CN206376273U - Foundation bolt fixing device - Google Patents

Foundation bolt fixing device Download PDF

Info

Publication number
CN206376273U
CN206376273U CN201621374398.6U CN201621374398U CN206376273U CN 206376273 U CN206376273 U CN 206376273U CN 201621374398 U CN201621374398 U CN 201621374398U CN 206376273 U CN206376273 U CN 206376273U
Authority
CN
China
Prior art keywords
foundation bolt
bolt
steel plate
square table
table framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621374398.6U
Other languages
Chinese (zh)
Inventor
刘建涛
季清
方晓雯
姜涛
徐平飞
成磊
马思文
沈泓
沈一泓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201621374398.6U priority Critical patent/CN206376273U/en
Application granted granted Critical
Publication of CN206376273U publication Critical patent/CN206376273U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a kind of foundation bolt fixing device, the utility model is unreliable for existing foundation bolt laying method, unstable the characteristics of, by being welded into square table framework between angle steel, because square table framework is combined by angle steel, all connection is again definitely reliable, the rigidity of whole system has just obtained absolute guarantee, ensure it after concrete floor cast, square table framework is connected with ground with corner brace and expansion bolt, square table framework is connected with foundation bolt by steel plate, foundation bolt is inserted after the perforate of steel plate relevant position, it can solve the problem that foundation bolt is burying positioning and fixation problem in putting, foundation bolt can either be allowed to be accurately positioned, it can reliably ensure that foundation bolt will not be shifted in construction working again, after after concrete coagulation hardening, steel plate only need to be removed, cut off after angle steel, just foundation bolt can be fixed, top steel plate can be reused, recycle, it is easy to operate, feasibility is high, it is cheap.

Description

Foundation bolt fixing device
Technical field
The utility model is related to a kind of foundation bolt fixing device.
Background technology
With the continuous improvement of living standards of the people, the requirement to building is also improved constantly, directly and concrete floor Also more and more extensively, the accuracy requirement that designer positions to it is also increasingly for the application of the steel column connected by foundation bolt It is high.To ensure being accurately positioned for steel column, placement, positioning of the foundation bolt before concrete cast are increasingly important.
Foundation bolt is generally used for fixing heavy mechanical equipment or structural elements, and one is cast on concrete floor, and one Head is screw screw thread fixed structural member or plant equipment.
Because the embedding precision of foundation bolt directly influences the installation accuracy and whole structural steelwork of later stage steel column Installation accuracy, so slight error that foundation bolt is positioned during embedded or rocking and can all cause serious consequence.Therefore, How to design a kind of both easy to operate, the device that can be accurately positioned and fixed to foundation bolt again, as art technology The problem that personnel face.
Traditional foundation bolt is typically placed directly on the reinforcing bar of concrete floor, and this laying method can not securely be consolidated Determine foundation bolt, during casting and compacting of concrete, easily cause the displacement of foundation bolt, and then influence the installation of later stage steel column to consolidate It is fixed.
Utility model content
The purpose of this utility model is to provide a kind of foundation bolt fixing device, can solve the problem that foundation bolt in burying and putting Positioning and fixation problem.
To solve the above problems, the utility model provides a kind of foundation bolt fixing device, including:
Square table framework, is welded by many many angle steel, and the surrounding of the top surface of the square table framework is provided with the first V-type Notch;
It is connected in the corner brace of the bottom of the square table framework, the corner brace and is provided with hole for the expansion bolt;
Expansion bolt, the corner brace by being connected by the expansion bolt through the hole for the expansion bolt with ground;
The steel plate of the top surface of the square table framework is arranged at, the surrounding of the steel plate is provided with embedded first V-groove Anchor (bolt) hole is offered on the second V-groove mouthful of mouth, the steel plate;
Foundation bolt, the foundation bolt is positioned to be fixed on ground by being inserted in the anchor (bolt) hole Position.
Further, in said apparatus, the top surface of the steel plate and the square table framework passes through self-drilling connection.
Further, in said apparatus, the foundation bolt fixing device also includes being sheathed on the foundation bolt Foundation bolt cap, the foundation bolt is fixed on the steel plate by foundation bolt nut.
Further, in said apparatus, the hole for the expansion bolt is mounting hole.
Further, in said apparatus, the corner brace and the bottom of square table framework are welded to connect.
Compared with prior art, the utility model for existing foundation bolt laying method it is unreliable, it is unstable the characteristics of, By being welded into a square table framework between angle steel, because square table framework is combined by angle steel, all connection is again definitely reliable, So the rigidity of whole system has just obtained absolute guarantee, it is ensured that it is after concrete floor cast, and foundation bolt can be used In the installation of steel column, square table framework is connected with ground with corner brace and expansion bolt, and square table framework passes through one block of steel with foundation bolt Plate is connected, and foundation bolt is inserted after the perforate of steel plate relevant position, can solve the problem that foundation bolt in the positioning buried in putting and consolidates Determine problem, foundation bolt can either be allowed to be accurately positioned, can reliably ensure that foundation bolt will not be shifted in construction working again, There is higher application value in practice of construction, after after concrete coagulation hardening, only need to remove steel plate, cut off after angle steel, just can be by Foundation bolt is fixed, and the utility model is conventional material from raw material, and top steel plate can be reused, recycled, Easy to operate, feasibility is high, and cheap, foundation bolt accurate positioning, position is fixed, reliably, stably.
Brief description of the drawings
Fig. 1 is the structure chart of the square table framework of the foundation bolt fixing device of the embodiment of the utility model one;
Fig. 2 is the overall structure figure of the foundation bolt fixing device of the embodiment of the utility model one;
Fig. 3 is the following position casting concrete terrace schematic diagram in the steel plate of the embodiment of the utility model one;
Fig. 4 is the schematic diagram for cutting away the square table framework remained on concrete floor of the embodiment of the utility model one;
Wherein, 1, angle steel 2, corner brace 3, expansion bolt 4, steel plate 5, the first V-groove mouthfuls 6, foundation bolt 7, lower margin The concrete floor of bolt nut 8, after-pouring.
Embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings and tool Body embodiment is described in further detail to the utility model.
Referring to Fig. 1 to 4, foundation bolt fixing device includes some angle steel 1, for fix whole device on the ground Some corner brace parts 2, the expansion bolt 3 for being connected whole device with ground by corner brace part 2, one piece be used for fix foundation bolt Steel plate 4 with the second V-groove mouthful, foundation bolt 6;Connect to form square table framework using full weld between described all angle steel 1, institute The surrounding for stating the top surface of square table framework is provided with the first V-groove mouthful 5 coordinated with second V-groove mouthful, described angle steel 1 with Connected between corner brace 2 with full weld;The whole foundation bolt fixing device is connected by expansion bolt 3 with ground;The steel plate 4 Pass through screw connection between angle steel 1.
As shown in Figures 1 to 4, the utility model provides a kind of foundation bolt fixing device, including:
Square table framework, is welded by many many angle steel 1, and the surrounding of the top surface of the square table framework is provided with the first V Type groove mouthful 5;Connected here, being welded into full weld between a square table framework, angle steel between angle steel;
It is connected in the corner brace 2 of the bottom of the square table framework, the corner brace 2 and is provided with hole for the expansion bolt;
Expansion bolt 3, the corner brace 3 by being connected by the expansion bolt through the hole for the expansion bolt with ground;Side The corner brace of the bottom of table framework is connected with ground with expansion bolt, it is necessary to use impact drill perforate on the ground, before perforate, must It is accurately positioned, after system is in place, the hole perforate in corner brace, to ensure that hole position is accurate;
The steel plate 4 of the top surface of the square table framework is arranged at, the surrounding of the steel plate is provided with embedded first V-groove Anchor (bolt) hole is offered on the second V-groove mouthful of mouth, the steel plate;Here, be ensure foundation bolt positioning accurate, need to be Steel plate surrounding cut with the angle steel relevant position of the top surface of square table framework together with V-groove mouthful, so as to enter to the position that steel plate enters Row is fixed, and is accurately positioned the anchor (bolt) hole on steel plate, and then makes the foundation bolt being inserted in the anchor (bolt) hole smart It is determined that position;
Foundation bolt 6, the foundation bolt is positioned to be fixed on ground by being inserted in the anchor (bolt) hole Position.The utility model for existing foundation bolt laying method it is unreliable, it is unstable the characteristics of, by being welded between angle steel One square table framework, because square table framework is combined by angle steel, all connection is again definitely reliable, so the rigidity of whole system Absolute guarantee is just obtained, it is ensured that it is after concrete floor cast, and foundation bolt can be used in the installation of steel column, square table frame Frame is connected with ground with corner brace and expansion bolt, and square table framework is connected with foundation bolt by one block of steel plate, corresponding in steel plate Foundation bolt is inserted after the perforate of position, can solve the problem that foundation bolt is burying positioning and fixation problem in putting, lower margin can either be allowed Bolt is accurately positioned, and can reliably ensure that foundation bolt will not be shifted in construction working, there is higher in practice of construction again Application value, after after concrete coagulation hardening, only need to remove steel plate, cut off after angle steel, just can fix foundation bolt, this practicality New selection raw material are conventional material, and top steel plate can be reused, recycled, easy to operate, and feasibility is high, valency Lattice are cheap, foundation bolt accurate positioning, and position is fixed, reliably, stably.
In the embodiment of the utility model one, the top surface of the steel plate and the square table framework by self-drilling connection, from And the position that steel plate enters is fixed, the anchor (bolt) hole on steel plate is more accurately positioned, and then make to be inserted in the lower margin Foundation bolt in bolt hole is more accurately positioned.
In the embodiment of the utility model one, the foundation bolt fixing device also includes being sheathed on the foundation bolt Foundation bolt cap 7, the foundation bolt 6 is fixed on the steel plate 4 by foundation bolt nut 7, further ensures that lower margin spiral shell Bolt will not be shifted in construction working.
In the embodiment of the utility model one, the hole for the expansion bolt is mounting hole, so that when facilitating the corner brace to be connected with ground, It is attached the fine setting of position.
In the embodiment of the utility model one, the corner brace and the bottom of square table framework are welded to connect, to ensure bonding strength.
As shown in figures 1-4, the localization method of above-mentioned foundation bolt fixing device, including:
Many angle steel 1 are welded into square table framework, the first V-groove mouthful 5 is set in the surrounding of the top surface of the square table framework; Connected here, full weld between a square table framework, angle steel can be welded between factory, angle steel;
In the bottom connecting corner yard 2 of the square table framework, hole for the expansion bolt is set in the corner brace;
Second V-groove mouthful is set in the surrounding of one block of steel plate 4, anchor (bolt) hole is opened up on the steel plate, by the steel Plate 4 is positioned over the top surface of the square table framework, by the top surface of the embedded square table framework of the second V-groove mouthful on the steel plate The first V-groove mouthful that surrounding is set, is put into foundation bolt so as to after;Here, be ensure foundation bolt positioning accurate, need to be Steel plate surrounding cut with the angle steel relevant position of the top surface of square table framework together with V-groove mouthful, so as to enter to the position that steel plate enters Row is fixed, and is accurately positioned the anchor (bolt) hole on steel plate, and then makes the foundation bolt being inserted in the anchor (bolt) hole smart It is determined that position, in the factory can be aligned the surrounding of steel plate and the top surface of square table framework, it is ensured that notch is corresponding with notch;
According to the relative position of hole for the expansion bolt in anchor (bolt) hole on the steel plate and the corner brace 2, at the construction field (site) Snap the line positions the installation site of the corner brace, and according to the installation site in ground plane apertures;
By the expansion bolt through the hole for the expansion bolt in the corner brace, the corner brace 2 and the perforate of ground institute are connected Connect;The corner brace of the bottom of square table framework is connected with ground with expansion bolt, it is necessary to use impact drill perforate on the ground, perforate it Before, it must be accurately positioned, after whole device is in place, the hole for the expansion bolt in corner brace is in ground plane apertures, to ensure hole position essence Really, meanwhile, foundation bolt is after concrete floor is poured, accurate positioning;
By the way that foundation bolt 6 is inserted in the anchor (bolt) hole, the foundation bolt 6 is positioned at treating on ground Fixed position;
In the following position casting concrete terrace 8 of the steel plate 4, the concrete floor 8 is coated below the steel plate Square table framework and the part of foundation bolt 6;
After the completion of concrete floor is poured, the steel plate 4 is removed, and cuts away the square table frame remained on concrete floor Frame.Here, all welding are completed in factory, at the construction field (site), it is only necessary to by the square table framework being welded and ground expanding screw Bolt is fixed, square table framework again with steel plate screw connection, after the completion for the treatment of that concrete floor is poured, remove steel plate so as to after Recycle, cut away the angle steel remained on concrete floor.The utility model is directed to existing foundation bolt laying method not Reliably, unstable the characteristics of, by being welded into a square table framework between angle steel, because square table framework is combined by angle steel, All connection is again definitely reliable, so the rigidity of whole system has just obtained absolute guarantee, it is ensured that it is poured in concrete floor After note, foundation bolt can be used in the installation of steel column, and square table framework is connected with ground with corner brace and expansion bolt, square table framework with Foundation bolt is connected by one block of steel plate, is inserted foundation bolt after the perforate of steel plate relevant position, be can solve the problem that foundation bolt Positioning and fixation problem in putting are being buried, foundation bolt can either allowed to be accurately positioned, can reliably ensure that foundation bolt is being applied again It will not be shifted in work work, there is higher application value in practice of construction, after after concrete coagulation hardening, only need to remove steel Plate, cut off after angle steel, just foundation bolt can be fixed, the utility model is conventional material from raw material, and top steel plate can Easy to operate to reuse, recycle, feasibility is high, cheap.
In the embodiment of the utility model one, by the top surface of the embedded square table framework of the second V-groove mouthful on the steel plate The first V-groove mouthful for setting of surrounding after, in addition to:
By the top surface of the steel plate 4 and the square table framework by self-drilling connection, so as to enter to the position that steel plate enters Row is fixed, and the anchor (bolt) hole on steel plate is more accurately positioned, and then makes the foundation bolt that is inserted in the anchor (bolt) hole More it is accurately positioned.
In the embodiment of the utility model one, after foundation bolt is inserted in the anchor (bolt) hole, in addition to:
Foundation bolt cap 7 is sheathed on the foundation bolt 6, the foundation bolt is fixed by foundation bolt nut In on the steel plate 4, further ensure that foundation bolt will not be shifted in construction working.
In the embodiment of the utility model one, the hole for the expansion bolt is mounting hole, so that when facilitating the corner brace to be connected with ground, It is attached the fine setting of position.
In the embodiment of the utility model one, in the bottom connecting corner yard of the square table framework, including:
The corner brace 2 and the bottom of square table framework are welded to connect.
In summary, the utility model for existing foundation bolt laying method it is unreliable, it is unstable the characteristics of, pass through angle A square table framework is welded between steel, because square table framework is combined by angle steel, all connection is again definitely reliable, so whole The rigidity of individual system has just obtained absolute guarantee, it is ensured that it is after concrete floor cast, and foundation bolt can be used in steel column Installation, square table framework is connected with ground with corner brace and expansion bolt, and square table framework is connected with foundation bolt by one block of steel plate Connect, foundation bolt inserted after the perforate of steel plate relevant position, can solve the problem that foundation bolt is burying positioning and fixation problem in putting, Foundation bolt can either be allowed to be accurately positioned, can reliably ensure that foundation bolt will not be shifted in construction working again, actually apply There is higher application value in work, after after concrete coagulation hardening, only need to remove steel plate, cut off after angle steel, just can be by lower margin spiral shell Bolt is fixed, and the utility model is conventional material from raw material, and top steel plate can be reused, recycled, operation letter Just, feasibility is high, and cheap, foundation bolt accurate positioning, position is fixed, reliably, stably.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other Between the difference of embodiment, each embodiment identical similar portion mutually referring to.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and The interchangeability of software, generally describes the composition and step of each example according to function in the above description.These Function is performed with hardware or software mode actually, depending on the application-specific and design constraint of technical scheme.Specialty Technical staff can realize described function to each specific application using distinct methods, but this realization should not Think to exceed scope of the present utility model.
Obviously, those skilled in the art can be new without departing from this practicality to the various changes of utility model progress and modification The spirit and scope of type.So, if these modifications and variations of the present utility model belong to the utility model claim and its Within the scope of equivalent technologies, then the utility model is also intended to including these changes and modification.

Claims (5)

1. a kind of foundation bolt fixing device, it is characterised in that including:
Square table framework, is welded by many many angle steel, and the surrounding of the top surface of the square table framework is provided with the first V-groove Mouthful;
It is connected in the corner brace of the bottom of the square table framework, the corner brace and is provided with hole for the expansion bolt;
Expansion bolt, the corner brace by being connected by the expansion bolt through the hole for the expansion bolt with ground;
The steel plate of the top surface of the square table framework is arranged at, the surrounding of the steel plate is provided with embedded first V-groove mouthful Anchor (bolt) hole is offered on second V-groove mouthful, the steel plate;
Foundation bolt, the foundation bolt is by being inserted in the anchor (bolt) hole, the position to be fixed being positioned on ground.
2. foundation bolt fixing device as claimed in claim 1, it is characterised in that the top of the steel plate and the square table framework Face passes through self-drilling connection.
3. foundation bolt fixing device as claimed in claim 1, it is characterised in that the foundation bolt fixing device also includes The foundation bolt cap on the foundation bolt is sheathed on, the foundation bolt is fixed on the steel plate by foundation bolt nut On.
4. foundation bolt fixing device as claimed in claim 1, it is characterised in that the hole for the expansion bolt is mounting hole.
5. the foundation bolt fixing device as described in any one of Claims 1-4, it is characterised in that the corner brace and square table frame The bottom of frame is welded to connect.
CN201621374398.6U 2016-12-15 2016-12-15 Foundation bolt fixing device Expired - Fee Related CN206376273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621374398.6U CN206376273U (en) 2016-12-15 2016-12-15 Foundation bolt fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621374398.6U CN206376273U (en) 2016-12-15 2016-12-15 Foundation bolt fixing device

Publications (1)

Publication Number Publication Date
CN206376273U true CN206376273U (en) 2017-08-04

Family

ID=59406208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621374398.6U Expired - Fee Related CN206376273U (en) 2016-12-15 2016-12-15 Foundation bolt fixing device

Country Status (1)

Country Link
CN (1) CN206376273U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638664A (en) * 2016-12-15 2017-05-10 上海建工集团股份有限公司 Foundation bolt fixing apparatus and positioning method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638664A (en) * 2016-12-15 2017-05-10 上海建工集团股份有限公司 Foundation bolt fixing apparatus and positioning method

Similar Documents

Publication Publication Date Title
CN203684398U (en) Device for positioning embedded parts in reinforced concrete structure
CN204225145U (en) A kind of simple and easy orientation tool for basic embedding anchor bolts
CN102425187B (en) Large steel structure heel embedded part positioning device and method
CN104695557A (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN105696800B (en) Anti- steel construction sill anchor construction generates relative displacement and is fixed temporarily stock
CN209585294U (en) A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction
CN106592990A (en) Prefabricated building foundation column bar precise positioning tool and positioning method
CN203270599U (en) Foundation bolt pre-buried die
CN206376273U (en) Foundation bolt fixing device
CN103161313A (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN205421322U (en) Pre -buried rag bolt crowd's positioning tool
CN105040973B (en) Construction method of external decorative layer template of conical column of comprehensive gymnasium
CN106638664A (en) Foundation bolt fixing apparatus and positioning method
CN206337668U (en) A kind of board-like adjustable damper embedded part of full assembled
CN111851754A (en) Steel structure foundation embedded bolt structure and construction method thereof
CN206189607U (en) Rag bolt location structure
CN204983699U (en) Bolt locator
CN109577364A (en) A kind of stacker-reclaimer track foundation construction method
CN206319632U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN206337654U (en) A kind of beam-column connection structure of steel-structure factory building
CN205857745U (en) Joint bar constructing structure
CN103352568A (en) Method for building constructional column on foundation pad
CN207144180U (en) A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure
JPH06316939A (en) Positioning jig for construction work, and construction of building therewith

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20191215