CN108589752A - Shallow source perched water green construction recycling construction - Google Patents

Shallow source perched water green construction recycling construction Download PDF

Info

Publication number
CN108589752A
CN108589752A CN201810382417.7A CN201810382417A CN108589752A CN 108589752 A CN108589752 A CN 108589752A CN 201810382417 A CN201810382417 A CN 201810382417A CN 108589752 A CN108589752 A CN 108589752A
Authority
CN
China
Prior art keywords
water
construction
installation
tank
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810382417.7A
Other languages
Chinese (zh)
Inventor
高原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Xinhuayou Construction Group Co Ltd
Original Assignee
Qingdao Xinhuayou Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Xinhuayou Construction Group Co Ltd filed Critical Qingdao Xinhuayou Construction Group Co Ltd
Priority to CN201810382417.7A priority Critical patent/CN108589752A/en
Publication of CN108589752A publication Critical patent/CN108589752A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Structural Engineering (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of shallow source perched water green construction recycling constructions, include the following steps:(One)Geological mapping;(Two)Precipitation well construction;(Three)Water tank, water pot installation;(Four)Respectively use water end erection of equipment.The underground water that the engineering method of the present invention exploits dewatering project is recycled, and reduces cost of building projects;Municipal drainage net is not directly discharged into the underground water taken, reduces the pressure of municipal pipeline.It needs to reduce Water Level in Foundation Pit, underground water moisture content height, in addition to construction water matter is more demanding, other engineerings for using water water quality requirement relatively low suitable for construction.

Description

Shallow source perched water green construction recycling construction
Technical field
The present invention relates to a kind of shallow source perched water green construction recycling constructions, belong to building construction technology Field.
Background technology
In the higher area of level of ground water, during construction project deep pit construction, since water-bearing layer is cut off, Under differential pressure action, underground water constantly will necessarily enter foundation pit by seepage flow.It such as works without foundation pit Yield rainfall relation, it will foundation pit is caused to soak Water makes construction condition be deteriorated, and foundation bearing capacity declines, and is also possible to cause quicksand, piping and side under flowing pressure effect Phenomena such as slope unstability.Therefore, to ensure security of foundation ditch construction, it is necessary to take effective precipitation and drainage measure, pass through to exploit and take out The underground water in certain area coverage is taken, causes groundwater level in particular range to reduce, i.e. dewatering project.Dewatering project underground Water has the characteristics that water is big, uninterruptedly exploitation, exploitation period length, mining time and construction project building time registration are high.
Current most of dewatering project underground water are efficiently used without other is directly discharged into municipal pipeline or ground open channel, river Stream.However, construction project construction itself consumes a large amount of water again, for live drink, fire-fighting, live depositing dust, vehicle rinsing, field Area's greening, lavatory flushing, construction(Including in structure construction concrete curing, concrete test block maintenance, build by laying bricks or stones plastering, Decorations are constructed)Deng.Most of these construction waters use municipal water supply at present.These use water, except Drinking Water matter is wanted Ask higher outer, other are relatively low with water water quality requirement, have in this regard with dewatering project underground water it is very high at right, one Determine in degree, dewatering project underground water can partly or entirely meet these demands.
Invention content
The technical problem to be solved by the present invention is to:A kind of shallow source perched water green construction recycling construction is provided Engineering method.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
Shallow source perched water green construction recycling construction provided by the invention, includes the following steps:
(One)Geological mapping:According to geology exploration report, Engineering Zone geology, hydrologic regime are found out;It finds out and constructs near water simultaneously The barriers such as underground utilities, cable situation and the influence to drill to close to buildings in region, according to formation condition, it is suitable to select Construction equipment and auxiliary facility, carry out the technical training of each work post.Levelling of the land is carried out by designed elevation, excavates influence precipitation The various barriers of well construction.
(Two)Precipitation well construction
1 dewatering well technological process:Divided into well casing water pump, installation pumping control circuit → examination draw water → dewatering well normal work.
2 dewatering well tripping in immersible pumps, be laid with drainage pipeline, connect cable, ground vacuum pump installation etc., it draws water and drainage system It installs, you can start examination and draw water.
Water is drained into the bright ditch of place surrounding by 3 precipitation using pipeline when running(Canal)It is interior, pass through gutter(Canal)Water is arranged Enter in over-the-counter preset drainage ditch, the drainage pipeline of place surrounding should be cleared up periodically, it is ensured that drainage system it is unimpeded.
(Three)Water tank, water pot installation
1 carries out the integral solder of water tank:It is required that the defects of weld seam is without sand holes, stomata, slag inclusion.First carry out the paving weldering of tank bottom bottom plate; Then the group weldering of top layer siding and top plate is carried out;The installation of lifting means is carried out again;The second layer is finally sequentially carried out to bottom wall The assembling and welding of plate.
2 pressurized tanks lift:After basic acceptance(check), you can the lifting operation for carrying out pressurized tank, by tower crane pressure Tank is lifted on the basis of tank body, is secured by threads on base plate.Check the verticality of pressurized tank.
3 connection precipitation well pump pipes are connect with water tank, without each water pipe flange (hot melt) of pressure tower pipe, are pacified according to operating diagram Fill each check-valves and gate valve
4 simultaneously installing submersible pump distribution box, trial operation check pressurized tank operating condition.
(Four)Respectively use water end erection of equipment
1, domestic water end installation
(1) spacing that channel steel is determined according to water tank sheet size is welded and fixed bottom plate and side plate chassis according to water tank sheet size It determines the spacing of channel steel, channel steel spot welding is fixed first, is proofreaded with horizon rule, it is ensured that its smooth and then integral solder again.
(2) internal tie is fixed according to cisten mechanism and is completed by installation attachment, and installs interior outside staircase.
(3) trepanning and welds the flange short tube of each trepanning point according to the requirement trepanning of position shown in drawing and caliber, The levelness of flange will meet the requirements with verticality.
(4) water tank is installed in fixed steelframe, checks tank seal.
2, construction water end installation installation
(1) car washer is installed:
1) it presses the car washer foundation drawing that car washer equipment vendors provide and carries out car washer basic earthwork excavation, build car washer base by laying bricks or stones Plinth.
2) basis pours reach intensity after, contact producer installation personnel carries out car washer installation, debugging.
3) the water band of car washer and pressurized tank, test-run a machine are connected.
(2) live dedusting spray installation:
1) supervisor, the installation of secondary pipe:Holder is installed(It is required that smooth vertical and horizontal), fixed super hole cutter trepanning, then upper mechanical three-way, so Supervisor, the connection of secondary pipe afterwards.Determine and adjust pipeline rout.
2) tube net outside is installed:Connection between plastic conduit uses the special fusion splicer welding of PVC pipe, plastic tube and gold Belonging to the connection of pipe fitting, valve etc. should use threaded connection or flanged joint, the PVC pipe that pipe is walked on ground brick need to be used to make lid Plate protects.
3) supervisor connect installation with pressure of supply water tank:Supervisor connect with pressurized tank output flange.
4) pipeline pressure test:Before pipeline is hidden, corresponding pipeline section will carry out the hidden preceding water pressure test.After system installs, The carry out system water pressure test, testing pressure observation has ne-leakage, deformation.
Engineering method feature:The underground water of dewatering project exploitation is recycled, cost of building projects is reduced.Not to adopting The underground water taken is directly discharged into municipal drainage net, reduces the pressure of municipal pipeline.
The scope of application:It needs to reduce Water Level in Foundation Pit, underground water moisture content height suitable for construction, except the requirement of construction water matter It is higher outer, other engineerings for using water water quality requirement relatively low.
Technological principle:The engineering method focuses on the underground water of extraction dewatering well in water tank by immersible pump, and immersible pump is logical Cross water tank inner float ball control water tank reservoir storage, the high-pressure water tank being then connected with water tank to the underground water of extraction carry out pressurize and it is defeated It is sent to and each uses water spot.
Beneficial effects of the present invention:
Economic benefit:The engineering method is discharged into the underground water progress recycling of city planting ductwork to that should waste, and can save every month The water resource of about 600 or so m3, this project construction period is longer, and equipment investment return rate is high, and equipment high recycling rate can Dismounting puts into next building site and uses, remarkable in economical benefits.
Technical benefits:The engineering method successfully solve the problems, such as underground water recycling, multiplexing many places carry out classification supply with water, Solve the problems, such as building site ground water drainage difficulty.
Social benefit:The engineering method has accomplished effects of energy saving and emission reduction, has saved building-site water resource and has recycled low problem, section About live municipal water use, foundation pit and its neighbouring underground water are extracted in general building site during Dewatering, and be discharged into downcomer In road, this is a kind of non-green construction method to consume groundwater resources as cost.Generally site construction is directly by underground Water is discharged into sewage conduct, not only waste of resource, and increases sewage treatment plant's processing load.Total 27989.4 yuan of reduction of expenditure.
Specific implementation mode
Embodiment 1
Shallow source perched water green construction recycling construction provided in this embodiment, includes the following steps:
(One)Geological mapping:According to geology exploration report, Engineering Zone geology, hydrologic regime are found out;It finds out and constructs near water simultaneously The barriers such as underground utilities, cable situation and the influence to drill to close to buildings in region, according to formation condition, it is suitable to select Construction equipment and auxiliary facility, carry out the technical training of each work post.Levelling of the land is carried out by designed elevation, excavates influence precipitation The various barriers of well construction.
(Two)Precipitation well construction
1 dewatering well technological process:Divided into well casing water pump, installation pumping control circuit → examination draw water → dewatering well normal work.
2 dewatering well tripping in immersible pumps, be laid with drainage pipeline, connect cable, ground vacuum pump installation etc., it draws water and drainage system It installs, you can start examination and draw water.
Water is drained into the bright ditch of place surrounding by 3 precipitation using pipeline when running(Canal)It is interior, pass through gutter(Canal)Water is arranged Enter in over-the-counter preset drainage ditch, the drainage pipeline of place surrounding should be cleared up periodically, it is ensured that drainage system it is unimpeded.
(Three)Water tank, water pot installation
1 carries out the integral solder of water tank:It is required that the defects of weld seam is without sand holes, stomata, slag inclusion.First carry out the paving weldering of tank bottom bottom plate; Then the group weldering of top layer siding and top plate is carried out;The installation of lifting means is carried out again;The second layer is finally sequentially carried out to bottom wall The assembling and welding of plate.
2 pressurized tanks lift:After basic acceptance(check), you can the lifting operation for carrying out pressurized tank, by tower crane pressure Tank is lifted on the basis of tank body, is secured by threads on base plate.Check the verticality of pressurized tank.
3 connection precipitation well pump pipes are connect with water tank, without each water pipe flange (hot melt) of pressure tower pipe, are pacified according to operating diagram Fill each check-valves and gate valve
4 simultaneously installing submersible pump distribution box, trial operation check pressurized tank operating condition.
(Four)Respectively use water end erection of equipment
1, domestic water end installation
(1) spacing that channel steel is determined according to water tank sheet size is welded and fixed bottom plate and side plate chassis according to water tank sheet size It determines the spacing of channel steel, channel steel spot welding is fixed first, is proofreaded with horizon rule, it is ensured that its smooth and then integral solder again.
(2) internal tie is fixed according to cisten mechanism and is completed by installation attachment, and installs interior outside staircase.
(3) trepanning and welds the flange short tube of each trepanning point according to the requirement trepanning of position shown in drawing and caliber, The levelness of flange will meet the requirements with verticality.
(4) water tank is installed in fixed steelframe, checks tank seal.
2, construction water end installation installation
(1) car washer is installed:
1) it presses the car washer foundation drawing that car washer equipment vendors provide and carries out car washer basic earthwork excavation, build car washer base by laying bricks or stones Plinth.
2) basis pours reach intensity after, contact producer installation personnel carries out car washer installation, debugging.
3) the water band of car washer and pressurized tank, test-run a machine are connected.
(2) live dedusting spray installation:
1) supervisor, the installation of secondary pipe:Holder is installed(It is required that smooth vertical and horizontal), fixed super hole cutter trepanning, then upper mechanical three-way, so Supervisor, the connection of secondary pipe afterwards.Determine and adjust pipeline rout.
2) tube net outside is installed:Connection between plastic conduit uses the special fusion splicer welding of PVC pipe, plastic tube and gold Belonging to the connection of pipe fitting, valve etc. should use threaded connection or flanged joint, the PVC pipe that pipe is walked on ground brick need to be used to make lid Plate protects.
3) supervisor connect installation with pressure of supply water tank:Supervisor connect with pressurized tank output flange.
4) pipeline pressure test:Before pipeline is hidden, corresponding pipeline section will carry out the hidden preceding water pressure test.After system installs, The carry out system water pressure test, testing pressure observation has ne-leakage, deformation.
2 application example of embodiment
(One)Good and the home building 4#, 5#, 7#, the areas F site and underground garage engineering
Condition of construction
The good and home area 4#, 5#, 7#, F site and underground garage engineering by construction project foundation pit dewatering project groundwater reclaim again It utilizes, further decreases construction project construction cost, increase the reasonable utilization of water resource, composition has municipal water supply and underground recycling The interim water system in scene that water supplies water jointly.
Application effect
This engineering utilization underground water replaces part construction water mode, has greatly saved water resource, has reduced to water resource Waste solves the problems, such as underground water reutilization technology, and response government establishes conservation-minded society's call, by responsible institution and construction The favorable comment of unit and support.
(Two)The Science and Technology Buildings Yin Hai engineering
Condition of construction
The Science and Technology Buildings the Yin Hai engineering undertaken the construction of by my company is guidance with " green construction " thought in the construction process, according to because The principle of ground suiting measures to different conditions implements saving construction, by scientific management and effectively implementation, economizes on resources and is reduced to ring to the maximum extent The negative effect in border.
Application effect
In the construction process, company has carried out detailed investigation, research for field condition to underground water, is taken by the engineering method A series of measure, washes away underground water, equipment and has carried out centralized collection processing with water, for fire-fighting, sprinkling road surface, flushes the toilet And a series of operations such as concrete curing, water resource has greatly been saved, the waste to water resource is reduced.

Claims (1)

1. shallow source perched water green construction recycling construction, which is characterized in that include the following steps:
(One)Geological mapping:According to geology exploration report, Engineering Zone geology, hydrologic regime are found out;It finds out and constructs near water simultaneously The barriers such as underground utilities, cable situation and the influence to drill to close to buildings in region, according to formation condition, it is suitable to select Construction equipment and auxiliary facility, carry out the technical training of each work post;Levelling of the land is carried out by designed elevation, excavates influence precipitation The various barriers of well construction;
(Two)Precipitation well construction
1 dewatering well technological process:Divided into well casing water pump, installation pumping control circuit → examination draw water → dewatering well normal work;
2 dewatering well tripping in immersible pumps are laid with drainage pipeline, connect cable, ground vacuum pump installation, draw water and installed with drainage system Finish, you can start examination and draw water;
Water is drained into the bright ditch of place surrounding by 3 precipitation using pipeline when running(Canal)It is interior, pass through gutter(Canal)Water is discharged into field In outer preset drainage ditch, the drainage pipeline of place surrounding should be cleared up periodically, it is ensured that drainage system it is unimpeded;
(Three)Water tank, water pot installation
1 carries out the integral solder of water tank:It is required that the defects of weld seam is without sand holes, stomata, slag inclusion;First carry out the paving weldering of tank bottom bottom plate; Then the group weldering of top layer siding and top plate is carried out;The installation of lifting means is carried out again;The second layer is finally sequentially carried out to bottom wall The assembling and welding of plate;
2 pressurized tanks lift:After basic acceptance(check), you can the lifting operation for carrying out pressurized tank hangs pressurized tank by tower crane It is attached on the basis of tank body, is secured by threads on base plate;Check the verticality of pressurized tank;
3 connection precipitation well pump pipes are connect with water tank, without each water pipe flange (hot melt) of pressure tower pipe, are installed according to operating diagram each Check-valves and gate valve
4 simultaneously installing submersible pump distribution box, trial operation check pressurized tank operating condition;
(Four)Respectively use water end erection of equipment
1, domestic water end installation
(1) spacing that channel steel is determined according to water tank sheet size is welded and fixed bottom plate and side plate chassis according to water tank sheet size It determines the spacing of channel steel, channel steel spot welding is fixed first, is proofreaded with horizon rule, it is ensured that its smooth and then integral solder again;
(2) internal tie is fixed according to cisten mechanism and is completed by installation attachment, and installs interior outside staircase;
(3) trepanning and welds the flange short tube of each trepanning point, flange according to the requirement trepanning of position shown in drawing and caliber Levelness to meet the requirements with verticality;
(4) water tank is installed in fixed steelframe, checks tank seal;
2, construction water end is installed
(1) car washer is installed:
1) it presses the car washer foundation drawing that car washer equipment vendors provide and carries out car washer basic earthwork excavation, build car washer base by laying bricks or stones Plinth;
2) basis pours reach intensity after, contact producer installation personnel carries out car washer installation, debugging;
3) the water band of car washer and pressurized tank, test-run a machine are connected;
(2) live dedusting spray installation:
1) supervisor, the installation of secondary pipe:Holder is installed(It is required that smooth vertical and horizontal), fixed super hole cutter trepanning, then upper mechanical three-way, so Supervisor, the connection of secondary pipe afterwards;Determine and adjust pipeline rout;
2) tube net outside is installed:Connection between plastic conduit uses the special fusion splicer welding of PVC pipe, plastic tube and metal tube The connection of accessory, valve etc. should use threaded connection or flanged joint, and the PVC pipe that pipe is walked on ground need to be anti-with brick making cover board Shield;
3) supervisor connect installation with pressure of supply water tank:Supervisor connect with pressurized tank output flange;
4) pipeline pressure test:Before pipeline is hidden, corresponding pipeline section will carry out the hidden preceding water pressure test;After system installs, to carry out The system water pressure test, testing pressure observation has ne-leakage, deformation.
CN201810382417.7A 2018-04-26 2018-04-26 Shallow source perched water green construction recycling construction Pending CN108589752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810382417.7A CN108589752A (en) 2018-04-26 2018-04-26 Shallow source perched water green construction recycling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810382417.7A CN108589752A (en) 2018-04-26 2018-04-26 Shallow source perched water green construction recycling construction

Publications (1)

Publication Number Publication Date
CN108589752A true CN108589752A (en) 2018-09-28

Family

ID=63609993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810382417.7A Pending CN108589752A (en) 2018-04-26 2018-04-26 Shallow source perched water green construction recycling construction

Country Status (1)

Country Link
CN (1) CN108589752A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383412A (en) * 2010-08-27 2012-03-21 中铁二十二局集团第三工程有限公司 Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
CN102635122A (en) * 2012-04-10 2012-08-15 上海广联建设发展有限公司 Dewatering-recharging integrated device and process for foundation pit engineering
CN103161194A (en) * 2012-07-30 2013-06-19 中国二十二冶集团有限公司 Construction site abandoned water well reusing construction method
CN204080837U (en) * 2014-09-22 2015-01-07 中建八局第一建设有限公司 A kind of foundation pit dewatering recycle device
CN104878771A (en) * 2015-06-05 2015-09-02 北京地矿工程建设有限责任公司 Construction method for vacuum tube well dewatering system
CN104929143A (en) * 2015-04-27 2015-09-23 华东交通大学 Well sealing method of dewatering well at bottom of foundation pit
CN206143859U (en) * 2016-11-09 2017-05-03 云南农业大学 Energy -efficient water purification water supply installation
CN106638553A (en) * 2016-11-16 2017-05-10 中铁三局集团建筑安装工程有限公司 Intelligent full-automatic recharging system of underground water on outer side of deep foundation pit and construction method
CN107227961A (en) * 2017-06-29 2017-10-03 中铁十二局集团有限公司 Heavy caliber dewatering well construction method in metro built by mining method hole
CN206607636U (en) * 2017-02-27 2017-11-03 中建八局第三建设有限公司 A kind of collection of job site water and utilize device
CN206693132U (en) * 2017-05-15 2017-12-01 中建安装工程有限公司 A kind of automatic sprinkler fire-extinguishing system for job site depositing dust

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383412A (en) * 2010-08-27 2012-03-21 中铁二十二局集团第三工程有限公司 Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
CN102635122A (en) * 2012-04-10 2012-08-15 上海广联建设发展有限公司 Dewatering-recharging integrated device and process for foundation pit engineering
CN103161194A (en) * 2012-07-30 2013-06-19 中国二十二冶集团有限公司 Construction site abandoned water well reusing construction method
CN204080837U (en) * 2014-09-22 2015-01-07 中建八局第一建设有限公司 A kind of foundation pit dewatering recycle device
CN104929143A (en) * 2015-04-27 2015-09-23 华东交通大学 Well sealing method of dewatering well at bottom of foundation pit
CN104878771A (en) * 2015-06-05 2015-09-02 北京地矿工程建设有限责任公司 Construction method for vacuum tube well dewatering system
CN206143859U (en) * 2016-11-09 2017-05-03 云南农业大学 Energy -efficient water purification water supply installation
CN106638553A (en) * 2016-11-16 2017-05-10 中铁三局集团建筑安装工程有限公司 Intelligent full-automatic recharging system of underground water on outer side of deep foundation pit and construction method
CN206607636U (en) * 2017-02-27 2017-11-03 中建八局第三建设有限公司 A kind of collection of job site water and utilize device
CN206693132U (en) * 2017-05-15 2017-12-01 中建安装工程有限公司 A kind of automatic sprinkler fire-extinguishing system for job site depositing dust
CN107227961A (en) * 2017-06-29 2017-10-03 中铁十二局集团有限公司 Heavy caliber dewatering well construction method in metro built by mining method hole

Similar Documents

Publication Publication Date Title
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN102454167A (en) Construction method for large ultra-deep well
CN203174616U (en) Clay foundation rain falling and water saving system
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
CN111519734B (en) Silt dredging method for river channel hidden culvert
CN113175005A (en) Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN204080839U (en) A kind of Yield rainfall relation device
CN204298837U (en) Bright, dark drainage system
CN111022759A (en) Large-diameter pipeline pipe jacking construction process
CN104328836B (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit and construction method thereof
CN101289865A (en) Water resource recycling system for base pit engineering
CN216552030U (en) Basement outer wall fat groove falls drainage structures
CN108589752A (en) Shallow source perched water green construction recycling construction
CN204543668U (en) One under water gas rushes soil discharging facility
CN113914342A (en) Basement outer wall fertilizer groove drainage construction method
CN106869236A (en) A kind of sponge urban rainwater collection system is with horizontal tank and its construction method of regulating and storing
CN112012330A (en) Installation and construction method of integrated sewage lifting equipment under roadway
CN202369996U (en) Water-draining sealing device for foundation pit
CN113202121A (en) Automatic control underground hydraulic device suitable for underground structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication