CN206385568U - A kind of city integrated piping lane hoisting ring device - Google Patents

A kind of city integrated piping lane hoisting ring device Download PDF

Info

Publication number
CN206385568U
CN206385568U CN201621489284.6U CN201621489284U CN206385568U CN 206385568 U CN206385568 U CN 206385568U CN 201621489284 U CN201621489284 U CN 201621489284U CN 206385568 U CN206385568 U CN 206385568U
Authority
CN
China
Prior art keywords
buried
suspension ring
attaching nut
ring body
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621489284.6U
Other languages
Chinese (zh)
Inventor
尤兆云
王新福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Zhongli Pipe Corridor Technology Co Ltd
Original Assignee
Ningxia Zhongli Pipe Corridor Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Zhongli Pipe Corridor Technology Co Ltd filed Critical Ningxia Zhongli Pipe Corridor Technology Co Ltd
Priority to CN201621489284.6U priority Critical patent/CN206385568U/en
Application granted granted Critical
Publication of CN206385568U publication Critical patent/CN206385568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of city integrated piping lane hoisting ring device, including suspension ring body and pre-buried connection component, the pre-buried connection component, which is located at the top of city integrated piping lane Lang Ding, to be poured at component inner bottom part position, the pre-buried connection component bottom pours member bottom section and is in communication with the outside positioned at the top, the suspension ring body pours component lower position positioned at the top, and the suspension ring body is detachably fixed with the pre-buried connection component and is connected.A kind of city integrated piping lane hoisting ring device of the present utility model is simple in construction, easy for installation, accurate positioning, can be fixedly secured, cost it is low, greatly shorten the construction period.

Description

A kind of city integrated piping lane hoisting ring device
Technical field
The utility model is related to a kind of hoisting ring device, more particularly to a kind of city integrated piping lane hoisting ring device.
Background technology
At present, the communal facility such as electric power, communication, water and heat provision, combustion gas, directly buried for a long time or independent block ditch is worn Pipe, due to a lack of unified planning design, causes all kinds of pipelines to interlock layout, and each supervisor does things in his own way, meanwhile, to dilatation and repair band It is inconvenient to come.Frequently " road slide fastener " makes troubles to urban transportation and people's lives every year, and " sea is seen in city " is even more to threaten People people and the safety of property.City integrated piping lane construction is in the starting stage, and construction technology is conventional method, and formwork is still adopted With scaffold and wood glue plate mode, formwork error is big, quality control difficulties, and the consumption of materials such as wood glue plate scrapped is big, environment Influence is big, long construction period, and cost of labor is high, and engineering cost is big, and traffic impact is big.In use in city integrated piping lane Top directly suspension ring are embedded in concrete, so because suspension ring extend downwardly from template, bring difficulty to template construction, together Shi Wufa carries out the use of large-scale assembled template, seriously governs the construction speed and efficiency of pipe gallery, is constructed into This height, utilization rate are than relatively low.
The content of the invention
The utility model is completed to solve of the prior art not enough, and the purpose of this utility model is to provide one Kind of simple in construction, easy for installation, accurate positioning, can be fixedly secured, cost it is low, greatly shorten the city integrated pipe of construction period Corridor hoisting ring device.
A kind of city integrated piping lane hoisting ring device of the present utility model, including suspension ring body and pre-buried connection component, it is described Pre-buried connection component, which is located at the top of city integrated piping lane Lang Ding, to be poured at component inner bottom part position, the pre-buried connection component bottom Portion pours member bottom section and is in communication with the outside positioned at the top, and the suspension ring body pours orientation under component positioned at the top Place is put, the suspension ring body is detachably fixed with the pre-buried connection component and is connected.
A kind of city integrated piping lane hoisting ring device of the present utility model can also be:
The pre-buried connection component includes at least one pre-buried attaching nut and at least one anchor rib, the pre-buried connection Nut is fixedly connected with the anchor rib bottom, and the anchor rib is poured in component positioned at the top, the pre-buried connection spiral shell Female bottom pours member bottom section positioned at the top and is in communication with the outside, the suspension ring body upper part and pre-buried attaching nut's spiral shell Line is connected.
The pre-buried attaching nut is fixedly connected with the anchor rib by pre-buried fixed plate, the pre-buried attaching nut bottom Surface is fixedly connected with the upper surface of the pre-buried fixed plate, the bottom of the anchor rib and the upper surface of the pre-buried fixed plate It is fixedly connected, the pre-buried fixed plate is located at the bottom that the top pours component, the pre-buried fixed plate and the pre-buried company Connected nut corresponding position offers pre-buried fixing hole, and the pre-buried attaching nut is connected by the pre-buried fixing hole with extraneous Logical, the suspension ring body upper part is threadedly coupled after passing through the pre-buried fixing hole from the bottom to top with the pre-buried attaching nut.
The pre-buried attaching nut is fixedly connected with the anchor rib by pre-buried fixed plate, on the pre-buried attaching nut Surface is fixedly connected with the lower surface of the pre-buried fixed plate, and the anchor rib bottom and the upper surface of the pre-buried fixed plate are consolidated Fixed connection, the pre-buried attaching nut pours member lower positioned at the top, the top pour member lower with it is described pre- Bury attaching nut position corresponding position and be provided with pre-buried connecting hole, the pre-buried attaching nut passes through the pre-buried connecting hole and the external world Connection, the suspension ring body upper part is threadedly coupled after passing through the pre-buried connecting hole from the bottom to top with the pre-buried attaching nut.
The suspension ring body upper part is threadedly coupled by suspension ring fixed plate with the pre-buried attaching nut, the suspension ring body It is hung in the suspension ring fixed plate middle position, the suspension ring fixed plate and is set with the pre-buried attaching nut position corresponding position Suspension ring fixing hole is equipped with, the lifting bolt connects through the suspension ring fixing hole with pre-buried attaching nut's screw thread from the bottom to top Connect.
The pre-buried attaching nut is fixedly connected with the anchor rib by embedded bar frame, the pre-buried attaching nut side Surface is fixedly connected with the side surface of the embedded bar frame, and the anchor rib bottom and the side surface of the embedded nut are fixed Connection, the pre-buried attaching nut pours member lower positioned at the top, the top pour member lower with it is described pre-buried Attaching nut position corresponding position is provided with pre-buried connecting hole, and the pre-buried attaching nut is connected by the pre-buried connecting hole with extraneous Logical, the suspension ring body upper part is threadedly coupled after passing through the pre-buried connecting hole from the bottom to top with the pre-buried attaching nut.
The pre-buried connection component include pre-buried direct-connected plate and at least one anchor rib, the anchor rib bottom with it is described pre- Bury direct-connected plate to be fixedly connected, at least two pre-buried internal thread holes, the suspension ring body are arranged at intervals with the pre-buried direct-connected plate Top is detachably fixed with the pre-buried direct-connected plate and is connected by being threadedly coupled with the pre-buried internal thread hole.
The suspension ring body upper part is detachably fixed with the pre-buried direct-connected plate by suspension ring fixed plate and is connected, the suspension ring Body is hung at corresponding with the pre-buried internal thread hole position in the suspension ring fixed plate middle position, the suspension ring fixed plate Place is provided with suspension ring fixing hole, and the lifting bolt connects through the suspension ring fixing hole with the internal thread hole screw thread from the bottom to top Connect and be detachably fixed and be connected with the pre-buried direct-connected plate.
The suspension ring body upper part integrally formed with or be fixed with suspension ring screw rod, the suspension ring screw rod and the pre-buried connection Component is threadedly coupled.
The suspension ring body lower part is arranged with rotating hoisting ring, and the suspension ring body is mutually set in that in the rotating hoisting ring In this ring.
A kind of city integrated piping lane hoisting ring device of the present utility model, including suspension ring body and pre-buried connection component, it is described Pre-buried connection component, which is located at the top of city integrated piping lane Lang Ding, to be poured at component inner bottom part position, the pre-buried connection component bottom Portion pours member bottom section and is in communication with the outside positioned at the top, and the suspension ring body pours orientation under component positioned at the top Place is put, the suspension ring body is detachably fixed with the pre-buried connection component and is connected.So, by pre-buried company during pouring Connected components are shelved according to fixed arrangement mode arrangement in advance, are then poured, pour the rear pre-buried connection component Bottom is concordant with the bottom that the top pours component or is slightly higher than the bottom that the top pours component, and to ensure The bottom of pre-buried connection component is in communication with the outside, facilitate the top of suspension ring body by various modes and various connectors with it is pre-buried The bottom of connection component carries out detachable be connected.It is directly pre-buried into job site casting process to set described pre-buried Connection component, during pipe gallery use, it is not necessary to play the measures such as screwed hole at the scene, it is only necessary to which connector is direct The installation of suspension ring can be completed by being connected with the pre-buried connection component, simple in construction, and greatly save manpower and materials, contraposition Accurately, it is not necessary to the step such as measure again, installation effectiveness is high, greatly shortens the construction period.And the pre-buried connection component and institute It is separated to state suspension ring body, and the pre-buried connection component is embedded in the top and poured in component, and institute is not protruded in its bottom State top to pour outside member bottom section, therefore casting process easy construction, type face is neat.The species for being also suspension ring body is can Selected with type of action, select shape and size of suspension ring body to be detachably fixed the pre-buried company according to application target On connected components, you can above-mentioned suspension ring body is removably fixed in the top of the city integrated piping lane, facilitates it to play a role, And after the suspension ring body is damaged, directly dismantle it is bad after more renew again.A kind of city of the present utility model is comprehensive Piping lane hoisting ring device is closed, the advantage relative to prior art is:Simple in construction, easy for installation, accurate positioning, can firmly it consolidate Fixed, cost is low, greatly shortens the construction period, later period maintenance cost is low.
Brief description of the drawings
A kind of city integrated pre-buried connection component first embodiment schematic diagram of piping lane hoisting ring device of Fig. 1 the utility model.
A kind of city integrated pre-buried connection component second embodiment schematic diagram of piping lane hoisting ring device of Fig. 2 the utility model.
A kind of city integrated pre-buried connection component 3rd embodiment schematic diagram of piping lane hoisting ring device of Fig. 3 the utility model.
A kind of city integrated pre-buried connection component fourth embodiment schematic diagram of piping lane hoisting ring device of Fig. 4 the utility model.
A kind of city integrated piping lane hoisting ring device first embodiment connection diagram of Fig. 5 the utility model.
A kind of other schematic diagram of city integrated piping lane hoisting ring device first embodiment of Fig. 6 the utility model.
A kind of city integrated piping lane hoisting ring device second embodiment connection diagram of Fig. 7 the utility model.
A kind of city integrated piping lane hoisting ring device 3rd embodiment connection diagram of Fig. 8 the utility model.
A kind of city integrated piping lane hoisting ring device first embodiment sectional view of Fig. 9 the utility model.
A kind of city integrated other sectional view of piping lane hoisting ring device first embodiment of Figure 10 the utility model.
A kind of city integrated piping lane hoisting ring device second embodiment sectional view of Figure 11 the utility model.
A kind of city integrated piping lane hoisting ring device 3rd embodiment sectional view of Figure 12 the utility model.
A kind of city integrated pre-buried connection component first embodiment sectional view of piping lane hoisting ring device of Figure 13 the utility model.
A kind of city integrated pre-buried connection component second embodiment sectional view of piping lane hoisting ring device of Figure 14 the utility model.
A kind of city integrated pre-buried connection component 3rd embodiment sectional view of piping lane hoisting ring device of Figure 15 the utility model.
A kind of city integrated piping lane hoisting ring device suspension ring species schematic diagram of Figure 16 the utility model.
Figure number explanation
1 ... suspension ring body 2 ... top pours component 3 ... anchor rib
4 ... pre-buried pre-buried fixed plate 8 ... the suspension ring fixed plates of attaching nut 5 ...
Pre-buried direct-connected plate 11 ... the suspension ring screw rod of 9 ... lifting bolts 10 ...
12 ... rotating hoisting ring 13 ... crotch 14 ... embedded bar frames
Embodiment
Fig. 1 below in conjunction with the accompanying drawings to Figure 16 makees further to a kind of city integrated piping lane hoisting ring device of the present utility model Describe in detail.
A kind of city integrated piping lane hoisting ring device of the present utility model, refer to the related each figures of Fig. 1 to Figure 15, including suspension ring Body 1 and pre-buried connection component, the pre-buried connection component, which is located at the top of city integrated piping lane Lang Ding, pours the inner bottom part of component 2 At position, the pre-buried connection component bottom pours the bottom of component 2 positioned at the top and is in communication with the outside, the suspension ring body 1 pours the lower position of component 2 positioned at the top, and the suspension ring body 1 is detachably fixed company with the pre-buried connection component Connect.So, pre-buried connection component is shelved according to fixed arrangement mode arrangement in advance during pouring, then carried out Pour, pour the rear pre-buried connection component bottom it is concordant with the bottom that the top pours component 2 or be slightly higher than or Person is slightly below the bottom that the top pours component 2, and to ensure that the bottom of pre-buried connection component is in communication with the outside, and conveniently hangs The top of ring body 1 carries out detachable connection by the bottom of various modes and various connectors and pre-buried connection component and consolidated It is fixed.It is directly pre-buried into job site casting process that the pre-buried connection component is set, during pipe gallery use, no Need to play the measures such as screwed hole at the scene, it is only necessary to which suspension ring can be completed by being directly connected connector with the pre-buried connection component Installation, simple in construction, and greatly save manpower and materials, contraposition is accurate, it is not necessary to the step, installation effectiveness such as measure again Height, greatly shortens the construction period.And the pre-buried connection component and the suspension ring body 1 are separated, the pre-buried connections Component is embedded in the top and poured in component 2, and its bottom is not protruded the top and poured outside the bottom of component 2, therefore pours Process easy construction, type face is neat.The species for being also suspension ring body 1 is can be selected with type of action, according to application target Shape and size of suspension ring body 1 is selected to be detachably fixed on the pre-buried connection component, you can by above-mentioned suspension ring sheet Body 1 is removably fixed in the top of the city integrated piping lane, facilitates it to play a role, and when the suspension ring body 1 is damaged Afterwards, directly dismantle it is bad after more renew again.A kind of city integrated piping lane hoisting ring device of the present utility model, relative to existing Having the advantages that technology is:Simple in construction, easy for installation, accurate positioning, can be fixedly secured, cost it is low, greatly shorten construction work Phase, later period maintenance cost is low.
A kind of city integrated piping lane hoisting ring device of the present utility model, refer to the related each figures of Fig. 1 to Figure 15, in above skill It can also be on the basis of art scheme:The pre-buried connection component includes at least one pre-buried attaching nut 4 and at least one anchor Gu muscle 3, the pre-buried attaching nut 4 is fixedly connected with the bottom of anchor rib 3, the anchor rib 3 is poured positioned at the top In component 2, the pre-buried bottom of attaching nut 4 pours the bottom of component 2 positioned at the top and is in communication with the outside, the suspension ring body 1 top is threadedly coupled with the pre-buried attaching nut 4.So, poured at the top in component 2 anchor rib 3 due to coagulation Soil is combined together, and the pre-buried attaching nut 4 is fixed on the bottom of anchor rib 3, the effect of the pre-buried attaching nut 4 It is that its internal thread is threadedly coupled with the top of the suspension ring body 1, and the bottom of the pre-buried attaching nut 4 is located at the top Pour the bottom of component 2 and be in communication with the outside, its effect being in communication with the outside be facilitate suspension ring body 1 top or connector with The internal thread hole exposed threaded connection, and then the suspension ring body 1 be fixed on the top pour the top of component 2.Certainly The quantity of the anchor rib 3 more than one, can be two or three or more, as long as it can be fixed on The top is poured in component 2, and it can improve the pre-buried attaching nut 4 and the fixation of component 2 is poured at the top Stability and fastness.Further preferred technical scheme is:The pre-buried attaching nut 4 is with the anchor rib 3 by pre-buried Fixed plate 5 is fixedly connected, and the pre-buried basal surface of attaching nut 4 is fixedly connected with the upper surface of the pre-buried fixed plate 5, described The bottom of anchor rib 3 is fixedly connected with the upper surface of the pre-buried fixed plate 5, and the pre-buried fixed plate 5 is poured positioned at the top The bottom of component 2 is built, the pre-buried fixed plate 5 offers pre-buried fixing hole 6 with the pre-buried corresponding position of attaching nut 4, The pre-buried attaching nut 4 is in communication with the outside by the pre-buried fixing hole 6, and the top of suspension ring body 1 is passed through from the bottom to top It is threadedly coupled after the pre-buried fixing hole 6 with the pre-buried attaching nut 4.So, the bottom of the anchor rib 3 with it is described pre-buried Fixed plate 5 is fixed, and the pre-buried fixed plate 5 when push when can be effectively increased its half body stress with the top Pour the lifting surface area at the position contacted in component 2, and then improve stress non-deformability, and then by the anchor rib 3 More it is securely fixed in the top to pour inside component 2, generally improves the bearing capacity of suspension ring body 1.And it is described pre- Attaching nut 4 is buried in the pre-buried fixed plate 5, and the pre-buried attaching nut 4 is arranged in pre-buried fixing hole 6, The basal surface of pre-buried attaching nut 4 is concordant with the basal surface that the top pours component 2 or a little higher than top is poured Build component 2, the internal thread hole of so described pre-buried attaching nut 4 exposes, convenient top with the suspension ring body 1 or Connector is threadedly coupled, and the suspension ring body 1 is finally detachably secured into the top and poured on the basal surface of component 2, complete Into the installation of the suspension ring body 1.It can also be that the pre-buried attaching nut 4 is solid by pre-buried fixed plate 5 with the anchor rib 3 Fixed connection, the pre-buried upper surface of attaching nut 4 is fixedly connected with the lower surface of the pre-buried fixed plate 5, the bottom of anchor rib 3 Portion is fixedly connected with the upper surface of the pre-buried fixed plate 5, and the pre-buried attaching nut 4 is poured under component 2 positioned at the top Portion, the top pours the bottom of component 2 and the pre-buried position corresponding position of attaching nut 4 is provided with pre-buried connecting hole 7, described pre- Bury attaching nut 4 to be in communication with the outside by the pre-buried connecting hole 7, the top of suspension ring body 1 is from the bottom to top through described pre- Bury after connecting hole 7 and to be threadedly coupled with the pre-buried attaching nut 4.Such technical scheme is to use the pre-buried fixed plate 5 First the bottom of the anchor rib 3 is fixed together and increases lifting surface area, non-deformability is improved, improves suspension ring body 1 Bearing capacity.The pre-buried attaching nut 4 is fixed on to the lower section of the pre-buried fixed plate 5, i.e., described pre-buried connection spiral shell simultaneously The upper surface of mother 4 is fixedly connected with the lower surface of the pre-buried fixed plate 5.And poured at the top bottom of component 2 with it is described The pre-buried position corresponding position of attaching nut 4 is provided with the pre-buried connecting hole 7, and the pre-buried bottom of attaching nut 4 is arranged on described In pre-buried connecting hole 7, or the bottom of pre-buried attaching nut 4 offsets with the pre-buried connecting hole 7.As long as can will be described The internal thread hole of pre-buried attaching nut 4 exposes the top and pours the basal surface of component 2, facilitates the top of suspension ring body 1 It is threadedly coupled with the pre-buried attaching nut 4.Further preferred technical scheme is:The top of suspension ring body 1 passes through suspension ring Fixed plate is threadedly coupled with the pre-buried attaching nut 4, and the suspension ring body 1 is hung at the suspension ring fixed plate centre position The pre-buried position corresponding position of attaching nut 4 is provided with suspension ring fixing hole, the lifting bolt in place, the suspension ring fixed plate 9 are threadedly coupled through the suspension ring fixing hole with the pre-buried attaching nut 4 from the bottom to top.So, by 1 set of the suspension ring body The centre position of the suspension ring fixed plate is located at, then by the suspension ring fixed plate two ends or other parts and the pre-buried connection Nut 4 is detachably fixed, and then the suspension ring fixed plate is fixed on into the top poured on the basal surface of component 2, most institute at last State suspension ring body 1 and be fixed on the top and pour on the basal surface of component 2, be easy for installation and removal, and pour be embedded in it is described Top is poured inside component 2, it is not necessary to scene punching etc., saves man power and material.Specifically suspension ring are thread through the suspension ring Fixing hole is threadedly coupled with the pre-buried attaching nut 4 realizes its being detachably fixed with the pre-buried attaching nut 4.Can be with It is that the pre-buried attaching nut 4 is fixedly connected with the anchor rib 3 by embedded bar frame 14, the pre-buried attaching nut's 4 Side surface is fixedly connected with the side surface of the embedded bar frame 14,3, the anchor rib bottom and the side table of the embedded nut 4 Face is fixedly connected, and the pre-buried attaching nut 4 pours the bottom of component 2 positioned at the top, the top pour the bottom of component 2 with The position corresponding position of pre-buried attaching nut 4 is provided with pre-buried connecting hole, and the pre-buried attaching nut 4 passes through the pre-buried connection Hole is in communication with the outside, the top of suspension ring body 1 from the bottom to top pass through the pre-buried connecting hole after with the pre-buried attaching nut 4 Threaded connection.So it is fixed by embedded bar frame 14, most suspension ring body 1 is threadedly coupled with pre-buried attaching nut at last, And then above-mentioned suspension ring body 1 is detachably fixed is connected to the top and pours the bottom of component 2.
A kind of city integrated piping lane hoisting ring device of the present utility model, refer to the related each figures of Fig. 1 to Figure 15, in above skill It can also be on the basis of art scheme:The pre-buried connection component includes pre-buried direct-connected plate 10 and at least one anchor rib 3, described The bottom of anchor rib 3 is fixedly connected with the pre-buried direct-connected plate 10, and it is pre- to be arranged at intervals with least two on the pre-buried direct-connected plate 10 Bury internal thread hole, the top of suspension ring body 1 by be threadedly coupled with the pre-buried internal thread hole and with the pre-buried direct-connected plate 10 are detachably fixed connection.So, it is described to hang due to being arranged at intervals the pre-buried internal thread hole on the pre-buried direct-connected plate 10 The top of ring body 1 is threadedly coupled with the pre-buried internal thread hole, and then can by the suspension ring body 1 and the pre-buried direct-connected plate 10 Dismounting is fixedly connected, and most the suspension ring body 1 is removably fixed in the top and poured in component 2 at last, realizes the suspension ring The installation of body 1.It is easy for installation and removal, and pours and be embedded in the top and pour inside component 2, it is not necessary to scene punching Deng, save man power and material, be conveniently replaceable and select the suspension ring body 1 of different shape and species.Further preferred skill Art scheme is:The top of suspension ring body 1 is detachably fixed with the pre-buried direct-connected plate 10 by suspension ring fixed plate and is connected, described Suspension ring body 1 is hung in the suspension ring fixed plate middle position, the suspension ring fixed plate and the pre-buried internal thread hole position Put corresponding position and be provided with suspension ring fixing hole, the lifting bolt 9 is from the bottom to top through the suspension ring fixing hole and the internal thread Hole is threadedly coupled and is detachably fixed and is connected with the pre-buried direct-connected plate 10.So, the suspension ring body 1 is set in described hang The centre position of ring fixed plate, it is then that the suspension ring fixed plate two ends or other parts and the pre-buried direct-connected plate 10 are detachable It is fixed, the suspension ring fixed plate and the pre-buried direct-connected plate 10 are each attached to the top and pour component 2 by lifting bolt 9 On basal surface, most the suspension ring body 1 is fixed on the top and poured on the basal surface of component 2 at last.It is easy for installation and removal, and And the pre-buried direct-connected plate 10 and anchor rib 3 pour and are embedded in the top and pour inside component 2, it is not necessary to scene punching etc., Save man power and material.Specifically suspension ring are thread through the suspension ring fixing hole and are threadedly coupled reality with the pre-buried attaching nut 4 Its existing being detachably fixed with the pre-buried attaching nut 4.
A kind of city integrated piping lane hoisting ring device of the present utility model, refer to the related each figures of Fig. 1 to Figure 15, in above skill It can also be on the basis of art scheme:The top of suspension ring body 1 integrally formed with or be fixed with suspension ring screw rod 11, the suspension ring Screw rod 11 is threadedly coupled with the pre-buried connection component.The suspension ring body 1 on the top of so described suspension ring body 1 with above The pre-buried connection component threaded connection of the various structures of description.Be easy for installation and removal, it is convenient to change, bearing capacity it is strong and It is wide using scope.Further preferred technical scheme is:The bottom of suspension ring body 1 is arranged with rotating hoisting ring 12, the suspension ring Body 1 is mutually set in ring each other in the rotating hoisting ring 12.The effect for setting rotating hoisting ring 12 is conveniently to change its angle And direction so that the final directionality of rotating hoisting ring 12 and switching performance used changes.
A kind of city integrated piping lane hoisting ring device of the present utility model, refer to the related each figures of Fig. 1 to Figure 15, in above skill It can also be on the basis of art scheme:The middle and lower part of anchor rib 3 is longitudinally disposed, and the top of anchor rib 3 is provided with laterally outward The bending bar of extension, the bending bar is poured inside component 2 positioned at the top.Such anchor rib 3, because top is set Put the bending bar extended laterally outward, the bending bar pours the inside of component 2 by being then situated on the top, can be significantly Improve the bearing capacity of suspension ring body 1.Further preferred technical scheme is:The end of the bending bar is provided with downwards in Entreat the crotch 13 of bending extension.Set further increase the anchor rib 3 after crotch 13 and the top pour between component 2 by Power area, further improves the bearing capacity of suspension ring body 1.
It is above-mentioned that only several specific embodiments in the utility model are illustrated, but can not be as of the present utility model Protection domain, equivalent change or modification or equal proportion amplification or contracting made by every design spirit according in the utility model It is small etc., it is deemed to fall protection domain of the present utility model.

Claims (10)

1. a kind of city integrated piping lane hoisting ring device, it is characterised in that:It is described pre-buried including suspension ring body and pre-buried connection component Connection component, which is located at the top of city integrated piping lane Lang Ding, to be poured at component inner bottom part position, the pre-buried connection component bottom position Member bottom section is poured in the top and is in communication with the outside, and the suspension ring body pours component lower position positioned at the top Place, the suspension ring body is detachably fixed with the pre-buried connection component and is connected.
2. a kind of city integrated piping lane hoisting ring device according to claim 1, it is characterised in that:The pre-buried connection component Including at least one pre-buried attaching nut and at least one anchor rib, the pre-buried attaching nut fixes with the anchor rib bottom Connection, the anchor rib is poured in component positioned at the top, and the pre-buried attaching nut bottom pours structure positioned at the top The bottom of part is simultaneously in communication with the outside, and the suspension ring body upper part is threadedly coupled with the pre-buried attaching nut.
3. a kind of city integrated piping lane hoisting ring device according to claim 2, it is characterised in that:The pre-buried attaching nut It is fixedly connected with the anchor rib by pre-buried fixed plate, pre-buried attaching nut's basal surface is upper with the pre-buried fixed plate Surface is fixedly connected, and the bottom of the anchor rib is fixedly connected with the upper surface of the pre-buried fixed plate, the pre-buried fixed plate The bottom of component is poured positioned at the top, the pre-buried fixed plate offers pre- with the pre-buried attaching nut corresponding position Bury fixing hole, the pre-buried attaching nut is in communication with the outside by the pre-buried fixing hole, the suspension ring body upper part by it is lower extremely On through being threadedly coupled with the pre-buried attaching nut after the pre-buried fixing hole.
4. a kind of city integrated piping lane hoisting ring device according to claim 2, it is characterised in that:The pre-buried attaching nut It is fixedly connected with the anchor rib by pre-buried fixed plate, under the pre-buried attaching nut upper surface and the pre-buried fixed plate Surface is fixedly connected, and the anchor rib bottom is fixedly connected with the upper surface of the pre-buried fixed plate, the pre-buried attaching nut Member lower is poured positioned at the top, the top pours member lower and set with the pre-buried attaching nut position corresponding position Have pre-buried connecting hole, the pre-buried attaching nut is in communication with the outside by the pre-buried connecting hole, the suspension ring body upper part by Under it is supreme pass through the pre-buried connecting hole after be threadedly coupled with the pre-buried attaching nut.
5. a kind of city integrated piping lane hoisting ring device according to claim 4, it is characterised in that:The suspension ring body upper part It is threadedly coupled by suspension ring fixed plate with the pre-buried attaching nut, the suspension ring body is hung in the middle of the suspension ring fixed plate At position, the pre-buried attaching nut position corresponding position is provided with suspension ring fixing hole, the suspension ring in the suspension ring fixed plate Bolt is threadedly coupled through the suspension ring fixing hole with the pre-buried attaching nut from the bottom to top.
6. a kind of city integrated piping lane hoisting ring device according to claim 2, it is characterised in that:The pre-buried attaching nut It is fixedly connected with the anchor rib by embedded bar frame, the pre-buried attaching nut side surface and the side of the embedded bar frame Surface is fixedly connected, and the anchor rib bottom is fixedly connected with the side surface of the embedded nut, the pre-buried attaching nut position Member lower is poured in the top, the top pours member lower and is provided with the pre-buried attaching nut position corresponding position Pre-buried connecting hole, the pre-buried attaching nut is in communication with the outside by the pre-buried connecting hole, and the suspension ring body upper part is under It is supreme pass through the pre-buried connecting hole after be threadedly coupled with the pre-buried attaching nut.
7. a kind of city integrated piping lane hoisting ring device according to claim 1, it is characterised in that:The pre-buried connection component Including pre-buried direct-connected plate and at least one anchor rib, the anchor rib bottom is fixedly connected with the pre-buried direct-connected plate, described pre- Bury and at least two pre-buried internal thread holes be arranged at intervals with direct-connected plate, the suspension ring body upper part by with the pre-buried internal thread Hole is threadedly coupled and is detachably fixed and is connected with the pre-buried direct-connected plate.
8. a kind of city integrated piping lane hoisting ring device according to claim 7, it is characterised in that:The suspension ring body upper part It is detachably fixed and is connected with the pre-buried direct-connected plate by suspension ring fixed plate, the suspension ring body is hung at the suspension ring fixed plate The pre-buried internal thread hole position corresponding position is provided with suspension ring fixing hole in middle position, the suspension ring fixed plate, it is described Lifting bolt is threadedly coupled with the internal thread hole through the suspension ring fixing hole and can with the pre-buried direct-connected plate from the bottom to top Dismounting is fixedly connected.
9. according to a kind of city integrated piping lane hoisting ring device described in claim 1 to 8 any one claim, its feature exists In:The suspension ring body upper part integrally formed with or be fixed with suspension ring screw rod, the suspension ring screw rod and the pre-buried connection component Threaded connection.
10. a kind of city integrated piping lane hoisting ring device according to claim 9, it is characterised in that:Under the suspension ring body Portion is arranged with rotating hoisting ring, and the suspension ring body is mutually set in ring each other in the rotating hoisting ring.
CN201621489284.6U 2016-12-30 2016-12-30 A kind of city integrated piping lane hoisting ring device Active CN206385568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621489284.6U CN206385568U (en) 2016-12-30 2016-12-30 A kind of city integrated piping lane hoisting ring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621489284.6U CN206385568U (en) 2016-12-30 2016-12-30 A kind of city integrated piping lane hoisting ring device

Publications (1)

Publication Number Publication Date
CN206385568U true CN206385568U (en) 2017-08-08

Family

ID=59491730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621489284.6U Active CN206385568U (en) 2016-12-30 2016-12-30 A kind of city integrated piping lane hoisting ring device

Country Status (1)

Country Link
CN (1) CN206385568U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759479A (en) * 2016-12-30 2017-05-31 宁夏众力管廊科技有限公司 A kind of city integrated piping lane hoisting ring device
CN110385783A (en) * 2019-06-24 2019-10-29 中国一冶集团有限公司 The prefabricated components and construction method of pre-buried hanging ring in a kind of pipe gallery plate member

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759479A (en) * 2016-12-30 2017-05-31 宁夏众力管廊科技有限公司 A kind of city integrated piping lane hoisting ring device
CN106759479B (en) * 2016-12-30 2020-09-04 宁夏众力管廊科技有限公司 City utility tunnel rings device
CN110385783A (en) * 2019-06-24 2019-10-29 中国一冶集团有限公司 The prefabricated components and construction method of pre-buried hanging ring in a kind of pipe gallery plate member

Similar Documents

Publication Publication Date Title
CN203903834U (en) Internal-climbing tower crane
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN205062668U (en) Light -duty pier bent cap of highway construction segmental timbering
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN212128885U (en) Flange plate connecting device for support and concrete foundation
CN210263929U (en) A preformed hole template for building civil engineering
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN208039809U (en) The closed small space plate device of reinforced concrete structure
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN206467580U (en) A kind of reinforced bridge pier
CN206189607U (en) Rag bolt location structure
CN106759479A (en) A kind of city integrated piping lane hoisting ring device
CN104878700A (en) Truss and formwork
CN202001787U (en) Detachable ground anchor of tower crane
CN207761052U (en) A kind of girder steel and steel column connecting node
CN208167780U (en) A kind of foundation bolt mounting device
CN206267039U (en) A kind of jack support platform of hollow slab girder jack-up construction
CN207073118U (en) Dam hangs the concrete prefabricated formwork structure of body by the feet
CN207862787U (en) A kind of pin-connected panel slideway
CN202108299U (en) Segmented assembled water tank tower with adjustable height
CN206128108U (en) Prestressing force bucket foundation of removable crab -bolt
CN105386521B (en) The beam and post module for building frame can be assembled
CN205444443U (en) Adopt environment -friendly type wall body's building window subassembly structure
CN204370796U (en) Hoistway formwork platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant