CN205907920U - Archaize building's wood constructs high eaves subassembly - Google Patents
Archaize building's wood constructs high eaves subassembly Download PDFInfo
- Publication number
- CN205907920U CN205907920U CN201620847117.8U CN201620847117U CN205907920U CN 205907920 U CN205907920 U CN 205907920U CN 201620847117 U CN201620847117 U CN 201620847117U CN 205907920 U CN205907920 U CN 205907920U
- Authority
- CN
- China
- Prior art keywords
- wooden
- rafter
- wood
- pavilion
- beam portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses an archaize building's wood constructs high eaves subassembly, based on the girder construction board constitution of concrete, the girder construction board has integrated into one piece's roofing portion, two outer, inboard roof beam portions are separated by one section distance and establish, its characterized in that: above -mentioned wood construct high eaves subassembly at least by post, wooden stringer, wooden square wood, pocket rafter, the flying -rafter constitutes and through steel structural embedded parts, expansion bolts, lead to that long steel hoop is fixed to be assembled in the girder construction board, wherein wooden stringer, post, wooden square wood adorn connect fix respectively pre -buried on the steel structural embedded parts of inside and outside curb girder portion, there is a lumber skid in roofing portion through the expansion bolts rigid coupling, and the pocket rafter is shelved to be fixed in in lumber skid and its afterbody and is led to long steel hoop, mouthful wood and flying -rafter in pocket rafter upper portion dress connects, and wooden stringer is equipped with floodgate rafter board within a definite time. The utility model discloses scheme make full use of concrete structure in architectural many -sided advantage to feel through integrating the visual hierarchy that richenes that high eaves subassembly made the concrete main part give the timber compoment, embodied the style of ancient building.
Description
Technical field
This utility model is related to a kind of Mu Gou pavilion eaves assembly based on modern concrete structure building in the style of the ancients and its attaching knot
Structure.
Background technology
Strengthen along with Chinese national power, national consciousness is gradually revived, people start from numerous and disorderly " copy and copy " and " copy
Main threads is sorted out, the new period that traditional culture revives arrives gradually, and the architectural style of Neo Chinese style is just arisen at the historic moment in shellfish ".
The life system of now is built to be stood on the west standard of such as America and Europe etc., and still goes out toward in the depth of one's heart
China's vast civilization of 5,000 years.Need how to process this contradiction?Then, modern architects just come up with cleverly
Method, goes out to meet structure in the building of Modern Mechanics intensity requirement with reinforced concrete construction, and is aided with brick and tile and wood decorations in outside
Panel, builds the white washed wall black pigment used by women in ancient times to paint their eyebrows watt of traditional architecture, mixes the Inner court of Chinese style landscape, and the building in the style of the ancients being built into allows the user can
The firm impression of the modern life while experiencing Chinese culture, can be enjoyed again.
Because modern architecture is two kinds of diverse structural systems with traditional ancient building in structural system, existing imitative
Ancient building, is all much to build to meet modeling requirement by later stage powder, does not have those wood of traditional architecture on visual experience
Component finely attractive in appearance.
Content of the invention
In view of the defect that above-mentioned prior art exists, the purpose of this utility model is to propose a kind of Mu Gou pavilion of building in the style of the ancients
Eaves assembly, solves the problems, such as that concrete construction is combined with traditional Mu Gou pavilion eaves, so that building can take into account the performance of concrete
Construction and the visual aesthetics of ancient architecture timber structure.
Above-mentioned purpose of the present utility model, will be achieved by the following technical programs: the Mu Gou pavilion eaves group of building in the style of the ancients
Part, the girder construction plate based on concrete is constituted, and described girder construction plate has integrally formed roofing portion, outside beam portion and inboard beams
Portion, and from inner side beam portion, beam portion is in dip down ramp-like laterally in roofing portion, two beam portions set at a distance and move back respectively
Occupy the inner side of the pin of phase attaching it is characterised in that: described Mu Gou pavilion eaves assembly is at least by pin, wooden stringer, wooden a long thick piece of timber shaped like a square pillar, pocket
Rafter, flying-rafter, inner mouth wood constitute and are assembled in girder construction plate, wherein by steel structural embedded parts, expansion bolt, the fixation of elongated stirrup
Described wood stringer, pin, wooden a long thick piece of timber shaped like a square pillar attaching are fixed on and are embedded in advance respectively on the steel structural embedded parts of medial and lateral beam portion;Roofing portion
Chock is connected with by expansion bolt, described pocket rafter is held on chock and pocket rafter afterbody is fixed on elongated stirrup, pocket
In the attaching of rafter top, mouth wood and flying-rafter, are provided with lock rafter plate between wooden stringer.
Further, described wood stringer is lain across by steel structural embedded parts and is secured to the positive top side of outside beam portion, and logical
Cross wood even machine, wooden clamp for carving hall, wooden corridor a tree, used in making timber for boats and the wooden pin that wooden a long thick piece of timber shaped like a square pillar Tenon is connected to hanging shape, described pin combines wooden a long thick piece of timber shaped like a square pillar
And by steel structural embedded parts be vertically secured to inner side beam portion just laterally.
Further, described steel structural embedded parts have vertical substrate and its one side vertically integrally formed knot
A kind of steel structural embedded parts setting between plywood integrally formed four support feets vertical with another side, and corresponding wood stringer
Board is in level to a kind of board of steel structural embedded parts at corresponding pin position is in vertically to described support feet grafting
Position steel structural embedded parts in corresponding inner side beam portion or outside beam portion.
Further, setting up attaching between described wood corridor a tree, used in making timber for boats and pin has the pavilion rafter of arch and its pavilion of downside attaching
Beam, the top of described pavilion rafter is less than the bottom surface of outside beam portion.
Yet further, the top surface of described pavilion rafter is equipped with thin sheathing tile.
Further, described wood peg ends mounting is provided with wood and hangs foot carving basket.
Further, along inboard beams minister's degree to being distributed with more than two pins, and it is provided with wood between pin two-by-two
A long thick piece of timber shaped like a square pillar and wooden clamp for carving hall.
The application implementation of technical solutions of the utility model, is had the advantage that and is embodied in: this programme is by wooden component
Stress depends on the girder construction plate of concrete, takes full advantage of the good globality of xoncrete structure, durable refractory, Yi Jijing
The construction costs of Ji and maintenance cost, and by integrating the pavilion eaves assembly of wooden structure, make concrete main body have been assigned wooden component
Abundant visual hierarchy sense, has embodied the style of ancient building in appearance.
Brief description
Fig. 1 is the preferred embodiment structural representation of the Mu Gou pavilion eaves of this utility model building in the style of the ancients.
Fig. 2 is a kind of structural representation of steel structural embedded parts used by this utility model.
Fig. 3 is the structural representation of another kind of steel structural embedded parts used by this utility model.
Specific embodiment
This utility model builds the problem of wooden structure cornice for concrete construction, and innovation proposes a kind of moving back of building in the style of the ancients
Beam type wood structure cornice.
From the point of view of the description of recapitulative architectural feature, as shown in figure 1, the Mu Gou pavilion eaves assembly of this building in the style of the ancients, based on mixed
The girder construction plate 1 of solidifying soil is constituted, and this girder construction plate 1 has integrally formed roofing portion 11, outside beam portion 12 and inner side beam portion 13,
And from inner side beam portion 13, beam portion 12 is in dip down ramp-like laterally in roofing portion 11, two beam portions set and respectively at a distance
Withdraw to the inner side (be and move back girder construction) of the pin of phase attaching.Especially, this Mu Gou pavilion eaves assembly is at least by pin, wooden purlin
Bar, wooden a long thick piece of timber shaped like a square pillar, pocket rafter, flying-rafter, inner mouth wood are constituted and fixing by steel structural embedded parts 6, expansion bolt 71, elongated stirrup 72
It is assembled on girder construction plate 1, wherein this wooden stringer 41, pin 2, wooden a long thick piece of timber shaped like a square pillar 42 attaching is fixed on and is embedded in medial and lateral respectively in advance
On the steel structural embedded parts 6 of beam portion;Roofing portion 11 is connected with chock 8 by expansion bolt 71, and above-mentioned pocket rafter 43 is held on pad
Wooden and pocket rafter 43 afterbody is fixed on elongated stirrup 72 and prevents from toppling, mouth wood and flying-rafter 44 in pocket rafter 43 top attaching, and
It is provided with lock rafter plate 9 between each bar pocket rafter 43 on wooden stringer 41.Thus achieve the outside wood structure decoration of xoncrete structure,
Make it possess certain local flavor modelled after an antique, and the Wood member nationality of above-mentioned Mu Gou pavilion eaves assembly is by steel structural embedded parts, expansion bolt
And the hidden attachment such as elongated stirrup, steel nail is firmly assembled, and do not undertake main stress reason effect, only need to deal with limited
, the hogging moment that itself causes and antidumping.
Above-mentioned expansion bolt 71, elongated stirrup 72 are existing conventional fastening attachment, and its structure is construed broadly, Gu Sheng
Slightly describe, only need to be discussed in detail is above-mentioned steel structural embedded parts.Visible as shown in Figures 2 and 3, it has vertical substrate
61 and its one side vertically integrally formed board 62 integrally formed three supported above feet 63 vertical with another side, and
And a kind of board 62 of steel structural embedded parts of corresponding wood stringer 41 is in level to, corresponding wood a long thick piece of timber shaped like a square pillar 42(and pin 2) one
The board 62 of kind of steel structural embedded parts be in vertically to, and support feet 63 be mainly used in being plugged in beam portion positioning steel construction pre-buried
Part.Can certainly also may be used in the position boring of the corresponding support feet of substrate, the swell fixture installing certain length additional.
In diagram embodiment, this steel structural embedded parts 6 has four support feets 63, and with respect to the distribution of board 62 both sides
If stronger ability of holding is reached it is ensured that the stability of wooden ele-ment with this.
In conjunction with this utility model Mu Gou pavilion eaves assembly shown in Fig. 1, the enforcement structure of more refinement is: from outside beam portion 12
From the point of view of wooden structure structure: wooden stringer 41 is lain across by steel structural embedded parts 6 and is secured to the positive top side of outside beam portion 12, and by wood
A long thick piece of timber shaped like a square pillar 42 Tenon is connected to wood even machine 47, wooden clamp for carving hall 48, wooden corridor a tree, used in making timber for boats 45 and the wooden pin 46 of hanging shape, and wooden pin 46 bottom
Portion's mounting is provided with wood and hangs foot carving basket 49.It can be seen that, nationality is just completed a series of wood structures from wooden stringer by this steel structural embedded parts
The combination of part, makes outside beam portion 12 obtain comprehensively and effectively wooden structure and decorates and have stronger fastness guarantee.
From the point of view of the wooden structure structure of inner side beam portion 13: pin 2 is combined wooden a long thick piece of timber shaped like a square pillar 42 and vertically filled by steel structural embedded parts 6
Be connected to inner side beam portion just laterally.Along inner side beam portion 13 length to being distributed with more than two pins 2, and two-by-two pin 2 it
Between be provided with wooden a long thick piece of timber shaped like a square pillar 42 and wooden clamp for carving hall 44.
In addition, setting up attaching between above-mentioned wood corridor a tree, used in making timber for boats 45 and pin 2 have the pavilion rafter 51 of arch and its pavilion beam of downside attaching
52, and the top of this pavilion rafter 51 is less than the bottom surface of outside beam portion 12.As further attractive, decorative and moisture preventive measure, this pavilion rafter
51 top surface is equipped with thin sheathing tile (mark).
Above-mentioned Mu Gou pavilion eaves assembly is in construction: various required wooden component of pre-production first, such as pin, wood stringer,
Even machine, wooden clamp for carving hall, wood hang foot carving basket, pocket rafter, flying-rafter etc. for wooden a long thick piece of timber shaped like a square pillar, wood, and scene is according to xoncrete structure scene
Design and make steel structural embedded parts;Then setting-out, fixing steel structural embedded parts are on xoncrete structure;Then can be successively
Or each wooden component of synchronous attaching medial and lateral beam portion
, i.e. spacing timber stringer, pin, wooden a long thick piece of timber shaped like a square pillar is inserted the Tenon position of pin and by pin and wooden a long thick piece of timber shaped like a square pillar attaching simultaneously
It is fixed on steel structural embedded parts (can further bolt fix), subsequently wood clamp hall, wood even machine, wooden stringer are passed through Tenon
Structure is connected with pin fixation, and wooden stringer attaching simultaneously is fixed on corresponding steel structural embedded parts;Then on roofing portion upper berth
If chock, with expansion bolt, chock is fixed with concrete roof, shelve pocket rafter and fix the tail of pocket rafter with elongated stirrup
End is it is ensured that the stability of pocket rafter;Then, mouth wood and flying-rafter in attaching on pocket rafter, and then in each pocket on wooden stringer 41
Between rafter, nail is provided with lock rafter plate 9.For extending the service life of wooden component, preferably repave last layer ointment with waterproof sealing;Finally
In rolled roof cover tile.
In sum, in building in the style of the ancients, its advantage is embodied in application implementation this utility model Mu Gou pavilion eaves assembly:
The stress of wooden component is depended on the girder construction plate of concrete by the program, take full advantage of the good globality of xoncrete structure,
Durable refractory, and the construction costs of economy and maintenance cost, and by integrating the pavilion eaves assembly of wooden structure, make concrete master
Body has been assigned the abundant visual hierarchy sense of wooden component, has embodied the style of ancient building in appearance.
Claims (7)
1. the Mu Gou pavilion eaves assembly of building in the style of the ancients, the girder construction plate based on concrete is constituted, and described girder construction plate has one and becomes
The roofing portion of type, outside beam portion and inner side beam portion, and from inner side beam portion, beam portion is in dip down ramp-like, two beams laterally in roofing portion
Portion set at a distance and withdraw to respectively phase attaching pin inner side it is characterised in that: described Mu Gou pavilion eaves assembly is extremely
Few it is made up of pin, wooden stringer, wooden a long thick piece of timber shaped like a square pillar, pocket rafter, flying-rafter, inner mouth wood and by steel structural embedded parts, expansion bolt, elongated
Stirrup fixation is assembled in girder construction plate, and wherein said wood stringer, pin, wooden a long thick piece of timber shaped like a square pillar attaching are fixed on and are embedded in medial and lateral respectively in advance
On the steel structural embedded parts of beam portion;Roofing portion is connected with chock by expansion bolt, and described pocket rafter is held on chock and pocket
Rafter afterbody is fixed on elongated stirrup, and in the top attaching of pocket rafter, mouth wood and flying-rafter, are provided with lock rafter plate between wooden stringer.
2. according to claim 1 building in the style of the ancients Mu Gou pavilion eaves assembly it is characterised in that: described wood stringer pass through steel construction
Built-in fitting lies across and is secured to the positive top side of outside beam portion, and is connected to wood even machine, the woodcarving of hanging shape by wooden a long thick piece of timber shaped like a square pillar Tenon
Flower Jia Tang, wooden corridor a tree, used in making timber for boats and wooden pin, described pin combines wooden a long thick piece of timber shaped like a square pillar and is vertically secured to inner side beam portion by steel structural embedded parts
Just laterally.
3. according to claim 2 building in the style of the ancients Mu Gou pavilion eaves assembly it is characterised in that: described steel structural embedded parts have
Vertical substrate and its one side vertically integrally formed board integrally formed four support feets vertical with another side,
And a kind of board of the steel structural embedded parts setting between corresponding wood stringer is in level to a kind of steel construction at corresponding pin position
The board of built-in fitting is in vertically to described support feet is plugged in corresponding inner side beam portion or beam portion positioning steel construction in outside is pre-buried
Part.
4. according to claim 2 building in the style of the ancients Mu Gou pavilion eaves assembly it is characterised in that: described wood corridor a tree, used in making timber for boats and pin between
Setting up attaching has the pavilion rafter of arch and its pavilion beam of downside attaching, and the top of described pavilion rafter is less than the bottom surface of outside beam portion.
5. according to claim 4 building in the style of the ancients Mu Gou pavilion eaves assembly it is characterised in that: the top surface of described pavilion rafter is equipped with
Thin sheathing tile.
6. according to claim 2 building in the style of the ancients Mu Gou pavilion eaves assembly it is characterised in that: described wood peg ends mounting set
Wood is had to hang foot carving basket.
7. according to claim 2 building in the style of the ancients Mu Gou pavilion eaves assembly it is characterised in that: along inboard beams minister's degree to distribution
It is provided with more than two pins, and be provided with wooden a long thick piece of timber shaped like a square pillar and wooden clamp for carving hall two-by-two between pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620847117.8U CN205907920U (en) | 2016-08-08 | 2016-08-08 | Archaize building's wood constructs high eaves subassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620847117.8U CN205907920U (en) | 2016-08-08 | 2016-08-08 | Archaize building's wood constructs high eaves subassembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205907920U true CN205907920U (en) | 2017-01-25 |
Family
ID=57804180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620847117.8U Active CN205907920U (en) | 2016-08-08 | 2016-08-08 | Archaize building's wood constructs high eaves subassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205907920U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005287A (en) * | 2017-12-28 | 2018-05-08 | 北京城建亚泰建设集团有限公司 | Steel construction roof structure modelled after an antique |
CN110075544A (en) * | 2019-06-05 | 2019-08-02 | 张洋 | Pillar and a tree, used in making timber for boats component in pseudo-classic architecture model |
CN110805190A (en) * | 2019-10-24 | 2020-02-18 | 绿城房地产集团有限公司 | Two-part mountaineering roof |
CN110827662A (en) * | 2019-10-24 | 2020-02-21 | 绿城房地产集团有限公司 | Door head for entering door |
CN113047542A (en) * | 2021-03-17 | 2021-06-29 | 福建绿城建筑设计有限公司 | Novel node technology of traditional eaves mouth application in modern low-rise residence |
-
2016
- 2016-08-08 CN CN201620847117.8U patent/CN205907920U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005287A (en) * | 2017-12-28 | 2018-05-08 | 北京城建亚泰建设集团有限公司 | Steel construction roof structure modelled after an antique |
CN108005287B (en) * | 2017-12-28 | 2022-10-11 | 北京城建亚泰建设集团有限公司 | Steel construction roofing structure modelled after an antique |
CN110075544A (en) * | 2019-06-05 | 2019-08-02 | 张洋 | Pillar and a tree, used in making timber for boats component in pseudo-classic architecture model |
CN110805190A (en) * | 2019-10-24 | 2020-02-18 | 绿城房地产集团有限公司 | Two-part mountaineering roof |
CN110827662A (en) * | 2019-10-24 | 2020-02-21 | 绿城房地产集团有限公司 | Door head for entering door |
CN113047542A (en) * | 2021-03-17 | 2021-06-29 | 福建绿城建筑设计有限公司 | Novel node technology of traditional eaves mouth application in modern low-rise residence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205907920U (en) | Archaize building's wood constructs high eaves subassembly | |
CN203452205U (en) | Stud and cross beam structural assembly of wooden house | |
KR101730460B1 (en) | Korean-style houses constructed by using tradition wooden building constructing structure and steel structure and a construction method thereof | |
CN205907918U (en) | Archaize building moves back beam type wood and constructs eaves mouth | |
KR200451029Y1 (en) | A support assembly type for various facilities | |
CN205907915U (en) | Archaize building drapes over one's shoulders eaves | |
CN200992814Y (en) | Spliced combined type archaized building | |
CN207974347U (en) | European drop level furred ceiling | |
CN203452187U (en) | Gable top structural assembly of wooden house | |
CN207004101U (en) | Triangle tree room | |
CN205907919U (en) | Archaize building does not have concrete beam formula wood and constructs eaves mouth | |
CN204001283U (en) | A kind of grade beam of and the supporting Fast Installation of house wall | |
CN203452206U (en) | Column and floor beam structural assembly of wooden house | |
CN208701885U (en) | There is the large pillar net reinforcing bar of lateral support concrete roof beam modelled after an antique | |
CN205171797U (en) | Coupling mechanism of wood fossil fragments | |
CN204876394U (en) | Fixed revolving stage of integral type and stair | |
CN205907818U (en) | Dress tying of archaize building rush shoes head constructs | |
CN204626671U (en) | External-wall exterior insulation structure | |
CN201003212Y (en) | Movable support | |
CN206091156U (en) | Decoration member suitable for outer facade of building | |
CN205976000U (en) | Dress tying that archaize building wood constructs stringer constructs | |
KR200451005Y1 (en) | Prefabricated Shores for Facilities | |
CN206267457U (en) | A kind of Household ornament plate | |
CN205894535U (en) | No framework glass railing | |
CN204899112U (en) | Composite construction's T shape switching fossil fragments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |