CN205591073U - Novel assembled skating rink - Google Patents

Novel assembled skating rink Download PDF

Info

Publication number
CN205591073U
CN205591073U CN201620309423.6U CN201620309423U CN205591073U CN 205591073 U CN205591073 U CN 205591073U CN 201620309423 U CN201620309423 U CN 201620309423U CN 205591073 U CN205591073 U CN 205591073U
Authority
CN
China
Prior art keywords
many
gateway
connector
crossbeam
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620309423.6U
Other languages
Chinese (zh)
Inventor
张贵海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620309423.6U priority Critical patent/CN205591073U/en
Application granted granted Critical
Publication of CN205591073U publication Critical patent/CN205591073U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a novel assembled skating rink, relates to an athletic ground. The one end of assembled rail be provided with the access & exit, the well lower part of assembled rail is fixed with a plurality of steel couple all around along assembled rail, the waterproof cloth lay in assembled rail, ice surface is pour through a plurality of steel couple and assembled rail fixed connection in the edge all around of waterproof cloth in the space that the waterproof cloth encloses. Manufacturing process is simple, adopts the form of spare part equipment to install in a flexible way and to dismantle, can recycle, can realize buildding fast and dismantling environmental protection, energy -conservation, zero release, zero leakage, zero pollution moreover.

Description

A kind of novel assembled ice rink
Technical field
This utility model relates to a kind of athletic ground, especially a kind of novel assembled ice rink.
Background technology
Skating is one of main project of China's winter sports, especially the main content of courses of students in middle and primary schools' physical education of winter.At present most schools is that to carry out the ice rink that skating class casts be all based on existing playground, and surrounding adds deburring edge, the most repeatedly waters, and is frozen into the ice face of respective thickness, carrying out skating teaching and training;After the skating phase, ice face is dissolved naturally, and the edge, ice stadium of periphery is evened out again, recovers original playground, continues to adopt original sports items.The ice rink using above-mentioned conventional art to cast, is easily destroyed place, causes water resource waste, and environment easily damages formation water pollution.
Utility model content
The purpose of this utility model is to provide a kind of novel assembled ice rink, it can meet the primary demand of user, manufacturing process is simple, the form using parts to assemble can install and dismantle flexibly, can recycle, and it is capable of fast construction and dismounting, environmental protection, energy-conservation, zero-emission, zero leakage, no pollution.
Realize above-mentioned purpose, this utility model takes following technical proposals: a kind of novel assembled ice rink, including waterproof cloth, assembled fence, multiple steel hook, one end of described assembled fence is provided with gateway, the middle and lower part of assembled fence is fixed with multiple steel hook along assembled fence surrounding, described waterproof cloth is laid in assembled fence, and the edge of waterproof cloth is connected by multiple steels hook and assembled fence are fixing, pours ice face in the space that waterproof cloth surrounds.
Compared with prior art, the beneficial effects of the utility model are:
1. this utility model entirety uses the form assembled, and manufacturing process is simple, has feature detachable and that can be recycled.
2. this utility model is not limited by site condition, in the place specified, no matter how are shape, earth construction and composition, can realize quickly completing on the spot the fixing of the laying in ice stadium and edge under the surface conditions such as cement flooring, asphalt floor, timber floor, lawn, be rapidly completed the casting of ice face.After the skating phase, treating ablation, frozen water is used as pouring HUAMU around or plant is used, therefore, this utility model has more environmental protection, energy-conservation, zero-emission, zero leakage, the feature of no pollution.
Ice rink dismounting being removed, the component disassembled again with building another ice rink, and can will not destroy place, does not results in water resource waste, will not welding and formation water pollution.
Accompanying drawing explanation
Fig. 1 is the overall structure axonometric drawing of novel assembled ice rink of the present utility model;
Fig. 2 is the waterproof cloth scheme of installation of the ice rink shown in Fig. 1;
Component names shown in figure and label are as follows:
1-waterproof cloth;2-assembled fence;3-steel is linked up with;4-gateway;5-ice face;6-benzene plate cushion;21-entablature;22-middle cross beam;Inboard crossbeam under 23-;Outside crossbeam under 24-;25-upper pillar stand;26-lower pillar stand;27-tie-beam;28-cant beam;29-connector one;30-connector two;31-connector three;32-connector four.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment; technical scheme in this utility model is clearly and completely described; obviously; described embodiment is only a part of embodiment of utility model; rather than whole embodiments; based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
As shown in Fig. 1 ~ Fig. 2, the utility model discloses a kind of novel assembled ice rink, including waterproof cloth 1, assembled fence 2, multiple steels hook 3, gateway 4, ice face 5 and benzene plate cushion 6, one end of described assembled fence 2 is provided with gateway 4, assembled fence 2 includes many entablatures 21, many middle cross beams 22, inboard crossbeam 23 under many, outside crossbeam 24 under many, many upper pillar stands 25, many lower pillar stands 26, many tie-beams 27, many cant beams 28, multiple connectors 1, multiple connectors 2 30, multiple connectors 3 31 and multiple connector 4 32;nullMany described entablatures 21 head and the tail successively arrange one rectangle with gateway 4 of composition separately,Described many middle cross beams 22 are arranged with many entablature 21 one_to_one corresponding,Under described many, inboard crossbeam 23 is arranged with many middle cross beam 22 one_to_one corresponding,Under described many outside crossbeam 24 with many under inboard crossbeam 23 horizontal alignment one by one arrange,The head and the tail place separately of the most adjacent two entablatures 21 and be positioned at entablature 21 at described gateway 4 and be respectively arranged with a upper pillar stand 25 towards one end of gateway 4,Described many lower pillar stands 26 are arranged with many upper pillar stand 25 one_to_one corresponding,It is provided with many tie-beams 27 between the crossbeam 24 of outside under inboard crossbeam 23 and many under many,The head and the tail of the most adjacent two entablatures 21 are located to be provided with a cant beam 28 between separately with the head and the tail of outside crossbeam 24 under the most adjacent two separately,Entablature 21 at described gateway 4 is also equipped with a cant beam 28 towards one end of gateway 4 and the lower outside crossbeam 24 at gateway 4 between one end of gateway 4,The two ends of the most adjacent two entablatures 21 are removably connected by connector 1 respectively with the upper end of corresponding upper pillar stand 25 and the upper end of cant beam 28,It is positioned at entablature 21 at described gateway 4 to removably connect also by connector 1 towards one end of gateway 4 with the upper end of corresponding upper pillar stand 25 and the upper end of cant beam 28,The two ends of the most adjacent two middle cross beams 22 are removably connected by connector 2 30 respectively with the lower end of corresponding upper pillar stand 25 and the upper end of upper pillar stand 25,It is positioned at the lower end of the upper pillar stand 25 at gateway 4 and the upper end of corresponding lower pillar stand 26 and middle cross beam 22 to removably connect towards one end of gateway 4 also by connector 2 30,Under the most adjacent two, the inboard two ends of crossbeam 23 are removably connected by connector 3 31 respectively with one end of the lower end of corresponding lower pillar stand 26 and tie-beam 27,It is positioned at lower inboard crossbeam 23 at gateway 4 to removably connect also by connector 3 31 towards one end of gateway 4 with the lower end of corresponding lower pillar stand 26 and one end of tie-beam 27,Under the most adjacent two, the two ends of crossbeam 24, outside are removably connected by connector 4 32 respectively with the lower end of the other end of corresponding tie-beam 27 and cant beam 28,It is positioned at lower outside crossbeam 24 at gateway 4 to removably connect also by connector 4 32 towards one end of gateway 4 with the other end of corresponding tie-beam 27 and the lower end of cant beam 28;Many entablatures 21, many middle cross beams 22, inboard crossbeam 23 under many, outside crossbeam 24, many upper pillar stands 25, many lower pillar stands 26, many tie-beams 27 and many cant beams 28 are steel pipe under many, described steel pipe is square tube or pipe, and described pipe is preferred version;Multiple connectors 1, multiple connector 2 30, multiple connector 3 31 and multiple connector 4 32 are four-way connector, and concrete structure shape is purchased as required;The middle and lower part of assembled fence 2 is fixed with multiple steel hook 3 along assembled fence 2 surrounding, described multiple steels hook 3 is fixed on the lateral surface of many middle cross beams 22, described waterproof cloth 1 is laid in assembled fence 2, the edge of waterproof cloth 1 is connected by multiple steels hook 3 is fixing with assembled fence 2, ice face 5 is poured in the space that waterproof cloth 1 surrounds, described benzene plate cushion 6 is arranged on the surrounding in assembled fence 2, and benzene plate cushion 6 is arranged on above described ice face 5 and fixes and is attached on waterproof cloth 1.
During use, first ground is being specified to complete the laying in ice stadium and the fixing of edge the most on the spot;Casting the stage subsequently into ice face 5, after the molding of ice face 5, completion i.e. accused by ice rink, in the case of ice making is conditionally complete, only needs within 4-6 days, can complete and come into operation;After the skating phase required, frozen water being used as pouring around HUAMU or plant and is used, afterwards, remove assembled fence 2 and waterproof cloth 1, recover original ground shape, the facility disassembled can be again with building another ice rink.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this utility model with other dress bodily form formula.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes fallen in the implication of condition of equivalent and scope of claim included in this utility model.Should not be considered as limiting involved claim by any reference in claim.
In addition, it is to be understood that, although this specification is been described by according to embodiment, but the most each embodiment only comprises an independent technical scheme, this narrating mode of description is only for clarity sake, description should can also be formed, through appropriately combined, other embodiments that it will be appreciated by those skilled in the art that as an entirety, the technical scheme in each embodiment by those skilled in the art.

Claims (4)

1. a novel assembled ice rink, it is characterized in that: include waterproof cloth (1), assembled fence (2), multiple steels hook (3), one end of described assembled fence (2) is provided with gateway (4), the middle and lower part of assembled fence (2) is fixed with multiple steel hook (3) along assembled fence (2) surrounding, described waterproof cloth (1) is laid in assembled fence (2), the edge of waterproof cloth (1) is connected by multiple steels hook (3) and assembled fence (2) are fixing, ice face (5) is poured in the space that waterproof cloth (1) surrounds.
A kind of novel assembled ice rink the most according to claim 1, it is characterised in that: described assembled fence (2) includes many entablatures (21), many middle cross beams (22), inboard crossbeam (23) under many, outside crossbeam (24) under many, many upper pillar stands (25), many lower pillar stands (26), many tie-beams (27), many cant beams (28), multiple connector one (29), multiple connector two (30), multiple connector three (31) and multiple connector four (32);nullMany described entablatures (21) head and the tail successively arrange one rectangle with gateway (4) of composition separately,Many described middle cross beams (22) are arranged with many entablature (21) one_to_one corresponding,Under described many, inboard crossbeam (23) is arranged with many middle cross beam (22) one_to_one corresponding,Under described many outside crossbeam (24) with many under inboard crossbeam (23) horizontal alignment one by one arrange,The head and the tail place separately of the most adjacent two entablatures (21) and be positioned at the entablature (21) at described gateway (4) place and be respectively arranged with a upper pillar stand (25) towards the one end of gateway (4),Many described lower pillar stands (26) are arranged with many upper pillar stand (25) one_to_one corresponding,Under many inboard crossbeam (23) with many under outside be provided with many tie-beams (27) between crossbeam (24),The head and the tail of the most adjacent two entablatures (21) are located to be provided with a cant beam (28) between separately with the head and the tail in outside crossbeam (24) under the most adjacent two separately,It is positioned at the entablature (21) at described gateway (4) place one end towards gateway (4) and is positioned at lower outside crossbeam (24) at gateway (4) place and is also equipped with a cant beam (28) between one end of gateway (4),The two ends of the most adjacent two entablatures (21) are removably connected by connector one (29) respectively with the upper end of corresponding upper pillar stand (25) and the upper end of cant beam (28),It is positioned at the entablature (21) at described gateway (4) place to removably connect also by connector one (29) towards the one end of gateway (4) with the upper end of corresponding upper pillar stand (25) and the upper end of cant beam (28),The two ends of the most adjacent two middle cross beams (22) are removably connected by connector two (30) respectively with the lower end of corresponding upper pillar stand (25) and the upper end of upper pillar stand (25),It is positioned at the lower end of upper pillar stand (25) at gateway (4) place and the upper end of corresponding lower pillar stand (26) and middle cross beam (22) to removably connect towards the one end of gateway (4) also by connector two (30),Under the most adjacent two, the inboard two ends of crossbeam (23) are removably connected by connector three (31) respectively with one end of the lower end of corresponding lower pillar stand (26) and tie-beam (27),It is positioned at the lower inboard crossbeam (23) at gateway (4) place to removably connect also by connector three (31) towards the one end of gateway (4) with the lower end of corresponding lower pillar stand (26) and one end of tie-beam (27),Under the most adjacent two, the two ends in outside crossbeam (24) are removably connected by connector four (32) respectively with the lower end of the other end of corresponding tie-beam (27) and cant beam (28),It is positioned at lower outside crossbeam (24) at gateway (4) place to removably connect also by connector four (32) towards the one end of gateway (4) with the other end of corresponding tie-beam (27) and the lower end of cant beam (28).
A kind of novel assembled ice rink the most according to claim 2, it is characterised in that: described multiple steels hook (3) are fixed on the lateral surface of many middle cross beams (22).
4. according to a kind of novel assembled ice rink described in claim 1,2 or 3, it is characterized in that: described novel assembled ice rink also includes benzene plate cushion (6), described benzene plate cushion (6) is arranged on the surrounding in assembled fence (2), and benzene plate cushion (6) is arranged on above described ice face (5) and fixes and is attached on waterproof cloth (1).
CN201620309423.6U 2016-04-14 2016-04-14 Novel assembled skating rink Expired - Fee Related CN205591073U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620309423.6U CN205591073U (en) 2016-04-14 2016-04-14 Novel assembled skating rink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620309423.6U CN205591073U (en) 2016-04-14 2016-04-14 Novel assembled skating rink

Publications (1)

Publication Number Publication Date
CN205591073U true CN205591073U (en) 2016-09-21

Family

ID=56923123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620309423.6U Expired - Fee Related CN205591073U (en) 2016-04-14 2016-04-14 Novel assembled skating rink

Country Status (1)

Country Link
CN (1) CN205591073U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356409A (en) * 2018-10-11 2019-02-19 金诺恒健体育发展(天津)有限公司 A kind of class ice training court comprising safety device
CN109403183A (en) * 2018-12-14 2019-03-01 金诺恒晟(天津)高新科技有限公司 A kind of dismountable moving class ice, true ice stadium ground ground structure
CN113718588A (en) * 2021-09-06 2021-11-30 北京城建亚泰建设集团有限公司 Stair opening sealing cover plate for realizing full ice surface of speed skating hall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356409A (en) * 2018-10-11 2019-02-19 金诺恒健体育发展(天津)有限公司 A kind of class ice training court comprising safety device
CN109356409B (en) * 2018-10-11 2024-04-16 金诺恒健体育发展(天津)有限公司 Ice-like training field comprising safety protection device
CN109403183A (en) * 2018-12-14 2019-03-01 金诺恒晟(天津)高新科技有限公司 A kind of dismountable moving class ice, true ice stadium ground ground structure
CN109403183B (en) * 2018-12-14 2024-04-16 金诺恒晟(天津)高新科技有限公司 Detachable movable ice-like and true ice field ground structure
CN113718588A (en) * 2021-09-06 2021-11-30 北京城建亚泰建设集团有限公司 Stair opening sealing cover plate for realizing full ice surface of speed skating hall

Similar Documents

Publication Publication Date Title
CN106088530B (en) Large area method for constructing terrace
CN103899088B (en) Large span ultra-thin overlength cast-in-situ clear-water concrete Slate hanging construction method
CN205591073U (en) Novel assembled skating rink
CN106759462B (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
CN106284044A (en) A kind of Novel steel concrete composite bridge and construction method thereof
CN106760110B (en) Based on BIM profiled sheet-armored concrete hollow sandwich floor construction engineering method
CN109750829A (en) The construction method that the unit-combination type support system of deformation monitoring automation is early torn open
CN105755954B (en) A kind of construction technology of intercommunication clear-water concrete anticollision barrier
CN204212042U (en) Prefabricated ultra-high performance concrete π shape bridge construction
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN110284702A (en) A kind of constructing device and construction method of hyperboloid arc mixed mud wall
CN206599798U (en) Advanced water-stop post-pouring belt of foundation slab structure
CN103161176A (en) Tower crane foundation construction method in main building connected garage
CN104831932A (en) Construction technology for high-grade concrete column base
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN104647587B (en) Combined sleeve driving type steel structure girder fabricating table seat and prefabricated box girder combined sleeve driving method
CN203846523U (en) Combined tower crane foundation
CN104453235B (en) Current conversion station fire wall construction technology
CN207846471U (en) Partly inverse for road tunnel makees underground structure
CN103578346A (en) Teaching simulation structural body of simply-supported girder bridge
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN110565549A (en) New bridge dismantling process for urban viaduct
CN106592438B (en) Twin shaft pier and middle binder truss move integrally construction method
CN202622992U (en) Universal-type post-tensioned T-beam precast pedestal with detachable modules and adjustable steel members
CN209084167U (en) Cross a river segment pipe aerial construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

Termination date: 20180414

CF01 Termination of patent right due to non-payment of annual fee