CN205917840U - Connected node of wallboard and floor - Google Patents

Connected node of wallboard and floor Download PDF

Info

Publication number
CN205917840U
CN205917840U CN201620780346.2U CN201620780346U CN205917840U CN 205917840 U CN205917840 U CN 205917840U CN 201620780346 U CN201620780346 U CN 201620780346U CN 205917840 U CN205917840 U CN 205917840U
Authority
CN
China
Prior art keywords
floor
wallboard
sheathing
cornice sheathing
connecting node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620780346.2U
Other languages
Chinese (zh)
Inventor
俞大有
陈定球
李昌州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongmin Zhuyou House Technology Group Co ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620780346.2U priority Critical patent/CN205917840U/en
Application granted granted Critical
Publication of CN205917840U publication Critical patent/CN205917840U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model belongs to the technical field of building engineering, a wallboard and floor connected node is disclosed, include first floor and second floor and the cornice sheathing and the lower wallboard that connect through vertical connecting piece, first floor was connected with close piecing together of second floor, the concatenation end of first floor and the concatenation of second floor end all are equipped with tenon and tongue -and -groove, and first floor and second floor imbed each other and form mortise -tenon joint, and the tenon that sets up on first floor and second floor all is equipped with the cross -under hole, first floor and second floor set up between lower wallboard and cornice sheathing, vertical connecting piece passes the cross -under hole connects into whole with the cornice sheathing with lower wallboard. The utility model discloses need not cast in situ concrete in assembling process, the cost saving, construction speed is fast, and construction cycle is short to increased the taut ability of connection between the prefab, cornice sheathing and lower wallboard connect with fixed through vertical connecting piece, satisfy the building quality and the specifications of building.

Description

A kind of wallboard and the connecting node of floor
Technical field
This utility model belongs to construction engineering technical field and in particular to the connecting node of a kind of wallboard and floor.
Background technology
Assembled architecture is built with respect to conventional steel bar concrete field cast-in-place formula, a technical beyond doubt much progress, The prefabricated components factorial praluction of assembled architecture, Assembling, thus can factory normalization produce, quality controllable, efficiently soon Victory, material economy no wastes, production scene and job site non-environmental-pollution.But, in prior art, pre- in assembled architecture In the assembling process of product, node is still had to need using cast-in-place, such as the connection of shear wall and floor, for stable connection, building Plate would generally adopt laminated floor slab, pours one layer of in-situ layer again on the top of precast floor slab, in installation process, the overlapping such as need building The installation of next step prefabricated component could be carried out after the in-situ layer solidification of plate on this basis, so have a strong impact on speed of application, fall Low efficiency of construction, cast in situs simultaneously will inevitably carry out the operation such as formwork, concreting, cause job site to complicate, make Construction cost is increased while becoming potential safety hazard.
In sum, thus need that a kind of speed of application of exploitation is fast, the connection of cost savings, the wallboard being connected firmly and floor badly Node.
Utility model content
The purpose of this utility model be provide that a kind of speed of application is fast, cost savings, the wallboard being connected firmly and floor company Connect node.
Above-mentioned purpose is to be achieved through the following technical solutions: the connecting node of a kind of wallboard and floor, including being horizontally disposed with Floor and vertically arranged wallboard, wherein, described floor includes the first floor and the second floor, and described wallboard is included by perpendicular The cornice sheathing connecting to connector and wainscot sheathing, the splice ends of described first floor and the splice ends of the second floor are equipped with tenon And tongue-and-groove, the first floor and the mutually embedded formation mortise-tenon joint of the second floor, it is arranged on the tenon on the first floor and the second floor Head is equipped with jack hole;Described first floor and the second floor are overlapped on described wainscot sheathing top, and described cornice sheathing is arranged on One floor and the top of the second floor connection end, described vertical connector is passed through described jack hole and is connected cornice sheathing with wainscot sheathing It is connected into entirety.In assembling process, after wainscot sheathing dropping place, carry out the assembly of floor, the first floor and the second floor are mutually embedded Form mortise-tenon joint, then lifting cornice sheathing is allowed to dropping place on floor top, after cornice sheathing dropping place, will using vertical connector Cornice sheathing is connected with wainscot sheathing, and vertical connector passes through the jack hole being arranged on the first floor and the second floor.It is arranged such, Vertical connector not only acts as the effect connecting cornice sheathing and wainscot sheathing, may also function as the effect of fixing floor, it is to avoid building simultaneously Plate is moved under external force, need not connect additionally by connector between floor, not only cost-effective, simplifies simultaneously Constructing operation, reduces difficulty of construction, improves efficiency of construction.This utility model in assembling process without cast-in-place concrete, Cost savings, speed of application is fast, short construction period, and described floor and wallboard form entirety by vertical connector and be jointly subject to Power, increased the connection tension ability of floor, is conducive to the conduction of power between prefabricated component, meets construction quality and the technology of building Performance.
Further, described vertical connector includes the screw rod being embedded in wainscot sheathing and is embedded in pre-buried in cornice sheathing Assembly, described screw rod is connected through jack hole with the fastener inserts in cornice sheathing, and is fixed by nut screwing clamping.So, upper wall Plate sockets fixation with wainscot sheathing by screw rod, and structural strength is high;Connect the operation of cornice sheathing and wainscot sheathing in vertical connector Cheng Zhong, for the ease of construction, screw rod is connected by tightening nuts with fastener inserts, can operate at cornice sheathing setting fastener inserts Mouthful, when filling paste in gathering hole, slurry can fill described jack hole simultaneously, and harden aftershaping concrete shear key, hard Consolidation is real, effectively absorbs and consume horizontal, the oblique shear power between four.
Further, it is provided with gathering hole at described cornice sheathing setting fastener inserts.
Further, described fastener inserts include being provided with the connecting plate of through hole and are arranged on the anchoring supporting leg on connecting plate. The setting of anchoring supporting leg, can be effectively increased anchor force in floor for the fastener inserts, improve the knot that connecting plate is connected with floor Structure intensity.
Further, described fastener inserts are to connect box, and the bottom of described connection box is provided with through hole.
Further, described connection box at least one side forms gathering hole with connecting outside cornice sheathing.In the pre-buried process connecting box In, its one side leaving certain gaps uncovered by the economic plan, and breach connects with outside cornice sheathing, so, need not in addition arrange in the prefabrication process of cornice sheathing Gathering hole, and after filling paste in breach, the position that setting connects box forms hard point, and the fastener inserts making are connected with screw rod Firmly.
Further, it is filled with slurry in described gathering hole.It is arranged such, on the one hand can solve to lead to because of reservation operations mouth Unsightly problem, on the other hand, after the slurry in gathering hole solidifies, can play the effect of standing screw and nut, it is to avoid Service life screw rod and nut loosening long or under the influence of external force.Now filling paste has no effect on construction speed, without waiting for slurry Material hardening carries out the installation of next prefabricated component node again.Certainly, while filling paste, jack hole is filled in gathering hole, so Node is more firm.
Further, described screw rod is provided with anchoring piece.It is arranged such, anchoring in wainscot sheathing for the screw rod can be effectively increased Power, improves the structural strength that screw rod is connected with wainscot sheathing, substantially increases the resistance to drawing ability of screw rod, can effectively prevent Fastener inserts and screw rod are tightened solid by lower screw rod axially and radially the moving in wainscot sheathing of external force effect, especially rotation nut Regularly, so, screw rod is more firm with what fastener inserts were also connected.
Further, wallboard and the contact surface of floor are embedded with elastic water-proof body.In the prefabrication process of wallboard and/or floor, Elastic water-proof body is embedded in its Mosaic face, after this utility model completes assembled docking, wallboard and floor are tight by water-proof elastomer Tightly it is squeezed in the Mosaic face of the two, so, water can be prevented along the Mosaic face seepage of wallboard and floor.Certainly, can be in its Mosaic face It is embedded with multiple elastic water-proof bodies.Preferably, can be in the contact surface setting groove with elastic water-proof body, elastic water-proof body side embeds building Plate or the Mosaic face of wallboard, opposite side is squeezed in corresponding wallboard or the groove of floor Mosaic face, so both can play waterproof Effect, nor affects on the smooth of the two contact surface.
Further, wallboard and the stitching portion of floor are provided with waterproof steel plate, and adjacent waterproof steel plate welding is integral.So set Put, waterproof steel plate now plays closing or the effect blocking Mosaic face, can effectively prevent water along Mosaic face seepage.Certainly, prevent By polisher, welding position can be polished flat so as to more attractive in appearance after the welding of water steel plate.
Brief description
The accompanying drawing constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used for explaining this utility model, does not constitute to improper restriction of the present utility model.
The sectional view of the connecting node of Fig. 1 and the wallboard involved by a kind of embodiment of this utility model and floor;Fig. 2 Splicing schematic diagram for involved the first floor in Fig. 1 and the second floor.
In figure:
1 first floor 2 second floor, 3 cornice sheathing 4 wainscot sheathing
5 connecting plate 6 anchors supporting leg 7 gathering hole 8 screw rod
9 nut, 10 tenon, 11 tongue-and-groove 12 anchoring piece
13 jack holes
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in detail, the description of this part is only exemplary and explanatory, Should not there is any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiment.
This utility model embodiment is as follows, sees figures.1.and.2, the connecting node of a kind of wallboard and floor, sets including level The floor put and vertically arranged wallboard, wherein, described floor includes the first floor 1 and the second floor 2, and described wallboard includes leading to Cross cornice sheathing 3 and the wainscot sheathing 4 that vertical connector connects, the splice ends of described first floor 1 and the splice ends of the second floor 2 are equal It is provided with tenon 10 and tongue-and-groove 11, the first floor 1 and the mutually embedded formation mortise-tenon joint of the second floor 2, be arranged on the first floor 1 He Tenon 10 on second floor 2 is equipped with jack hole 13;Described first floor 1 and the second floor 2 are overlapped on described wainscot sheathing 4 and push up End, described cornice sheathing 3 is arranged on the first floor 1 and the top of the second floor 2 connection end, and described vertical connector passes through described wearing Connect hole 13 and cornice sheathing 3 is connected with wainscot sheathing 4 integral.In assembling process, after wainscot sheathing 4 dropping place, carry out the spelling of floor Dress, the first floor 1 and the second floor 2 are mutually embedded to form mortise-tenon joint, and then lifting cornice sheathing 3 is allowed to dropping place on floor Cornice sheathing 3, after cornice sheathing 3 dropping place, is connected with wainscot sheathing 4 by portion using vertical connector, and vertical connector passes through and is arranged on Jack hole 13 on first floor 1 and the second floor 2.It is arranged such, vertical connector not only acts as connection cornice sheathing 3 and Xia Qiang The effect of plate 4, may also function as the effect of fixing floor, it is to avoid floor is moved under external force, that is, between floor simultaneously Need not connect additionally by connector, not only cost-effective, simplify constructing operation simultaneously, reduce difficulty of construction, improve and apply Work efficiency rate., without cast-in-place concrete, cost savings in assembling process, speed of application is fast, short construction period, institute for this utility model The floor stated and wallboard form overall common stress by vertical connector, increased the connection tension ability of floor, are conducive to The conduction of power between prefabricated component, meets construction quality and the technical performance of building.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, described vertical connector includes The screw rod 8 that is embedded in wainscot sheathing 4 and be embedded in fastener inserts in cornice sheathing 3, described screw rod 8 pass through jack hole 13 with upper Fastener inserts in wallboard 3 are connected, and tighten fixation by nut 9.So, cornice sheathing 3 and wainscot sheathing 4 are socketed by screw rod 8 Fixing, structural strength is high;In the operating process that vertical connector connects cornice sheathing 3 and wainscot sheathing 4, for the ease of construction, twist Screw rod 8 is connected by tight nut with fastener inserts, can at cornice sheathing 3 setting fastener inserts gathering hole 7, when filling out in gathering hole 7 When filling slurry, slurry can fill described jack hole 13 simultaneously, and harden aftershaping concrete shear key, firm solid, effectively inhales Receive and consume horizontal, oblique shear power between four.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, described cornice sheathing 3 arranges pre-buried It is provided with gathering hole 7 at assembly.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, described fastener inserts include setting There is the connecting plate 5 of through hole and be arranged on the anchoring supporting leg 6 on connecting plate 5.The setting of anchoring supporting leg 6, can be effectively increased pre-buried Anchor force in floor for the assembly, improves the structural strength that connecting plate 5 is connected with floor.
On the basis of above-described embodiment, in another embodiment of this utility model, described fastener inserts are to connect box, described The bottom connecting box is provided with through hole.
On the basis of above-described embodiment, in another embodiment of this utility model, described connection box at least one side and Shang Qiang The outer connection of plate 3 forms gathering hole 7.Connect box pre-buried during, its one side leaving certain gaps uncovered by the economic plan, and breach and cornice sheathing 3 connect outward Logical, so, in the prefabrication process of cornice sheathing 3, need not in addition gathering hole 7 be set, and after filling paste in breach, setting is even The position connecing box forms hard point, and the fastener inserts making are connected firmly with screw rod 8.
On the basis of above-described embodiment, in another embodiment of this utility model, in described gathering hole 7, it is filled with slurry. It is arranged such, on the one hand can solve the unsightly problem leading to because of reservation operations mouth 7, on the other hand, slurry in gathering hole 7 The effect of standing screw 8 and nut 9 after solidification, can be played, it is to avoid service life screw rod 8 and nut 9 long or under the influence of external force Loosen.Now filling paste has no effect on construction speed, carries out the installation of next prefabricated component node again without waiting for slurry hardening. Certainly, while filling paste, jack hole 13 is filled in gathering hole 7, such node is more firm.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, described screw rod 8 is provided with anchoring Part 12.It is arranged such, anchor force in wainscot sheathing 4 for the screw rod 8 can be effectively increased, improve the knot that screw rod 8 is connected with wainscot sheathing 4 Structure intensity, substantially increases the resistance to drawing ability of screw rod 8, can effectively prevent under external force screw rod 8 in wainscot sheathing 4 Axially and radially move, when especially fastener inserts and screw rod 8 are tightened fixing by rotation nut 9, so, screw rod 8 with pre-buried group It is more firm that part also connects.
On the basis of above-described embodiment, in another embodiment of this utility model, wallboard is embedded with bullet with the contact surface of floor Property waterproof body.In the prefabrication process of wallboard and/or floor, elastic water-proof body is embedded in its Mosaic face, when this utility model is complete After becoming assembled docking, water-proof elastomer is tightly squeezed in the Mosaic face of the two by wallboard and floor, so, can prevent water along wallboard Mosaic face seepage with floor.Certainly, multiple elastic water-proof bodies can be embedded with its Mosaic face.Preferably, can with elastic water-proof body Contact surface setting groove, elastic water-proof body side embeds the Mosaic face of floor or wallboard, and opposite side is squeezed into corresponding wallboard Or in the groove of floor Mosaic face, so both can play waterproof effect, and nor affect on the smooth of the two contact surface.
On the basis of above-described embodiment, in another embodiment of this utility model, the stitching portion of wallboard and floor is provided with anti- Water steel plate, adjacent waterproof steel plate welding is integral.It is arranged such, waterproof steel plate now plays closing or blocks Mosaic face Effect, can effectively prevent water along Mosaic face seepage.Certainly, by polisher, welding position can be polished flat after waterproof steel plate welding Whole so as to more attractive in appearance.
The above is only preferred implementation of the present utility model it is noted that common skill for the art For art personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. the connecting node of a kind of wallboard and floor, including horizontally disposed floor and vertically arranged wallboard, wherein, described building Plate includes the first floor and the second floor, and described wallboard includes cornice sheathing and the wainscot sheathing connecting by vertical connector, and it is special Levy and be, the splice ends of described first floor and the splice ends of the second floor are equipped with tenon and tongue-and-groove, the first floor and second Floor is mutually embedded to form mortise-tenon joint, and the tenon being arranged on the first floor and the second floor is equipped with jack hole;Described One floor and the second floor are overlapped on described wainscot sheathing top, and described cornice sheathing is arranged on the first floor and the second floor connection end Top, described vertical connector passes through described jack hole be connected cornice sheathing with wainscot sheathing integral.
2. wallboard according to claim 1 and floor connecting node it is characterised in that described vertical connector include pre- The screw rod that is embedded in wainscot sheathing and be embedded in fastener inserts in cornice sheathing, described screw rod passes through in jack hole and cornice sheathing Fastener inserts are connected, and are fixed by nut screwing clamping.
3. wallboard according to claim 2 and the connecting node of floor are it is characterised in that described cornice sheathing arranges pre-buried group It is provided with gathering hole at part.
4. wallboard according to claim 3 and the connecting node of floor are it is characterised in that described fastener inserts include being provided with The connecting plate of through hole and be arranged on the anchoring supporting leg on connecting plate.
5. the connecting node of wallboard according to claim 3 and floor is it is characterised in that described fastener inserts are to be connected Box, the bottom of described connection box is provided with through hole.
6. wallboard according to claim 5 and floor connecting node it is characterised in that described connection box at least one side with Outside cornice sheathing, connection forms gathering hole.
7. the connecting node of the wallboard according to claim 3~6 any one and floor is it is characterised in that described operation It is filled with slurry in mouthful.
8. wallboard according to claim 7 and the connecting node of floor are it is characterised in that described screw rod is provided with anchoring Part.
9. wallboard according to claim 1 and the connecting node of floor are it is characterised in that wallboard is embedding with the contact surface of floor Flexible waterproof body.
10. the connecting node of wallboard according to claim 1 and floor is it is characterised in that the stitching portion of wallboard and floor It is provided with waterproof steel plate, adjacent waterproof steel plate welding is integral.
CN201620780346.2U 2016-07-22 2016-07-22 Connected node of wallboard and floor Expired - Fee Related CN205917840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620780346.2U CN205917840U (en) 2016-07-22 2016-07-22 Connected node of wallboard and floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620780346.2U CN205917840U (en) 2016-07-22 2016-07-22 Connected node of wallboard and floor

Publications (1)

Publication Number Publication Date
CN205917840U true CN205917840U (en) 2017-02-01

Family

ID=57873842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620780346.2U Expired - Fee Related CN205917840U (en) 2016-07-22 2016-07-22 Connected node of wallboard and floor

Country Status (1)

Country Link
CN (1) CN205917840U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267646A (en) * 2018-11-09 2019-01-25 中欧云建科技发展有限公司 A kind of cross connection structure for building floor and building wall board

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267646A (en) * 2018-11-09 2019-01-25 中欧云建科技发展有限公司 A kind of cross connection structure for building floor and building wall board

Similar Documents

Publication Publication Date Title
CN206034631U (en) Connected node of wallboard and floor
CN205604473U (en) Assembled shear force wall tooth's socket formula connection structure who combines coincide floor
CN205917838U (en) Balcony board installation node
CN205917945U (en) Floor connected node
CN201217847Y (en) Plug-in type preformed hole grouting reinforcement lapping connection component
CN104975652B (en) A kind of precast concrete docks attachment structure
CN107460954A (en) A kind of post-tensioned prestressing assembling concrete frame energy dissipation component system and construction method
CN206189455U (en) Piping lane
CN207003634U (en) A kind of balcony slab installs node
CN205444475U (en) Prefab and basic connected node
CN207003643U (en) A kind of assembled beam-column node
CN105926766A (en) Prefabricated shear wall toothed groove type connecting structure assembling construction method
CN107119799A (en) The prestressing force assembling type node construction and its construction method of beam-ends friction energy-dissipating
CN206815666U (en) A kind of connecting node of multilayer wallboard and wallboard and floor
CN206815547U (en) A kind of frame-type bean column node
CN205917839U (en) Connected node of wallboard and floor
CN206034662U (en) Connected node of wallboard and floor
CN205917863U (en) Connected node of wallboard and floor
CN107938856A (en) Walling system
CN205917840U (en) Connected node of wallboard and floor
CN206128281U (en) Balcony board installation node
CN205917873U (en) Connected node of prefab
CN206941799U (en) The prestressing force assembling type node construction of beam-ends friction energy-dissipating
CN207003644U (en) A kind of low layer assembled beam-column node
CN206157919U (en) Connected node of prefab

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180808

Address after: 410015 clocks Road 10, Kaifu District, Changsha, Hunan

Patentee after: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Address before: 410205 room 3005, complex building, Changsha Jin Xia bonded logistics center, 30 Xingang Road, Kaifu District, Changsha, Hunan.

Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Yun yuan Qing

Assignor: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Contract record no.: 2019430000018

Denomination of utility model: Connected node of wallboard and floor

Granted publication date: 20170201

License type: Common License

Record date: 20190703

Assignee: Guangdong Jianhui Investment Consulting Co.,Ltd.

Assignor: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Contract record no.: 2019430000019

Denomination of utility model: Connected node of wallboard and floor

Granted publication date: 20170201

License type: Common License

Record date: 20190703

Assignee: Guangdong Hengli Investment Co.,Ltd.

Assignor: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Contract record no.: 2019430000020

Denomination of utility model: Connected node of wallboard and floor

Granted publication date: 20170201

License type: Common License

Record date: 20190703

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201

Termination date: 20210722