CN206227125U - A kind of prefabricated planting unit of salt-soda soil arbor - Google Patents

A kind of prefabricated planting unit of salt-soda soil arbor Download PDF

Info

Publication number
CN206227125U
CN206227125U CN201621320044.3U CN201621320044U CN206227125U CN 206227125 U CN206227125 U CN 206227125U CN 201621320044 U CN201621320044 U CN 201621320044U CN 206227125 U CN206227125 U CN 206227125U
Authority
CN
China
Prior art keywords
salt
soda soil
layer
planting
separation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621320044.3U
Other languages
Chinese (zh)
Inventor
唐春艳
白晶晶
赵珊珊
刘晓红
赵强民
陈娜娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Palm Eco-Town Development Co Ltd
Original Assignee
Palm Eco-Town Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Palm Eco-Town Development Co Ltd filed Critical Palm Eco-Town Development Co Ltd
Priority to CN201621320044.3U priority Critical patent/CN206227125U/en
Application granted granted Critical
Publication of CN206227125U publication Critical patent/CN206227125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a kind of prefabricated planting unit of salt-soda soil arbor, planting container including upper end open, aquifer, separation layer and fertilizer layer are sequentially provided with described planting container from the bottom to top, described aquifer is separated with fertilizer layer with separation layer and separation layer using geotextiles, and the drainage channel in connection planting container and the external world is additionally provided with described planting container side wall;The utility model can both be effectively isolated it is saline and alkaline, and can drought-relief, waterlogging-preventing, and simple structure; can rapidly be drained the ponding of surrounding plant roots soil, protect nursery stock not by saline and alkaline infringement, while having water storage function concurrently; also for greening seedling provides suitable growing environment, plant percent is improved.

Description

A kind of prefabricated planting unit of salt-soda soil arbor
【Technical field】
The utility model is related to salt-soda soil arbor planting technology field, more particularly to a kind of prefabricated plantation dress of salt-soda soil arbor Put.
【Background technology】
The soil salinization is a global resource and ecological problem, and China's wetland with saline-alkaline is wide, almost accounts for China The 1/3 of area, is mainly distributed on the North China Plain, Northeast plain, northwest and hinterland and coastal region.Level of ground water connects Near surface is the main cause for producing soil modern times salification process, and soil and groundwater saliferous is too high, and because of surface evaporation, underground is shallow Layer water is delivered to earth's surface, water evaporation through capillary, and the salinity in water accumulates in upper soll layer therewith, causes soil alkaline Change.Salt-soda soil natural conditions are poor, and structure is viscous, and aeration is poor, and capillarity is strong, and the survival rate of planting plants is general all very It is low.Salt-soda soil is developed when carrying out afforestation, agricultural and forestry production, salt and alkali component is too high usually to cause the physiological drought of plant, Make plant wilt even dead, exceptional hardship is brought to greening or production.Especially in beach saline land, summer rainfall is concentrated, easily Produce flood;Long-term wind makes moisture rapid evaporation, and the moisture holding capacity of sandy soil is not strong, makes ground, the underground part of plant Divide equal water shortage, often lead to flood drought alkali and coexist, plant is more difficult to survive.
At present, the domestic modification method for salt-soda soil mainly has physically improved, chemical modifying, biological modification and engineering to change Good etc., in practice often using comprehensive measure, its key problem in technology is to follow moisture-salt transport rule, keeps the long-acting of soil moved in improve the original, is had Effect draining, blocks capillarity.Should be given priority to for specific territorial environment ameliorative measure, such as sea front face it is saline and alkaline, The multiple problem of waterlogging and water shortage, focuses on also considering water conservation while draining.
The Chinese invention patent of Application No. 201110293273.6 discloses a kind of seedling planting method in alkaline land, including Excavate plantation hole, lay saline and alkaline separation layer, laying aquifer, laying filter layer, backfill planting soil and plant nursery stock step;Isolation Layer isolated material is non-woven fabrics, careless grid or degradation plastic cloth, and aquifer is rubble, filter layer be 20-30cm slag or Agricultural crop straw.It is disadvantageous in that, when flood is irrigated or heavy rain lands, though the aquifer planted in plant hole has certain depositing Energy storage power, but drainability is not enough, may cause plant root waterlogging, reduces plant survival rate.
The utility model is to propose in view of the shortcomings of the prior art.
【Utility model content】
The technical problems to be solved in the utility model is to provide a kind of prefabricated planting unit of salt-soda soil arbor, both can be effective Ground isolation is saline and alkaline, and energy drought-relief, waterlogging-preventing, and simple structure, the ponding of the surrounding plant roots soil that can drain rapidly, protects nursery stock Saline and alkaline infringement is not received, while having water storage function concurrently, also for greening seedling provides suitable growing environment, plant percent is improved.
In order to solve the above technical problems, the utility model includes the planting container of upper end open, in described planting container Aquifer, separation layer and fertilizer layer, described aquifer and separation layer and separation layer and fertilizer are sequentially provided with from the bottom to top Layer is separated using geotextiles, and the drainage channel in connection planting container and the external world is additionally provided with described planting container side wall.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described fertilizer layer using organic fertilizer or slow release without Machine fertilizer filling, the thickness of described fertilizer layer is H1, and H1 meets:3cm≤H1≤5cm.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described separation layer is filled using fine sand, described The thickness of separation layer is H2, and H2 meets:20cm≤H2≤30cm.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described aquifer is filled using haydite, described The thickness of aquifer is H3, and H3 meets:15cm≤H3≤20cm.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described drainage channel is drainpipe;Drainpipe Distance of the water inlet end apart from planting container bottom is D, and D meets:15cm≤D≤25cm.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, the water side of described drainpipe is entered less than drainpipe Water end (W.E.).
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described drainpipe water inlet end uses nonwoven fabric width Mouthful.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described planting container is cylinder.
A kind of prefabricated planting unit of salt-soda soil arbor as described above, described planting container uses plastics and adds anti-ageing Agent, antioxidant, antifreeze are made into integration.
Compared with prior art, the utility model has the following advantages that:
1st, using the utility model in saline-land vegetable planting, can both be effectively isolated it is saline and alkaline, and can drought-relief, waterlogging-preventing, also The nutrition of abundance is provided for root system of plant, it is ensured that nursery stock normal growth, it is its simple structure, low cost, easy to operate, can be saline and alkaline Regional popularization and application.
2nd, fertilizer layer is filled using organic fertilizer or slow release inorganic fertilizer, and organic fertilizer may be selected mushroom fertilizer or the farmers' become thoroughly decomposed Fertilizer, the thickness of described fertilizer layer is H1, and H1 meets:3cm≤H1≤5cm, by increasing capacitance it is possible to increase the soil organism, improves soil fertilizer Power, moreover it is possible to promote microbial activities, further improves the physico-chemical property of soil, enduringly for Tree growth provides nutrient.
3rd, separation layer is filled using fine sand, and using soil between separation layer and aquifer and separation layer and fertilizer layer Work cloth separates, and can effectively block the salt marsh that may be brought into by drainpipe by capillarity every salt deposit, can prevent the salt in salt-soda soil Alkali enters in planting container, and the effect of geotextiles prevents the filler of fertilizer layer or the filler of aquifer from entering separation layer.
4th, planting container can add age resister, antioxidant, antifreeze to be processed into using recycled plastic, environmental protection, Durable, economy, twice laid, long service life, while planting container has isolated saline-alkali soil and planting soil, block in the horizontal into That invades is saline and alkaline, prevents the plantation soil layer salinization of soil of backfill, good every salt effect.
5th, aquifer and drainage channel, have the effect of water conservation and draining concurrently, after with flood irrigation or heavy rain, current From planting soil through being oozed under separation layer, partly store to aquifer, unnecessary water is discharged by drainpipe, prevention waterlogging is played to nursery stock and is made With;When planting soil water shortage, the water stored in aquifer is delivered up to plantation soil layer, so as to prevent by evaporation through separation layer Nursery stock arid.
6th, drainpipe is the measuring body pvc pipe of Salt And Alkali Tolerance, the retaining more long and with low cost, described of corrosion-resistant, service life Layer is the haydite layer of 15-20cm, and quality is light, with low cost.
【Brief description of the drawings】
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is that the utility model plants the sectional view of arbor in salt-soda soil.
Fig. 2 is that the utility model plants the top view of arbor in salt-soda soil.
【Specific embodiment】
Implementation method of the present utility model is elaborated below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of kind of prefabricated planting unit of salt-soda soil arbor of the present embodiment, including upper end open Container 1 is planted, aquifer 2, separation layer 3 and fertilizer layer 4, described storage is sequentially provided with described planting container 1 from the bottom to top Water layer 2 is separated with fertilizer layer 4 with separation layer 3 and separation layer 3 using geotextiles 5, is additionally provided with the described side wall of planting container 1 Connection planting container 1 and the drainage channel 6 in the external world.The utility model excavates one in salt-soda soil 100 when in use, first can be held Receive the kind plant hole of planting container 1, plant the diameter of plant hole at least than the big 60cm of diameter of arbor soil ball 300, preferably plant the diameter of plant hole It is 2.5 times of the diameter of arbor soil ball 300;The depth ratio arbor soil ball diameter depth 45cm to 70cm of plant hole is planted, and in kind of a plant hole Surrounding excavates gutter 400, then the utility model is moved in kind of plant hole, and drainage channel 6 is led at gutter In order to draining, then arbor soil ball 300 is transplanted in planting container 1, is filled with planting soil 200, fixed, in order to avoid fertilizer The fertility of the bed of material 4 is excessive, plant the phenomenon of burn seedlings is occurred, can be filled with planting soil 200 and cause arbor soil ball 300 and fertilizer It is separated by 5cm to 8cm between layer 4.Using the utility model in saline-land vegetable planting, saline and alkaline, and energy can be both effectively isolated Drought-relief, waterlogging-preventing, also provides the nutrition of abundance, it is ensured that nursery stock normal growth, its simple structure, low cost, operation side for root system of plant Just, can be applicable in varieties in saline-alkali areas.
Fertilizer layer 4 is filled using organic fertilizer or slow release inorganic fertilizer, and organic fertilizer may be selected mushroom fertilizer or the farm manure for becoming thoroughly decomposed, The thickness of described fertilizer layer 4 is H1, and H1 meets:3cm≤H1≤5cm, fertilizer layer 4 can guarantee that plant between this thickness range The nutrient of thing growth needs.
Separation layer 3 is filled using fine sand, and is adopted between separation layer 3 and aquifer 2 and separation layer 3 and fertilizer layer 4 Separated with geotextiles 5, can effectively block the salt marsh that may be brought into by drainpipe 7 by capillarity every salt deposit 3, can prevented saline and alkaline In the saline and alkaline entrance planting container 1 on ground, the effect of geotextiles 5 prevents the filler of fertilizer layer 4 or the filler of aquifer 2 from entering Between 0.35mm to 1mm, the thickness of separation layer 3 is H2 to the particle diameter of separation layer 4, preferably fine sand, and H2 meets:20cm≤H2≤ 30cm。
Aquifer 2 is filled using haydite, and the quality of haydite is light, with low cost, and water-holding capacity is strong, and the thickness of aquifer 2 is H3, H3 meet:15cm≤H3≤20cm.
Drainage channel 6 is entering for drainpipe 7, the preferential pvc pipe for being about 50mm from caliber of drainpipe 7, and drainpipe 7 Distance of the water end (W.E.) apart from planting container bottom is D, and D meets:15cm≤D≤25cm, can make the water in planting container 1 maintain one Rational height, can prevent waterlogging and can take precautions against drought.
In order to ensure drainage effect, the water side of drainpipe 7 is less than the water inlet end of drainpipe 7, and in the water inlet end of drainpipe 7 Use non-woven fabrics 8 to seal and drainpipe 7 is blocked in drainpipe 7 to prevent the fine sand in separation layer 3 from entering.
Planting container 1 can be made for cylinder according to situations such as the landform of actual planting area.
Planting container 1 is using plastics and adds age resister, antioxidant, antifreeze to be made into integration, environmentally friendly, durable, warp Ji, twice laid, long service life, while planting container has isolated saline-alkali soil and planting soil, block the salt of invasion in the horizontal Alkali, prevents the plantation soil layer salinization of soil of backfill, good every salt effect.
The utility model should be noted that the upper end open outline of planting container 1, higher than the upper surface of saline-alkali soil 100, is planted when implementing Routine Management after thing field planting.
It is that this technology is applied in agricultural and forestry production and Garden Engineering it was verified that being planted in salt-soda soil using the utility model Plant plant, can both be effectively isolated it is saline and alkaline, and can drought-relief, waterlogging-preventing, also for root system of plant provides sufficient nutrition, it is ensured that nursery stock Normal growth, its simple structure is easy to operate, low cost durable, and the saline and alkaline effect of isolation is good, and plant survival rate is high, grows good It is good, can be applicable in varieties in saline-alkali areas.
It should be noted that:The present embodiment applies the planting plants on salt-soda soil with by the utility model, but this practicality New use scope is not limited to only be used in salt-soda soil, it is equally possible that the utility model is applied into the rings such as city Planting plants under border, equally can also reach drought-relief, waterlogging-preventing, the nutrition of abundance be provided for root system of plant, it is ensured that nursery stock normal growth, Low cost durable, plant survival rate is high.

Claims (9)

1. a kind of prefabricated planting unit of salt-soda soil arbor, it is characterised in that the planting container (1) including upper end open, described kind Plant and be sequentially provided with aquifer (2), separation layer (3) and fertilizer layer (4) in container (1) from the bottom to top, described aquifer (2) with Separation layer (3) and separation layer (3) are separated with fertilizer layer (4) using geotextiles (5), on described planting container (1) side wall also It is communicated with the drainage channel (6) in planting container (1) and the external world.
2. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 1, it is characterised in that described fertilizer layer (4) Filled using organic fertilizer or slow release inorganic fertilizer, the thickness of described fertilizer layer (4) is H1, and H1 meets:3cm≤H1≤5cm.
3. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 2, it is characterised in that described separation layer (3) Filled using fine sand, the thickness of described separation layer (3) is H2, and H2 meets:20cm≤H2≤30cm.
4. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 3, it is characterised in that described aquifer (2) Filled using haydite, the thickness of described aquifer (2) is H3, and H3 meets:15cm≤H3≤20cm.
5. a kind of prefabricated planting unit of salt-soda soil arbor according to any one of Claims 1-4, it is characterised in that described Drainage channel (6) is drainpipe (7), and the distance of the water inlet end of drainpipe (7) apart from planting container bottom is D, and D meets:15cm ≤D≤25cm。
6. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 5, it is characterised in that described drainpipe (7) Water side be less than drainpipe (7) water inlet end.
7. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 6, it is characterised in that described drainpipe (7) Water inlet end is sealed using non-woven fabrics (8).
8. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 5, it is characterised in that described planting container (1) it is cylinder.
9. a kind of prefabricated planting unit of salt-soda soil arbor according to claim 8, it is characterised in that described planting container (1) it is made into integration using plastics and addition age resister, antioxidant, antifreeze.
CN201621320044.3U 2016-12-02 2016-12-02 A kind of prefabricated planting unit of salt-soda soil arbor Expired - Fee Related CN206227125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621320044.3U CN206227125U (en) 2016-12-02 2016-12-02 A kind of prefabricated planting unit of salt-soda soil arbor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621320044.3U CN206227125U (en) 2016-12-02 2016-12-02 A kind of prefabricated planting unit of salt-soda soil arbor

Publications (1)

Publication Number Publication Date
CN206227125U true CN206227125U (en) 2017-06-09

Family

ID=58977778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621320044.3U Expired - Fee Related CN206227125U (en) 2016-12-02 2016-12-02 A kind of prefabricated planting unit of salt-soda soil arbor

Country Status (1)

Country Link
CN (1) CN206227125U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110679223A (en) * 2019-10-10 2020-01-14 深圳市国艺园林建设有限公司 Saline-alkali soil restoration system and saline-alkali soil restoration method
CN115399200A (en) * 2022-09-23 2022-11-29 丽水市瑞芝食用菌科技有限公司 Saline-alkali soil crop salt-avoiding cultivation method and cultivation container thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110679223A (en) * 2019-10-10 2020-01-14 深圳市国艺园林建设有限公司 Saline-alkali soil restoration system and saline-alkali soil restoration method
CN115399200A (en) * 2022-09-23 2022-11-29 丽水市瑞芝食用菌科技有限公司 Saline-alkali soil crop salt-avoiding cultivation method and cultivation container thereof

Similar Documents

Publication Publication Date Title
CN103262689B (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN104131572B (en) A kind of method for administering red soil deep erosion hillside fields
CN101322470B (en) Coast saline-alkali soil forestation method
CN102067753B (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN204860389U (en) Saline and alkaline land arbor pattern of farming
CN204741975U (en) Planting technique structure
CN102696300B (en) Method for water seepage, salt discharge and afforestation of low-humidity saline and alkaline beach and application of method
CN104620898B (en) Water-holding seedling cultivation device and seedling cultivation method
CN104186137A (en) Technology for cultivating and greening tall fescue grass on inshore mud flat saline-alkali soil
CN203735160U (en) Saline-alkali soil planting device
CN105706555B (en) Saline land greening engineering original soil structure-improved and its construction method
CN101390487A (en) Method of alkaline land small-hole improving in-situ remediation for artificial forest planting
CN110178473A (en) The application of dewatered sludge landfill field ecological restoring method and afforestation trimming waste
CN102550160A (en) Rainwater-harvesting permeability-enhancing and evaporation-inhibiting method for improving saline and alkaline lands locally
CN104365206A (en) Water-saving seashore saline soil local soil improving and vegetation planting method
CN203407257U (en) Desert greening device
CN206227125U (en) A kind of prefabricated planting unit of salt-soda soil arbor
CN203233657U (en) Local modeling of coast saline-alkali land terraced field dredger fill
CN206034395U (en) There is plow pan paddy field layering underground drainage nitrogen phosphorus filtration interception system
CN103141323B (en) Season drought barren slope economic crop planting pit and planting method
CN112825639A (en) Coastal saline and alkaline land greening system based on landscaping waste utilization
CN210226428U (en) Water collecting device for deep irrigation of soil
CN103636403A (en) Method for planting plants in drought region in root retention manner
CN105493807A (en) Vegetation plantation method preventing water and soil loss
CN211880949U (en) Saline and alkaline land salt elimination system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Room 305, No. 136, Zhengkai Avenue, Zhengdong New District, Zhengzhou City, Henan Province

Patentee after: PALM ECO-TOWN DEVELOPMENT Co.,Ltd.

Address before: 528400 Guangdong Province, Zhongshan City Xiaolan Town Xiangfeng West Road No. 21

Patentee before: PALM ECO-TOWN DEVELOPMENT Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20211202

CF01 Termination of patent right due to non-payment of annual fee