CN107035122A - A kind of saddle climbing type Work platform system and its construction method - Google Patents

A kind of saddle climbing type Work platform system and its construction method Download PDF

Info

Publication number
CN107035122A
CN107035122A CN201710133185.7A CN201710133185A CN107035122A CN 107035122 A CN107035122 A CN 107035122A CN 201710133185 A CN201710133185 A CN 201710133185A CN 107035122 A CN107035122 A CN 107035122A
Authority
CN
China
Prior art keywords
saddle
platform
seat
plane frame
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710133185.7A
Other languages
Chinese (zh)
Other versions
CN107035122B (en
Inventor
龚剑
黄跃申
黄玉林
周虹
潘曦
吴联定
扶新立
顾国明
刘鑫
朱亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201710133185.7A priority Critical patent/CN107035122B/en
Publication of CN107035122A publication Critical patent/CN107035122A/en
Application granted granted Critical
Publication of CN107035122B publication Critical patent/CN107035122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/38Scaffolds partly supported by the building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • E04G2001/244Scaffolds movable on wheels or tracks mechanically operated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/248Inclined struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a kind of saddle climbing type Work platform system and its construction method, for the construction of assembled arthitecutral structure, the system includes:At least two groups lift drive systems, every group of lift drive system includes saddle, drive device and seat in the plane frame, seat in the plane frame is sheathed on saddle, drive device is fixed on the frame of seat in the plane, pass through operating platform connection composition integral lifting platform between the seat in the plane frame of adjacent lift drive system, operating platform between the seat in the plane frame of adjacent lift drive system is that two upper lateral parts of intermediary operation platform are hinged with corresponding seat in the plane frame, two side lower parts of intermediary operation platform are connected with corresponding seat in the plane frame by sliding laterally attachment means, the lateral displacement constraint of low connection point of the intermediary operation platform caused by frame operation in both sides seat in the plane is asynchronous can be discharged, it ensure that the constraint of vertical and horizontal both direction is still effective simultaneously, so as to reach release internal stress and ensure platform stabilization and the double effectses of security.

Description

A kind of saddle climbing type Work platform system and its construction method
Technical field
The present invention relates to assembled architecture construction field, more particularly to a kind of saddle climbing type Work platform system and its apply Work method.
Background technology
Accelerate in China under the key strategy driving of propulsion building industrialization, novel fabricated building is rapidly developed, State Council's issue《Instruction on greatly developing assembled architecture》, even more specify that made assembling with 10 years or so time Formula building account for new building area ratio reach 30% objectives.As novel fabricated construction project is increasing, Corresponding industrialized production process technology is also in continuous transition and upgrade, but domestic assembled architecture agent structure building course at present In still continue to use the mode of production of cast-in-place structural mostly, such as in main body construction and decoration of exterior wall stage using traditional scaffold, whole The operating type such as body hoisting scaffold and driven hanging basket, has high material consumption, low construction efficiency, cost high etc. Problem.
Thus, saddle climbing type workbench is applied and given birth to.Saddle climbing type workbench is a kind of large-scale from lift Aerial work platform, for high-altitude engineering construction, solves that the use material that traditional scaffold exists is more, sets up time length, grasp Constructing operation, construction material are not easy to as podium level and is not easy to the problems such as transmission, safe construction hidden danger is more, are especially suitable for With skin decorations operation.
According to saddle number can be divided into single saddle and many saddles, wherein double saddles because its have concurrently each side's advantage turn into it is most normal Saddle climbing type workbench.Intermediary operation platform between double saddles, it is the main of saddle climbing type workbench Part, it is formed according to construction requirement by the connection of multiple standard platform modules, and the two ends of intermediary operation platform are connected to both sides machine On the frame of position.Because both sides seat in the plane frame can not operationally accomplish Complete Synchronization, this will result in intermediary operation platform operationally Have situation about being slightly tilted to occur, one will be become if intermediary operation platform is used and is all hinged up and down with both sides seat in the plane frame Individual redundant structure and produce larger internal stress;And then in stability and security if only using top hinged lower portion connectionless It is upper to be weak again.
In addition, common saddle climbing type Work platform system is generally individual layer, and generally uses triangular truss, and it is single Layer operation platform carry out prefabricated components pose adjustment, reinforcing bar arrange and colligation, the work such as pour when, it is impossible to meet efficiently construction It is required that.
The content of the invention
It is an object of the invention to provide a kind of saddle climbing type Work platform system, existing saddle climbing type work is solved Operating platform in plateform system between the seat in the plane frame of adjacent lift drive system is intermediary operation platform platform and adjacent seat in the plane frame The problem of internal stresses release demand present in connection is with stability, security contradiction.
As this in order to solve the above technical problems, the present invention provides following technical scheme:
A kind of saddle climbing type Work platform system, for the construction of assembled arthitecutral structure, including:At least two groups liftings Drive system, lift drive system described in every group includes saddle, drive device and seat in the plane frame, and seat in the plane frame is sheathed on saddle, Drive device is fixed on the frame of seat in the plane, is risen between the seat in the plane frame of adjacent lift drive system by the way that operating platform connection composition is overall Platform is dropped, and the integral lifting platform can be moved under the drive of drive device along saddle as vertical lifting, adjacent lifting Two upper lateral parts of the operating platform between the seat in the plane frame of drive system are hinged with corresponding seat in the plane frame, adjacent lift drive system Two side lower parts of the operating platform between the frame of seat in the plane are connected with corresponding seat in the plane frame by sliding laterally attachment means.
It is preferred that, it is described to slide laterally attachment means, including fixation in above-mentioned saddle climbing type Work platform system The horizontal cross sleeve pipe of the lower side for the operating platform being installed between the seat in the plane frame of the adjacent lift drive system, extension Bar and spacer pin, one end of the extension rod are hinged with corresponding seat in the plane frame, and the other end of the extension rod passes the water It is fixedly connected after flat transverse direction sleeve pipe with the spacer pin, the length of the extension rod is more than the length of the horizontal cross sleeve pipe, The extension rod can be moved relative to the horizontal cross sleeve pipe.
It is preferred that, in above-mentioned saddle climbing type Work platform system, the integral lifting platform is double-deck operation horizontal Platform, the operating platform is formed by connecting by some console modules, and the console module includes a rectangle truss structure, rectangle truss The top surface laying upper strata platen of structure is used as lower floor as upper strata job platform, the bottom surface laying lower floor platen of rectangle truss structure Job platform, the periphery of the integral lifting platform installs protection network additional.
It is preferred that, in above-mentioned saddle climbing type Work platform system, between the upper strata platen and lower floor's platen Distance is 1.8m-3.1m.
It is preferred that, in above-mentioned saddle climbing type Work platform system, the rectangle truss structure by crossbeam, longeron, Vertically connection is constituted column two-by-two, and the crossbeam is horizontally disposed with the longeron, and the longeron is perpendicular to building structure wall Face, the console module also includes flexible rod and bridging piece, the flexible rod be arranged on longeron towards building that End and can opposing side rails movement, when the flexible rod stretches out longeron, bridging piece is layed on flexible rod, and correspondence lower floor makees The bridging piece of industry platform is hinged with a turnover panel, width and the integral lifting platform and building of the turnover panel close to that side of building Between spacing match.
It is preferred that, in above-mentioned saddle climbing type Work platform system, being additionally included in when integral lifting platform is stopped makes Rack locking device, the drive device includes motor and by motor-driven gear, and the saddle is by some saddles Standard knot is formed by connecting, and the correspondence position of the saddle standard knot is provided with stationary rack, the gear and the stationary rack phase Engagement, the rack locking device include be used for be meshed with the stationary rack on saddle locking rack, be installed on seat in the plane frame On locking base, caging bolt and the limit switch for cutting off dynamical system, the locking base include one it is vertical every The locking base is separated into two parts by plate, the vertical baffle, and one is for housing the rack for locking rack Installing frame, another is to be opened up on the switch attachment member for setting limit switch, the vertical baffle for the caging bolt The bolt hole worn, when the nut of the caging bolt cuts off dynamical system by triggering limit switch, the locking rack It can just be embedded in the rack installing frame and be meshed with the stationary rack on the saddle.
It is preferred that, in above-mentioned saddle climbing type Work platform system, in addition to some groups of laser sensors, it is adjacent Operating platform between the seat in the plane frame of lift drive system is as intermediary operation platform, and the integral lifting platform also includes setting Outside operating platform on the outside of the seat in the plane frame of outside lift drive system, each laser sensor includes transmitter and reception Device, the transmitter and receiver are respectively arranged at the down either side of intermediary operation platform and outside operating platform.
It is preferred that, in above-mentioned saddle climbing type Work platform system, in addition to some tool-type wall-attaching equipments, it is described Saddle is fixed on construction floor exterior wall by the tool-type wall-attaching equipment interval, the tool-type wall-attaching equipment, including One is arranged in attached wall framework, three expansion links and a connector on building structure window, and one end of the attached wall framework is consolidated Surely there is a limited block, the other end of the attached wall framework is provided with the adjustable fastening assembly in position, the limited block and described tight Gu component is located at the inside and outside both sides of exterior wall respectively;One end of the expansion link and the attached wall frame articulation, the expansion link The other end is connected by connector with the saddle, and the fastening assembly includes positioning rod member and transverse screw, the attached wall It is remote on the first screwed hole on framework along the direction of vertical wall provided with a row for setting positioning rod member, the positioning rod member One end of attached wall framework is provided with the second screwed hole for the transverse screw that is spirally connected, the transverse screw and the limited block The first supporting steel plate of the flexible cushion block of band first is equipped with towards the side of exterior wall.
It is preferred that, in above-mentioned saddle climbing type Work platform system, the expansion link, including big sleeve pipe, middle sleeve, Adjusting screw rod and connecting seat, one end of the big sleeve pipe and the attached wall frame articulation, institute is stretched into one end of the middle sleeve The other end of big sleeve pipe is stated, the threaded one end of the adjusting screw rod is connected in the other end of the middle sleeve, the regulation spiral shell The other end of bar is threadedly coupled with connecting seat, and the connecting seat is hinged with the connector, the big equal edge of sleeve pipe and middle sleeve Itself row's bolt hole is axially arranged with, by selecting the different bolts hole on the big sleeve pipe and middle sleeve to realize that expansion link is long The coarse adjustment of degree, the accurate adjustment section of length of telescopic bar is realized by being threadedly coupled between middle sleeve and adjusting screw rod.
It is preferred that, it is symmetrical on the attached wall framework to be provided with one in above-mentioned saddle climbing type Work platform system To the top bracing mechanism for supporting window vertical side walls, the top bracing mechanism include a shore provided with some bolts hole and Positioning screw, the shore is threadedly coupled by one in the bolt hole with the attached wall framework, on the shore That one end away from attached wall framework sets one to connect protrusive board, and the connection protrusive board and the shore are perpendicular, and the connection is convex The screwed hole for being threadedly coupled the positioning screw is opened up on plate, the positioning screw is parallel with the shore, described Second supporting steel plate of that one end provided with the flexible cushion block of band second away from attached wall framework on positioning screw.
It is preferred that, in above-mentioned saddle climbing type Work platform system, a combined type is fixed in the bottom of each saddle In support base, the Combined support base includes steel framework, four flexible support legs, some return pulleys, saddle underframe and passage Ladder, the return pulley is arranged at the lower section of the steel framework, and the saddle underframe is fixedly installed in institute's steel framework, and the access ladder is set In the side of the steel framework, the steel framework includes a pair of two ends and is provided with bolt locking holes and the horizontal steel pipe being parallel to each other, described Bolt locking holes are located on four Angle Positions of the steel framework, and row's spiral shell is axially arranged with along flexible support leg in every flexible support leg Keyhole, one end of every flexible support leg be can extend into the corresponding end of the horizontal steel pipe of correspondence, and the other end of every flexible support leg is set Spike is put, steel framework can be fixed on by the bolt locking holes and bolt on steel framework on ground, or by steel framework Bolt locking holes and bolt fix every flexible support leg.
It is preferred that, in above-mentioned saddle climbing type Work platform system, the quantity of the integral lifting platform is at least There are two, be arranged at intervals on the saddle.
The invention also discloses a kind of construction method of saddle climbing type Work platform system as described above, including:
Step one, saddle is installed on Combined support base, the saddle is made up of some section saddle standard knot connections, Saddle is provided with stationary rack, and the seat in the plane frame with drive device is installed on saddle, and drive device includes motor and by electricity The gear of machine driving, the gear is meshed with the stationary rack, so as to complete the assembling of lift drive system;
Step 2, the seat in the plane frame of each lift drive system passes through operating platform connection composition integral lifting platform, the behaviour Make platform to be formed by connecting by some console modules, the console module includes a rectangle truss structure, the top of the truss structure Face is used as lower floor's job platform, upper strata job platform and lower floor's truss structure as upper strata job platform, the bottom surface of truss structure Periphery installs two upper lateral parts and corresponding seat in the plane frame of the operating platform between protection network, the seat in the plane frame of adjacent lift drive system additional It is hinged, two side lower parts of the operating platform between the seat in the plane frame of adjacent lift drive system pass through horizontal cunning with corresponding seat in the plane frame Dynamic attachment means connection;
Step 3, by drive device so that it is that N structures to be onstructed are applied that the bottom of integral lifting platform, which stops height, Below workshop section bottom at 600mm-800mm, the turnover panel of upset integral lifting platform bottom makes it be close to N-1 structure constructions section Metope, wherein N be natural number, N >=2;
Step 4, operating personnel completes the constructing operation of N structure constructions section on integral lifting platform, and in N knots Wall-attaching equipment is set between the exterior wall and saddle of structure construction section;
Step 5, opens the checking motion at the top of the turnover panel of integral lifting platform bottom, saddle of dismantling;
Step 6, lifts saddle standard knot progress saddle using suspension rod and increases, lifting integral elevating by drive device puts down Platform, makes integral lifting platform bottom stop at highly for 600mm-800mm below N+1 structure constructions section bottom;
Step 7, repeat step three is to step 6, until assembled architecture agent structure binds;
Step 8, driving integral lifting platform rises or falls along saddle, carries out decoration of exterior wall construction, until completing whole The construction of building structure decoration of exterior wall is completed;
Step 9, saddle top is promoted to by integral lifting platform;
Step 10, each wall-attaching equipment and saddle standard knot are removed with the decline of integral lifting platform successively, until completely Remove.
From techniques disclosed above scheme, compared with prior art, beneficial effects of the present invention are as follows:
First, the present invention is provided saddle climbing type Work platform system and its construction method, solve existing saddle climbing type Operating platform in Work platform system between the seat in the plane frame of adjacent lift drive system is intermediary operation platform and corresponding seat in the plane The problem of internal stresses release and stability, security contradiction present in frame connection, the present invention is by by intermediary operation platform Two upper lateral parts are with corresponding seat in the plane frame using the connecting mode being hinged, and two side lower parts use with corresponding seat in the plane frame and slide laterally dress Connection is put, transverse direction (the i.e. X of low connection point of the intermediary operation platform caused by frame operation in both sides seat in the plane is asynchronous is released To) displacement constraint, while ensure that vertical and laterally (i.e. Y-direction and Z-direction) both direction constraint is still effective, so as to reach Discharge internal stress and ensure platform stabilization and the double effectses of security.
2nd, the present invention is provided saddle climbing type Work platform system and its construction method, by the triangle generally used Truss is changed to rectangle truss structure, and truss structure is highly drawn high, and double-decked platform, rectangle are developed into using truss structure itself The top surface laying upper strata platen of truss structure is used as upper strata job platform, the bottom surface laying lower floor platen conduct of rectangle truss structure Lower floor's job platform, not only simple in construction, stress force transfer system is clear and definite, stability is good, furthermore, it is possible to meet some needs upper Lower two planes demand for being constructed simultaneously, especially in the pose adjustment of precast facade of assembling structure, reinforcing bar colligation, is poured During Deng constructing, it can simultaneously carry out up and down, substantially increasing the efficiency of assembling of precast facade, meeting wanting for safe efficient construction Ask.In addition, the present invention can be easily combined into according to construction requirement by using flexible rod and bridging piece it is variously-shaped Integral lifting platform.In addition, using coupling type connecting mode between adjacent operation module, the making of each standard platform is reduced Required precision, simplifies mounting process, facilitates the installation at scene.
3rd, the present invention is provided saddle climbing type Work platform system and its construction method, in integral lifting platform quiet When only, integral lifting platform is fixed on saddle with engaging for the rack on saddle by the rack locking device so that whole The load transfer of body hoistable platform is between locking rack and stationary rack, thus freeing that the brake force of motor, improving motor makes With operating mode, the brake force deficiency that solving the long-term electromagnetic braking of motor may occur causes the problem of platform declines.In addition, by inciting somebody to action Saddle is installed on Combined support base, solves the fixed base of elevating construction platform and movable base accessory device can not The problem of exchange.
4th, the present invention is provided saddle climbing type Work platform system and its construction method, wall-attaching equipment use clamping type Wall-attaching equipment, by the window of building structure, the part that attached wall is connected with building structure is tied by the way of clip with building Structure is connected.Clip spacing combines regulation using equidistant bolt hole plus two kinds of coarse-fine modes of screw thread, and any distance can be achieved Spacing is to be adapted to the exterior wall of different-thickness.With exterior wall contact portion using the first supporting steel plate flexible cushion block side of combination that adds the first Formula, protects wall face to exempt to recruit destruction, solves asking for existing attached wall External Wall destruction to greatest extent while clamping force is increased Topic.
5th, the present invention is provided saddle climbing type Work platform system and its construction method, by setting some groups of laser Induction installation, each laser sensor includes transmitter and receiver, and the transmitter and receiver are respectively arranged at centre The down either side of operating platform and outside operating platform, if receiver can not receive the signal from transmitter, illustrates future The barrier that collision is likely to occur on running orbit is present, thus can be detected in integral lifting platform during decline The barrier that collision whether is likely to occur on following running orbit is present, and if any barrier, can stop overall liter in time Reruned after dropping platform motion, complete barrier for clearance, so that what may be occurred during solving integral lifting platform decline touches Hit problem, it is ensured that construction safety.
Brief description of the drawings
Fig. 1 is the positive structure schematic of the saddle climbing type Work platform system of one embodiment of the invention.
Fig. 2 is the side structure schematic diagram of the saddle climbing type Work platform system of one embodiment of the invention.
Fig. 3 is the flat structural representation for sliding laterally attachment means in one embodiment of the invention.
Fig. 4 is one of structural representation of console module in one embodiment of the invention.
Fig. 5 is two (turnover panel is not drawn into) of the structural representation of console module in one embodiment of the invention.
Fig. 6 is the planar structure schematic diagram of wall-attaching equipment in one embodiment of the invention.
Fig. 7 is the facade structures schematic diagram of wall-attaching equipment in one embodiment of the invention.
Fig. 8 (installs locking rack triggering for one of structural representation of rack locking device in one embodiment of the invention During limit switch).
Fig. 9 (does not install locking rack triggering for the two of the structural representation of one embodiment of the invention middle rack locking device During limit switch).
Figure 10 is the schematic top plan view (locking rack scheme of installation) of one embodiment of the invention middle rack locking device.
Figure 11 is the dimensional structure diagram of one embodiment of the invention middle rack locking device.
Figure 12 is the dimensional structure diagram of Combined support base in one embodiment of the invention.
Figure 13 is the schematic top plan view of Combined support base in one embodiment of the invention.
In figure:1- lift drive systems, 11- saddles, 111- stationary racks, 12- seats in the plane frame, 13- drive devices, 14- are hung Bar, 2- integral lifting platforms, 21- intermediary operations platform, 22- peripheral operations platform, 211- upper stratas platen, 212- lower floors platen, 213- crossbeams, 214- longerons, 215- columns, 216- stretch rod, 217- bridging pieces, 218- protection networks, 219- hook, 220- connections Lug, 221- turnover panels, 3- tool-types wall-attaching equipment, 31- attached walls framework, 311- vertical poles, 312- cross bars, 313- diagonal braces, 32- stretch The big sleeve pipe of bar, 321-, 322- middle sleeves, 323- adjusting screw rods, 324- connecting seats, 33- connectors, 34- limited blocks, 35- fastenings Component, 351- positioning rod member, 352- transverse screws, the supporting steel plates of 36- first, the flexible cushion block of 37- first, 38- top bracing mechanisms, 381- shores, 382- positioning screws, 383- connections protrusive board, the supporting steel plates of 384- second, 4- slide laterally attachment means, 41- Horizontal cross sleeve pipe, 42- extension rods, 43- spacer pins, 5- racks locking device, 51- lockings rack, 52- lockings base, 521- Vertical baffle, 522- racks installing frame, 5221- top plates, 5222- bottom plates, the vertical connecting plates of 5223-, 5224- gussets, 523- are opened Close installation portion, 53- caging bolts, 54- limit switches, 55- draw rings screw, 61- transmitters, 62- receivers, 7- checking motions, 8- exterior walls, 9- Combined support bases, -91- steel frameworks, 911- bolt locking holes, 92- stretch support leg, 93- return pulleys, 94- saddles bottom Frame, 95- access ladders, 96- spikes.
Embodiment
Below in conjunction with the drawings and specific embodiments to saddle climbing type Work platform system proposed by the present invention and its construction Method is described in further detail.According to following explanation and claims, advantages and features of the invention will become apparent from.Need Bright, accompanying drawing is using very simplified form and uses non-accurately ratio, only conveniently, lucidly to aid in illustrating The purpose of the embodiment of the present invention.
Fig. 1 to Figure 13 is referred to, present embodiment discloses a kind of saddle climbing type Work platform system, is built for assembled The construction of building structure, including:At least two groups lift drive systems 1, lift drive system 1 described in every group is included by some section guide rails Saddle 11, drive device 13 and the seat in the plane frame 12 of frame standard knot connection composition, the seat in the plane frame 12 are sheathed on saddle 11, institute State drive device 13 to be fixed on seat in the plane frame 12, the drive device 13 can drive the seat in the plane frame 12 along the saddle 11 Move up and down, pass through operating platform connection composition integral lifting platform 2, institute between the seat in the plane frame 12 of adjacent lift drive system 1 Stating integral lifting platform 2 can move under the drive of drive device 13 along saddle 11 as vertical lifting, adjacent lifting driving Operating platform between the seat in the plane frame 12 of system 1 is that two upper lateral parts of intermediary operation platform 21 are hinged with corresponding seat in the plane frame 12, Operating platform between the seat in the plane frame 12 of adjacent lift drive system 1 is two side lower parts and corresponding machine of intermediary operation platform 21 Position frame 12 is connected by sliding laterally attachment means 4.
The saddle climbing type Work platform system that the present embodiment is provided, due to two upper lateral parts of the intermediary operation platform 21 It is hinged with corresponding seat in the plane frame 12, two side lower parts of the intermediary operation platform 21 pass through laterally (i.e. X with corresponding seat in the plane frame 12 To) sliding connecting device connection, release intermediary operation platform 21 because both sides seat in the plane frame 12 is run it is asynchronous caused by centre The lateral displacement constraint of low connection point between operating platform 21 and corresponding seat in the plane frame 12, while ensure that vertical and horizontal (i.e. Y To and Z-direction) both direction constraint it is still effective so that reached release internal stress and ensure the internal junction of integral lifting platform 2 Structure couples stability and security.
Please emphasis refer to Fig. 3, it is described laterally sliding preferably, in the saddle climbing type Work platform system of the present embodiment Dynamic attachment means 4, including the operating platform i.e. centre being fixedly installed between the seat in the plane frame 12 of the adjacent lift drive system 1 Horizontal cross sleeve pipe 41, extension rod 42 and the spacer pin 43 of the lower side of operating platform 21, one end of the extension rod 42 Be hinged with corresponding seat in the plane frame 12, the other end of the extension rod 42 pass after the horizontal cross sleeve pipe 41 with the spacer pin 43 are fixedly connected, and the length of the extension rod 42 is more than the length of the horizontal cross sleeve pipe 41, and the extension rod 42 being capable of phase The horizontal cross sleeve pipe 41 is moved.In the present embodiment, the horizontal cross sleeve pipe 41 is divided into two sections of settings, is individually fixed in On intermediary operation platform 21.The present embodiment can prevent 41 points of extension rod 42 and horizontal cross sleeve pipe by setting spacer pin 43 From, it is ensured that safety.Attachment means 4 are slid laterally using said structure, simple in construction, connection is reliable, releases intermediary operation Platform 21 because both sides seat in the plane frame 12 is run it is asynchronous caused by intermediary operation platform 21 and corresponding seat in the plane frame 12 between bottom connect The lateral displacement constraint of contact, while ensure that the constraint of vertical and horizontal both direction is still effective, so as to reach release While internal stress, it is ensured that the internal structure of integral lifting platform 2 couples stability, it is ensured that whole saddle climbing type workbench system The security of system.
The operation that the integral lifting platform 2 can only be included between the seat in the plane frame 12 of adjacent lift drive system 1 is put down Platform is intermediary operation platform 21, can also also include being arranged at outside lift drive system 1 in addition to intermediary operation platform 21 The operating platform in the outside of seat in the plane frame 12 is peripheral operation platform 22.
Please emphasis refer to Fig. 4 and Fig. 5, in the present embodiment, integral lifting platform 2 includes intermediary operation platform 21 and grasped with outside Make platform 22.Preferably, in the saddle climbing type Work platform system of the present embodiment, the integral lifting platform 2 is bilayer Job platform, the operating platform is formed by connecting by some console modules, that is to say, that in the present embodiment, the intermediary operation Platform 21 is formed by connecting with peripheral operation platform 22 by some console modules, and the console module includes a rectangle truss knot Structure, the top surface laying upper strata platen 211 of rectangle truss structure is as upper strata job platform, under the bottom surface laying of rectangle truss structure Layer platen 212 is as lower floor's job platform, and the periphery of the integral lifting platform 2 installs protection network 218 additional.Integral lifting platform 2 Existing triangular truss is substituted using rectangle truss structure, and rectangle truss structure is highly drawn high, by rectangle truss structure Double-decked platform itself is developed into, the top surface laying upper strata platen 211 of rectangle truss structure is used as upper strata job platform, rectangle truss The bottom surface laying lower floor platen 212 of structure is as lower floor's job platform, and not only simple in construction, stress force transfer system is clearly, stably Property it is good, furthermore, it is possible to some needs be met in two planes up and down while the demand constructed, especially in the pre- of assembling structure The pose adjustment of exterior wall 8 processed, reinforcing bar colligation, when the construction such as pouring, can progress simultaneously up and down, substantially increase precast facade 8 Efficiency of assembling, meet the requirement of safe efficient construction.In addition, the present invention is by using flexible rod 216 and bridging piece 217 Variously-shaped integral lifting platform 2 can be easily combined into according to construction requirement.In addition, being adopted between adjacent console module With 219 formula connecting modes of hook, the making required precision of each standard platform is reduced, mounting process is simplified, facilitates scene Installation.The console module adjacent with seat in the plane frame 12 is additionally provided with the connection lug 220 for being threadedly coupled with adjacent seat in the plane frame 12.
For the ease of workmen upper strata job platform with lower floor job platform synchronously carry out same precast facade 8 The construction of upper and lower end, in the saddle climbing type Work platform system of the present embodiment, the upper strata platen 211 and lower floor's platen The distance between 212 be 1.8m-3.1m.
Preferably, in the saddle climbing type Work platform system of the present embodiment, the rectangle truss structure is by crossbeam 213rd, vertical connection is constituted two-by-two for longeron 214, column 215, and the crossbeam 213 is horizontally disposed with the longeron 214, and described Longeron 214 is exterior wall 8 perpendicular to building structure metope, and the console module also includes flexible rod 216 and bridging piece 217, can To install the flexible rod and bridging piece according to the exterior wall shape of building, the flexible rod 216 be arranged on longeron 214 towards That one end of building and can opposing side rails 214 move, that side hinge of the bridging piece 217 of correspondence lower floor job platform close to building A turnover panel 221 is connected to, the spacing between the width and integral lifting platform 2 and building of the turnover panel 221 matches.Stretched when described When contracting rod 216 stretches out longeron 214, bridging piece 217 is layed on flexible rod 216, when integral lifting platform 2 is vertically movable, Turnover panel 221 is rolled, so that integral lifting platform 2 is moved up and down;When integral lifting platform 2 vertically stops workmen's construction When, turnover panel 221 is layed in flexible rod 216, to avoid falling object from high altitude.
Please emphasis refer to Fig. 6 and Fig. 7, preferably, in the saddle climbing type Work platform system of the present embodiment, in addition to Some tool-type wall-attaching equipments 3, the saddle 11 is fixed on construction floor exterior wall by the tool-type wall-attaching equipment 3 interval On 8, the tool-type wall-attaching equipment 3, including one be arranged in attached wall framework 31 on building structure window, three expansion links 32 and One connector 33, one end of the attached wall framework 31 is fixed with a limited block 34, and the other end of the attached wall framework 31 is set There is the adjustable fastening assembly 35 in position, the limited block 34 and the fastening assembly 35 are located at the inside and outside both sides of exterior wall 8 respectively; One end of the expansion link 32 is hinged with the attached wall framework 31, the other end of the expansion link 32 by connector 33 with it is described Saddle 11 is connected, and the fastening assembly 35 is included on positioning rod member 351 and transverse screw 352, the attached wall framework 31 along vertical The direction in stalk face is used on the first screwed hole for setting positioning rod member 351, the positioning rod member 351 provided with a row away from attached wall One end of framework 31 is provided with the second screwed hole for the transverse screw 352 that is spirally connected, the transverse screw 352 and the limit The side of position block 34 towards exterior wall 8 is equipped with the first supporting steel plate 36 of the flexible cushion block 37 of band first.With existing by outside Burrow pre-buried on wall 8 or fixed to wearing bolt unlike the mode of wall-attaching equipment, wall-attaching equipment is using clamping type attached wall dress Put, by the window of building structure, the part that attached wall is connected with building structure is connected by the way of clip with building structure. Clip spacing combines regulation using equidistant bolt hole plus two kinds of coarse-fine modes of screw thread, and the spacing of any distance can be achieved with suitable Exterior wall with different-thickness.With exterior wall contact portion using the first supporting steel plate 36 flexible combination of cushion block 37 of Jia the first, Protect the face of exterior wall 8 to exempt to recruit destruction to greatest extent while clamping force is increased, solve asking for the existing destruction of attached wall External Wall 8 Topic.
The ingenious support that make use of building structure window exterior wall 8 to be fixed as it of wall-attaching equipment of the present invention, it passes through attached The U-shaped frame structure that wall framework 31, limited block 34 and fastening assembly 35 are constituted is clamped on building structure window exterior wall 8, is used Clip mode is connected with building, avoid the destruction of External Wall 8 while fixed wall-attaching equipment is reached, clamping type is consolidated Determining mode realizes the lossless construction to building, protects the structure of exterior wall 8, reduces the patch work of later stage exterior wall 8;By In terms of power, the stress of wall-attaching equipment of the invention perpendicular to metope direction employs rigid tension and compression stress, and stress-bearing capability is big;Separately Outside, when installing, safeguarding and dismantling the wall-attaching equipment of the climbing type workbench of saddle 11, it can operate indoors, compared to it For his device that need to be operated outside wall, its security and convenience are greatly improved.Preferably, in the saddle of the present embodiment In climbing type Work platform system, the attached wall framework 31 include at least two interval and be set up in parallel (perpendicular to the side of exterior wall 8 To) vertical pole 311 and some cross bars 312 at the two ends of vertical pole 311 being arranged at, being set on the vertical pole 311 some is used to connect Connect in the bolt hole of the positioning rod member 351, the attached wall framework 31 and be additionally provided with diagonal brace 313.There are three to indulge in the present embodiment Set on bar 311, every vertical pole 311 and rod member 351 is positioned described in one, therefore have first of the flexible cushion block 37 of three pairs of bands first Support steel plate 36 clamps exterior wall 8, exterior wall is contacted using the first flexible cushion block 37, to protect exterior wall 8.
Preferably, in the saddle climbing type Work platform system of the present embodiment, the expansion link 32, including big sleeve pipe 321st, middle sleeve 322, adjusting screw rod 323 and connecting seat 324, one end and the attached wall framework 31 of the big sleeve pipe 321 are cut with scissors Connect, the other end of the big sleeve pipe 321, the threaded one end connection of the adjusting screw rod 323 are stretched into one end of the middle sleeve 322 In in the other end of the middle sleeve 322, the other end of the adjusting screw rod 323 is threadedly coupled with the connecting seat 324, described Connecting seat 324 is hinged with the connector 33, is used to be threadedly coupled the regulation spiral shell specifically, one end of the connecting seat has The barrel of bar 323, the other end of the connecting seat has the connection otic placode for being used for being hinged with the connector 33, the big sleeve pipe 321 and middle sleeve 322 be axially arranged with row's bolt hole along itself, by selecting on the big sleeve pipe 321 and middle sleeve 322 Different bolts hole realize the coarse adjustment of the length of expansion link 32, it is real by being threadedly coupled between middle sleeve 322 and adjusting screw rod 323 The accurate adjustment section of the existing length of expansion link 32.
In order that connection relatively reliable between wall-attaching equipment 3 and external wall 8 is obtained, preferably, leading in the present embodiment It is symmetrical on the attached wall framework 31 to be provided with a pair for supporting window vertical side walls in frame climbing type Work platform system Top bracing mechanism 38, the top bracing mechanism 38 includes the shore 381 and positioning screw 382 for being provided with some bolts hole, described Shore 381 is threadedly coupled by one in the bolt hole with the attached wall framework 31, away from attached on the shore 381 That one end of wall framework 31 sets one to connect protrusive board 383, and the connection protrusive board 383 and the shore 381 are perpendicular, the company The screwed hole opened up on protrusive board 383 for being threadedly coupled the positioning screw 382 is connect, the positioning screw 382 is shored with described Bar 381 is parallel, and that one end away from attached wall framework 31 on the positioning screw 382 is provided with second of the flexible cushion block of band second Support steel plate 384.
Please emphasis refering to Fig. 8 to Figure 11, preferably, in the saddle climbing type Work platform system of the present embodiment, also wrapping Include the rack locking device 5 used when integral lifting platform 2 is stopped.The drive device 13 includes motor and driven by motor Dynamic gear, the correspondence position of saddle standard knot is provided with stationary rack 111, and the gear is meshed with the stationary rack 111. The rack locking device 5 include be used for be meshed with the stationary rack 111 on saddle 11 locking rack 51, be installed on seat in the plane Locking base 52, caging bolt 53 on frame 12 and the limit switch 54 for cutting off dynamical system, the locking base 52 Including a vertical baffle 521, the locking base 52 is separated into two parts by the vertical baffle 521, and one is for holding The rack installing frame 522 of the locking rack 51 is put, another is the switch attachment member 523 for setting limit switch 54, institute The bolt hole for opening up and being worn for the caging bolt 53 on vertical baffle 521 is stated, when the nut of the caging bolt 53 is by touching When sending out the cut-out dynamical system of limit switch 54, the locking rack 51 can just be embedded in the rack installing frame 522 with it is described Stationary rack 111 on saddle 11 is meshed.The present embodiment is by using rack locking device 5, in integral lifting platform 2 quiet When only, integral lifting platform 2 is fixed on saddle 11 with engaging for the rack on saddle 11 by the rack locking device 5, So that the load transfer of integral lifting platform 2 is between locking rack 51 and stationary rack 111, thus freeing that the braking of motor Power, improves motor applying working condition, and the brake force deficiency that solving the long-term electromagnetic braking of motor may occur causes asking for platform decline Topic.
For the ease of locking rack 51 is embedded in rack installing frame 522, preferably, the rack in the present embodiment is locked In device 5, the rack installing frame 522 be in " Contraband " font, the rack installing frame 522, including top plate 5221, bottom plate 5222 with And the vertical connecting plate 5223 of connection top plate 5221 and bottom plate 5222, the vertical baffle 521 and the vertical connecting plate 5223 Upper that one end away from the stationary rack 111 is fixedly connected, and the vertical baffle 521 and the vertical phase of connecting plate 5223 It is mutually vertical.In order to improve the top plate 5221 on the intensity of whole rack locking device 5, the rack installing frame 522 with it is vertical every Gusset 5224 is set between plate 521, further to improve working security.
Engaged in order that rack 51 must be locked and consolidated with the stationary rack 111 on saddle 11, preferably, in the present embodiment In rack locking device 5, the locking rack 51 is in bulk, and side sets 4-8 teeth, opposite side and the rack installing frame 522 inner chamber matches.The side that rack 51 is locked in the present embodiment sets 6 teeth.It is preferred that, lock dress in above-mentioned rack Put in 5, the rack installing frame 522, a length of 150-250mm, a width of 30-50mm, to ensure that locking rack 51 has 1 tooth away from perpendicular To the horizontal adjustable scope of adjustable extent and 5mm or so.
Engaged in order that rack 51 must be locked and consolidated with the stationary rack 111 on saddle 11, preferably, in the present embodiment In rack locking device 5, the locking rack 51 is provided with a draw ring screw 55, and locking rack is picked and placeed with convenient construction personnel 51.In addition, in the rack locking device 5 of the present embodiment, using channel-section steel as switch attachment member 523, the limit switch 54 is pacified In groove bottom loaded on the channel-section steel, the cell wall on the channel-section steel close to rack installing frame 522 is used as the vertical baffle 521. Channel-section steel cost is low, convenient material drawing, is conducive to making the rack locking device 5.
Preferably, in the rack locking device 5 of the present embodiment, the limit switch 54 is connected with the dynamical system, The limit switch 54 can cut off dynamical system.The nut of caging bolt 53 touches limit switch 54, cuts off dynamical system, prevents Only start motor when locking rack 51 is engaged with stationary rack 111, to protect motor.
In use, after integral lifting platform 2 reaches specified altitude assignment under the drive of electromagnetic braking motor, turning on spacing spiral shell Bolt 53, touches the action of limit switch 54 to cut off dynamical system, now platform will be unable to rise or fall action, will lock rack 51 are placed in rack installing frame 522, and tightening caging bolt 53 makes locking rack 51 be engaged with the stationary rack 111 on saddle 11 To lock platform.When platform needs motion, unscrew caging bolt 53, locking rack 51 is pulled out in rack installing frame 522, will Caging bolt 53 is tightened, and is allowed to separate with limit switch 54, and power system, now electromagnetic braking electricity are connected in the action of limit switch 54 Machine can drive integral lifting platform 2 to rise or fall action.
Preferably, in the saddle climbing type Work platform system of the present embodiment, in addition to some groups of laser sensors, The integral lifting platform 2 can also include the seat in the plane frame for being arranged at outside lift drive system 1 except intermediary operation platform 21 The peripheral operation platform 22 in 12 outsides, each laser sensor includes transmitter 61 and receiver 62, the He of transmitter 61 Receiver 62 is respectively arranged at the down either side of intermediary operation platform 21 and peripheral operation platform 22.If receiver 62 can not receive The barrier that collision is likely to occur on signal from transmitter 61, the running orbit for illustrating future is present, thus can be Integral lifting platform 2 detects that the barrier that collision whether is likely to occur on following running orbit is present during decline, If any barrier, integral lifting platform 2 can be stopped in time and moved, reruned after complete barrier for clearance, so as to solve entirety The collision problem that hoistable platform 2 may occur during declining, it is ensured that construction safety.
Preferably, in the saddle climbing type Work platform system of the present embodiment, the bottom of each saddle 11 is fixed on one On Combined support base 9, the Combined support base 9 includes steel framework 91, four flexible support legs 92, some return pulleys 93, led Frame underframe 94 and access ladder 95, the return pulley 93 are arranged at the lower section of the steel framework 91, and the saddle underframe 94 is fixedly installed In in institute's steel framework 91, the access ladder 95 is arranged at the side of the steel framework 91, and the steel framework 91 includes a pair of two ends and is provided with spiral shell Bolt lock hole 911 and horizontal steel pipe, a pair of the parallel longitudinal steel pipes being parallel to each other, the horizontal steel pipe and longitudinal steel Also include a cross hang steel pipe in pipe connection one horizontal rectangular framework of composition, the steel framework, to strengthen the entirety of steel framework 91 Intensity and being easy to sets the saddle underframe 94, and the saddle underframe 94 is used to install saddle 11, the bolt locking holes 911 On four Angle Positions of the steel framework 91, row's bolt is axially arranged with along flexible support leg 92 in every flexible support leg 92 Hole, one end of every flexible support leg 92 can extend into the corresponding end of the horizontal steel pipe of correspondence, the other end of every flexible support leg 92 Spike 96 is set, steel framework 91 can be fixed on by the bolt locking holes 911 and bolt on steel framework 91 on ground, Huo Zhetong The bolt locking holes 911 and bolt crossed on steel framework 91 fix every flexible support leg 92.
Embodiment two
Please continue to refer to Fig. 1 to Figure 13, a kind of saddle climbing type work as described in embodiment one is present embodiments provided The construction method of plateform system, including:
Step one, saddle 11 is installed on Combined support base 9, the saddle 11 is connected by some section saddle standard knots Composition, saddle 11 is provided with stationary rack 111, and the seat in the plane frame 12 with drive device 13 is installed on saddle 11, driving dress Putting 13 includes motor and by motor-driven gear, and the gear is meshed with the stationary rack 111, is driven so as to complete lifting The assembling of dynamic system 1.
Step 2, the seat in the plane frame 12 of each lift drive system 1 passes through operating platform connection composition integral lifting platform 2, institute State operating platform 2 to be formed by connecting by some console modules, the console module includes a rectangle truss structure, the truss structure Top surface as upper strata job platform, the bottom surface of truss structure is used as lower floor's job platform, upper strata job platform and lower floor's truss Structure peripheral install additional two upper lateral parts of the operating platform between protection network 218, the seat in the plane frame 12 of adjacent lift drive system 1 with it is right The seat in the plane frame 12 answered is hinged, two side lower parts of the operating platform between the seat in the plane frame 12 of adjacent lift drive system 1 with it is corresponding Seat in the plane frame 12 is connected by sliding laterally attachment means 4.Will be flexible preferably, can be installed according to the exterior wall shape of building Rod and bridging piece are installed on the integral lifting platform 2, in order to which workmen constructs.
Step 3, causes the bottom of integral lifting platform 2 stops height to be N structures to be onstructed by drive device 13 Below construction section bottom at 600mm-800mm, the turnover panel 221 of upset integral lifting platform 12 bottom makes it be close to N-1 structures The metope of construction section, wherein N are natural number, N >=2.
Step 4, operating personnel completes the constructing operation of N structure constructions section on integral lifting platform 2, and in N knots Wall-attaching equipment 3 is set between the exterior wall 8 and saddle 11 of structure construction section.
Step 5, opens the turnover panel 221 of the bottom of integral lifting platform 2, the checking motion 7 at the top of saddle 11 of dismantling.
Step 6, lifts saddle standard knot progress saddle 11 using suspension rod 14 and increases, entirety is lifted by drive device 13 Hoistable platform 2, makes the bottom of integral lifting platform 2 stop at highly for 600mm-800mm below N+1 structure constructions section bottom.
Step 7, repeat step three is to step 6, until assembled architecture agent structure binds.
Step 8, driving integral lifting platform 2 rises or falls along saddle 11, carries out decoration of exterior wall construction, until completing Whole building structure outer decoration construction is completed.
Step 9, the top of saddle 11 is promoted to by integral lifting platform 2.
Step 10, as each wall-attaching equipment 3 and saddle standard knot are removed in the decline of integral lifting platform 2 successively, until complete It is complete to remove.
Embodiment three
The present embodiment and the difference of embodiment one are that the quantity of the integral lifting platform 2 is at least two, interval It is arranged on the saddle 11, positioned at the integral lifting platform 2 of different height, independent operating, the integral lifting platform 2 of the top For the structure construction of assembled architecture, underlying integral lifting platform 2 is used for the decoration construction of alien invasion, different layers Structure can be carried out simultaneously with decoration of exterior wall work, so as to significantly improve the efficiency of construction of assembled architecture.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (11)

1. a kind of saddle climbing type Work platform system, the construction for assembled arthitecutral structure, it is characterised in that including:Extremely Few two groups of lift drive systems, lift drive system described in every group includes saddle, drive device and seat in the plane frame, and seat in the plane frame is arranged In on saddle, drive device is fixed on the frame of seat in the plane, is connected between the seat in the plane frame of adjacent lift drive system by operating platform Integral lifting platform is constituted, the integral lifting platform can make vertical lifting fortune under the drive of drive device along saddle Dynamic, two upper lateral parts of the operating platform between the seat in the plane frame of adjacent lift drive system are hinged with corresponding seat in the plane frame, adjacent liter Two side lower parts of the operating platform between the seat in the plane frame of drop drive system are with corresponding seat in the plane frame by sliding laterally attachment means Connection.
2. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that described to slide laterally connection dress Put, including the level of the lower side for the operating platform being fixedly installed between the seat in the plane frame of the adjacent lift drive system is horizontal To sleeve pipe, extension rod and spacer pin, one end of the extension rod is hinged with corresponding seat in the plane frame, the other end of the extension rod It is fixedly connected after passing the horizontal cross sleeve pipe with the spacer pin, the length of the extension rod is more than the horizontal cross set The length of pipe, the extension rod can be moved relative to the horizontal cross sleeve pipe.
3. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that the integral lifting platform is double Layer job platform, the operating platform is formed by connecting by some console modules, and the console module includes a rectangle truss structure, The top surface laying upper strata platen of rectangle truss structure is used as upper strata job platform, the bottom surface laying lower floor platen of rectangle truss structure As lower floor's job platform, the periphery of the integral lifting platform installs protection network additional.
4. saddle climbing type Work platform system as claimed in claim 3, it is characterised in that the rectangle truss structure is by horizontal stroke Beam, longeron, column vertical connection composition two-by-two, the crossbeam and the longeron are horizontally disposed with, and the longeron is perpendicular to building Building structure metope, the console module also includes flexible rod and bridging piece, and the flexible rod is arranged on longeron towards building That one end for building and can opposing side rails movement, when the flexible rod stretches out longeron, bridging piece is layed on flexible rod, The bridging piece of correspondence lower floor job platform is hinged with a turnover panel close to that side of building, and width and the integral elevating of the turnover panel are put down Spacing between platform and building matches.
5. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that be additionally included in integral lifting platform The rack locking device used during stop, the drive device includes motor and by motor-driven gear, the saddle by Some saddle standard knots are formed by connecting, and the correspondence position of the saddle standard knot is provided with stationary rack, the gear with it is described solid Fixed rack is meshed, and the rack locking device includes locking rack, the installation for being used to be meshed with the stationary rack on saddle In the locking base on the frame of seat in the plane, caging bolt and limit switch for cutting off dynamical system, the locking base includes The locking base is separated into two parts by one vertical baffle, the vertical baffle, and one is for housing the locking teeth The rack installing frame of bar, another is to be opened up on the switch attachment member for setting limit switch, the vertical baffle for described The bolt hole that caging bolt is worn, it is described when the nut of the caging bolt cuts off dynamical system by triggering limit switch Locking rack can be just embedded in the rack installing frame to be meshed with the stationary rack on the saddle.
6. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that also laser induced including some groups Operating platform between device, the seat in the plane frame of adjacent lift drive system is intermediary operation platform, and the integral lifting platform is also Including the outside operating platform being arranged on the outside of the seat in the plane frame of outside lift drive system, each laser sensor includes transmitting Device and receiver, the transmitter and receiver are respectively arranged under the both sides of intermediary operation platform and outside operating platform Side.
7. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that also including some tool-type attached walls Device, the saddle is fixed on construction floor exterior wall by the tool-type wall-attaching equipment interval, the tool-type attached wall Device, including one be arranged in attached wall framework, three expansion links and a connector on building structure window, the attached wall framework One end be fixed with a limited block, the other end of the attached wall framework is provided with the adjustable fastening assembly in position, the limited block It is located at the inside and outside both sides of exterior wall respectively with the fastening assembly;One end of the expansion link and the attached wall frame articulation, it is described The other end of expansion link is connected by connector with the saddle, and the fastening assembly includes positioning rod member and transverse screw, It is used for the first screwed hole of setting positioning rod member, the locating rod on the attached wall framework provided with a row along the direction of vertical wall One end away from attached wall framework on part is provided with the second screwed hole for the transverse screw that is spirally connected, the transverse screw and institute The side for stating limited block towards exterior wall is equipped with the first supporting steel plate of the flexible cushion block of band first.
8. saddle climbing type Work platform system as claimed in claim 7, it is characterised in that the expansion link, including big set Pipe, middle sleeve and adjusting screw rod and connecting seat, one end of the big sleeve pipe and the attached wall frame articulation, the middle sleeve One end stretch into the other end of the big sleeve pipe, the threaded one end of the adjusting screw rod is connected to the other end of the middle sleeve Interior, the other end of the adjusting screw rod is threadedly coupled with connecting seat, and the connecting seat is hinged with the connector, the big sleeve pipe Row's bolt hole is axially arranged with along itself with middle sleeve, by selecting the different bolts hole on the big sleeve pipe and middle sleeve The coarse adjustment of length of telescopic bar is realized, the accurate adjustment of length of telescopic bar is realized by being threadedly coupled between middle sleeve and adjusting screw rod Section.
9. saddle climbing type Work platform system as claimed in claim 7, it is characterised in that left and right is right on the attached wall framework Claim provided with a pair of top bracing mechanisms for supporting window vertical side walls, the top bracing mechanism includes a top for being provided with some bolts hole Strut and positioning screw, the shore are threadedly coupled by one in the bolt hole with the attached wall framework, described That one end away from attached wall framework on shore sets one to connect protrusive board, and the connection protrusive board and the shore are perpendicular, institute The screwed hole opened up on connection protrusive board for being threadedly coupled the positioning screw is stated, the positioning screw is equal with the shore OK, second supporting steel plate of that one end away from attached wall framework on the positioning screw provided with the flexible cushion block of band second.
10. saddle climbing type Work platform system as claimed in claim 1, it is characterised in that the bottom of each saddle is fixed In on a Combined support base, the Combined support base includes steel framework, four flexible support legs, some return pulleys, saddle bottoms Frame and access ladder, the return pulley are arranged at the lower section of the steel framework, and the saddle underframe is fixedly installed in institute's steel framework, described Access ladder is arranged at the side of the steel framework, and the steel framework includes a pair of two ends and is provided with bolt locking holes and the transverse direction being parallel to each other Steel pipe, the bolt locking holes are located on four Angle Positions of the steel framework, along the axial direction of flexible support leg in every flexible support leg Provided with row's bolt hole, one end of every flexible support leg can extend into the corresponding end of the horizontal steel pipe of correspondence, every flexible support leg The other end set spike, steel framework can be fixed on by the bolt locking holes and bolt on steel framework on ground, Huo Zhetong The bolt locking holes and bolt crossed on steel framework fix every flexible support leg.
11. a kind of construction method of the saddle climbing type Work platform system in 1-10 such as claim as described in any one, its It is characterised by, including:
Step one, saddle is installed on Combined support base, the saddle is made up of some section saddle standard knot connections, saddle Stationary rack is provided with, the seat in the plane frame with drive device is installed on saddle, drive device includes motor and driven by motor Dynamic gear, the gear is meshed with the stationary rack, so as to complete the assembling of lift drive system;
Step 2, the seat in the plane frame of each lift drive system is by operating platform connection composition integral lifting platform, and the operation is put down Platform is formed by connecting by some console modules, and the console module includes a rectangle truss structure, and the top surface of the truss structure is made For upper strata job platform, the bottom surface of truss structure is used as lower floor's job platform, upper strata job platform and lower floor's truss structure periphery Two upper lateral parts for installing the operating platform between protection network, the seat in the plane frame of adjacent lift drive system additional are cut with scissors with corresponding seat in the plane frame Connect, two side lower parts of the operating platform between the seat in the plane frame of adjacent lift drive system are with corresponding seat in the plane frame by sliding laterally Attachment means are connected;
Step 3, by drive device so that it is N structure constructions section to be onstructed that the bottom of integral lifting platform, which stops height, Below bottom at 600mm-800mm, the turnover panel of upset integral lifting platform bottom, the wall for making it be close to N-1 structure constructions section Face, wherein N are natural number, N >=2;
Step 4, operating personnel completes the constructing operation of N structure constructions section on integral lifting platform, and is applied in N structures Wall-attaching equipment is set between the exterior wall and saddle of workshop section;
Step 5, opens the checking motion at the top of the turnover panel of integral lifting platform bottom, saddle of dismantling;
Step 6, lifts saddle standard knot progress saddle using suspension rod and increases, lift integral lifting platform by drive device, make Integral lifting platform bottom is stopped at highly for 600mm-800mm below N+1 structure constructions section bottom;
Step 7, repeat step three is to step 6, until assembled architecture agent structure binds;
Step 8, driving integral lifting platform rises or falls along saddle, carries out decoration of exterior wall construction, until completing whole building Structure outer decoration construction is completed;
Step 9, saddle top is promoted to by integral lifting platform;
Step 10, each wall-attaching equipment and saddle standard knot are removed with the decline of integral lifting platform successively, until dismounting completely.
CN201710133185.7A 2017-03-08 2017-03-08 Guide frame climbing type working platform system and construction method thereof Active CN107035122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710133185.7A CN107035122B (en) 2017-03-08 2017-03-08 Guide frame climbing type working platform system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710133185.7A CN107035122B (en) 2017-03-08 2017-03-08 Guide frame climbing type working platform system and construction method thereof

Publications (2)

Publication Number Publication Date
CN107035122A true CN107035122A (en) 2017-08-11
CN107035122B CN107035122B (en) 2023-10-24

Family

ID=59533231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710133185.7A Active CN107035122B (en) 2017-03-08 2017-03-08 Guide frame climbing type working platform system and construction method thereof

Country Status (1)

Country Link
CN (1) CN107035122B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577626A (en) * 2018-11-29 2019-04-05 山西八建集团有限公司 Sliding rack for assembling type steel structure construction
CN110453612A (en) * 2019-07-25 2019-11-15 陈艳龙 A kind of protective device of road and bridge construction hanging basket
CN111307937A (en) * 2019-12-11 2020-06-19 内江师范学院 Civil engineering uses nondestructive test device
CN112978543A (en) * 2021-02-07 2021-06-18 上海建工二建集团有限公司 Wall attaching device and construction method thereof
CN114704068A (en) * 2022-06-07 2022-07-05 中铁城建集团第一工程有限公司 Attached lifting scaffold system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101045515A (en) * 2007-04-10 2007-10-03 陈定方 Vertical lifting and locking device
CN101225706A (en) * 2007-01-19 2008-07-23 西北工业大学 Adhered self-lifting highrise operation platform
WO2010047477A2 (en) * 2008-10-22 2010-04-29 주식회사 리프텍 Construction hoist
CN102120556A (en) * 2011-02-28 2011-07-13 大连理工大学 Ultrasonic probe type anti-collision device for working platform
CN102345375A (en) * 2011-11-08 2012-02-08 江苏申锡建筑机械有限公司 Dual-mast construction operation platform capable of being leveled automatically
CN202984122U (en) * 2012-12-20 2013-06-12 石河子市华农种子机械制造有限公司 Movable seed cleaner
CN105672642A (en) * 2016-03-11 2016-06-15 上海建工集团股份有限公司 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN106064801A (en) * 2016-08-01 2016-11-02 申锡机械有限公司 A kind of multilamellar construction lifting platform
CN205875669U (en) * 2016-07-27 2017-01-11 中国建筑第六工程局有限公司 Hanging basket device
CN206625526U (en) * 2017-03-08 2017-11-10 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system
CN206625528U (en) * 2017-03-08 2017-11-10 上海建工集团股份有限公司 A kind of saddle climbing type Work platform system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225706A (en) * 2007-01-19 2008-07-23 西北工业大学 Adhered self-lifting highrise operation platform
CN101045515A (en) * 2007-04-10 2007-10-03 陈定方 Vertical lifting and locking device
WO2010047477A2 (en) * 2008-10-22 2010-04-29 주식회사 리프텍 Construction hoist
CN102120556A (en) * 2011-02-28 2011-07-13 大连理工大学 Ultrasonic probe type anti-collision device for working platform
CN102345375A (en) * 2011-11-08 2012-02-08 江苏申锡建筑机械有限公司 Dual-mast construction operation platform capable of being leveled automatically
CN202984122U (en) * 2012-12-20 2013-06-12 石河子市华农种子机械制造有限公司 Movable seed cleaner
CN105672642A (en) * 2016-03-11 2016-06-15 上海建工集团股份有限公司 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN205875669U (en) * 2016-07-27 2017-01-11 中国建筑第六工程局有限公司 Hanging basket device
CN106064801A (en) * 2016-08-01 2016-11-02 申锡机械有限公司 A kind of multilamellar construction lifting platform
CN206625526U (en) * 2017-03-08 2017-11-10 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system
CN206625528U (en) * 2017-03-08 2017-11-10 上海建工集团股份有限公司 A kind of saddle climbing type Work platform system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577626A (en) * 2018-11-29 2019-04-05 山西八建集团有限公司 Sliding rack for assembling type steel structure construction
CN109577626B (en) * 2018-11-29 2021-03-26 山西八建集团有限公司 Sliding frame for construction of assembled steel structure building
CN110453612A (en) * 2019-07-25 2019-11-15 陈艳龙 A kind of protective device of road and bridge construction hanging basket
CN110453612B (en) * 2019-07-25 2021-05-14 广东腾盛模架科技有限公司 Protection device of hanging flower basket is used in road bridge construction
CN111307937A (en) * 2019-12-11 2020-06-19 内江师范学院 Civil engineering uses nondestructive test device
CN112978543A (en) * 2021-02-07 2021-06-18 上海建工二建集团有限公司 Wall attaching device and construction method thereof
CN114704068A (en) * 2022-06-07 2022-07-05 中铁城建集团第一工程有限公司 Attached lifting scaffold system
CN114704068B (en) * 2022-06-07 2022-08-19 中铁城建集团第一工程有限公司 Attached lifting scaffold system

Also Published As

Publication number Publication date
CN107035122B (en) 2023-10-24

Similar Documents

Publication Publication Date Title
CN106894622B (en) Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN206625528U (en) A kind of saddle climbing type Work platform system
CN206625526U (en) Saddle climbing type bilayer rectangle truss module plateform system
CN107035122A (en) A kind of saddle climbing type Work platform system and its construction method
CN106906994A (en) Saddle climbing type Work platform system and its construction method with lossless wall-attaching equipment
CN206625522U (en) Saddle climbing type Work platform system with lossless wall-attaching equipment
WO2011002120A1 (en) Composite cage for construction
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
CN112761348A (en) Hanging basket suspension system without counter weight and installation method
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN103193137A (en) Full-automatic overhead lifting machine and application method thereof
CN109267500A (en) Bridge maintaining lift truss work platform
CN110219451B (en) Lifting protection platform for main body construction and decoration synchronous operation and operation method
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN114517523B (en) Multi-layer air corridor for high-rise steel structure building and construction method thereof
CN206693599U (en) Modularization external hanging type scaffold
CN210438301U (en) Light slat lifting device for building partition wall
CN102465601A (en) Method for installing main body frame steel structure of benzene hydrogenation project
CN207513137U (en) Building engineering construction builder's jack
CN108442678A (en) Slope roof type skin repair crosshead and its construction method
CN116181041B (en) Building machine of multilayer quick construction
CN114109014A (en) Ultrahigh small-diameter cylindrical curtain wall annular hanging basket and construction method thereof
CN212404902U (en) Light-duty pin-connected panel bridge bottom surface construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant