CN207144180U - A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure - Google Patents

A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure Download PDF

Info

Publication number
CN207144180U
CN207144180U CN201721120268.4U CN201721120268U CN207144180U CN 207144180 U CN207144180 U CN 207144180U CN 201721120268 U CN201721120268 U CN 201721120268U CN 207144180 U CN207144180 U CN 207144180U
Authority
CN
China
Prior art keywords
energy
putting
backing plate
newly
concrete column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721120268.4U
Other languages
Chinese (zh)
Inventor
龙建文
庄妍
周裕利
钟永国
陈达
周泽佳
吴奕武
郭晓兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Original Assignee
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd filed Critical NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Priority to CN201721120268.4U priority Critical patent/CN207144180U/en
Application granted granted Critical
Publication of CN207144180U publication Critical patent/CN207144180U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Put more energy into the utility model discloses the prefabricated attachment structure of a kind of newly-increased steel core concrete column and existing structure, including described in two pieces of backing plates of putting more energy into be arrangeding in parallel, connection the connecting plate of backing plate, some connecting holes are provided with the backing plate of putting more energy into;Split bolt is provided with the connecting hole, the split bolt runs through all backing plates of putting more energy into be arrangeding in parallel, and the both ends of the split bolt are connected by nut with backing plate of putting more energy into;The both ends of the split bolt extend outward the backing plate of putting more energy into and form connection end;Plug hole is additionally provided with the backing plate of putting more energy into.Steel pipe column and attachment structure in the utility model can be prefabricated in the factory, improve efficiency of construction, shorten the construction period.The utility model opens bolt hole in advance on steel pipe column, is connected by screw bolts, and reduces Site Welding operation, convenient construction.In casting concrete, it can increase vertical reinforcement in Ban Dongchu, the connection of lower floor's post and upper strata post can be strengthened;It ensure that the quality of construction.

Description

A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of newly-increased steel core concrete column and existing structure Prefabricated attachment structure.
Background technology
Many times need to increase structural column in present aseismatic reinforcement engineering, it is universal in newly-increased structural column both at home and abroad at present By the way of cast-in-situ reinforced concrete column, which and essentially identical, the steel planting work on the beam of original building of commonly constructing To increase the steel bar stress of post, then formwork supporting plate casting concrete newly, newly-increased structural column construction is completed after conserving form removal.
The connection of steel core concrete column and structure is primarily referred to as its connection with beam.At present, steel core concrete column and beam Mainly by setting ring beam to form linkage section in post upper end, the ring beam linkage section need to configure more reinforcing bar or be joined using reinforcing bar for connection It is reinforced beam and steel core concrete column, makes structural union entirety stress.Newly-increased steel core concrete column is not retrieved at present With the interconnection technique of existing structure, more without prefabricated interconnection technique.
1st, there is the shortcomings that following in the reinforcing mode for increasing structural column newly using cast-in-situ steel reinforced concrete:
(1) this method must carry out bar planting intensity detection, increase technique and duration, increase testing cost.It must detect and be implanted in Whether the reinforcing bar on original building beam has enough adhesion strengths, if adhesion strength not enough cannot function as the principal rod of newly-increased post, not Lower construction together can not be entered by detection.
(2) technique needs formwork supporting plate, wire-ties, and technique is cumbersome, and construction space is small, increases difficulty of construction, easily increases the duration. With respect to Construction of Steel Pipe Concrete Column, cast-in-situ reinforced concrete column needs formwork supporting plate and ties up reinforcing bar, technique is more add it is artificial and Time cost.Existing building reinforces project with respect to new building, and its construction space is small, is unfavorable for operation and adds difficulty of construction, Easily influence the duration.
(3) technology is not implemented prefabricated, does not often reach the requirement of plan time, influences the lasting use of building function. In single span teaching building more typically, plan time requires to complete within summer vacation 60 newly-increased structural column reinforcing engineering more, but due to mixed Solidifying soil reaches design strength must be 28 days, and have the new maintenance for doing basis and detection, wire-tie, formwork form removal, the stream such as later stage finishing Journey work occupies more time, reinforcement can not be completed in plan time, influences teaching building normal use.
(4) the technical quality effect is poor.Newly-increased cast-in-situ reinforced concrete column generally uses the capital template in this layer of post Mouthful grouting, because floor limits construction space, makes pouring construction face to look up grouting, be unfavorable in artificial and mechanical top Envelope grouting mouth, and easily running mould causes newly-increased reinforced column second-rate.
2nd, existing common steel core concrete column and reinforced beam interconnection technique:
(1) new building is applicable, if being used in existing structure, original structure beam must be removed, destroy original structure globality.
(2) technology it is actual for post through beam be interrupted, interruption beam is connected by ring beam, but ring beam position reinforcing bar compared with More, reinforcing bar colligation is more complicated.
Utility model content
The utility model in order to solve in existing building increase newly concrete column space it is small, constructional difficulties, low construction efficiency, A kind of technical problem of construction period length, there is provided the newly-increased steel core concrete column that construction quality that can be prefabricated is high, efficiency of construction is high With the prefabricated attachment structure of existing structure.
In order to solve the above problems, the utility model is achieved by following technical scheme:
The prefabricated attachment structure of newly-increased steel core concrete column and existing structure described in the utility model, including two pieces parallel set Put more energy into described in the backing plate of putting more energy into put, connection the connecting plate of backing plate, some connecting holes are provided with the backing plate of putting more energy into;The connection Split bolt is provided with hole, the split bolt runs through all backing plates of putting more energy into be arrangeding in parallel, the both ends of the split bolt It is connected by nut with backing plate of putting more energy into;The both ends of the split bolt extend outward the backing plate of putting more energy into and form connection end;
Plug hole is additionally provided with the backing plate of putting more energy into.
Further, the upper surface for being arranged on the backing plate of putting more energy into of upper end is extended with vertical baffle plate, the vertical baffle plate and institute State backing plate of putting more energy into be vertically arranged, the surrounding for backing plate of putting more energy into described in the vertical baffle plate edge is end to end to surround a square cavity.
Further, some first through hole are provided with the connecting plate.
Further, the connecting hole is mounting hole.
Further, the second through hole of corresponding floor with opening is provided with the backing plate of putting more energy into.
Further, the plug hole is arranged on two angle positions of backing plate of putting more energy into so that the backing plate of putting more energy into forms T Shape structure.
Further, the attachment means can be completed or make according to on-site customization, whole prefabrications.
A kind of prefabricated connection method of newly-increased steel core concrete column and existing structure, comprises the following steps:
S1, it is in the intersecting position of Cantilever Beams and end carriage in the floor to need reinforcement backing plate of putting more energy into, the pad of putting more energy into is set Plate is arranged on the upper and lower surface of floor, and is drilled in the end face of Cantilever Beams and connecting plate is put more energy into through floor connection two Backing plate;Some connecting holes, plug hole are provided with the backing plate of putting more energy into;
S2, by connecting hole to existing building drill, by plug hole to existing building bore plug hole;
S3, by split bolt through putting more energy into backing plate, existing building, and be inserted in nut check at the both ends of split bolt;
S4, in the lower end of the backing plate of putting more energy into installed in soffit steel pipe column is set, the steel pipe column and is arranged on bottom Backing plate of putting more energy into welding carried out by seam squeegeeed processing;
S5, the height by plug hole casting concrete to the backing plate of putting more energy into for being arranged on upper end, complete a newly-increased steel pipe and mix The construction of solidifying earth pillar.
Further, before the S1, the physical dimension at Column border node is increased newly by in-site measurement, and according to design drawing Paper and scene reality carry out node modeling, according to modeling and calculate the size for determining to increase steel core concrete column newly, and corresponding pre- The size of attachment structure processed, and prefabricated backing plate of putting more energy into.
Further, in the S1, the upper surface for being arranged on the backing plate of putting more energy into of upper end is extended with vertical baffle plate, described vertical Baffle plate is vertically arranged with the backing plate of putting more energy into, and the vertical baffle plate is put more energy into described in, and end to end to surround one square for the surrounding of backing plate Cavity, the height of the concreting to the vertical plate washer.
Further, before the S1, in addition to the appurtenances of original building are purged, reserve corresponding working face Afterwards, dabbing cleaning is carried out to newly-increased Column border node position.
Compared with prior art, the beneficial effects of the utility model are:
Steel pipe column and attachment structure in the utility model can be prefabricated in the factory, improve efficiency of construction, shorten Construction period.Template need not be assembled and disassembled, saves construction cost.Open bolt hole in advance on steel pipe column, be connected by screw bolts, Reduce Site Welding operation, convenient construction.In casting concrete, it can increase vertical reinforcement in Ban Dongchu, lower floor can be strengthened The connection of post and upper strata post;It ensure that the quality of construction.
Brief description of the drawings
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the structural representation of the prefabricated attachment structure of newly-increased steel core concrete column and existing structure described in the utility model Figure;
Fig. 2 is the front view of the prefabricated attachment structure of newly-increased steel core concrete column and existing structure described in the utility model;
Fig. 3 is the top view of the prefabricated attachment structure of newly-increased steel core concrete column and existing structure described in the utility model;
Fig. 4 is the construction signal of the prefabricated attachment structure of newly-increased steel core concrete column and existing structure described in the utility model Figure;
Fig. 5 is the prefabricated attachment structure and steel pipe column of newly-increased steel core concrete column and existing structure described in the utility model Scheme of installation.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
As shown in Fig. 1~Fig. 5, the prefabricated connection knot of newly-increased steel core concrete column and existing structure described in the utility model Structure, including put more energy into backing plate 1, the second put more energy into backing plate 2, the connection described first of two pieces of first to be arranged in parallel are put more energy into backing plate 1 and second Put more energy into the connecting plate 4 of backing plate 2, the described first backing plate 1 of putting more energy into puts more energy into backing plate 2 as putting more energy into as shape, structure and size with second Backing plate, some connecting holes 6 are provided with the backing plate of putting more energy into;In the present embodiment, the connecting hole 6 is mounting hole.
It is provided with split bolt 5 in the connecting hole 6, the split bolt 5, which runs through first to be arranged in parallel, puts more energy into backing plate 1 Put more energy into backing plate 2 with second, the both ends of the split bolt 5 are connected by nut 51 with backing plate of putting more energy into;The two of the split bolt 5 End extends outward the backing plate of putting more energy into and forms connection end, can be embedded in newly-increased steel core concrete column, increases the firm of connection Property.The plug hole 7 of corresponding floor with opening is provided with the backing plate of putting more energy into.The plug hole 7 is arranged on two of backing plate of putting more energy into Angle position so that the backing plate of putting more energy into forms T-shaped structure.
First upper surface for putting more energy into backing plate 1 is extended with vertical baffle plate 3, and the vertical baffle plate 3 is put more energy into described first Backing plate 1 is vertically arranged, and the vertical baffle plate 3 end to end surrounds a square cavity along the described first surrounding for putting more energy into backing plate 1.
Some first through hole 41 are provided with the connecting plate 4.Described first backing plate 1 and second of putting more energy into is put more energy on backing plate 2 The second through hole 11 is provided with, mitigates the weight of put more energy into backing plate and connecting plate 4, saves material.
Described first puts more energy into backing plate 1 and vertical plate washer 3 less times greater than steel pipe column 8, steel pipe column 8 is directly inserted into vertical shelves In the cavity that plate 3 surrounds, beneficial to the positioning of upper strata steel pipe column 8.The split bolt 5 is vertical strip, and end can be used curved The mode of folding or end increase anchor slab crab-bolt increases the bonding of split bolt 5 and concrete, strengthens the vertical of steel core concrete column Global configuration.First puts more energy into backing plate and the second connecting plate put more energy between backing plate can be replaced Wasted-energy steel plate, inferior in non-earthquake situations condition Same general steel plate, the preferential energy-dissipating and shock-absorbing under geological process, makes eaerthquake damage occur mainly at newly-increased steel core concrete column, Reduce the destruction to original structure.If newly-increased structural column in the inner side of structure, can save when can not install vertical connecting plate.
A kind of prefabricated connection method of newly-increased steel core concrete column and existing structure, comprises the following steps:
S1, increase the physical dimension at Column border node newly by in-site measurement, and actually saved according to design drawing and scene Point modeling, the size of newly-increased steel core concrete column, and the size of corresponding prefabricated attachment structure are determined according to modeling and calculating, and Prefabricated backing plate of putting more energy into.In the upper surface that first puts more energy into backing plate, vertical baffle plate 3 is set.
S2, the appurtenances to original building 92 are purged, and after reserving corresponding working face, newly-increased Column border node position is entered Row dabbing is cleaned.
S3, it is in the intersecting position of Cantilever Beams 9 and end carriage 91 in the floor to need reinforcement backing plate of putting more energy into is set, described first Backing plate 1 of putting more energy into is arranged on the upper surface of floor, and the described second backing plate 2 of putting more energy into is arranged on the lower surface of floor, and in Cantilever Beams 9 End face, which drills, causes connecting plate to be put more energy into backing plate 2 through the backing plate 1 and second of putting more energy into of floor connection first.
S4, by connecting hole 6 to existing building drill, by plug hole 7 to existing building bore plug hole.
S5, by split bolt through putting more energy into backing plate, existing building, and be inserted in nut check at the both ends of split bolt.
S6, steel pipe column 8, the steel pipe column 8 and second are being set installed in the second of the soffit lower end for putting more energy into backing plate 2 Backing plate 2 of putting more energy into carries out welding by seam and squeegeeed processing.
S7, the height by plug hole casting concrete to the vertical plate washer 3, complete a newly-increased steel core concrete column Construction.
The utility model, can prefabricated attachment structure using cleverly structure so that construction worker constructs according to construction procedure , in the reinforcing for adapting to the small existing building in space, the flow of standardization, the guarantee of quality, efficiency of construction height, it is ensured that Duration is timely completed.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is made any formal Limitation, it is therefore every without departing from the content of the technical scheme of the utility model, implement according to the technical essence of the utility model to more than Example any modification, equivalent variations and the modification made, in the range of still falling within technical solutions of the utility model.

Claims (6)

  1. A kind of 1. prefabricated attachment structure of newly-increased steel core concrete column and existing structure, it is characterised in that:Parallel set including two pieces Put more energy into described in the backing plate of putting more energy into put, connection the connecting plate of backing plate, some connecting holes are provided with the backing plate of putting more energy into;The connection Split bolt is provided with hole, the split bolt runs through all backing plates of putting more energy into be arrangeding in parallel, the both ends of the split bolt It is connected by nut with backing plate of putting more energy into;The both ends of the split bolt extend outward the backing plate of putting more energy into and form connection end;
    Plug hole is additionally provided with the backing plate of putting more energy into.
  2. 2. increase the prefabricated attachment structure of steel core concrete column and existing structure newly according to claim 1, it is characterised in that:If To put and vertical baffle plate is extended with the upper surface of the backing plate of putting more energy into of upper end, the vertical baffle plate is vertically arranged with the backing plate of putting more energy into, Put more energy into described in the surrounding of backing plate of the vertical baffle plate end to end surrounds a square cavity.
  3. 3. increase the prefabricated attachment structure of steel core concrete column and existing structure newly according to claim 2, it is characterised in that:Institute State and some first through hole are provided with connecting plate.
  4. 4. according to the prefabricated attachment structure of any one of claims 1 to 3 newly-increased steel core concrete column and existing structure, it is special Sign is:The connecting hole is mounting hole.
  5. 5. increase the prefabricated attachment structure of steel core concrete column and existing structure newly according to claim 4, it is characterised in that:Institute State the second through hole that corresponding floor with opening is provided with backing plate of putting more energy into.
  6. 6. increase the prefabricated attachment structure of steel core concrete column and existing structure newly according to claim 4, it is characterised in that:Institute State two angle positions that plug hole is arranged on backing plate of putting more energy into so that the backing plate of putting more energy into forms T-shaped structure.
CN201721120268.4U 2017-09-01 2017-09-01 A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure Expired - Fee Related CN207144180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721120268.4U CN207144180U (en) 2017-09-01 2017-09-01 A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721120268.4U CN207144180U (en) 2017-09-01 2017-09-01 A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure

Publications (1)

Publication Number Publication Date
CN207144180U true CN207144180U (en) 2018-03-27

Family

ID=61677164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721120268.4U Expired - Fee Related CN207144180U (en) 2017-09-01 2017-09-01 A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure

Country Status (1)

Country Link
CN (1) CN207144180U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355008A (en) * 2017-09-01 2017-11-17 广州市建筑科学研究院新技术开发中心有限公司 A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355008A (en) * 2017-09-01 2017-11-17 广州市建筑科学研究院新技术开发中心有限公司 A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN107355008B (en) * 2017-09-01 2023-04-28 广州建筑产业开发有限公司 Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure

Similar Documents

Publication Publication Date Title
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN103556749A (en) Suspension type flexible connection for precast concrete infilled wall
CN104831734A (en) Construction method of jet-grouting pile and composite soil-nailed wall support for deep foundation pit construction
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN110273436A (en) Open trench tunnel utilizes support pile and bear down on one float Structure and its construction method of crown beam
CN103469803A (en) Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system
CN111254966A (en) Mountain abutment and pier column foundation structure and construction method thereof
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN109403654A (en) A kind of underpinning method of existing building structure
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN204282399U (en) A kind of subway space enclosing structure
CN207144180U (en) A kind of prefabricated attachment structure of newly-increased steel core concrete column and existing structure
CN101492918B (en) Beam column node for base pit engineering of topdown construction method
CN109853537B (en) Prestressed pile and construction method thereof
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN105370306B (en) The massif tunnel excavation construction method of vertical pre-reinforcement processing
CN106592598A (en) Same-layer double-beam large-diameter steel pipe support and deep foundation pit combined inner support formed thereby
CN204570997U (en) The horizontal piece linkage of a kind of fabricated shear wall
CN205421276U (en) Strut heterotypic double row pile of foundation ditch lateral wall
CN209260899U (en) A kind of steel pipe connecting node of assembly concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20200901

CF01 Termination of patent right due to non-payment of annual fee