode between adjacent operation module, the making essence of each standard platform is reduced Degree requires, simplifies mounting process, facilitates the installation at scene.
3rd, saddle climbing type Work platform system provided by the utility model, in integral lifting platform when static, pass through Integral lifting platform is fixed on saddle by the rack locking device with engaging for the rack on saddle so that integral lifting platform Load transfer between locking rack and stationary rack, thus freeing that the brake force of motor, improve motor applying working condition, solve The problem of brake force deficiency that the long-term electromagnetic braking of motor may occur causes platform to decline.In addition, by the way that saddle is installed on On Combined support base, solve the fixed base of elevating construction platform and what movable base accessory device can not exchange asks Topic.
4th, saddle climbing type Work platform system provided by the utility model, wall-attaching equipment use clamping type wall-attaching equipment, By the window of building structure, the part that attached wall is connected with building structure is connected by the way of clip with building structure.Folder Button spacing combines regulation using equidistant bolt hole plus two kinds of coarse-fine modes of screw thread, and the spacing of achievable any distance is to be adapted to The exterior wall of different-thickness.The first flexible cushion block combination is being added using the first supporting steel plate with exterior wall contact portion, increased Protect wall face to exempt to recruit destruction while clamping force to greatest extent, solve the problems, such as that existing attached wall External Wall destroys.
5th, saddle climbing type Work platform system provided by the utility model, by setting some groups of laser sensors, Each laser sensor includes transmitter and receiver, the transmitter and receiver be respectively arranged at intermediary operation platform with And the down either side of outside operating platform, if receiver can not receive the signal from transmitter, illustrate on following running orbit The barrier for being likely to occur collision is present, thus in integral lifting platform during decline, can detect the operation in future The barrier that collision whether is likely to occur on track is present, and if any barrier, can stop integral lifting platform motion in time, Reruned after complete barrier for clearance, so as to solve the collision problem that may occur during integral lifting platform decline, it is ensured that Construction safety.
Brief description of the drawings
Fig. 1 is the positive structure schematic of the saddle climbing type Work platform system of the embodiment of the utility model one.
Fig. 2 is the side structure schematic diagram of the saddle climbing type Work platform system of the embodiment of the utility model one.
Fig. 3 is that the structural representation for sliding laterally attachment means is put down in the embodiment of the utility model one.
Fig. 4 is one of structural representation of console module in the embodiment of the utility model one.
Fig. 5 is two (turnover panel is not drawn into) of the structural representation of console module in the embodiment of the utility model one.
Fig. 6 is the planar structure schematic diagram of wall-attaching equipment in the embodiment of the utility model one.
Fig. 7 is the facade structures schematic diagram of wall-attaching equipment in the embodiment of the utility model one.
Fig. 8 is one of structural representation of rack locking device in the embodiment of the utility model one (installation locking rack When triggering limit switch).
Fig. 9 (does not install locking rack for the two of the structural representation of the embodiment middle rack locking device of the utility model one When triggering limit switch).
Figure 10 is that the schematic top plan view of the embodiment middle rack locking device of the utility model one (locks rack installation signal Figure).
Figure 11 is the dimensional structure diagram of the embodiment middle rack locking device of the utility model one.
Figure 12 is the dimensional structure diagram of Combined support base in the embodiment of the utility model one.
Figure 13 is the schematic top plan view of Combined support base in the embodiment of the utility model one.
In figure:1- lift drive systems, 11- saddles, 111- stationary racks, 12- seats in the plane frame, 13- drive devices, 14- are hung Bar, 2- integral lifting platforms, 21- intermediary operations platform, 22- peripheral operations platform, 211- upper stratas platen, 212- lower floors platen, The flexible rod of 213- crossbeams, 214- longerons, 215- columns, 216-, 217- bridging pieces, 218- protection networks, 219- hooks, 220- connections Lug, 221- turnover panels, 3- tool-types wall-attaching equipment, 31- attached walls framework, 311- vertical poles, 312- cross bars, 313- diagonal braces, 32- stretch The big sleeve pipe of bar, 321-, 322- middle sleeves, 323- adjusting screw rods, 324- connecting seats, 33- connectors, 34- limited blocks, 35- fastenings Component, 351- positioning rod member, 352- transverse screws, the supporting steel plates of 36- first, the first flexible cushion blocks of 37-, 38- top bracing mechanisms, 381- shores, 382- positioning screws, 383- connections protrusive board, the supporting steel plates of 384- second, 4- slide laterally attachment means, 41- Horizontal cross sleeve pipe, 42- extension rods, 43- spacer pins, 5- racks locking device, 51- lockings rack, 52- lockings base, 521- Vertical baffle, 522- racks installing frame, 5221- top plates, 5222- bottom plates, the vertical connecting plates of 5223-, 5224- gussets, 523- are opened Close installation portion, 53- caging bolts, 54- limit switches, 55- draw rings screw, 61- transmitters, 62- receivers, 7- checking motions, The flexible support leg of 8- exterior walls, 9- Combined support bases, -91- steel frameworks, 911- bolt locking holes, 92-, 93- return pulleys, 94- saddles bottom Frame, 95- access ladders, 96- spikes.
Embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes saddle climbing type Work platform system make into One step describes in detail.According to following explanation and claims, advantages and features of the present utility model will become apparent from.It should be noted It is that accompanying drawing uses using very simplified form and non-accurately ratio, only to convenience, lucidly aids in illustrating this reality With the purpose of new embodiment.
Fig. 1 to Figure 13 is referred to, present embodiment discloses a kind of saddle climbing type Work platform system, is built for assembled The construction of building structure, including:At least two groups of lift drive systems 1, lift drive system 1 described in every group are included by some section guide rails Saddle 11, drive device 13 and the seat in the plane frame 12 of frame standard knot connection composition, the seat in the plane frame 12 are sheathed on saddle 11, institute State drive device 13 to be fixed on seat in the plane frame 12, the drive device 13 can drive the seat in the plane frame 12 along the saddle 11 Move up and down, composition integral lifting platform 2, institute are connected by operating platform between the seat in the plane frame 12 of adjacent lift drive system 1 Stating integral lifting platform 2 can move under the drive of drive device 13 along saddle 11 as vertical lifting, adjacent lifting driving Operating platform between the seat in the plane frame 12 of system 1 is that two upper lateral parts of intermediary operation platform 21 are be hinged with corresponding seat in the plane frame 12, Operating platform between the seat in the plane frame 12 of adjacent lift drive system 1 is two side lower parts of intermediary operation platform 21 and corresponding machine Position frame 12 is connected by sliding laterally attachment means 4.
The saddle climbing type Work platform system that the present embodiment provides, due to two upper lateral parts of the intermediary operation platform 21 Be hinged with corresponding seat in the plane frame 12, two side lower parts of the intermediary operation platform 21 pass through laterally (i.e. X with corresponding seat in the plane frame 12 To) sliding connecting device connection, release intermediary operation platform 21 because both sides seat in the plane frame 12 is run it is asynchronous caused by centre The lateral displacement constraint of low connection point between operating platform 21 and corresponding seat in the plane frame 12, while ensure that vertical and horizontal (i.e. Y To and Z-direction) both direction constraint it is still effective, so as to reached release internal stress and ensure the internal junction of integral lifting platform 2 Structure couples stability and security.
Please emphasis refer to Fig. 3, it is described laterally sliding preferably, in the saddle climbing type Work platform system of the present embodiment Dynamic attachment means 4, including the operating platform being fixedly installed between the seat in the plane frame 12 of the adjacent lift drive system 1 are i.e. middle Horizontal cross sleeve pipe 41, extension rod 42 and the spacer pin 43 of the lower side of operating platform 21, one end of the extension rod 42 It is be hinged with corresponding seat in the plane frame 12, the other end of the extension rod 42 pass after the horizontal cross sleeve pipe 41 with the spacer pin 43 are fixedly connected, and the length of the extension rod 42 is more than the length of the horizontal cross sleeve pipe 41, and the extension rod 42 being capable of phase The horizontal cross sleeve pipe 41 is moved.In the present embodiment, the horizontal cross sleeve pipe 41 is divided into two sections of settings, is individually fixed in On intermediary operation platform 21.The present embodiment can prevent extension rod 42 from dividing with horizontal cross sleeve pipe 41 by setting spacer pin 43 From, it is ensured that safety.Attachment means 4 are slid laterally using said structure, simple in construction, connection is reliable, releases intermediary operation Platform 21 because both sides seat in the plane frame 12 is run it is asynchronous caused by intermediary operation platform 21 and corresponding seat in the plane frame 12 between bottom connect The lateral displacement constraint of contact, while ensure that the constraint of vertical and horizontal both direction is still effective, so as to reach release While internal stress, ensure the internal structure of integral lifting platform 2 connection stability, it is ensured that whole saddle climbing type workbench system The security of system.
The operation that the integral lifting platform 2 can only be included between the seat in the plane frame 12 of adjacent lift drive system 1 is put down Platform is intermediary operation platform 21, can also also include being arranged at outside lift drive system 1 in addition to intermediary operation platform 21 The operating platform in the outside of seat in the plane frame 12 is peripheral operation platform 22.
Please emphasis refer to Fig. 4 and Fig. 5, in the present embodiment, integral lifting platform 2 includes intermediary operation platform 21 and grasped with outside Make platform 22.Preferably, in the saddle climbing type Work platform system of the present embodiment, the integral lifting platform 2 is bilayer Job platform, the operating platform are formed by connecting by some console modules, that is to say, that in the present embodiment, the intermediary operation Platform 21 is formed by connecting with peripheral operation platform 22 by some console modules, and the console module includes a rectangle truss knot Structure, the top surface laying upper strata platen 211 of rectangle truss structure is used as upper strata job platform, under the bottom surface laying of rectangle truss structure Layer platen 212 installs protection network 218 additional as lower floor's job platform, the periphery of the integral lifting platform 2.Integral lifting platform 2 Existing triangular truss is substituted using rectangle truss structure, and rectangle truss structure is highly drawn high, by rectangle truss structure Double-decked platform itself is developed into, the top surface laying upper strata platen 211 of rectangle truss structure is used as upper strata job platform, rectangle truss The bottom surface laying lower floor platen 212 of structure is as lower floor's job platform, and not only simple in construction, stress force transfer system is clearly, stably Property is good, furthermore, it is possible to meet some needs in upper and lower two planes while the needs of being constructed, especially in the pre- of assembling structure The pose adjustment of exterior wall 8 processed, reinforcing bar colligation, when the construction such as pouring, it can simultaneously carry out up and down, substantially increase precast facade 8 Efficiency of assembling, meet the requirement of safe efficient construction.In addition, the utility model is by using flexible rod 216 and bridging piece 217 can easily be combined into variously-shaped integral lifting platform 2 according to construction requirement.In addition, adjacent console module it Between using hook 219 formula connecting modes, reduce the making required precision of each standard platform, simplify mounting process, facilitate The installation at scene.The console module adjacent with seat in the plane frame 12 is additionally provided with the connection lug for being threadedly coupled with adjacent seat in the plane frame 12 220。
For the ease of workmen same precast facade 8 is synchronously carried out on upper strata job platform and lower floor's job platform The construction of upper and lower end, in the saddle climbing type Work platform system of the present embodiment, the upper strata platen 211 and lower floor's platen The distance between 212 be 1.8m-3.1m.
Preferably, in the saddle climbing type Work platform system of the present embodiment, the rectangle truss structure is by crossbeam 213rd, vertical connection forms two-by-two for longeron 214, column 215, and the crossbeam 213 is horizontally disposed and described with the longeron 214 Longeron 214 is exterior wall 8 perpendicular to building structure metope, and the console module also includes flexible rod 216 and bridging piece 217, can To install the flexible rod and bridging piece according to the exterior wall shape of building, the flexible rod 216 be arranged on longeron 214 towards That one end of building and can opposing side rails 214 move, the bridging piece 217 of corresponding lower floor's job platform is close to that side of building hinge A turnover panel 221 is connected to, the spacing between the width and integral lifting platform 2 and building of the turnover panel 221 matches.Stretched when described When contracting rod 216 stretches out longeron 214, bridging piece 217 is layed on flexible rod 216, when integral lifting platform 2 is vertically movable, Turnover panel 221 is rolled, so that integral lifting platform 2 moves up and down;When integral lifting platform 2 vertically stops workmen's construction When, turnover panel 221 is layed in flexible rod 216, to avoid falling object from high altitude.
Please emphasis refer to Fig. 6 and Fig. 7, preferably, in the saddle climbing type Work platform system of the present embodiment, in addition to Some tool-type wall-attaching equipments 3, the saddle 11 are fixed on construction floor exterior wall by the tool-type wall-attaching equipment 3 interval On 8, the tool-type wall-attaching equipment 3, including one be arranged in 31, three expansion links 32 of attached wall framework on building structure window and One connector 33, one end of the attached wall framework 31 are fixed with a limited block 34, and the other end of the attached wall framework 31 is set There is the adjustable fastening assembly 35 in position, the limited block 34 and the fastening assembly 35 are located at the inside and outside both sides of exterior wall 8 respectively; One end of the expansion link 32 and the attached wall framework 31 are be hinged, the other end of the expansion link 32 by connector 33 with it is described Saddle 11 connects, and the fastening assembly 35 includes positioning rod member 351 and transverse screw 352, along hanging down on the attached wall framework 31 The direction in stalk face is provided with the first screwed hole that a row is used to set positioning rod member 351, described to position on rod member 351 away from attached wall One end of framework 31 is provided with the second screwed hole for the transverse screw 352 that is spirally connected, the transverse screw 352 and the limit The side of position block 34 towards exterior wall 8 is equipped with the first supporting steel plate 36 of the flexible cushion block 37 of band first.With existing by outside Burrow pre-buried on wall 8 or fixed to wearing bolt unlike the mode of wall-attaching equipment, wall-attaching equipment is using clamping type attached wall dress Put, by the window of building structure, the part that attached wall is connected with building structure is connected by the way of clip with building structure. Clip spacing combines regulation using equidistant bolt hole plus two kinds of coarse-fine modes of screw thread, and the spacing of any distance can be achieved with suitable Exterior wall with different-thickness.The first flexible combination of cushion block 37 is being added using the first supporting steel plate 36 with exterior wall contact portion, Protect the face of exterior wall 8 to exempt to recruit destruction to greatest extent while clamping force is increased, solve asking for the existing destruction of attached wall External Wall 8 Topic.
The ingenious support that make use of building structure window exterior wall 8 to be fixed as it of wall-attaching equipment of the present utility model, it is logical The U-shaped frame structure that attached wall framework 31, limited block 34 and fastening assembly 35 are formed is crossed to be clamped on building structure window exterior wall 8, It is connected using clip mode with building, the destruction of External Wall 8, clamping type is avoided while fixed wall-attaching equipment is reached Fixed form realize lossless construction to building, protect the structure of exterior wall 8, reduce the patch work of later stage exterior wall 8; In terms of stress, stress of the wall-attaching equipment of the present utility model perpendicular to metope direction employs rigid tension and compression stress, stress energy Power is big;In addition, when installing, safeguarding and dismantling the wall-attaching equipment of the climbing type workbench of saddle 11, can operate indoors, For the device that need to be operated compared to others outside wall, its security and convenience greatly improve.Preferably, in the present embodiment Saddle climbing type Work platform system in, the attached wall framework 31 include at least two interval and be set up in parallel (perpendicular to The direction of exterior wall 8) vertical pole 311 and some cross bars 312 at the both ends of vertical pole 311 are arranged at, set on the vertical pole 311 some For connecting the bolt hole of the positioning rod member 351, diagonal brace 313 is additionally provided with the attached wall framework 31.Have in the present embodiment Three vertical poles 311, a positioning rod member 351 is set on every vertical pole 311, therefore shares the flexible cushion block 37 of three pairs of bands first First supporting steel plate 36 clamps exterior wall 8, exterior wall is contacted using the first flexible cushion block 37, to protect exterior wall 8.
Preferably, in the saddle climbing type Work platform system of the present embodiment, the expansion link 32, including big sleeve pipe 321st, middle sleeve 322, adjusting screw rod 323 and connecting seat 324, one end and the attached wall framework 31 of the big sleeve pipe 321 are cut with scissors Connect, the other end of the big sleeve pipe 321, the threaded one end connection of the adjusting screw rod 323 are stretched into one end of the middle sleeve 322 In in the other end of the middle sleeve 322, the other end of the adjusting screw rod 323 is threadedly coupled with the connecting seat 324, described Connecting seat 324 is be hinged with the connector 33, is used to be threadedly coupled the regulation spiral shell specifically, one end of the connecting seat has The barrel of bar 323, the other end of the connecting seat have the connection otic placode for being used for being hinged with the connector 33, the big sleeve pipe 321 and middle sleeve 322 be axially arranged with row's bolt hole along itself, by selecting on the big sleeve pipe 321 and middle sleeve 322 Different bolts hole realize the coarse adjustment of the length of expansion link 32, it is real by being threadedly coupled between middle sleeve 322 and adjusting screw rod 323 The accurate adjustment section of the existing length of expansion link 32.
In order that connection relatively reliable between wall-attaching equipment 3 and external wall 8 is obtained, preferably, leading in the present embodiment It is symmetrical on the attached wall framework 31 to be provided with a pair for supporting window vertical side walls in frame climbing type Work platform system Top bracing mechanism 38, the top bracing mechanism 38 includes the shore 381 and positioning screw 382 for being provided with some bolts hole, described Shore 381 is threadedly coupled by one in the bolt hole with the attached wall framework 31, away from attached on the shore 381 That one end of wall framework 31 sets a connection protrusive board 383, and the connection protrusive board 383 and the shore 381 are perpendicular, the company The screwed hole opened up on protrusive board 383 for being threadedly coupled the positioning screw 382 is connect, the positioning screw 382 is shored with described Bar 381 is parallel, and that one end away from attached wall framework 31 on the positioning screw 382 is provided with second of the second flexible cushion block of band Support steel plate 384.
Please emphasis refering to Fig. 8 to Figure 11, preferably, in the saddle climbing type Work platform system of the present embodiment, also wrap Include the rack locking device 5 used when integral lifting platform 2 stops.The drive device 13 includes motor and driven by motor Dynamic gear, the correspondence position of saddle standard knot are provided with stationary rack 111, and the gear is meshed with the stationary rack 111. The rack locking device 5 include be used for be meshed with the stationary rack 111 on saddle 11 locking rack 51, be installed on seat in the plane Locking base 52, caging bolt 53 on frame 12 and the limit switch 54 for cutting off dynamical system, the locking base 52 Including a vertical baffle 521, the locking base 52 is separated into two parts by the vertical baffle 521, and one is for holding The rack installing frame 522 of the locking rack 51 is put, another is the switch attachment member 523 for setting limit switch 54, institute The bolt hole for opening up on vertical baffle 521 and being worn for the caging bolt 53 is stated, when the nut of the caging bolt 53 is by touching When sending out limit switch 54 and cutting off dynamical system, the locking rack 51 could be embedded at the rack installing frame 522 it is interior with it is described Stationary rack 111 on saddle 11 is meshed.The present embodiment is by using rack locking device 5, in integral lifting platform 2 quiet When only, integral lifting platform 2 is fixed on saddle 11 with engaging for the rack on saddle 11 by the rack locking device 5, So that the load transfer of integral lifting platform 2 to locking rack 51 and stationary rack 111 between, thus freeing that the braking of motor Power, improve motor applying working condition, the brake force deficiency that solving the long-term electromagnetic braking of motor may occur causes asking for platform decline Topic.
For the ease of locking rack 51 is embedded in rack installing frame 522, preferably, the rack in the present embodiment locks In device 5, the rack installing frame 522 be in " Contraband " font, the rack installing frame 522, including top plate 5221, bottom plate 5222 with And the vertical connecting plate 5223 of connection top plate 5221 and bottom plate 5222, the vertical baffle 521 and the vertical connecting plate 5223 Upper that one end away from the stationary rack 111 is fixedly connected, and the vertical baffle 521 and the vertical phase of connecting plate 5223 It is mutually vertical.In order to improve the intensity of whole rack locking device 5, top plate 5221 on the rack installing frame 522 with vertically every Gusset 5224 is set between plate 521, further to improve working security.
Engaged in order that rack 51 must be locked and consolidated with the stationary rack 111 on saddle 11, preferably, in the present embodiment In rack locking device 5, for the locking rack 51 in bulk, side sets 4-8 teeth, opposite side and the rack installing frame 522 inner chamber matches.The side that rack 51 is locked in the present embodiment sets 6 teeth.Preferably, dress is locked in above-mentioned rack In putting 5, the rack installing frame 522, a length of 150-250mm, a width of 30-50mm, to ensure that locking rack 51 has 1 tooth away from perpendicular To adjustable extent and 5mm or so horizontal adjustable scope.
Engaged in order that rack 51 must be locked and consolidated with the stationary rack 111 on saddle 11, preferably, in the present embodiment In rack locking device 5, the locking rack 51 is provided with a draw ring screw 55, and locking rack is picked and placeed with convenient construction personnel 51.In addition, in the rack locking device 5 of the present embodiment, pacified using channel-section steel as switch attachment member 523, the limit switch 54 In groove bottom loaded on the channel-section steel, the cell wall on the channel-section steel close to rack installing frame 522 is as the vertical baffle 521. Channel-section steel cost is low, convenient material drawing, is advantageous to make the rack locking device 5.
Preferably, in the rack locking device 5 of the present embodiment, the limit switch 54 is connected with the dynamical system, The limit switch 54 can cut off dynamical system.The nut of caging bolt 53 touches limit switch 54, cuts off dynamical system, prevents Only start motor when locking rack 51 and being engaged with stationary rack 111, to protect motor.
In use, after integral lifting platform 2 reaches specified altitude assignment under the drive of electromagnetic braking motor, spacing spiral shell is turned on Bolt 53, the action of limit switch 54 is touched to cut off dynamical system, now platform will be unable to rise or fall action, will lock rack 51 are placed in rack installing frame 522, and tightening caging bolt 53 makes locking rack 51 be engaged with the stationary rack 111 on saddle 11 To lock platform.When platform needs motion, unscrew caging bolt 53, locking rack 51 is pulled out in rack installing frame 522, will Caging bolt 53 is tightened, and is allowed to separate with limit switch 54, and power system, now electromagnetic braking electricity are connected in the action of limit switch 54 Machine can drive integral lifting platform 2 to rise or fall action.
Preferably, in the saddle climbing type Work platform system of the present embodiment, in addition to some groups of laser sensors, The integral lifting platform 2 can also include the seat in the plane frame for being arranged at outside lift drive system 1 except intermediary operation platform 21 The peripheral operation platform 22 in 12 outsides, each laser sensor include transmitter 61 and receiver 62, the He of transmitter 61 Receiver 62 is respectively arranged at the down either side of intermediary operation platform 21 and peripheral operation platform 22.If receiver 62 can not receive Signal from transmitter 61, illustrate that the barrier that collision is likely to occur on the running orbit in future is present, thus can be Integral lifting platform 2 detects the barrier that collision whether is likely to occur on the running orbit in future and existed during decline, If any barrier, integral lifting platform 2 can be stopped in time and moved, reruned after complete barrier for clearance, so as to solve entirety The collision problem that hoistable platform 2 may occur during declining, it is ensured that construction safety.
Preferably, in the saddle climbing type Work platform system of the present embodiment, the bottom of each saddle 11 is fixed on one On Combined support base 9, the Combined support base 9 includes 91, four flexible support legs 92 of steel framework, some return pulleys 93, led Frame underframe 94 and access ladder 95, the return pulley 93 are arranged at the lower section of the steel framework 91, and the saddle underframe 94 is fixedly installed In in institute's steel framework 91, the access ladder 95 is arranged at the side of the steel framework 91, and the steel framework 91 is provided with spiral shell including a pair of both ends Bolt lock hole 911 and horizontal steel pipe, a pair of the parallel longitudinal steel pipes being parallel to each other, the horizontal steel pipe and longitudinal steel Pipe connection forms a horizontal rectangular framework, also includes a cross hang steel pipe in the steel framework, to strengthen the entirety of steel framework 91 Intensity and being easy to sets the saddle underframe 94, and the saddle underframe 94 is used to install saddle 11, the bolt locking holes 911 On four Angle Positions of the steel framework 91, row's bolt is axially arranged with along flexible support leg 92 in every flexible support leg 92 Hole, one end of every flexible support leg 92 can extend into the corresponding end of corresponding horizontal steel pipe, the other end of every flexible support leg 92 Spike 96 is set, steel framework 91 can be fixed on by the bolt locking holes 911 on steel framework 91 and bolt on ground, Huo Zhetong The bolt locking holes 911 and bolt crossed on steel framework 91 fix every flexible support leg 92.
Please continue to refer to Fig. 1 to Figure 13, the construction method of the saddle climbing type Work platform system of the present embodiment, including:
Step 1, on Combined support base 9, the saddle 11 is connected installation saddle 11 by some section saddle standard knots Composition, saddle 11 are provided with stationary rack 111, the seat in the plane frame 12 with drive device 13 are installed on saddle 11, driving dress Putting 13 includes motor and is meshed by motor-driven gear, the gear with the stationary rack 111, is driven so as to complete lifting The assembling of dynamic system 1.
Step 2, the seat in the plane frame 12 of each lift drive system 1 connect composition integral lifting platform 2, institute by operating platform State operating platform 2 to be formed by connecting by some console modules, the console module includes a rectangle truss structure, the truss structure Top surface as upper strata job platform, the bottom surface of truss structure is as lower floor's job platform, upper strata job platform and lower floor's truss Structure peripheral installs protection network 218 additional, two upper lateral parts of the operating platform between the seat in the plane frame 12 of adjacent lift drive system 1 with it is right The seat in the plane frame 12 answered is be hinged, two side lower parts of the operating platform between the seat in the plane frame 12 of adjacent lift drive system 1 with it is corresponding Seat in the plane frame 12 is connected by sliding laterally attachment means 4.Will be flexible preferably, can be installed according to the exterior wall shape of building Rod and bridging piece are installed on the integral lifting platform 2, in order to which workmen constructs.
Step 3, it is N structures to be onstructed to stop height by the bottom of the integral lifting platform 2 of drive device 13 Below construction section bottom at 600mm-800mm, the turnover panel 221 of upset integral lifting platform 12 bottom, it is set to be close to N-1 structures The metope of construction section, wherein N are natural number, N >=2.
Step 4, operating personnel completes the constructing operation of N structure construction sections on integral lifting platform 2, and is tied in N Wall-attaching equipment 3 is set between the exterior wall 8 and saddle 11 of structure construction section.
Step 5, the turnover panel 221 of the bottom of integral lifting platform 2 is opened, the checking motion 7 at the top of saddle 11 of dismantling.
Step 6, lift saddle standard knot progress saddle 11 using suspension rod 14 and increase, entirety is lifted by drive device 13 Hoistable platform 2, the bottom of integral lifting platform 2 is set to stop at highly for 600mm-800mm below N+1 structure construction sections bottom.
Step 7, repeat step three to step 6, until assembled architecture agent structure binds.
Step 8, driving integral lifting platform 2 rise or fall along saddle 11, carry out decoration of exterior wall construction, until completing Whole building structure outer decoration construction is completed.
Step 9, integral lifting platform 2 is promoted to the top of saddle 11.
Step 10, as each wall-attaching equipment 3 and saddle standard knot are removed in the decline of integral lifting platform 2 successively, until complete It is complete to remove.
Embodiment two
The present embodiment and the difference of embodiment one are that the quantity of the integral lifting platform 2 is at least two, interval It is arranged on the saddle 11, positioned at the integral lifting platform 2 of different height, independent operating, the integral lifting platform 2 of the top For the structure construction of assembled architecture, underlying integral lifting platform 2 is used for the decoration construction of alien invasion, different layers Structure can be carried out simultaneously with decoration of exterior wall work, so as to significantly improve the efficiency of construction of assembled architecture.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model Calmly, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content, belonging to right will Seek the protection domain of book.

Claims (10)

1. a kind of saddle climbing type Work platform system, the construction for assembled arthitecutral structure, it is characterised in that including:Extremely Few two groups of lift drive systems, lift drive system described in every group include saddle, drive device and seat in the plane frame, and seat in the plane frame is arranged In on saddle, drive device is fixed on the frame of seat in the plane, is connected between the seat in the plane frame of adjacent lift drive system by operating platform Integral lifting platform is formed, the integral lifting platform can make vertical lifting fortune under the drive of drive device along saddle Dynamic, two upper lateral parts of the operating platform between the seat in the plane frame of adjacent lift drive system are hinged with corresponding seat in the plane frame, adjacent liter Two side lower parts of the operating platform between the seat in the plane frame of drop drive system are with corresponding seat in the plane frame by sliding laterally attachment means Connection.
2. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that described to slide laterally connection dress Put, including the level of the lower side for the operating platform being fixedly installed between the seat in the plane frame of the adjacent lift drive system is horizontal To sleeve pipe, extension rod and spacer pin, one end of the extension rod is hinged with corresponding seat in the plane frame, the other end of the extension rod It is fixedly connected after passing the horizontal cross sleeve pipe with the spacer pin, the length of the extension rod is more than the horizontal cross set The length of pipe, the extension rod can move relative to the horizontal cross sleeve pipe.
3. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that the integral lifting platform is double Layer job platform, the operating platform are formed by connecting by some console modules, and the console module includes a rectangle truss structure, The top surface laying upper strata platen of rectangle truss structure is as upper strata job platform, the bottom surface laying lower floor platen of rectangle truss structure As lower floor's job platform, the periphery of the integral lifting platform installs protection network additional.
4. saddle climbing type Work platform system as claimed in claim 3, it is characterised in that the rectangle truss structure is by horizontal stroke Vertical connection forms two-by-two for beam, longeron, column, and the crossbeam and the longeron are horizontally disposed, and the longeron is perpendicular to building Building structure metope, the console module also include flexible rod and bridging piece, and the flexible rod is arranged on longeron towards building That one end for building and can opposing side rails movement, when the flexible rod stretches out longeron, bridging piece is layed on flexible rod, The bridging piece of corresponding lower floor job platform is hinged with a turnover panel close to that side of building, and width and the integral elevating of the turnover panel are put down Spacing between platform and building matches.
5. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that be additionally included in integral lifting platform The rack locking device used during stop, the drive device include motor and by motor-driven gears, the saddle by Some saddle standard knots are formed by connecting, and the correspondence position of the saddle standard knot is provided with stationary rack, the gear with it is described solid Fixed rack is meshed, and the rack locking device includes being used for locking rack, the installation being meshed with the stationary rack on saddle In the locking base on the frame of seat in the plane, caging bolt and limit switch for cutting off dynamical system, the locking base includes The locking base is separated into two parts by one vertical baffle, the vertical baffle, and one is for housing the locking teeth The rack installing frame of bar, another is the switch attachment member for setting limit switch, is opened up on the vertical baffle described in confession The bolt hole that caging bolt is worn, it is described when the nut of the caging bolt cuts off dynamical system by triggering limit switch Locking rack could be embedded in the rack installing frame and is meshed with the stationary rack on the saddle.
6. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that also laser induced including some groups Device, the operating platform between the seat in the plane frame of adjacent lift drive system is intermediary operation platform, and the integral lifting platform is also Including the outside operating platform being arranged on the outside of the seat in the plane frame of outside lift drive system, each laser sensor includes transmitting Device and receiver, the transmitter and receiver are respectively arranged under the both sides of intermediary operation platform and outside operating platform Side.
7. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that also including some tool-type attached walls Device, the saddle are fixed on construction floor exterior wall by the tool-type wall-attaching equipment interval, the tool-type attached wall Device, including one be arranged in attached wall framework, three expansion links and a connector on building structure window, the attached wall framework One end be fixed with a limited block, the other end of the attached wall framework is provided with the adjustable fastening assembly in position, the limited block It is located at the inside and outside both sides of exterior wall respectively with the fastening assembly;One end of the expansion link and the attached wall frame articulation, it is described The other end of expansion link is connected by connector with the saddle, and the fastening assembly includes positioning rod member and transverse screw, A row is provided with the attached wall framework along the direction of vertical wall to be used to set the first screwed hole for positioning rod member, the locating rod One end away from attached wall framework on part is provided with the second screwed hole for the transverse screw that is spirally connected, the transverse screw and institute The side for stating limited block towards exterior wall is equipped with the first supporting steel plate of the first flexible cushion block of band.
8. saddle climbing type Work platform system as claimed in claim 7, it is characterised in that the expansion link, including big set Pipe, middle sleeve and adjusting screw rod and connecting seat, one end of the big sleeve pipe and the attached wall frame articulation, the middle sleeve One end stretch into the other end of the big sleeve pipe, the threaded one end of the adjusting screw rod is connected to the other end of the middle sleeve Interior, the other end of the adjusting screw rod is threadedly coupled with connecting seat, and the connecting seat is hinged with the connector, the big sleeve pipe Row's bolt hole is axially arranged with along itself with middle sleeve, by selecting the different bolts hole on the big sleeve pipe and middle sleeve The coarse adjustment of length of telescopic bar is realized, the accurate adjustment of length of telescopic bar is realized by being threadedly coupled between middle sleeve and adjusting screw rod Section.
9. saddle climbing type Work platform system as claimed in claim 7, it is characterised in that left and right is right on the attached wall framework Claim to be provided with a pair of top bracing mechanisms for being used to support window vertical side walls, the top bracing mechanism includes a top for being provided with some bolts hole Strut and positioning screw, the shore is threadedly coupled by one in the bolt hole with the attached wall framework, described That one end away from attached wall framework on shore sets a connection protrusive board, and the connection protrusive board and the shore are perpendicular, institute The screwed hole opened up on connection protrusive board for being threadedly coupled the positioning screw is stated, the positioning screw is equal with the shore OK, that one end away from attached wall framework on the positioning screw is provided with the second supporting steel plate of the second flexible cushion block of band.
10. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that the bottom of each saddle is fixed In on a Combined support base, the Combined support base includes steel framework, four flexible support legs, some return pulleys, saddle bottom Frame and access ladder, the return pulley are arranged at the lower section of the steel framework, and the saddle underframe is fixedly installed in institute's steel framework, described Access ladder is arranged at the side of the steel framework, and the steel framework includes a pair of both ends and is provided with bolt locking holes and the transverse direction being parallel to each other Steel pipe, the bolt locking holes are located on four Angle Positions of the steel framework, along the axial direction of flexible support leg in every flexible support leg Provided with row's bolt hole, one end of every flexible support leg can extend into the corresponding end of corresponding horizontal steel pipe, every flexible support leg The other end set spike, steel framework can be fixed on by the bolt locking holes on steel framework and bolt on ground, Huo Zhetong The bolt locking holes and bolt crossed on steel framework fix every flexible support leg.
CN201720219361.4U 2017-03-08 2017-03-08 A kind of saddle climbing type Work platform system Active CN206625528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720219361.4U CN206625528U (en) 2017-03-08 2017-03-08 A kind of saddle climbing type Work platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720219361.4U CN206625528U (en) 2017-03-08 2017-03-08 A kind of saddle climbing type Work platform system

Publications (1)

Publication Number Publication Date
CN206625528U true CN206625528U (en) 2017-11-10

Family

ID=60211274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720219361.4U Active CN206625528U (en) 2017-03-08 2017-03-08 A kind of saddle climbing type Work platform system

Country Status (1)

Country Link
CN (1) CN206625528U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894622A (en) * 2017-03-08 2017-06-27 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN107035122A (en) * 2017-03-08 2017-08-11 上海建工集团股份有限公司 A kind of saddle climbing type Work platform system and its construction method
WO2019143298A1 (en) * 2018-01-18 2019-07-25 Building Modern Pte. Ltd. Integrated structural and architectural facade level-by-level construction system
CN110259097A (en) * 2019-07-03 2019-09-20 河北建匠科技发展有限公司 A kind of attachment type raise scaffold protective device
CN110593547A (en) * 2019-09-24 2019-12-20 陕西百斯特工程技术有限公司 Frame body structure based on attached lifting scaffold and construction method thereof
CN111962854A (en) * 2020-08-12 2020-11-20 鹏程建设集团有限公司 Scaffold with safety protection mechanism and building method
CN114607133A (en) * 2022-03-24 2022-06-10 中煤第三建设(集团)有限责任公司 Assembly type climbing frame for building and using method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894622A (en) * 2017-03-08 2017-06-27 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN107035122A (en) * 2017-03-08 2017-08-11 上海建工集团股份有限公司 A kind of saddle climbing type Work platform system and its construction method
CN106894622B (en) * 2017-03-08 2019-04-02 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN107035122B (en) * 2017-03-08 2023-10-24 上海建工集团股份有限公司 Guide frame climbing type working platform system and construction method thereof
WO2019143298A1 (en) * 2018-01-18 2019-07-25 Building Modern Pte. Ltd. Integrated structural and architectural facade level-by-level construction system
CN110259097A (en) * 2019-07-03 2019-09-20 河北建匠科技发展有限公司 A kind of attachment type raise scaffold protective device
CN110259097B (en) * 2019-07-03 2024-05-24 河北建匠科技发展有限公司 Attached lifting scaffold protecting device
CN110593547A (en) * 2019-09-24 2019-12-20 陕西百斯特工程技术有限公司 Frame body structure based on attached lifting scaffold and construction method thereof
CN110593547B (en) * 2019-09-24 2021-10-15 陕西百斯特工程技术有限公司 Frame body structure based on attached lifting scaffold and construction method thereof
CN111962854A (en) * 2020-08-12 2020-11-20 鹏程建设集团有限公司 Scaffold with safety protection mechanism and building method
CN114607133A (en) * 2022-03-24 2022-06-10 中煤第三建设(集团)有限责任公司 Assembly type climbing frame for building and using method thereof

Similar Documents

Publication Publication Date Title
CN206625528U (en) A kind of saddle climbing type Work platform system
CN106894622B (en) Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN206625526U (en) Saddle climbing type bilayer rectangle truss module plateform system
CN107035122A (en) A kind of saddle climbing type Work platform system and its construction method
CN206625522U (en) Saddle climbing type Work platform system with lossless wall-attaching equipment
CN106906994A (en) Saddle climbing type Work platform system and its construction method with lossless wall-attaching equipment
CN103669845A (en) High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CA2934319C (en) Method and apparatus for raising a structure
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
CN208792758U (en) A kind of huge column climbing apparatus
CN206467994U (en) A kind of novel hanging basket support
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN201567160U (en) Detachable combined high-level crane boom
CN109296082A (en) A kind of frame or half inverted construction structure of cylinder load-bearing high level modular architectural and construction method
CN202866261U (en) Operation hanging rack for civil construction
CN104790644A (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN206693599U (en) Modularization external hanging type scaffold
CN212689494U (en) Construction platform for building construction
CN210438301U (en) Light slat lifting device for building partition wall
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
CN102465601A (en) Method for installing main body frame steel structure of benzene hydrogenation project
CN214935438U (en) Assembled building wallboard hoist device
CN108331337A (en) A kind of whole formwork system and its construction method for structure missing layer
CN108442678A (en) Slope roof type skin repair crosshead and its construction method
CN202787931U (en) Driving structure of van-type protected automatic lifting construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant