CN206607636U - A kind of collection of job site water and utilize device - Google Patents
A kind of collection of job site water and utilize device Download PDFInfo
- Publication number
- CN206607636U CN206607636U CN201720177886.6U CN201720177886U CN206607636U CN 206607636 U CN206607636 U CN 206607636U CN 201720177886 U CN201720177886 U CN 201720177886U CN 206607636 U CN206607636 U CN 206607636U
- Authority
- CN
- China
- Prior art keywords
- water
- tank
- job site
- cistern
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model discloses a kind of collection of job site water and utilizes device, including cistern, living area water tank and main building water system;Cistern is connected with the dewatering well of job site, and living area water tank is connected by immersible pump with cistern;Main building water system is including the water tank located at main building attic, the water main being connected between attic tank and cistern and is distributed in the fire extinguisher canvas hose that every layer of main building is connected with water main, and cistern is connected by water pump, through water main with attic tank.The water overflowed in basement dewatering well and basement ponding are collected and are used as water source by the utility model, reduce water source cost, pass through reasonable layout water system, fire demand water, concrete curing are flushed the toilet with water, job site road surface depositing dust with water and crew quarter with water etc. on main building, drop low water usage cost.
Description
Technical field
The utility model is related to job site water technical field, and in particular to a kind of collection and utilization of job site water
Device.
Background technology
Progressively perfect with the expansion of architectural engineering scale and using function, most of buildings have basement structure,
It is that construction safety considers that every layer needs fire demand water in engineering structure work progress;And structural concrete pour after, it is necessary to
A large amount of maintenance water;Masonry, decoration and the installing engineering in later stage are both needed to construction water guiding to place to use.General way is
Directly from one layer of access running water, when floor reach a certain height, tap water pressure is not enough, it is necessary to increase pump supplement pressure.
The temporary construction water and fire demand water of such a form are using more, and Pipe installing is simple, but lack there is also many
Point:
1st, running water is largely used, makes the increase of project economic cost;
2nd, booster pump is used in the case that tap water pressure is inadequate, equipment cost is not only increased and also results in maintenance cost increasing
Plus;
3rd, in construction period, especially during main structure construction, due to causing basement using water and Atmospheric precipitation
A large amount of ponding, can cause the increase for the expense of drawing water.
The content of the invention
Goal of the invention:The utility model purpose is that there is provided a kind of receipts of job site water in view of the shortcomings of the prior art
Collect and utilize device, reduce job site water cost.
Technical scheme:The collection of job site water described in the utility model and device is utilized, including cistern, life
Area's water tank and main building water system;Cistern is connected with the dewatering well of job site, and living area water tank passes through immersible pump and retaining
Pond is connected;Main building water system includes the water tank for being located at main building attic, the water main being connected between attic tank and cistern
And the fire extinguisher canvas hose that every layer of main building is connected with water main is distributed in, cistern connects by water pump, through water main and attic tank
It is logical.Main building water system directly is constituted using fire extinguisher canvas hose, greatly reduces cost.
Further improve above-mentioned technical proposal, the living area water tank is provided with water level fluid level controller, current probe, upper
Probe and the next probe, upper probe is positioned at the top of the living area water tank, the next probe positioned at the living area water tank
Bottom, current probe positioned at the delivery port of the immersible pump, water level fluid level controller popped one's head in by four core control lines and current, on
Position probe, the next probe are connected and are connected with immersible pump control.Living area water tank is controlled using water level fluid level controller,
Water-use efficiency is improved, water resource waste is reduced.
Further, the size of the cistern is 5m × 5m × 2m.
Further, the main building water system is two groups.
Further, the water tank is made of steel plate welding.It is welded, can be reused using steel plate, is saved
Use cost.
Further, the tank size is 2.5m × 2.5m × 2m.
Further, water inlet is controlled provided with ball valve in the attic tank.
Further, check valve is provided with away from the attic tank at least 5m water main, is provided with check valve bottom
By-pass line is connected with attic tank.
Beneficial effect:Compared with prior art, the utility model has the advantage of:The utility model is by basement dewatering well
The water and basement ponding of middle spilling are collected as water source, water source cost are reduced, by reasonable layout water system, for leading
Upstairs fire demand water, concrete curing are flushed the toilet with water, job site road surface depositing dust with water and crew quarter with water etc., reduction use
Water cost, attic tank is supplied water using deadweight, reduces equipment cost and maintenance cost.
Brief description of the drawings
Fig. 1 is connection diagram of the present utility model;
Fig. 2 is the structural representation of water tank water pump system in the utility model;
Fig. 3 is the control principle drawing of the utility model water level liquid level meter;
Fig. 4 is cistern purposes schematic diagram of the present utility model;
In figure:1st, cistern;2nd, living area water tank, 31, A buildings water tank, 32, B buildings water tank, 301, A buildings check valve, 302, B
Building check valve, 303, A buildings ball valve, 304, B buildings ball valve, 41, immersible pump, the 42, first multistage pressuring machine pump, the 42, second multistage pressuring machine
Pump, water pump discharge pressure table 401,402,5, water level fluid level controller, 201, the next probe, 202, upper probe, 203, current
Probe, 21, the connecting path of dewatering well and cistern, 22, the connecting path of cistern and living area water tank, 23, cistern and A
The connection water main in building, 24, the connection water main in cistern and B buildings, 25, four core control lines.
Embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but protection domain of the present utility model
It is not limited to the embodiment.
Embodiment 1:The collection of job site water as shown in Figure 1 and device is utilized, including cistern 1, living area water tank 2
With two groups of main buildings(A buildings, B buildings)Water system;Cistern 1 is used during basement construction, a purposive reserved day
Right water catch pit, is 5m × 5m × 2m elevator foundation pit, and cistern 1 is logical by water pump and the formation connection of the dewatering well of job site
The water and Atmospheric precipitation that dewatering well is overflowed on road 21, which are collected, is used as the water source of whole device.Engineering construction on the ground(Layer 2-3)Cross
Cheng Zhong, uses steel plate welding that water tank of the size for 2.5m × 2.5m × 2m, every layer of job site fire extinguisher canvas hose is made in basement
The formal fire extinguisher canvas hose of engineering is all used, greatly reduces cost, main building water system as shown in Fig. 2 job site structure is sealed
Behind top, water tank 31,32 is set respectively in A buildings, B roofs building, will be stored using the first multistage pressuring machine pump 42, the second multistage pressuring machine pump 43
The water in pond 1 is evacuated to water tank 31,32 at the top of two building high buildings, when attic tank 31,32 water are completely to 1.8m, in attic tank
Ball valve 303,304 close water inlet, make fire extinguisher canvas hose internal water pressure increase, when increasing to certain pressure value, -3 layers of water are pumped out
Mouth pressure gauge 401,402 controls the first multistage pressuring machine pump 42, the second multistage pressuring machine pump 43 out of service respectively, so as to reach automatic
Control;Check valve 301,302 is respectively mounted at attic tank >=5m in A buildings, B buildings, it is ensured that enough hydraulic pressure opens check valve
301st, 302, attic tank 31,32 water produce pressure to two building high building construction production water supplies after pumping full using water deadweight(Now disappear
Anti- pipe is outlet pipe), the frequency of use of -3 layers of water pump is reduced, the electricity charge are saved;Install other in addition below check valve 301,302
Thread a pipe and 305,306 lead to attic tank 31,32 as water inlet pipe, fire extinguisher canvas hose is that water inlet pipe is also outlet pipe, reaches and disappears
The dual-purpose type of guard tube, significantly less installation cost.
Water is evacuated in living area water tank 2 through connecting path 22 as shown in figure 3, installing an immersible pump 41 in cistern 1,
In living area, water tank 2 installs the Automatic Control living area water of water level fluid level controller 5, and living area water tank 2 is provided with water level liquid level control
Device processed, current probe 203, upper probe 202 and the next probe 201, upper probe 202 be located at the top of living area water tank 2, under
Position probe 201 is located at the bottom of living area water tank 2, and current probe 203 is located at the delivery port of immersible pump, water level fluid level controller 5
It is connected by four core control lines 25 with current probe 203, upper probe 202, the next probe 201 and controls phase with immersible pump 41
Even.
As shown in figure 4, the water overflowed in basement dewatering well and basement ponding is collected by the use of said apparatus be used as water
Source, while being flushed the toilet for fire demand water, concrete curing on main building with water, job site road surface depositing dust with water and crew quarter
With water etc..
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, it must not
It is construed to the limitation to the utility model itself.The spirit and scope of the present utility model that appended claims are defined are not being departed from
Under the premise of, can various changes can be made in the form and details to it.
Claims (8)
1. a kind of collection of job site water and utilize device, it is characterised in that:Supplied including cistern, living area water tank and main building
Water system;Cistern is connected with the dewatering well of job site, and living area water tank is connected by immersible pump with cistern;Main building supplies water
System includes the water tank located at main building attic, the water main that is connected between attic tank and cistern and to be distributed in main building every
The fire extinguisher canvas hose that layer is connected with water main, cistern is connected by water pump, through water main with attic tank.
2. the collection of job site water according to claim 1 and utilize device, it is characterised in that:The living area water tank
Provided with water level fluid level controller, current probe, upper probe and the next probe, upper probe is positioned at the top of the living area water tank
Portion, the next probe are positioned at the bottom of the living area water tank, and current probe is positioned at the delivery port of the immersible pump, water level liquid level control
Device processed is popped one's head in by four core control lines with current, upper probe, the next probe are connected and are connected with immersible pump control.
3. the collection of job site water according to claim 1 and utilize device, it is characterised in that:The chi of the cistern
Very little is 5m × 5m × 2m.
4. the collection of job site water according to claim 1 and utilize device, it is characterised in that:The main building, which supplies water, is
Unite as two groups.
5. the collection of the job site water according to claim 1 or 4 and utilize device, it is characterised in that:The water tank is adopted
It is made of steel plate welding.
6. the collection of job site water according to claim 5 and utilize device, it is characterised in that:The tank size is
2.5m×2.5m×2m。
7. the collection of job site water according to claim 1 and utilize device, it is characterised in that:In the attic tank
Control to intake provided with ball valve.
8. the collection of job site water according to claim 1 and utilize device, it is characterised in that:Away from the attic water
Check valve is provided with case at least 5m water main, is connected in check valve bottom provided with by-pass line with attic tank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720177886.6U CN206607636U (en) | 2017-02-27 | 2017-02-27 | A kind of collection of job site water and utilize device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720177886.6U CN206607636U (en) | 2017-02-27 | 2017-02-27 | A kind of collection of job site water and utilize device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206607636U true CN206607636U (en) | 2017-11-03 |
Family
ID=60168900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720177886.6U Expired - Fee Related CN206607636U (en) | 2017-02-27 | 2017-02-27 | A kind of collection of job site water and utilize device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206607636U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589752A (en) * | 2018-04-26 | 2018-09-28 | 青岛新华友建工集团股份有限公司 | Shallow source perched water green construction recycling construction |
CN110219315A (en) * | 2019-05-30 | 2019-09-10 | 五冶集团上海有限公司 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
CN114541446A (en) * | 2022-01-18 | 2022-05-27 | 中国黄金集团建设有限公司 | Precipitation treatment system for construction site |
-
2017
- 2017-02-27 CN CN201720177886.6U patent/CN206607636U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589752A (en) * | 2018-04-26 | 2018-09-28 | 青岛新华友建工集团股份有限公司 | Shallow source perched water green construction recycling construction |
CN110219315A (en) * | 2019-05-30 | 2019-09-10 | 五冶集团上海有限公司 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
CN114541446A (en) * | 2022-01-18 | 2022-05-27 | 中国黄金集团建设有限公司 | Precipitation treatment system for construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206607636U (en) | A kind of collection of job site water and utilize device | |
CN105332384B (en) | Super pressure inhales joint pumping system and its method of work | |
JP6873444B2 (en) | A system that uses the energy storage pipes of multiple high-rise buildings to generate electricity | |
CN108894239A (en) | The mobile cofferdam of whole walking | |
CN206233354U (en) | A kind of assembled prefabricated pumping plant of intelligence | |
CN105421578B (en) | A kind of prefabricated pumping plant bottom pull bar lifts cleaning apparatus for self | |
CN206784495U (en) | A kind of water system for high-rise building | |
CN202644495U (en) | Porous vertical shaft slide mold construction device in complicated structure | |
CN209154960U (en) | Fire fighting water system for the construction of super highrise building stage | |
CN206418579U (en) | A kind of integrated form coal sewage lifting pump station | |
CN202202360U (en) | Underground water utilizing system | |
CN206722059U (en) | A kind of monoblock type sewage lifter of anti-return | |
CN110173019B (en) | Superposed group water inlet lifting pump room | |
CN207376792U (en) | A kind of basement waterworks for firefighting | |
CN210459271U (en) | Fan jacket structure for offshore wind power | |
CN207048026U (en) | Prefabricated pumping plant in parallel | |
CN206844229U (en) | A kind of blower pump for pipeline position is higher than the fire cistern of water level | |
CN106906834B (en) | Improved multiphase extraction system and method based on light well point dewatering process | |
CN207376762U (en) | A kind of flood control electricity row station | |
CN206376226U (en) | A kind of accessible all standing dust falling system of contrary sequence method platform | |
CN207144496U (en) | Concrete filled steel tubular column concrete lift-up device for casting | |
CN101949145A (en) | Water supply and drainage system of plunge pool | |
CN205804467U (en) | Be suitable to the anchor block formula drain tap well of long-distance large-caliber surface aqueduct | |
CN203546820U (en) | Novel high-rise building energy-saving living water supply device | |
CN219471029U (en) | Basement anti-floating drainage structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171103 |