CN206110073U - Multi -functional full through -flow lock chamber pump station - Google Patents
Multi -functional full through -flow lock chamber pump station Download PDFInfo
- Publication number
- CN206110073U CN206110073U CN201621087558.9U CN201621087558U CN206110073U CN 206110073 U CN206110073 U CN 206110073U CN 201621087558 U CN201621087558 U CN 201621087558U CN 206110073 U CN206110073 U CN 206110073U
- Authority
- CN
- China
- Prior art keywords
- gate
- full
- lock chamber
- pump
- pumping plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model provides a multi -functional full through -flow lock chamber pump station, includes sluice and pump station, the sluice includes work gate (14) and bulkhead gate (13), and characterized by, be equipped with in work gate (14) mounting hole (32), the full through -flow pump of installation is gone up in mounting hole (32), and full through -flow pump shaft is to the level setting, the inside and outside river of work gate (14) side respectively through the flange with full through -flow pump is connected. The utility model discloses make sluice and pump station unite two into one, the lock chamber becomes the intake pool and the outlet water pool of pump station, through reserve the mounting hole on the work gate, installs two -way full through -flow pump, according to the water level combination in inland river and outer river, apply in a flexible way work gate and bulkhead gate, through the mode of connection that changes the three phase machine, change the direction of rotation of motor, realize the two -way operation of through -flow pump assembly, reach irrigate by lifting water to a higher level with a water pump, etc. The row of carrying, irritate certainly and the A number of functions that arranges certainly, have that the floodgate pump allies oneself with usefulness, simple to operate, easy operation, easily maintains, the occupation of land less, invest in advantage such as province.
Description
Technical field
This utility model is related to a kind of multi-functional full-tubular lock chamber pumping plant, belongs to Hydraulic and Hydro-Power Engineering and city supply and discharge water conservancy project
Journey technical field.
Background technology
The pumping plant applied in farmland water conservancy works can be divided into irrigation pumping station, drainage pumping stations and the row of filling by the function point of realizing
With reference to pumping plant.The pumping plant arrangement irrigated merely or drain flooded fields simply, will such as realize that filling row combines, or while it is also contemplated that from filling and certainly
Row function, then the arrangement of pumping station junction is just much more complex.The layout pattern of most typical pumping station for irrigation and drainage is a plane " station four
Lock ", can realize irrigating, water drainage, from row and from the function such as filling, have the advantages that unit efficiency is high, wide adaptability, but there is also and build
Build that thing is more, floor space big, it is more to invest, the shortcomings of complex management.In low-lift-head pumping station arrangement, also a kind of two-way Inlet and outlet water
" lock of a station four " on the structural shape of runner, referred to as facade, structure is compact, and building is few, and investment is relatively saved, but gate number
Amount is more, and maintenance workload is big, because the more vertical pump assembly efficiency of unit efficiency is low, is also often denounced.For plain reservoir and edge
River lakeside area, physical features is relatively low, and lift is not high, and due to carrying out contract and responsibility system, control area is little, and flow is also little, before
" lock of a station four " pumping plant layout pattern in described plane " lock of a station four " and facade is not all applied to, in the urgent need to a kind of structure
Simpler, floor space is few, investment is more saved can be from the multifunction pump station structure that fill, can arrange certainly, irrigate by lifting water to a higher level with a water pump, etc. and the row of carrying combines
Pattern.
Utility model content
The purpose of this utility model is to lack structure simpler, floor space for plain reservoir and riverine lakeside area
Less, a kind of realistic problem of pump station structure pattern that investment is more saved, it is proposed that multi-functional full-tubular lock chamber pumping plant, pumping plant with
Common sluice combines, natively installment work gate and bulkhead gate in lock chamber, now the entering as pumping plant using lock chamber
Pond and discharge bay, by the reserving installation hole on main gate, install two-way full-tubular pump, make sluice close two with pumping plant
For one.According to inland river and the water level combination in outer river, by flexibly with main gate and bulkhead gate, by changing three-phase unit
The mode of connection, change the direction of rotation of motor, realize the way traffic of through-flow pump assembly, be capable of achieving to irrigate by lifting water to a higher level with a water pump, etc., the row of carrying, from filling
With with from multi-functional demands such as rows, with the combination of lock pump, easy for installation, simple to operate, easy care, occupation of land less, reduced investment etc. it is excellent
Point.
The purpose of this utility model is achieved through the following technical solutions, a kind of multi-functional full-tubular lock chamber pumping plant, bag
Sluice and pumping plant are included, sluice includes main gate and bulkhead gate, it is characterized in that the main gate is provided with installing hole, peace
Full-tubular pump is installed, to being horizontally disposed with, Hough is fixed in the inside and outside river side of main gate to full-tubular pump shaft by the pump housing respectively on dress hole
Flange, pump housing mounting flange are connected with the full-tubular pump.
Preferably, the main gate is formed for steel plate welding processing, outside the installation bore dia on main gate and the pump housing
Shell is matched.
Preferably, the full-tubular pump includes diffuser, wheel hub, stator, rotor, S type bidirectional blades, diffuser, pump shaft,
Wheel hub is integrated with S type bidirectional blades, rotor welding, and the inner chamber of rotor is blade wheel chamber, rotor banding runner hub and the two-way leaf of S types
Piece rotates.
Preferably, the pump housing fixes two Houghs composition that half flange is diametrically subdivision, and the pump housing fixes Hough method
Blue vertical section is in inverted Z-type, and the pump housing fixes half flange includes the first vertical portion, horizontal part, the second vertical portion, horizontal part two
End is respectively provided with the first vertical portion, the second vertical portion, the first vertical portion, the second vertical portion towards conversely, the second vertical portion, first
Screw is respectively arranged on vertical portion, the second vertical portion, the first vertical portion are separately fixed at pump housing shell and work by bolt respectively
Make on gate.
Preferably, flap valve seat is connected by flange with diffuser, and flap valve is arranged on flap valve seat.
Preferably, lock chamber abutment wall is respectively provided with inland river side trash rack groove and Wai He sides trash rack in inland river Ce Hewai rivers side
Groove, is respectively mounted inland river side trash rack and Wai He sides trash rack on inland river side trash rack groove, Wai He sides trash rack groove.
Preferably, the main gate is arranged in main gate groove, and main gate is opened and closed by main gate hoist engine, work
Make the hoisting depth that gate limit switch controls main gate.
Preferably, the bulkhead gate is arranged in bulkhead gate groove, and bulkhead gate is opened and closed by bulkhead gate hoist engine, inspection
Repair gate limit switch control bulkhead gate hoisting depth.
Preferably, hoisting room is provided with, hoisting room includes installation maintenance platform and the elevator for setting gradually from bottom to top
Machine maintenance platform;Installing maintenance platform is used for the I&M of full-tubular pump;Hoist engine maintenance platform is used for the peace of hoist engine
Dress and maintenance.
Preferably, power distribution room is provided with, power distribution room is responsible for full-tubular lock chamber pumping plant distribution, electricity consumption, monitoring and protection equipment
Supply of electric power.
Compared with prior art, this utility model has the advantages that:Make sluice unite two into one with pumping plant, lock chamber into
For the intake pool and discharge bay of pumping plant, by the reserving installation hole on main gate, two-way full-tubular pump is installed;According to inland river and
The water level combination in outer river, flexibly with main gate and bulkhead gate, by the mode of connection for changing three phase electric machine, changes motor
Direction of rotation, realize the way traffic of through-flow pump assembly, reach irrigate by lifting water to a higher level with a water pump, etc., the row of carrying, from fill and and from row multiple function, have
The combination of lock pump, easy for installation, simple to operate, easy care, take up an area less, reduced investment the advantages of.
Description of the drawings
Fig. 1 is the facade view of the multi-functional full-tubular lock chamber pumping plant of this utility model.
In figure:1st, trash rack;2nd, the first diffuser;3rd, guide vane;4th, wheel hub;5th, stator;6th, rotor;7th, the two-way leaf of S types
Piece;8th, guide vane;9th, the second diffuser;10th, pump shaft;11st, lock floor;12nd, Wai He sides trash rack groove;13rd, bulkhead gate;
14th, main gate;15th, hoisting room;16th, bulkhead gate hoist engine;17th, bulkhead gate limit switch;18th, maintenance gate slot;19、
Maintenance platform is installed;20th, main gate groove;21st, main gate limit switch;22nd, main gate hoist engine;23rd, hoist engine dimension
Shield platform;24th, power distribution room;25th, trash rack groove;26th, pump housing mounting flange;27th, the pump housing fixes half flange;28th, flap valve seat is consolidated
Determine bolt and nut;29th, flap valve seat;30th, flap valve;31st, lock chamber abutment wall;32nd, installing hole;33rd, pump housing shell;34th, dirt is blocked in Wai He sides
Grid.
Specific embodiment
As shown in figure 1, a kind of multi-functional full-tubular lock chamber pumping plant, including the diffuser 2 of inland river side trash rack 1,2, first, lead
It is blade 3, the stator 5 of wheel hub 4, rotor 6, S types bidirectional blade 7, guide vane 8, the second diffuser 9, pump shaft 10, lock floor 11, outer
River side trash rack groove 12, bulkhead gate 13, main gate 14, hoisting room 15, bulkhead gate hoist engine 16, bulkhead gate are spacing
Switch 17, maintenance gate slot 18, installation maintenance platform 19, main gate groove 20, main gate limit switch 21, main gate elevator
Machine 22, hoist engine maintenance platform 23, power distribution room 24, trash rack groove 25, the pump housing mounting flange 26, pump housing fix half flange 27,
Flap valve seat anchor bolt nut 28, flap valve seat 29, flap valve 30, lock chamber abutment wall 31, installing hole 32, pump housing shell 33, Wai He sides are blocked
The grade part of dirty grid 34, is made up of sluice and pumping plant two large divisions.
Lock chamber is made up of the lock chamber abutment wall 31 and lock floor 11 of both sides, installment work gate 14 and bulkhead gate 13, lock
Room is simultaneously as the intake pool and discharge bay of pumping plant.
Main gate 14 is steel plate welding processing, and reserving installation hole 32, the diameter of installing hole 32 is matched with pump housing shell 33, pump
Body mounting flange 26 and the pump housing are fixed half flange 27 full-tubular pump is fixed on main gate 14 by bolts.
Full-tubular pump is mainly by diffuser 2, wheel hub 4, stator 5, rotor 6, S types bidirectional blade 7, diffuser 9, pump shaft 10 etc.
Part is constituted;Wheel hub 4 is welded as a whole with S types bidirectional blade 7, rotor 6, and the inner chamber of rotor 6 is blade wheel chamber, and rotor 6 is rotated
When, drive wheel hub 4 to rotate with S types bidirectional blade 7.
The pump housing fixes two Houghs composition that half flange 27 is diametrically subdivision, and section is in inverted Z-type, inside and outside arrangement
Two circle screws, are separately fixed on pump housing shell 33 and main gate 14 by bolt.
Flap valve seat 29 is connected by flange with diffuser 2, and flap valve 30 is arranged on flap valve seat 29.
Lock chamber abutment wall 31 is respectively provided with inland river side trash rack groove 25 and Wai He sides trash racks groove 12 in inland river Ce Hewai rivers side,
It is respectively mounted inland river side trash rack 1 and Wai He sides trash rack 34.
Main gate 14 is arranged in main gate groove 20, is opened and closed by main gate hoist engine 22, and hoisting depth is by working
Gate limit switch 21 sets.
Bulkhead gate 13 is arranged in bulkhead gate groove 18, is opened and closed by bulkhead gate hoist engine 16, and hoisting depth is by overhauling
Gate limit switch 17 sets.
15 points of hoisting room is 23 2 layers of installation maintenance platform 19 and hoist engine maintenance platform;The installation of full-tubular pump and dimension
Shield is carried out on maintenance platform 19 is installed, and the I&M of hoist engine is carried out on hoist engine maintenance platform 23.
Power distribution room 24 is responsible for the supply of electric power of the equipment such as whole station distribution, electricity consumption, monitoring and protection.
The application of above-mentioned multi-functional full-tubular lock chamber pumping plant:
1st, irrigate by lifting water to a higher level with a water pump, etc.:
1 checks whether flap valve 30 is arranged on flap valve seat 29.
2 start bulkhead gate hoist engine 16, open bulkhead gate 13, and main gate 14 is remained turned-off.Electric motor starting is opened
Close input and irrigate by lifting water to a higher level with a water pump, etc. position, start full-tubular pump, the stress rotation in the presence of the alternating magnetic field of stator 5 of rotor 6 drives therewith
Fixed S types bidirectional blade 7, wheel hub 4 and pump shaft 10 rotates, and water body Jing Wai He sides trash rack 34 is entered from the second diffuser 9, stream
It is the inner chamber of rotor 6 into blade wheel chamber after crossing guide vane 8, S types bidirectional blade 7 does work to water body, the water body for obtaining energy is entered
First diffuser 2, flap valve seat 29 is entered Jing diffusion and after streaming guide vane 3, and flap valve 30 is made in the impulse force of natural buoyancy and current
Lower unlatching is used, water body realizes the function that multi-functional full-tubular lock chamber pumping plant is irrigated by lifting water to a higher level with a water pump, etc. through inland river side trash rack 1.
2nd, the row of carrying:
1 starts main gate hoist engine 22, lifts main gate 14 to maintenance platform 19 is installed, and pulls down flap valve 30, starts
Main gate hoist engine 22, main gate 14 is put down and is remained turned-off.
2 start bulkhead gate hoist engine 16, open bulkhead gate 13.Motor start switch input is carried into ranking to put by changing
Become the mode of connection of three phase electric machine, change the direction of rotation of motor, start full-tubular pump, rotor 6 is in the alternating magnetic field of stator 5
In the presence of stress rotation, drive S types bidirectional blade 7, wheel hub 4 fixed thereto and pump shaft 10 to rotate, water body Jing inland rivers side is blocked
Dirty grid 1 enter the first diffuser 2 from flap valve seat 29, are the inner chamber of rotor 6 into blade wheel chamber after flowing through guide vane 3, and S types are two-way
Blade 7 does work to water body, and the water body for obtaining energy enters the second diffuser 9, Jing after diffusion and streaming guide vane 8, through outer river
Side trash rack 34 is discharged, and realizes that multi-functional full-tubular lock chamber pumping plant puies forward the function of row.
3rd, from filling
When outer stream stage is higher than freshwater line, meets the water-head that pumping plant is required from filling, start bulkhead gate hoist engine
16, bulkhead gate 13 is opened, and start main gate hoist engine 22, open main gate 14, water body Jing Wai He sides trash rack 34
Into lock chamber, Jing inland rivers side trash rack 1 is flowed into, and realizes multi-functional full-tubular lock chamber pumping plant from the function of filling.
4th, from row
When freshwater line is higher than outer stream stage, meets the water-head that pumping plant is required from row, start bulkhead gate hoist engine
16, bulkhead gate 13 is opened, and start main gate hoist engine 22, and main gate 14 is opened, water body Jing inland rivers side trash rack 1 enters
Enter lock chamber, Jing Wai He sides trash rack 34 is discharged, realize multi-functional full-tubular lock chamber pumping plant from the function of arranging.
Claims (10)
1. a kind of multi-functional full-tubular lock chamber pumping plant, including sluice and pumping plant, sluice includes main gate(14)And bulkhead gate
(13), it is characterized in that, the main gate(14)It is provided with installing hole(32), installing hole(32)Upper installation full-tubular pump, passes through entirely
Stream pump shaft is to horizontally disposed, main gate(14)Half flange is fixed in inside and outside river side by the pump housing respectively(27), pump housing fixation
It is blue(26)It is connected with the full-tubular pump.
2. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 1, is characterized in that, the main gate(14)For
Steel plate welding processing is formed, main gate(14)On installing hole(32)Diameter and pump housing shell(33)Matching.
3. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 1 and 2, is characterized in that, the full-tubular pump bag
Include diffuser(2), wheel hub(4), stator(5), rotor(6), S type bidirectional blades(7), diffuser(9), pump shaft(10), wheel hub(4)
With S type bidirectional blades(7), rotor(6)It is welded as a whole, rotor(6)Inner chamber be blade wheel chamber, rotor(6)Drive wheel hub(4)
With S type bidirectional blades(7)Rotation.
4. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 3, is characterized in that, the pump housing fixes Hough method
It is blue(27)Two Houghs for diametrically subdivision are constituted, and the pump housing fixes half flange(27)Vertical section is in inverted Z-type, and the pump housing is solid
Determine half flange(27)Including the first vertical portion, horizontal part, the second vertical portion, horizontal part two ends be respectively provided with the first vertical portion,
Second vertical portion, the first vertical portion, the second vertical portion towards conversely, be respectively arranged screw on the second vertical portion, the first vertical portion,
Second vertical portion, the first vertical portion are separately fixed at pump housing shell by bolt respectively(33)And main gate(14)On.
5. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 4, is characterized in that, flap valve seat(29)By flange
With diffuser(2)It is connected, flap valve(30)Installed in flap valve seat(29)On.
6. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 5, is characterized in that, lock chamber abutment wall(31)In inland river
Side and Wai He sides are respectively provided with inland river side trash rack groove(25)With Wai He sides trash rack groove(12), inland river side trash rack groove(25)、
Wai He sides trash rack groove(12)On be respectively mounted inland river side trash rack(1)With Wai He sides trash rack(34).
7. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 6, is characterized in that, the main gate(14)Peace
It is mounted in main gate groove(20)In, main gate(14)By main gate hoist engine(22)Open and close, main gate limit switch
(21)Control main gate(14)Hoisting depth.
8. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 7, is characterized in that, the bulkhead gate(13)Peace
It is mounted in bulkhead gate groove(18)In, bulkhead gate(13)By bulkhead gate hoist engine(16)Open and close, bulkhead gate limit switch
(17)Control bulkhead gate(13)Hoisting depth.
9. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 8, is characterized in that, be provided with hoisting room(15),
Hoisting room(15)Including the installation maintenance platform for setting gradually from bottom to top(19)With hoist engine maintenance platform(23);Dimension is installed
Shield platform(19)For the I&M of full-tubular pump;Hoist engine maintenance platform(23)For the I&M of hoist engine.
10. a kind of multi-functional full-tubular lock chamber pumping plant according to claim 9, is characterized in that, be provided with power distribution room(24), match somebody with somebody
Electric room(24)Responsible full-tubular lock chamber pumping plant distribution, electricity consumption, monitoring and the supply of electric power of protection equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621087558.9U CN206110073U (en) | 2016-09-29 | 2016-09-29 | Multi -functional full through -flow lock chamber pump station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621087558.9U CN206110073U (en) | 2016-09-29 | 2016-09-29 | Multi -functional full through -flow lock chamber pump station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206110073U true CN206110073U (en) | 2017-04-19 |
Family
ID=58522161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621087558.9U Expired - Fee Related CN206110073U (en) | 2016-09-29 | 2016-09-29 | Multi -functional full through -flow lock chamber pump station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206110073U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104070A (en) * | 2018-01-18 | 2018-06-01 | 广东河海泵业机械有限公司 | It is a kind of that there is water drainage to fill the two-way gate pump for drawing drain function with drawing |
CN108980065A (en) * | 2018-09-10 | 2018-12-11 | 华南泵业有限公司 | A kind of gate pump |
CN109056990A (en) * | 2018-09-10 | 2018-12-21 | 华南泵业有限公司 | Integration pump lock station and application |
CN109371922A (en) * | 2018-11-22 | 2019-02-22 | 浙江省水利水电勘测设计院 | A kind of pump lock combination discharge structure |
-
2016
- 2016-09-29 CN CN201621087558.9U patent/CN206110073U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104070A (en) * | 2018-01-18 | 2018-06-01 | 广东河海泵业机械有限公司 | It is a kind of that there is water drainage to fill the two-way gate pump for drawing drain function with drawing |
CN108980065A (en) * | 2018-09-10 | 2018-12-11 | 华南泵业有限公司 | A kind of gate pump |
CN109056990A (en) * | 2018-09-10 | 2018-12-21 | 华南泵业有限公司 | Integration pump lock station and application |
CN109371922A (en) * | 2018-11-22 | 2019-02-22 | 浙江省水利水电勘测设计院 | A kind of pump lock combination discharge structure |
CN109371922B (en) * | 2018-11-22 | 2023-09-26 | 浙江省水利水电勘测设计院有限责任公司 | Pump brake combines drainage structures |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206110073U (en) | Multi -functional full through -flow lock chamber pump station | |
CN201502478U (en) | Waterwheel type hydraulic power generating device | |
CN205444311U (en) | City river pump station that gate combines | |
JP6873444B2 (en) | A system that uses the energy storage pipes of multiple high-rise buildings to generate electricity | |
KR20100078185A (en) | The generation of mini waterpower with siphon | |
CN104746475B (en) | A kind of utilization wind-force tidal power generation water-retention drain processes the device and method of river sewage | |
CN103556611A (en) | Plunge pool water filling and discharging system capable of generating electricity | |
CN211009142U (en) | Flow passage symmetric bidirectional tubular pump device | |
CN106013013B (en) | Tubular power station separate combination type factory building system | |
CN206752427U (en) | A kind of power station ground power house tailrace outlet structure and its power station | |
KR200349016Y1 (en) | The little water-power generating equipment which applies the surplus water level of irrigation channel | |
CN207959118U (en) | A kind of multi-functional flood control case of hydraulic engineering | |
CN206957862U (en) | A kind of paddle wheel formula hydroelectric installation | |
CN206667364U (en) | A kind of novel submerged pumping plant | |
CN105256782A (en) | Navigation, power generation and energy dissipation integrated ship lock | |
CN212336278U (en) | Large-scale underground type hydropower station factory building leakage drainage system combined with slope shaft | |
CN101858323A (en) | Siphon type water-discharging shaft tubular pump structure form | |
CN205088657U (en) | Can open navigation or air flight, integrated lock of electricity generation and energy dissipation | |
CN216515448U (en) | Water conservancy and hydropower engineering constructs water conservancy diversion drainage structures in hole | |
CN1924199A (en) | Tower pool circulated water type natural flow station | |
CN106958236A (en) | A kind of power station ground power house tailrace outlet structure and its power station | |
CN109162855B (en) | Turbofan water wheel boosting power generation system | |
CN217300755U (en) | Side-inclined dam hydroelectric generation system, multistage system and new energy system | |
CN211230690U (en) | Ecological power generation system based on reservoir dam earial drainage | |
CN219753161U (en) | Integrated water turbine gate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 Termination date: 20210929 |
|