CN114541446A - Precipitation treatment system for construction site - Google Patents

Precipitation treatment system for construction site Download PDF

Info

Publication number
CN114541446A
CN114541446A CN202210053583.9A CN202210053583A CN114541446A CN 114541446 A CN114541446 A CN 114541446A CN 202210053583 A CN202210053583 A CN 202210053583A CN 114541446 A CN114541446 A CN 114541446A
Authority
CN
China
Prior art keywords
water
tank
precipitation
storage tank
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210053583.9A
Other languages
Chinese (zh)
Inventor
吉志强
许宗波
张楠
文旭
徐恒雷
黄明亮
魏存生
付兴峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Gold Engineering Corp
Original Assignee
China National Gold Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Gold Engineering Corp filed Critical China National Gold Engineering Corp
Priority to CN202210053583.9A priority Critical patent/CN114541446A/en
Publication of CN114541446A publication Critical patent/CN114541446A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/101Dedicated additional structures, interposed or parallel to the sewer system
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a precipitation treatment system for a construction site, which comprises a precipitation well system, a blow-off pipe, a pump body system, a water storage tank system and a water using terminal, wherein the precipitation well system is connected with the water storage tank system through the pump body system, the water storage tank system is connected with the water using terminal, the blow-off pipe is connected with the precipitation well system, the water storage tank system is an underground water storage tank system, and a liquid level sensor for opening and closing a pump body is arranged in the water storage tank. The underground water storage tank is adopted, so that the water tank is lower than the thickness of a frozen soil layer, the water tank is prevented from freezing, and the operation of a precipitation treatment system is guaranteed; the water tank adopts a sensor to dynamically store water, and the operation of the water tank can be guaranteed under the condition of deep burying through the ultrasonic sensor; the water quality is graded through multi-stage sedimentation and is used immediately under the condition of proper water quality, so that the water using rhythm is guaranteed, and long-time siltation is avoided; through the water receiving tank arranged at the pipeline, waste of water generated at the position which is easy to damage can be immediately recycled to the inside of the system.

Description

Precipitation treatment system for construction site
Technical Field
The invention relates to the field of building construction, in particular to a precipitation treatment system for a construction site.
Background
In recent years, urban construction is developed rapidly, a large amount of construction water is required for engineering construction, and a large water load is undoubtedly caused for some cities with serious water shortage. For areas with high underground water level, deep foundation pit construction can be carried out only after precipitation is needed, and if the foundation pit is not subjected to dewatering and drainage work, confined water can soak the foundation pit to cause collapse; the pumped underground water resource is directly discharged into municipal pipelines or open channels without utilization. The construction site has large water consumption, each project needs water resource, most construction water adopts municipal tap water, and water using parts comprise site domestic drinking water, fire-fighting water, site greening sprinkling irrigation water, site dust fall, vehicle washing, toilet washing and building construction water (comprising pile machine slurry preparation, concrete structure construction period maintenance, concrete test block maintenance, masonry plastering, decoration and fitment, pipeline pressing and the like); the waste of water resources at construction sites is serious, and precipitation, rainwater, production and domestic wastewater almost all adopt an outward discharge mode, so that surface water pollution is caused, and the life of residents is influenced. The water quality requirement of other water is relatively low except that the drinking water requirement of life is higher in the real construction water, and normal water on site can be completely met by fully utilizing the reclaimed water and the precipitation engineering underground water, and the precipitation engineering underground water is used in the structural engineering and can be used after the water quality inspection is needed.
Nowadays, people actively advocate resource conservation when water resource consumption is more and more serious. The green construction is taken as a direction of the reform of the construction industry, and the water conservation and the water resource utilization are the symbols of the green construction. The construction site water resource utilization is reasonably planned, a perfect construction site water resource comprehensive recovery and utilization system is established, the utilization rate of water is improved, and the problem of construction site water resource waste can be effectively solved.
At present, the treatment method for the precipitation well only extracts water resources, and no reasonable treatment system is arranged during allocation and transportation, so that the water resources in the precipitation well cannot be immediately and efficiently utilized.
There is a need for a precipitation treatment system for a construction site that addresses the above-mentioned problems.
Disclosure of Invention
The invention provides a precipitation treatment system for a construction site, which aims to solve the problem that the water source in a precipitation well cannot be immediately and efficiently utilized because a reasonable treatment system is not arranged in the prior art because the treatment method for the precipitation well only extracts the water source and carries out allocation and transportation arrangement.
The invention provides a precipitation treatment system for a construction site, which comprises a precipitation well system, a blow-off pipe, a pump body system, a water storage tank system and a water using terminal, wherein the precipitation well system is connected with the water storage tank system through the pump body system, the water storage tank system is connected with the water using terminal, the blow-off pipe is connected with the precipitation well system, the water storage tank system is a buried water storage tank system, a liquid level sensor for opening and closing a pump body is arranged in the water storage tank, a water receiving tank is arranged below a connecting pipeline of the water using terminal, and the water receiving tank is connected with the water storage tank system.
The precipitation treatment system for the construction site comprises a precipitation well body, a first precipitation water tank, a second precipitation water tank and a third precipitation water tank, wherein the precipitation well body is sequentially connected with the first precipitation water tank, the second precipitation water tank and the third precipitation water tank, the first precipitation water tank is communicated with the bottom of the precipitation well body, the second precipitation water tank is communicated with the middle of the first precipitation water tank, the third precipitation water tank is communicated with the top of the second precipitation water tank, and a drain pipe is communicated with the first precipitation water tank.
The invention relates to a precipitation treatment system for a construction site.
The invention relates to a precipitation treatment system for a construction site, which is characterized in that a pump body system comprises a first pump body and a second pump body, wherein the first pump body is connected with a second settling water tank and a first water storage tank, the second pump body is connected with a third settling water tank and a second water storage tank, and a water receiving tank is connected with the first water storage tank.
The precipitation treatment system for the construction site is characterized in that the water terminal comprises a domestic water terminal and a construction water terminal, the domestic water terminal is connected with the second water storage tank, and the construction water terminal is connected with the first water storage tank.
The precipitation treatment system for the construction site is preferably provided with the liquid level sensor which is an ultrasonic liquid level sensor.
The precipitation treatment system for the construction site is used as a preferred mode, and an infrared induction switch is arranged between a domestic water terminal and the first water storage tank.
The invention has the following beneficial effects:
(1) the underground water storage tank is adopted, so that the thickness of the water tank is lower than that of a frozen soil layer, the water tank is prevented from freezing, and the operation of a precipitation treatment system is guaranteed;
(2) the water tank adopts a sensor to dynamically store water, and the operation of the water tank can be guaranteed under the condition of deep burying through the ultrasonic sensor;
(3) the water quality is graded through multi-stage sedimentation and is used immediately under the condition of proper water quality, so that the water using rhythm is guaranteed, and long-time siltation is avoided;
(4) through the water receiving tank arranged at the pipeline, waste of water generated at the position which is easy to damage can be immediately recycled to the inside of the system.
Drawings
FIG. 1 is a schematic view of a precipitation treatment system for use in a construction site;
FIG. 2 is a schematic view of a precipitation well system of the precipitation treatment system for construction site;
FIG. 3 is a schematic view of a water storage tank system of a precipitation treatment system for a construction site;
FIG. 4 is a schematic view of a pump system of a precipitation treatment system for a construction site;
fig. 5 is a schematic view of a water terminal of a precipitation treatment system for a construction site.
Reference numerals:
1. a dewatering well system; 11. a dewatering well body; 12. a first settling water tank; 13. a second settling water tank; 14. a third settling water tank; 2. a blow-off pipe; 3. a pump body system; 31. a first pump body; 32. a second pump body; 4. a water storage tank system; 41. a first water storage tank; 42. a second water storage tank; 5. a water using terminal; 51. a domestic water terminal; 52. construction water terminal.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example 1
As shown in figure 1, a precipitation treatment system for construction site, including precipitation well system 1, blow off pipe 2, pump body system 3, storage water tank system 4 and water terminal 5, precipitation well system 1 passes through pump body system 3 and connects storage water tank system 4, storage water tank system 4 connects water terminal 5, blow off pipe 2 connects precipitation well system 1, storage water tank system 4 buries storage water tank system 4 for ground, be provided with the level sensor who is used for the switch pump body in the storage water tank, the connecting line below of water terminal 5 is provided with the water receiving tank, water receiving tank connects storage water tank system 4.
As shown in fig. 2, the precipitation well system 1 comprises a precipitation well body 11, a first precipitation water tank 12, a second precipitation water tank 13 and a third precipitation water tank 14, the precipitation well body 11 is sequentially connected with the first precipitation water tank, the second precipitation water tank and the third precipitation water tank, the first precipitation water tank is communicated with the bottom of the precipitation well body 11, the second precipitation water tank is communicated with the middle of the first precipitation water tank, the third precipitation water tank is communicated with the top of the second precipitation water tank, and a drain pipe 2 is communicated with the first precipitation water tank 12.
As shown in fig. 3, the water storage tank system 4 includes a first water storage tank 41 and a second water storage tank 42, and the first water storage tank 41 and the second water storage tank 42 are not communicated with each other.
As shown in fig. 4, the pump system 3 includes a first pump 31 and a second pump 32, the first pump 31 is connected to the second settling tank and the first water storage tank 41, the second pump 32 is connected to the third settling tank and the second water storage tank 42, and the water receiving tank is connected to the first water storage tank 41.
As shown in fig. 5, the water terminal 5 includes a domestic water terminal 51 and a construction water terminal 52, the domestic water terminal 51 is connected to the second water storage tank 42, and the construction water terminal 52 is connected to the first water storage tank 41.
The liquid level sensor is an ultrasonic liquid level sensor. An infrared induction switch is arranged between the domestic water terminal 51 and the first water storage tank 41.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (7)

1. The utility model provides a precipitation treatment system for job site which characterized in that: including precipitation well system (1), blow off pipe (2), pump body system (3), storage water tank system (4) and water terminal (5), precipitation well system (1) passes through pump body system (3) are connected storage water tank system (4), storage water tank system (4) are connected water terminal (5), blow off pipe (2) are connected precipitation well system (1), storage water tank system (4) bury storage water tank system (4) for ground, be provided with in the storage water tank and be used for the switch the level sensor of the pump body, the connecting line below of water terminal (5) is provided with the water receiving tank, storage water tank system (4) is connected to the water receiving tank.
2. The precipitation treatment system for a construction site according to claim 1, wherein: precipitation well system (1) is including precipitation well body (11), first sediment water tank (12), second sediment water tank (13) and third sediment water tank (14), precipitation well body (11) with first settlement water tank the second subsides the water tank with the third subsides the water tank and connects gradually, first settlement water tank with precipitation well body (11) bottom intercommunication, the second subsides the water tank with first settlement water tank middle part intercommunication, the third subsides the water tank with the second subsides water tank top intercommunication, blow off pipe (2) intercommunication first sediment water tank (12).
3. The precipitation treatment system for a construction site according to claim 2, wherein: the water storage tank system (4) comprises a first water storage tank (41) and a second water storage tank (42), and the first water storage tank (41) and the second water storage tank (42) are not communicated with each other.
4. The precipitation treatment system for a construction site according to claim 3, wherein: the pump body system (3) comprises a first pump body (31) and a second pump body (32), the first pump body (31) is connected with the second settling water tank and the first water storage tank (41), the second pump body (32) is connected with the third settling water tank and the second water storage tank (42), and the water receiving tank is connected with the first water storage tank (41).
5. The precipitation treatment system for the construction site according to claim 4, wherein: the water terminal (5) comprises a domestic water terminal (51) and a construction water terminal (52), the domestic water terminal (51) is connected with the second water storage tank (42), and the construction water terminal (52) is connected with the first water storage tank (41).
6. The precipitation treatment system for a construction site according to claim 1, wherein: the liquid level sensor is an ultrasonic liquid level sensor.
7. The precipitation treatment system for a construction site according to claim 5, wherein: an infrared induction switch is arranged between the domestic water terminal (51) and the first water storage tank (41).
CN202210053583.9A 2022-01-18 2022-01-18 Precipitation treatment system for construction site Pending CN114541446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210053583.9A CN114541446A (en) 2022-01-18 2022-01-18 Precipitation treatment system for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210053583.9A CN114541446A (en) 2022-01-18 2022-01-18 Precipitation treatment system for construction site

Publications (1)

Publication Number Publication Date
CN114541446A true CN114541446A (en) 2022-05-27

Family

ID=81672496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210053583.9A Pending CN114541446A (en) 2022-01-18 2022-01-18 Precipitation treatment system for construction site

Country Status (1)

Country Link
CN (1) CN114541446A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204080837U (en) * 2014-09-22 2015-01-07 中建八局第一建设有限公司 A kind of foundation pit dewatering recycle device
CN206607636U (en) * 2017-02-27 2017-11-03 中建八局第三建设有限公司 A kind of collection of job site water and utilize device
CN207774926U (en) * 2017-12-15 2018-08-28 漳州长鑫环保科技有限公司 A kind of smoke processing system uses water circle device
CN110235768A (en) * 2019-07-22 2019-09-17 安徽瓦大现代农业科技有限公司 A kind of water-saving vegetable cultivation hydroponic device
CN211621640U (en) * 2019-12-14 2020-10-02 天津二建建筑工程有限公司 Well water circulating system of foundation pit dewatering well
CN217325440U (en) * 2022-01-18 2022-08-30 中国黄金集团建设有限公司 Precipitation treatment system for construction site

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204080837U (en) * 2014-09-22 2015-01-07 中建八局第一建设有限公司 A kind of foundation pit dewatering recycle device
CN206607636U (en) * 2017-02-27 2017-11-03 中建八局第三建设有限公司 A kind of collection of job site water and utilize device
CN207774926U (en) * 2017-12-15 2018-08-28 漳州长鑫环保科技有限公司 A kind of smoke processing system uses water circle device
CN110235768A (en) * 2019-07-22 2019-09-17 安徽瓦大现代农业科技有限公司 A kind of water-saving vegetable cultivation hydroponic device
CN211621640U (en) * 2019-12-14 2020-10-02 天津二建建筑工程有限公司 Well water circulating system of foundation pit dewatering well
CN217325440U (en) * 2022-01-18 2022-08-30 中国黄金集团建设有限公司 Precipitation treatment system for construction site

Similar Documents

Publication Publication Date Title
CN201276718Y (en) Rainwater collecting and recycling system on building roofing
CN107542107A (en) The dome type piping lane built using the pavement underground space
CN103374965B (en) Venturi self-circulation negative-pressure drainage system of refuse landfill
CN202227456U (en) Rainwater collection and recycling system for environment-friendly transformer station
CN217325440U (en) Precipitation treatment system for construction site
CN207268009U (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN101012658A (en) Town life water saving circulation network
CN206346221U (en) The left and right combined type piping lane built using the pavement underground space
CN206368389U (en) One kind backwash and sewage sucking system
CN211948651U (en) Comprehensive recovery and utilization system for green construction water resources in construction site
CN114541446A (en) Precipitation treatment system for construction site
CN101289865A (en) Water resource recycling system for base pit engineering
AU2021101264A4 (en) A foundation pit drainage system for flood control
CN2931584Y (en) Recovery utilization apparatus for rain water in plant area
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN203795512U (en) Rainwater recycling device
CN211973796U (en) Novel rainwater underground disconnection system
CN204645440U (en) A kind of environment-friendly type rain dirt shunting balcony drainage system
CN1821496B (en) Recovering and utilizing device for rain in factory area
CN208633131U (en) Building foundation pit precipitation recycling device
CN206128253U (en) Urban drainage pipe network collection yu jiao pond
CN219175299U (en) Self-cleaning multi-point pressure pollution discharge precipitation device
CN212224123U (en) Building site circulating water utilizes system
CN219639656U (en) Municipal administration pipeline rainy season anti-floating device
CN207176874U (en) A kind of pavement comprehensive pipe network and drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination