CN206034631U - Connected node of wallboard and floor - Google Patents

Connected node of wallboard and floor Download PDF

Info

Publication number
CN206034631U
CN206034631U CN201620779547.0U CN201620779547U CN206034631U CN 206034631 U CN206034631 U CN 206034631U CN 201620779547 U CN201620779547 U CN 201620779547U CN 206034631 U CN206034631 U CN 206034631U
Authority
CN
China
Prior art keywords
floor
wallboard
fastener inserts
connecting node
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620779547.0U
Other languages
Chinese (zh)
Inventor
俞大有
陈定球
李昌州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620779547.0U priority Critical patent/CN206034631U/en
Application granted granted Critical
Publication of CN206034631U publication Critical patent/CN206034631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model belongs to the technical field of building engineering, a connected node of wallboard and floor is disclosed, including the floor of level setting and the wallboard of vertical setting, wherein, the floor includes first floor and the second floor of being connected by transverse connection spare, the wallboard includes cornice sheathing and the lower wallboard who is connected by vertical connecting piece, transverse connection spare includes pre -buried subassembly and connection in first floor and second floor the bolt of pre -buried subassembly, first floor and second floor set up pre -buried subassembly department and have seted up the operation mouth, first floor and second floor overlap joint are on the lower wallboard top, the cornice sheathing sets up the upper portion at first floor and second floor link. The utility model discloses need not cast in situ concrete in assembling process, the cost saving, construction speed is fast, and construction cycle is short to increased the taut ability of connection between the prefab, cornice sheathing and lower wallboard connect with fixed through vertical connecting piece, satisfy the building quality and the specifications of building.

Description

A kind of connecting node of wallboard and floor
Technical field
This utility model belongs to construction engineering technical field, and in particular to the connecting node of a kind of wallboard and floor.
Background technology
Assembled architecture is built relative to conventional steel bar concrete field cast-in-place formula, a undoubtedly technical much progress, The prefabricated components factorial praluction of assembled architecture, Assembling, thus energy factory normalization production, it is quality controllable, it is efficiently fast Victory, material economy is without waste, production scene and job site non-environmental-pollution.But, it is in prior art, pre- in assembled architecture In the assembling process of product, still there is node to need using cast-in-place, such as the connection of shear wall and floor, for stable connection, building Plate would generally adopt laminated floor slab, i.e., pour one layer of in-situ layer again on the top of precast floor slab, in installation process, the overlapping such as need building The installation of next step prefabricated component could be carried out after the in-situ layer solidification of plate on this basis, speed of application is so had a strong impact on, dropped Low efficiency of construction, while cast in situs will inevitably carry out the operation such as formwork, concreting, causes job site to complicate, makes Construction cost be increased while into potential safety hazard.
In sum, thus need the connection of a kind of fast speed of application of exploitation, cost savings, the wallboard being connected firmly and floor badly Node.
Utility model content
The purpose of this utility model is to provide a kind of fast speed of application, cost savings, the wallboard being connected firmly and floor and connects Connect node.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of wallboard and floor connecting node, including horizontally disposed Floor and vertically arranged wallboard, wherein, the floor includes the first floor and the second floor connected by transverse connection, institute State cornice sheathing and wainscot sheathing that wallboard includes being connected by vertical connector, the transverse connection include being embedded in the first floor and The bolt of fastener inserts and the connection fastener inserts in the second floor, first floor and the second floor arrange pre-buried Gathering hole is offered at component;First floor and the second floor are overlapped on wainscot sheathing top, and the cornice sheathing is arranged on One floor and the top of the second floor connection end.In floor prefabrication process, fastener inserts reserved behaviour are embedded with its splice ends Make mouth.The assembly of floor in assembling process, after wainscot sheathing dropping place, is carried out, is embedded in using bolt respectively by gathering hole Fastener inserts connection in first floor and the second floor is integral, realizes the connection of floor, and the two forms overall common stress, Then lift cornice sheathing and dropping place is allowed on floor top, after cornice sheathing dropping place, using vertical connector by cornice sheathing and lower wall Plate connects.This utility model is equipped with gathering hole in the splice ends of the first floor and the second floor, facilitates between fastener inserts Connection, and two gathering holes constitute a larger gathering hole in stitching portion, working place is bigger, is so more beneficial for bolt company Operation construction during fastener inserts is connect, while making the mould unification of floor, manufacturing process is also more easy.This utility model exists Without the need for cast-in-place concrete in assembling process, cost savings, speed of application are fast, short construction period, and the first floor and the second floor are logical Cross that fastener inserts connection is integral, the connection that increased floor tenses ability, is conducive to the conduction of power between floor, cornice sheathing and Wainscot sheathing is connected and is fixed by vertical connector, meets construction quality and the technical performance of building.
Further, the fastener inserts include the connecting plate for being provided with jack hole and the anchoring being arranged on connecting plate Lower limb.The setting of anchoring supporting leg, can be effectively increased anchor force of the fastener inserts in floor, improve what connecting plate was connected with floor Structural strength.
Further, the bolt is worn and connects the jack hole by the fastener inserts being embedded in the first floor and the second floor company Entirety is connected into, and is fixed by nut screwing clamping.It is arranged such, bolt is passed through into jack hole, bolt is then tightened so that is pre- respectively The connection of the fastener inserts fastening being embedded in the first floor and the second floor is integral, passes through between the first floor and the second floor The bolt transmission shearing force of fastener inserts and connection fastener inserts.
Further, the vertical connector includes the screw rod being embedded in wainscot sheathing and is embedded in pre-buried in cornice sheathing Component, the screw rod are connected with the fastener inserts in cornice sheathing, and are fixed by nut screwing clamping.Thus, cornice sheathing and wainscot sheathing Fixation is socketed by screw rod, structural strength is high;In the operating process that vertical connector connects cornice sheathing and wainscot sheathing, in order to just In construction, screw rod is connected by tightening nuts with fastener inserts, can arrange gathering hole at fastener inserts in cornice sheathing.In addition, working as In gathering hole during filling paste, slurry can be filled in the first floor, the second floor simultaneously, between cornice sheathing and wainscot sheathing, harden Aftershaping concrete shear key, it is firm solid, effectively absorb and consume horizontal, the oblique shear power between four.
Further, leave between first floor and the connection end of the second floor and wear seam, the screw rod is worn and connect Seam is connected with the fastener inserts in cornice sheathing.It should be appreciated that the size for wearing seam should not be wide, it is allowed to which screw rod is passed through, or Diameter of the seam less than screw rod is worn, but socket part position is worn in screw rod and accordingly opened up through hole.
Further, first floor and close the joining of the second floor connect, and the stitching portion of the two opens up through hole, and the screw rod is worn Cross the through hole to be connected with the fastener inserts in cornice sheathing.So, it is to avoid preset slot between the first floor and the second floor, first Floor and the second floor is close joins the transmission being connected to beneficial to power therebetween.
Further, the screw rod is provided with anchoring piece.It is arranged such, anchoring of the screw rod in wainscot sheathing can be effectively increased Power, improves the structural strength that screw rod is connected with wainscot sheathing, substantially increases the resistance to drawing ability of screw rod, effectively can prevent Lower screw rod axially and radially the moving in wainscot sheathing of external force effect, especially rotates nut and tightens admittedly fastener inserts and screw rod Regularly, so, screw rod is more firm with what fastener inserts were also connected.
Further, slurry is filled with the gathering hole.It is arranged such, on the one hand can solves because caused by reservation operations mouth Unsightly problem, on the other hand, after the slurry in gathering hole solidifies, can play a part of fixing bolt, it is to avoid use year Limit bolt looseness under the influence of long or external force.Now filling paste has no effect on construction speed, is carried out without waiting for slurry hardening again The installation of next prefabricated component node.Certainly, seam will be worn while filling paste in gathering hole and floor splice ends opens up Through hole is filled, and such node is more firm.
Further, wallboard is embedded with elastic water-proof body with the contact surface of floor.In the prefabrication process of wallboard and/or floor, Elastic water-proof body is embedded in into its Mosaic face, after this utility model completes assembled docking, wallboard and floor are tight by water-proof elastomer The Mosaic face of the two is squeezed in tightly, thus, water can be prevented along wallboard and the Mosaic face seepage of floor.Certainly, can be in its Mosaic face It is embedded with multiple elastic water-proof bodies.It is preferred that, groove can be set in the contact surface with elastic water-proof body, elastic water-proof body side is embedded in building The Mosaic face of plate or wallboard, opposite side are squeezed in the groove of corresponding wallboard or floor Mosaic face, so can both play waterproof Effect, nor affects on the smooth of the two contact surface.
Further, wallboard is provided with waterproof steel plate with the stitching portion of floor, and adjacent waterproof steel plate welding is integral so to be set Put, waterproof steel plate now plays a part of to close or blocks Mosaic face, can effectively prevent water along Mosaic face seepage.Certainly, prevent Welding position can be polished flat by polisher after the welding of water steel plate so as to more attractive in appearance.
Description of the drawings
The accompanying drawing for constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used for explaining this utility model, does not constitute to improper restriction of the present utility model.
Fig. 1 and Fig. 2 is respectively the wallboard involved by a kind of embodiment of this utility model with the connecting node of floor not With the sectional view in section;
Fig. 3 is the connection diagram of the first involved floor and the second floor in Fig. 1.
In figure:
1 first 2 second floor of floor, 3 cornice sheathing, 4 wainscot sheathing
7 gathering hole of the anchoring supporting leg of 5 connecting plate 6,8 bolt
9 nuts 10 wear 11 screw rod of seam, 12 anchoring piece
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in detail, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiments.
This utility model embodiment is as follows, with reference to the connecting node of Fig. 1~3, a kind of wallboard and floor, including horizontally disposed Floor and vertically arranged wallboard, wherein, the floor include by transverse connection connect the first floor 1 and the second floor 2, the wallboard includes cornice sheathing 3 and the wainscot sheathing 4 connected by vertical connector, and the transverse connection includes being embedded in first Fastener inserts in floor 1 and the second floor 2 and connect the bolt 8 of the fastener inserts, first floor 1 and secondth floor Plate 2 to be arranged and offer gathering hole 7 at fastener inserts;First floor 1 and the second floor 2 are overlapped on 4 top of wainscot sheathing, described Cornice sheathing 3 is arranged on the top of 2 connection end of the first floor 1 and the second floor.In floor prefabrication process, it is embedded with its splice ends Fastener inserts reservation operations mouth 7.In assembling process, after 4 dropping place of wainscot sheathing, the assembly of floor is carried out, made by gathering hole 7 The fastener inserts in the first floor 1 and the second floor 2 are embedded in respectively with bolt 8 and are connected integral, realized the connection of floor, The two forms overall common stress, then lifts cornice sheathing 3 and is allowed to dropping place on floor top, after 3 dropping place of cornice sheathing, using perpendicular Cornice sheathing 3 is connected with wainscot sheathing 4 to connector.This utility model is equipped with the splice ends of the first floor 1 and the second floor 2 Gathering hole 7, facilitates the connection between connector, and two gathering holes 7 constitutes a larger gathering hole 7, operation in stitching portion Space is bigger, the operation construction being so more beneficial for during the connection fastener inserts of bolt 8, while making the mould unification of floor, system Make process also more easy., without the need for cast-in-place concrete in assembling process, cost savings, speed of application are fast, apply for this utility model Work cycle is short, the first floor 1 and the second floor 2 connect integral by fastener inserts, and the connection that increased floor tenses ability, Be conducive to the conduction of power between floor, cornice sheathing 3 and wainscot sheathing 4 to connect and fix by vertical connector, meet building for building Build quality and technical performance.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1 and Fig. 3, the fastener inserts bag Include the connecting plate 5 for being provided with jack hole and the anchoring supporting leg 6 being arranged on connecting plate 5.The setting of anchoring supporting leg 6, effectively can increase Plus anchor force of the fastener inserts in floor, improve the structural strength that connecting plate 5 is connected with floor.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1 and Fig. 3, the bolt 8 wear and connect The fastener inserts being embedded in the first floor 1 and the second floor 2 are connected integral by the jack hole, and are tightened by nut 9 It is fixed.It is arranged such, bolt 8 is passed through into jack hole, bolt 8 is then tightened so that be embedded in the first floor 1 and secondth floor respectively The connection of the fastener inserts fastening in plate 2 is integral, passes through fastener inserts and connection between the first floor 1 and the second floor 2 The transmission shearing force of bolt 8 of fastener inserts.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2, the vertical connector include The screw rod 11 being embedded in wainscot sheathing 4 and the fastener inserts being embedded in cornice sheathing 3, in the screw rod 11 and cornice sheathing 3 Fastener inserts are connected, and tighten fixation by nut 9.Thus, cornice sheathing 3 sockets fixation, structure with wainscot sheathing 4 by screw rod 11 Intensity is high;In the operating process that vertical connector connects cornice sheathing 3 and wainscot sheathing 4, for the ease of construction, tightening nuts are by spiral shell Bar 11 is connected with fastener inserts, can arrange gathering hole 7 at fastener inserts in cornice sheathing 3.In addition, when the filling slurry in gathering hole 7 During material, slurry can be filled in the first floor 1, the second floor 2 simultaneously, between cornice sheathing 3 and wainscot sheathing 4, harden aftershaping coagulation Native shear connector, it is firm solid, effectively absorb and consume horizontal, the oblique shear power between four.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1 and Fig. 3, first floor 1 And second floor 2 connection end between leave and wear seam 10, the screw rod 11 wears pre-buried group in seam 10 and cornice sheathing 3 Part is connected.It should be appreciated that the size for wearing seam 10 should not be wide, it is allowed to which screw rod 11 is passed through, or seam 10 is worn less than screw rod 11 diameter, but socket part position is worn in screw rod 11 accordingly open up through hole.
On the basis of above-described embodiment, in another embodiment of this utility model, first floor 1 and the second floor 2 Close joining connects, and the stitching portion of the two opens up through hole, and the screw rod 11 is through the fastener inserts phase in the through hole and cornice sheathing 3 Even.So, it is to avoid preset slot between the first floor 1 and the second floor 2, the first floor 1 and the second floor 2 it is close join to be connected to be beneficial to Therebetween the transmission of power.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2, the screw rod 11 are provided with anchor Firmware 12.It is arranged such, anchor force of the screw rod 11 in wainscot sheathing 4 can be effectively increased, improves screw rod 11 and be connected with wainscot sheathing 4 Structural strength, substantially increase the resistance to drawing ability of screw rod 11, effectively can prevent under external force screw rod 11 in Xia Qiang Axially and radially moving in plate 4, when especially fastener inserts and screw rod 11 are tightened fixed by rotation nut 9, so, screw rod 11 It is more firm with what fastener inserts were also connected.
On the basis of above-described embodiment, in another embodiment of this utility model, slurry in the gathering hole 7, is filled with. It is arranged such, on the one hand can solves because of 7 caused unsightly problem of reservation operations mouth, on the other hand, the slurry in gathering hole 7 After solidification, fixing bolt 8 can be played a part of, it is to avoid service life is long or bolt 8 loosens under the influence of external force.Now filling is starched Material has no effect on construction speed, carries out the installation of next prefabricated component node again without waiting for slurry hardening.Certainly, in gathering hole 7 The through hole that seam 10 and floor splice ends open up will be worn to fill while filling paste, such node is more firm.
On the basis of above-described embodiment, in another embodiment of this utility model, wallboard is embedded with bullet with the contact surface of floor Property waterproof body.In the prefabrication process of wallboard and/or floor, elastic water-proof body is embedded in into its Mosaic face, when this utility model it is complete Into after assembled docking, water-proof elastomer is tightly squeezed in the Mosaic face of the two for wallboard and floor, thus, water can be prevented along wallboard With the Mosaic face seepage of floor.Certainly, multiple elastic water-proof bodies can be embedded with its Mosaic face.It is preferred that, can with elastic water-proof body Contact surface the Mosaic face of groove, the embedded floor in elastic water-proof body side or wallboard is set, opposite side is squeezed into corresponding wallboard Or in the groove of floor Mosaic face, so can both play waterproof effect, and nor affect on the smooth of the two contact surface.
On the basis of above-described embodiment, in another embodiment of this utility model, wallboard is provided with anti-with the stitching portion of floor Water steel plate, adjacent waterproof steel plate welding is integral to be arranged such, and waterproof steel plate now plays closing or blocks Mosaic face Effect, can effectively prevent water along Mosaic face seepage.Certainly, welding position can be polished flat by polisher after waterproof steel plate welding It is whole so as to more attractive in appearance.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. the connecting node of a kind of wallboard and floor, including horizontally disposed floor and vertically arranged wallboard, wherein, the building Plate includes the first floor and the second floor connected by transverse connection, and the wallboard includes the upper wall connected by vertical connector Plate and wainscot sheathing, it is characterised in that the transverse connection includes the fastener inserts being embedded in the first floor and the second floor And the bolt of the connection fastener inserts, gathering hole is offered at first floor and the second floor setting fastener inserts; First floor and the second floor are overlapped on wainscot sheathing top, and the cornice sheathing is arranged on the first floor and the connection of the second floor The top at end.
2. the connecting node of wallboard according to claim 1 and floor, it is characterised in that the fastener inserts include being provided with The connecting plate of jack hole and the anchoring supporting leg being arranged on connecting plate.
3. the connecting node of wallboard according to claim 2 and floor, it is characterised in that the bolt is worn and connects described wearing and connect The fastener inserts being embedded in the first floor and the second floor are connected integral by hole, and are fixed by nut screwing clamping.
4. the connecting node of wallboard according to claim 3 and floor, it is characterised in that the vertical connector includes pre- Fastener inserts phase in the screw rod being embedded in wainscot sheathing and the fastener inserts being embedded in cornice sheathing, the screw rod and cornice sheathing Even, and fixed by nut screwing clamping.
5. the connecting node of wallboard according to claim 4 and floor, it is characterised in that first floor and secondth floor Leave between the connection end of plate and wear seam, the screw rod is worn seam and is connected with the fastener inserts in cornice sheathing.
6. the connecting node of wallboard according to claim 4 and floor, it is characterised in that first floor and secondth floor Close the joining of plate connects, and the stitching portion of the two opens up through hole, and the screw rod is connected through the through hole with the fastener inserts in cornice sheathing.
7. the connecting node of the wallboard according to claim 4~6 any one and floor, it is characterised in that the screw rod It is provided with anchoring piece.
8. the connecting node of the wallboard according to claim 1~6 any one and floor, it is characterised in that the operation Slurry is filled with mouthful.
9. the connecting node of wallboard according to claim 1 and floor, it is characterised in that wallboard is embedding with the contact surface of floor Flexible waterproof body.
10. the connecting node of wallboard according to claim 1 and floor, it is characterised in that the stitching portion of wallboard and floor Waterproof steel plate is provided with, adjacent waterproof steel plate welding is integral.
CN201620779547.0U 2016-07-22 2016-07-22 Connected node of wallboard and floor Active CN206034631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620779547.0U CN206034631U (en) 2016-07-22 2016-07-22 Connected node of wallboard and floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620779547.0U CN206034631U (en) 2016-07-22 2016-07-22 Connected node of wallboard and floor

Publications (1)

Publication Number Publication Date
CN206034631U true CN206034631U (en) 2017-03-22

Family

ID=58311502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620779547.0U Active CN206034631U (en) 2016-07-22 2016-07-22 Connected node of wallboard and floor

Country Status (1)

Country Link
CN (1) CN206034631U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894573A (en) * 2017-03-31 2017-06-27 中民筑友科技投资有限公司 A kind of connecting node of multilayer wallboard and wallboard and floor
CN107313517A (en) * 2017-07-24 2017-11-03 远大住宅工业(上海)有限公司 Overlap wall and intermediate layer laminated floor slab connecting node
CN107882232A (en) * 2017-11-23 2018-04-06 哈尔滨工业大学 A kind of assembly concrete is mated formation the node connector and attaching method thereof of building cover board in advance
CN108222280A (en) * 2017-12-29 2018-06-29 中国十七冶集团有限公司 A kind of assembly concrete component dry connecting device
CN110106970A (en) * 2019-05-31 2019-08-09 西安建工绿色建筑集团有限公司 The index bed method of construction that pin-connected panel index bed module and dry and wet technique combine
CN112431325A (en) * 2020-10-26 2021-03-02 温州华睿建设有限公司 Assembly structure and construction method of module wall board

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894573A (en) * 2017-03-31 2017-06-27 中民筑友科技投资有限公司 A kind of connecting node of multilayer wallboard and wallboard and floor
CN107313517A (en) * 2017-07-24 2017-11-03 远大住宅工业(上海)有限公司 Overlap wall and intermediate layer laminated floor slab connecting node
CN107313517B (en) * 2017-07-24 2023-08-18 远大住宅工业(上海)有限公司 Connecting node for laminated wall and laminated floor slab in middle layer
CN107882232A (en) * 2017-11-23 2018-04-06 哈尔滨工业大学 A kind of assembly concrete is mated formation the node connector and attaching method thereof of building cover board in advance
CN108222280A (en) * 2017-12-29 2018-06-29 中国十七冶集团有限公司 A kind of assembly concrete component dry connecting device
CN108222280B (en) * 2017-12-29 2020-03-20 中国十七冶集团有限公司 Assembled concrete member dry-type connecting device
CN110106970A (en) * 2019-05-31 2019-08-09 西安建工绿色建筑集团有限公司 The index bed method of construction that pin-connected panel index bed module and dry and wet technique combine
CN112431325A (en) * 2020-10-26 2021-03-02 温州华睿建设有限公司 Assembly structure and construction method of module wall board
CN112431325B (en) * 2020-10-26 2022-08-09 温州华睿建设有限公司 Assembly structure and construction method of module wall board

Similar Documents

Publication Publication Date Title
CN206034631U (en) Connected node of wallboard and floor
CN205604473U (en) Assembled shear force wall tooth's socket formula connection structure who combines coincide floor
CN201217847Y (en) Plug-in type preformed hole grouting reinforcement lapping connection component
CN205917838U (en) Balcony board installation node
CN205917945U (en) Floor connected node
CN206189455U (en) Piping lane
CN105862538B (en) The oblique bond-retarded prestressed concrete pavement structure of assembled
CN105926766B (en) Fabricated shear wall Alveolus type attachment structure assembly engineering method
CN207003643U (en) A kind of assembled beam-column node
CN207003634U (en) A kind of balcony slab installs node
CN206034662U (en) Connected node of wallboard and floor
CN206815666U (en) A kind of connecting node of multilayer wallboard and wallboard and floor
CN205917839U (en) Connected node of wallboard and floor
CN108678172A (en) The steel carton and crate body connector of assembling frame
CN107254912A (en) A kind of prefabricated concrete structure connection method
CN206157970U (en) Floor connected node
CN207003644U (en) A kind of low layer assembled beam-column node
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN206157919U (en) Connected node of prefab
CN206128281U (en) Balcony board installation node
CN206693265U (en) A kind of installation node of piping lane
CN207003685U (en) A kind of connecting node of Side fascia and floor
CN205917873U (en) Connected node of prefab
CN109667351B (en) Tooth socket type waterproof connecting structure of prefabricated wallboard horizontal joint grouting method of assembled building
CN205917840U (en) Connected node of wallboard and floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Connected node of wallboard and floor

Granted publication date: 20170322

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Connected node of wallboard and floor

Granted publication date: 20170322

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A kind of joint between wall panel and floor

Granted publication date: 20170322

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A kind of joint between wall panel and floor

Granted publication date: 20170322

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A kind of joint between wall panel and floor

Granted publication date: 20170322

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A kind of joint between wall panel and floor

Granted publication date: 20170322

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A kind of joint between wall panel and floor

Granted publication date: 20170322

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A connection node between wallboard and floor

Granted publication date: 20170322

License type: Common License