CN205574936U - Prefab conveyer - Google Patents

Prefab conveyer Download PDF

Info

Publication number
CN205574936U
CN205574936U CN201620096434.0U CN201620096434U CN205574936U CN 205574936 U CN205574936 U CN 205574936U CN 201620096434 U CN201620096434 U CN 201620096434U CN 205574936 U CN205574936 U CN 205574936U
Authority
CN
China
Prior art keywords
prefabricated component
sub
travelling bogie
mast
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620096434.0U
Other languages
Chinese (zh)
Inventor
王安徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Minsheng Zhuyou Co Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201620096434.0U priority Critical patent/CN205574936U/en
Application granted granted Critical
Publication of CN205574936U publication Critical patent/CN205574936U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model provides a prefab conveyer, including prefab travelling bogie, prefab hoisting trolley and walking track, prefab travelling bogie and prefab hoisting trolley are in move on the walking track, the prefab travelling bogie is used for the transportation of prefab, prefab hoisting trolley is used for arriving the prefab handling on the prefab travelling bogie, the prefab travelling bogie including sub - travelling bogie more than two, is connected between two adjacent sub - travelling bogies, the one end of prefab travelling bogie with prefab hoisting trolley links to each other. Like this, reduced the hoist and mount transportation time, practiced thrift production line place area occupied.

Description

A kind of prefabricated component conveying arrangement
Technical field
This utility model relates to construction engineering technical field, particularly to a kind of prefabricated component conveying arrangement.
Background technology
Along with the development of building trade, current various precast concretes have been widely used in various building In.Producing of precast concrete typically uses production line and the mode of supply line combination.In preform production During, due to prefabricated component quality weight, volume greatly, transport process is wasted time and energy, it is often necessary to use driving Or the crane lifting such as crane, then it is transported through by prefabricated component transport vehicle.But, use driving or lifting The hoisting prefabricated part of machine, not only occupied ground, lifting efficiency is relatively low, and existing prefabricated component transport vehicle is also required to Designing special transport channel, it is also desirable to occupied ground, therefore, design one lifting efficiency is high, place accounts for With the low prefabricated component conveying arrangement of rate, become those skilled in the art and be badly in need of solving the technical problem that.
Summary of the invention
This utility model solves the technical problem that and is: providing a kind of prefabricated component conveying arrangement, it can improve prefabricated The lifting efficiency of part, saves place area occupied.
Solution of the present utility model is achieved in that a kind of prefabricated component conveying arrangement, including in advance Product travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated component hang Dress dolly runs on described walking track, and described prefabricated component travelling bogie is for the transport of prefabricated component, described Prefabricated component lifting trolley is used for prefabricated component handling to described prefabricated component travelling bogie;Described prefabricated component transports Dolly, including the sub-travelling bogie of two or more, is connected between two adjacent sub-travelling bogies, described prefabricated One end of part travelling bogie is connected with described prefabricated component lifting trolley.So, described prefabricated component travelling bogie and Prefabricated component lifting trolley runs on described walking track, and prefabricated component lifting trolley is for arriving prefabricated component handling On described prefabricated component travelling bogie, prefabricated component travelling bogie and prefabricated component lifting trolley run on same track, Decrease the lifting transhipment time, save production line place area occupied, simultaneously that production line is whole with material flow line Amount to line, not only solve material line floor space problem, and can also avoid occur material report to the leadship after accomplishing a task blocking Problem.It addition, when prefabricated component travelling bogie is made up of the sub-travelling bogie of two or more, described prefabricated component is transported One end of defeated dolly is connected with described prefabricated component lifting trolley, described prefabricated component travelling bogie in transportation, Carried the two ends of prefabricated component by sub-travelling bogie respectively, make sub-travelling bogie by the bridge joint effect of prefabricated component Being linked to be entirety, the distance between sub-travelling bogie can adapt to adjust, such as sub-transport according to the length of prefabricated component Dolly bogey uses when can do the movable bearing device horizontally rotated so that prefabricated component travelling bogie can be The least stroke inside turn, it is possible to decrease the site area that transit route takies, is particularly well-suited to overlength prefabricated component Transport.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-travelling bogie includes son Bogey and sub-walking mechanism, described sub-walking mechanism is arranged on the bottom of sub-bogey, described sub-line Walking mechanism and include sub-driving means and at least two group sub-line travelling wheels, described sub-driving means drives at least a part of which one Group sub-line travelling wheel motion.So, sub-travelling bogie can be walked voluntarily by sub-walking mechanism, independent operating.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-bogey includes two Bar longitudinal bracing frame and at least two cross-brace framves, the two ends of described cross-brace frame respectively with described two Longitudinal bracing frame connects, and described cross-brace frame forms carrying platform with longitudinal bracing frame.So, group holds Carry to put and include at least two longitudinal bracing framves and at least two cross-brace framves, the two of described cross-brace frame End is when being connected with described two longitudinal bracing framves respectively, is lifted at boom hoisting and is placed to son by prefabricated component and holds Carrying after putting, contacting between prefabricated component with sub-bogey is linear contact lay, has not only saved bogey Weight and material, lay always according to its force way, effectively prevent prefabricated component from fractureing damage.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-line travelling wheel is arranged on institute State the bottom of longitudinal bracing frame.So, when group road wheel is arranged on the bottom of described longitudinal bracing frame, son The load of bogey and prefabricated component can be handed on sub-line travelling wheel by straight-line transmitting, decreases sub-line travelling wheel wheel shaft Moment of torsion, its deformed damaged under big load effect can be prevented.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-bogey also includes Adjusting means, described adjusting means is the sliding rail being arranged on described longitudinal bracing frame, described horizontal Support is slidably connected with described longitudinal bracing frame by sliding rail.So, regulated by sliding rail, Easy to operate simple, the amplitude of accommodation is easily controlled, and the safety being conducive to raising prefabricated component travelling bogie can By property.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-travelling bogie also includes Vehicle body, described sub-bogey is arranged on the top of vehicle body, and described sub-line travelling wheel is arranged on the bottom of vehicle body. So, when sub-bogey is arranged on the top of vehicle body, during transport prefabricated component, the one of prefabricated component End directly rests on sub-travelling bogie, by between deadweight and prefabricated component and the sub-travelling bogie of prefabricated component Frictional force, it is achieved the connection between sub-travelling bogie.
Another technical scheme of the present utility model is on above-mentioned basis, described sub-bogey include to Lacking two cross-brace framves, the bottom of described cross-brace frame is fixed with described body top section, described horizontal Carrying platform is formed at the top of support.So, group bogey includes at least two cross-brace framves, horizontal Fix with described body top section to the bottom of bracing frame, when carrying platform is formed at the top of cross-brace frame, After prefabricated component is lifted and is placed on sub-bogey by boom hoisting, between prefabricated component and sub-bogey Contact for linear contact lay, is laid according to its force way, can effectively prevent prefabricated component from fractureing damage.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-bogey also includes Adjusting means, described adjusting means is to be arranged on the sliding rail at described vehicle body top, described cross-brace frame It is connected with described vehicle body top slide by sliding rail.So, by being arranged on the slip rail at vehicle body top Road regulates, and easy to operate simple, the amplitude of accommodation is easily controlled, and is conducive to improving prefabricated component transport little The security reliability of car.
Another technical scheme of the present utility model is on above-mentioned basis, and described sub-travelling bogie is at least One end is provided with alignment pin or hole, location or hook.So, at least one end at sub-travelling bogie is provided with and determines After position pin or hole, location or hook, the sub-travelling bogie of prefabricated component can easily with other traction apparatuss or many Individual sub-travelling bogie connects traction, facilitate that production line is longer, prefabricated component more in the case of use, particularly Prefabricated component travelling bogie and the docking of boom hoisting platform are fixed and are accurately positioned, can be easily by orbital docking Accurately so that it is can successfully smoothly transit on boom hoisting platform and sub-bogey walking.
Another technical scheme of the present utility model is on above-mentioned basis, adjacent described sub-travelling bogie it Between connected by chain, the vehicle body of described sub-travelling bogie is provided with chain storage chamber.So, sub-transport Being connected by chain between dolly, many sub-travelling bogies can connect in column, it is simple to the transfer of sub-travelling bogie, Being provided with chain storage chamber on the vehicle body of described sub-travelling bogie, when need not chain and connecting, chain is received In storage chamber so that the use of sub-travelling bogie is convenient simply.
Another technical scheme of the present utility model is on above-mentioned basis, described prefabricated component lifting trolley bag Including hanging apparatus and walking mechanism, described walking mechanism is arranged on the bottom of hanging apparatus, described hanging apparatus Including mast-up and hook assembly, described mast-up is cantilever design, and described hook assembly can be in described lifting Move on the cantilever of frame;Described walking mechanism include driving means and at least two groups lifting road wheel, described in drive Dynamic device drives at least a part of which one group lifting road wheel motion.So, above-mentioned prefabricated component lifting trolley is used Carry out hoisting prefabricated part, have the advantage that compared with traditional driving or crane loading, sling height is low, Range ability is little, simple to operate flexibly and low power consumption and other advantages, meanwhile, uses self-propelled wheel-type across production The mode operation of line both sides, its work flow is short, and particularly it is along the lifting of production line direction and the operation of movement Mode so that it is in operation process, prefabricated component does not have and significantly swings, and can prevent lifting trolley from toppling, Drastically increase the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up top is cantilever Frame, described cantilever shalving is provided with boom hoisting track, described hook assembly boom hoisting rail on described Move on road.So, mast-up being provided with boom hoisting track, described hook assembly rises on described Move on device for hoisting track, good stability during boom hoisting hoisting prefabricated part, will not wave and topple, fully protect Demonstrate,prove the safety of operation.Simultaneously as described mast-up top is cantilever shalving, such hook assembly is outstanding On jib, the scope of movement can be more than the width bottom mast-up, it is possible to achieve do not move bottom mast-up In the case of, carry out cantilever lifting, improve lifting efficiency.
Another technical scheme of the present utility model is on above-mentioned basis, and described lifting road wheel is arranged on The bottom of described mast-up.So, when road wheel is arranged on the bottom of described mast-up, lifting trolley weight The heart is low, and it is along the lifting of production line direction and the operating type of movement so that it is in operation process, prefabricated Part does not have and significantly swings, and can prevent lifting trolley from toppling, improve the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, bottom described hanging apparatus End is provided with built-in fitting placement mechanism, and described built-in fitting placement mechanism is for placing produce needed for prefabricated component pre- Embedded part;Or at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, described limit mould fixes machine Structure picks and places for limit mould.So, during preform production, can be by lifting trolley by reinforcing bar, steel Muscle mesh sheet, reinforcing bar, steel skeleton or limit mould transport to production line precalculated position, and are put down one by one, as This, advantageously reduce hand labor intensity, improves production efficiency, reduces preform production cost.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up is inverted trapezoidal knot Structure, described mast-up is additionally provided with buttress brace, and described buttress brace forms multiple triangle with the skeleton of mast-up Shape structure.So, when mast-up is inverted trapezoidal structure, described mast-up is additionally provided with buttress brace, described When the skeleton of buttress brace and mast-up forms multiple triangular structure, significantly increase the stroke of boom hoisting, Make it lift by crane amplitude expanded, be conducive to lifting by crane the prefabricated component of ultra-wide, overlength;Further, triangular structure There is the most excellent stability so that it is be unlikely to deform in hoisting process.
Another technical scheme of the present utility model is on above-mentioned basis, the bottom of described mast-up or side Face is provided with counterweight device for hoisting.So, when the bottom of mast-up or side are provided with counterweight device for hoisting, Pass through counterweight so that the single-piece lifting weight of lifting trolley is greatly improved, meanwhile, its operation amplitude, Run span and the speed of service, stability and safety have also been obtained reinforcement further.
Another technical scheme of the present utility model is on above-mentioned basis, described hook assembly include suspension hook, Lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.So, use motor as lifting During actuating unit, hoisting prefabricated part controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative.
Another technical scheme of the present utility model is that, on above-mentioned basis, described hook assembly includes two Suspension hook and two motors, said two suspension hook interval layout, two motors individually drive on two suspension hooks Lower movement;Or described hook assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, Described motor drives two suspension hooks to move up and down.So, suspension hook interval is used to arrange, when hoisting prefabricated part, Can lift by flat condition, improve the translation stability of lifting trolley, be particularly prone to flat board and pile up, make plate body It is not easily susceptible to damage, and so that the relatively low height i.e. Liftable that lifts by crane of prefabricated component completes.
Another technical scheme of the present utility model is that, on above-mentioned basis, the bottom of described mast-up is extremely Few one end is provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley by fixed Position pin or hole, location are fixed.So, at least one end in the bottom of mast-up is provided with alignment pin or hole, location After, prefabricated component travelling bogie and prefabricated component lifting trolley are fixed by alignment pin or hole, location, and prefabricated component lifts Dolly can connect traction with other traction apparatuss or multiple travelling bogie easily, facilitate production line longer, Using in the case of prefabricated component is more, particularly prefabricated component lifting trolley and the docking of prefabricated component travelling bogie is fixing And be accurately positioned, can be accurate by orbital docking easily so that it is can be successfully at boom hoisting platform and holding Carry and put the walking that smoothly transits.
Another technical scheme of the present utility model is on above-mentioned basis, and described driving means is for driving horse Reach or drive motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.So, drive described in Dynamic device is for driving motor or driving motor;Prefabricated component lifting trolley controls simple, and technology realizes difficulty Relatively low, it is simple to operative;When described lifting road wheel is track rolling wheel or pneumatic tire, the most permissible Lifting road wheel is selected, it is possible to relatively easily meet the application in various different place according to practical situation.
Accompanying drawing explanation
The accompanying drawing constituting a part of the present utility model is further appreciated by of the present utility model for providing, this The schematic description and description of utility model is used for explaining this utility model, is not intended that this practicality new The improper restriction of type.
Fig. 1 is the front view of the prefabricated component conveying arrangement involved by a kind of embodiment of this technology;
Fig. 2 is a kind of embodiment of the prefabricated component travelling bogie shown in Fig. 1 in prefabricated component conveying arrangement Front view;
Fig. 3 is the structure of a kind of embodiment of the sub-travelling bogie shown in Fig. 2 in prefabricated component travelling bogie Schematic diagram;
Fig. 4 is a kind of embodiment of the prefabricated component lifting trolley shown in Fig. 1 in prefabricated component conveying arrangement Front view;
Fig. 5 is the another embodiment of the prefabricated component lifting trolley shown in Fig. 1 in prefabricated component conveying arrangement Front view;
Fig. 6 is a kind of embodiment of the prefabricated component lifting trolley shown in Fig. 1 in prefabricated component conveying arrangement Side view.
In figure:
1 hanging apparatus 11 mast-up 12 hook assembly
Boom hoisting track 2 walking mechanism on 13 buttress braces 14
21 driving means 22 lift road wheel 101 cross-brace frame
The 201 sub-driving means of sub-travelling bogie 202 chain 203
204 sub-line travelling wheel 205 vehicle bodies 206 are linked up with
207 chain storage chambeies
Detailed description of the invention
Being described in detail this utility model below in conjunction with the accompanying drawings, the description of this part is only exemplary reconciliation The property released, should not have any restriction effect to protection domain of the present utility model.Additionally, people in the art Feature in embodiment in presents and in different embodiment, according to the description of presents, can be carried out by member Respective combination.
This utility model embodiment is as follows, refers to Fig. 1 to Fig. 6, a kind of prefabricated component conveying arrangement, especially Can be used for the transport of prestressed slab, it includes prefabricated component travelling bogie, prefabricated component lifting trolley and walking track, Described prefabricated component travelling bogie and prefabricated component lifting trolley run on described walking track, and described prefabricated component is transported Defeated dolly is used for prefabricated component handling to described prefabricated for the transport of prefabricated component, described prefabricated component lifting trolley On part travelling bogie;Described prefabricated component travelling bogie, can include the sub-travelling bogie of two or more 201, two It is connected between individual adjacent sub-travelling bogie 201, one end of described prefabricated component travelling bogie and described prefabricated component Lifting trolley is connected.So, described prefabricated component travelling bogie and prefabricated component lifting trolley are at described walking track Upper operation, prefabricated component lifting trolley is used for prefabricated component handling to described prefabricated component travelling bogie, prefabricated component Travelling bogie and prefabricated component lifting trolley run on same track, decrease the lifting transhipment time, have saved life Produce field of line ground area occupied, production line and material flow line are integrated conllinear simultaneously, not only solve material line and take up an area face Long-pending problem, and can also avoid occurring material to report to the leadship after accomplishing a task the problem of blocking.It addition, when prefabricated component travelling bogie When being made up of the sub-travelling bogie of two or more 201, one end of described prefabricated component travelling bogie and described prefabricated component Lifting trolley is connected, and described prefabricated component travelling bogie, in transportation, is carried respectively by sub-travelling bogie 201 The two ends of prefabricated component, make sub-travelling bogie 201 be linked to be entirety, sub-transport by the bridge joint effect of prefabricated component Distance between dolly 201 can adapt to adjust, as sub-travelling bogie 201 carries according to the length of prefabricated component Device uses when can do the movable bearing device horizontally rotated so that prefabricated component travelling bogie can be at the least row Journey inside turn, it is possible to decrease the site area that transit route takies, is particularly well-suited to the transport of overlength prefabricated component.
It should be noted that be connected between described herein two adjacent sub-travelling bogies 201, permissible It is to be connected by connector between sub-travelling bogie, such as rope, chain or other component, it is also possible to be During work, being overlapped on the prefabricated component on travelling bogie will be connected between two adjacent sub-travelling bogies 201 Connecing, state when referring to work " being connected " the most described herein limits.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1 to Figure 3, Described sub-travelling bogie 201 can also include that sub-bogey and sub-walking mechanism, described sub-walking mechanism set Putting the bottom at sub-bogey, described sub-walking mechanism includes sub-driving means 203 and at least two group sub-line Travelling wheel 204, described sub-driving means 203 drives one group of sub-line travelling wheel 204 of at least a part of which to move.So, Sub-travelling bogie 201 can be walked voluntarily by sub-walking mechanism, independent operating.
On the basis of above-described embodiment, in another embodiment of this utility model, described sub-bogey is permissible Including two longitudinal bracing framves and at least two cross-brace framves 101, the two ends of described cross-brace frame 101 Being connected with described two longitudinal bracing framves respectively, described cross-brace frame 101 forms carrying with longitudinal bracing frame Platform.So, group bogey includes two longitudinal bracing framves and at least two cross-brace framves, described When the two ends of cross-brace frame are connected with described two longitudinal bracing framves respectively, at boom hoisting, prefabricated component is hung After filling and be placed on sub-bogey, contacting between prefabricated component with sub-bogey is linear contact lay, not only Save weight and the material of bogey, laid always according to its force way, effectively prevent prefabricated component from fractureing Damage.
On the basis of above-described embodiment, in another embodiment of this utility model, described sub-line travelling wheel 204 can To be arranged on the bottom of described longitudinal bracing frame.So, group road wheel 204 is arranged on described longitudinal bracing During the bottom of frame, the load of sub-bogey and prefabricated component can be handed on sub-line travelling wheel 204 by straight-line transmitting, Decrease the moment of torsion of sub-line travelling wheel 204 wheel shaft, its deformed damaged under big load effect can be prevented.
On the basis of above-described embodiment, in another embodiment of this utility model, described sub-bogey also may be used To include adjusting means, described adjusting means is the sliding rail being arranged on described longitudinal bracing frame, described Cross-brace frame is slidably connected with described longitudinal bracing frame by sliding rail.So, come by sliding rail Regulation, easy to operate simple, the amplitude of accommodation is easily controlled, and is conducive to improving prefabricated component travelling bogie Security reliability.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1 to Figure 3, Described sub-travelling bogie 201 can also include that vehicle body 205, described sub-bogey are arranged on vehicle body 205 Top, described sub-line travelling wheel 204 is arranged on the bottom of vehicle body 205.So, sub-bogey is arranged on car During the top of body 205, during transport prefabricated component, it is little that one end of prefabricated component directly rests on sub-transport On car 201, by the frictional force between deadweight and prefabricated component and the sub-travelling bogie 201 of prefabricated component, it is achieved Connection between sub-travelling bogie 201.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1 to Figure 3, Described sub-bogey can include at least two cross-brace framves 101, described cross-brace frame 101 times Portion is fixed with described vehicle body 205 top, and carrying platform is formed at the top of described cross-brace frame 101.So, Group bogey includes at least two cross-brace framves, the bottom of cross-brace frame and described vehicle body 205 Portion is fixed, and when carrying platform is formed at the top of cross-brace frame, is lifted by prefabricated component at boom hoisting and lays After on sub-bogey, contacting between prefabricated component with sub-bogey is linear contact lay, according to its stress side Formula is laid, and can effectively prevent prefabricated component from fractureing damage.
On the basis of above-described embodiment, in another embodiment of this utility model, described sub-bogey also wraps Including adjusting means, described adjusting means can be to be arranged on the sliding rail at described vehicle body 205 top, described Cross-brace frame is connected with described vehicle body 205 top slide by sliding rail.So, by being arranged on car The sliding rail at body 205 top regulates, and easy to operate simple, the amplitude of accommodation is easily controlled, favorably In the security reliability improving prefabricated component travelling bogie.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1 to Figure 3, At least one end of described sub-travelling bogie 201 can be provided with hook 206.So, at sub-travelling bogie 201 At least one end be provided with hook 206 after, the sub-travelling bogie of prefabricated component 201 can easily with other draw Device or many sub-travelling bogies 201 connect traction, facilitate the situation that production line is longer, prefabricated component is more Lower use, particularly prefabricated component travelling bogie and boom hoisting platform docking is fixing and is accurately positioned, Ke Yifang Just orbital docking is accurate so that it is can successfully to smoothly transit on boom hoisting platform and sub-bogey Walking.It is of course also possible to arrange alignment pin in one end of sub-travelling bogie 201 or hole, location substitutes described Hook 206.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1 to Figure 3, Can be connected by chain 202 between adjacent described sub-travelling bogie 201, described sub-travelling bogie 201 Chain storage chamber 207 it is provided with on vehicle body 205.So, by chain 202 between sub-travelling bogie 201 Connecting, many sub-travelling bogies 201 can connect in column, it is simple to the transfer of sub-travelling bogie 201, described son Chain storage chamber 207 it is provided with on the vehicle body 205 of travelling bogie 201, when need not chain 202 and connecting, Chain 202 is accommodated in storage chamber so that the use of sub-travelling bogie 201 is convenient simply.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, Fig. 4 to Fig. 6 Shown in, described prefabricated component lifting trolley can include hanging apparatus 1 and walking mechanism 2, described walking mechanism 2 Being arranged on the bottom of hanging apparatus 1, described hanging apparatus 1 includes mast-up 11 and hook assembly 12, institute Stating mast-up 11 is cantilever design, and described hook assembly 12 can move on the cantilever of described mast-up 11; Described walking mechanism 2 includes driving means 21 and at least two groups lifting road wheel 22, described driving means 21 At least a part of which one group lifting road wheel 22 is driven to move.So, above-mentioned prefabricated component lifting trolley is used to hang Dress prefabricated component, has the advantage that compared with traditional driving or crane loading, and sling height is low, operation Apart from little, simple to operate flexible and low power consumption and other advantages, meanwhile, use self-propelled wheel-type across production line two The mode operation of side, its work flow is short, and particularly it is along the lifting of production line direction and the operating type of movement, Making it in operation process, prefabricated component does not have and significantly swings, and can prevent lifting trolley from toppling, greatly Improve the security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, Fig. 4, Fig. 5 Shown in Fig. 6, described mast-up 11 top is cantilever shalving, and described cantilever shalving is provided with boom hoisting rail Road 14, described hook assembly 12 moves on boom hoisting track 14 on described.So, mast-up 11 On be provided with boom hoisting track 14, described hook assembly 12 on described on boom hoisting track 14 move Dynamic, good stability during boom hoisting hoisting prefabricated part, will not wave and topple, fully ensure that the safety of operation Property.Simultaneously as described mast-up 11 top is cantilever shalving, such hook assembly 12 moves on cantilever shalving Dynamic scope can be more than the width bottom mast-up 11, it is possible to achieve the feelings not moved bottom mast-up 11 Under condition, carry out cantilever lifting, improve lifting efficiency.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, Fig. 4 and Fig. 5 Shown in, described lifting road wheel 22 is arranged on the bottom of described mast-up 11.So, when lifting road wheel When being arranged on the bottom of described mast-up 11, lifting trolley center of gravity is low, and its along production line direction lifting and The operating type of movement so that it is in operation process, prefabricated component does not have and significantly swings, and can prevent lifting Dolly topples, and improves the security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, bottom described hanging apparatus 1 One end can be provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is used for placing production prefabricated component Required built-in fitting;Or at least side bottom described hanging apparatus 1 is provided with limit mould fixed mechanism, described Limit mould fixed mechanism picks and places for limit mould.So, during preform production, lifting trolley can be passed through Reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould are transported to production line precalculated position, and one by one will It puts down, and so, advantageously reduces hand labor intensity, improves production efficiency, reduces preform production and becomes This.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, Fig. 4 and Fig. 5 Shown in, described mast-up 11 can be inverted trapezoidal structure, and described mast-up 11 is additionally provided with buttress brace 13, Described buttress brace 13 forms multiple triangular structure with the skeleton of mast-up 11.So, when mast-up 11 it is Inverted trapezoidal structure, described mast-up 11 is additionally provided with buttress brace 13, described buttress brace 13 and mast-up 11 Skeleton when forming multiple triangular structure, significantly increase the stroke of boom hoisting so that it is lifting amplitude Expanded, is conducive to lifting by crane the prefabricated component of ultra-wide, overlength;Further, triangular structure has the most excellent Stability so that it is be unlikely to deform in hoisting process.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 Or side is provided with counterweight device for hoisting.So, bottom or the side of mast-up 11 are provided with lifting counterweight During device, pass through counterweight so that the single-piece lifting weight of lifting trolley is greatly improved, meanwhile, its Operation amplitude, operation span and the speed of service, stability and safety have also been obtained reinforcement further.
On the basis of above-described embodiment, in another embodiment of this utility model, described hook assembly 12 includes Suspension hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.So, motor is used to make During for lifting power machine structure, hoisting prefabricated part controls simple, and it is relatively low that technology realizes difficulty, it is simple to workman Operation.
On the basis of above-described embodiment, in another embodiment of this utility model, described hook assembly 12 includes Two suspension hooks and two motors, said two suspension hook interval layout, two motors individually drive two to hang Hook moves up and down;Or described hook assembly 12 includes two suspension hooks and a motor, said two suspension hook is spaced Arranging, described motor drives two suspension hooks to move up and down.So, suspension hook interval is used to arrange, pre-in lifting During product, can lift by flat condition, improve the translation stability of lifting trolley, be particularly prone to flat board and pile up, Plate body is made to be not easily susceptible to damage, and so that the relatively low height i.e. Liftable that lifts by crane of prefabricated component completes.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 At least one end be provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley lead to Cross alignment pin or hole, location is fixed.So, at least one end in the bottom of mast-up 11 be provided with alignment pin or Behind hole, location, prefabricated component travelling bogie and prefabricated component lifting trolley are fixed by alignment pin or hole, location, prefabricated Part lifting trolley can connect traction, convenient production easily with other traction apparatuss or multiple travelling bogie Line is longer, prefabricated component more in the case of use, particularly prefabricated component lifting trolley and prefabricated component travelling bogie Docking is fixing and is accurately positioned, can be accurate by orbital docking easily so that it is can be successfully at boom hoisting Smoothly transit on platform and bogey walking.
On the basis of above-described embodiment, in another embodiment of this utility model, described driving means 21 is permissible For driving motor or driving motor;Or described lifting road wheel 22 is track rolling wheel or pneumatic tire.This Sample, described driving means 21 is for driving motor or driving motor;Prefabricated component lifting trolley controls simple, It is relatively low that technology realizes difficulty, it is simple to operative;Described lifting road wheel 22 is track rolling wheel or inflation During tire, then can select lifting road wheel 22 according to practical situation, it is possible to relatively easily meet various The application in different places.
The above is only preferred implementation of the present utility model, it is noted that for the art For those of ordinary skill, on the premise of without departing from this utility model principle, it is also possible to make some improvement And retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (20)

1. a prefabricated component conveying arrangement, it is characterized in that: include prefabricated component travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated component lifting trolley run on described walking track, described prefabricated component travelling bogie is used for prefabricated component handling to described prefabricated component travelling bogie for the transport of prefabricated component, described prefabricated component lifting trolley;
Described prefabricated component travelling bogie, including the sub-travelling bogie of two or more, is connected between two adjacent sub-travelling bogies, and one end of described prefabricated component travelling bogie is connected with described prefabricated component lifting trolley.
Prefabricated component conveying arrangement the most according to claim 1, it is characterized in that, described sub-travelling bogie includes sub-bogey and sub-walking mechanism, described sub-walking mechanism is arranged on the bottom of sub-bogey, described sub-walking mechanism includes sub-driving means and at least two group sub-line travelling wheels, and described sub-driving means drives one group of sub-line travelling wheel motion of at least a part of which.
Prefabricated component conveying arrangement the most according to claim 2, it is characterized in that, described sub-bogey includes two longitudinal bracing framves and at least two cross-brace framves, the two ends of described cross-brace frame are connected with described two longitudinal bracing framves respectively, and described cross-brace frame forms carrying platform with longitudinal bracing frame.
Prefabricated component conveying arrangement the most according to claim 3, it is characterised in that described sub-line travelling wheel is arranged on the bottom of described longitudinal bracing frame.
Prefabricated component conveying arrangement the most according to claim 3, it is characterized in that, described sub-bogey also includes that adjusting means, described adjusting means are the sliding rail being arranged on described longitudinal bracing frame, and described cross-brace frame is slidably connected with described longitudinal bracing frame by sliding rail.
Prefabricated component conveying arrangement the most according to claim 2, it is characterised in that described sub-travelling bogie also includes that vehicle body, described sub-bogey are arranged on the top of vehicle body, and described sub-line travelling wheel is arranged on the bottom of vehicle body.
Prefabricated component conveying arrangement the most according to claim 6, it is characterised in that described sub-bogey includes that at least two cross-brace framves, the bottom of described cross-brace frame are fixed with described body top section, carrying platform is formed at the top of described cross-brace frame.
Prefabricated component conveying arrangement the most according to claim 7, it is characterized in that, described sub-bogey also includes that adjusting means, described adjusting means are to be arranged on the sliding rail at described vehicle body top, and described cross-brace frame is connected with described vehicle body top slide by sliding rail.
Prefabricated component conveying arrangement the most according to claim 1, it is characterised in that at least one end of described sub-travelling bogie is provided with alignment pin or hole, location or hook.
Prefabricated component conveying arrangement the most according to any one of claim 1 to 9, it is characterised in that connected by chain between adjacent described sub-travelling bogie, the vehicle body of described sub-travelling bogie is provided with chain storage chamber.
11. prefabricated component conveying arrangements according to claim 10, it is characterized in that, described prefabricated component lifting trolley includes hanging apparatus and walking mechanism, described walking mechanism is arranged on the bottom of hanging apparatus, described hanging apparatus includes mast-up and hook assembly, described mast-up is cantilever design, and described hook assembly can move on the cantilever of described mast-up;Described walking mechanism includes driving means and at least two groups lifting road wheel, and described driving means drives at least a part of which one group lifting road wheel motion.
12. prefabricated component conveying arrangements according to claim 11, it is characterised in that described mast-up top is cantilever shalving, described cantilever shalving is provided with boom hoisting track, and described hook assembly moves on boom hoisting track on described.
13. prefabricated component conveying arrangements according to claim 11, it is characterised in that described lifting road wheel is arranged on the bottom of described mast-up.
14. prefabricated component conveying arrangements according to claim 11, it is characterised in that the one end bottom described hanging apparatus is provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;Or at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, described limit mould fixed mechanism picks and places for limit mould.
15. prefabricated component conveying arrangements according to claim 11, it is characterised in that described mast-up is inverted trapezoidal structure, described mast-up is additionally provided with buttress brace, and described buttress brace forms multiple triangular structure with the skeleton of mast-up.
16. prefabricated component conveying arrangements according to claim 11, it is characterised in that bottom or the side of described mast-up are provided with counterweight device for hoisting.
17. prefabricated component conveying arrangements according to claim 11, it is characterised in that described hook assembly includes suspension hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.
18. prefabricated component conveying arrangements according to claim 17, it is characterised in that described hook assembly includes that two suspension hooks and two motors, said two suspension hook interval are arranged, two motors individually drive two suspension hooks to move up and down;Or described hook assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives two suspension hooks to move up and down.
19. prefabricated component conveying arrangements according to claim 11, it is characterised in that at least one end of the bottom of described mast-up is provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley and is fixed by alignment pin or hole, location.
20. prefabricated component conveying arrangements according to claim 11, it is characterised in that described driving means is for driving motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.
CN201620096434.0U 2016-01-29 2016-01-29 Prefab conveyer Expired - Fee Related CN205574936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620096434.0U CN205574936U (en) 2016-01-29 2016-01-29 Prefab conveyer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620096434.0U CN205574936U (en) 2016-01-29 2016-01-29 Prefab conveyer

Publications (1)

Publication Number Publication Date
CN205574936U true CN205574936U (en) 2016-09-14

Family

ID=56883365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620096434.0U Expired - Fee Related CN205574936U (en) 2016-01-29 2016-01-29 Prefab conveyer

Country Status (1)

Country Link
CN (1) CN205574936U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109573850A (en) * 2018-10-31 2019-04-05 中民筑友智能装备科技有限公司 A kind of prefabricated component boom hoisting
CN113387117A (en) * 2020-03-11 2021-09-14 长沙智能驾驶研究院有限公司 Transport robot, transport system, and transport robot connection control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109573850A (en) * 2018-10-31 2019-04-05 中民筑友智能装备科技有限公司 A kind of prefabricated component boom hoisting
CN109573850B (en) * 2018-10-31 2023-12-22 中民筑友智能装备科技有限公司 Prefabricated member lifting device
CN113387117A (en) * 2020-03-11 2021-09-14 长沙智能驾驶研究院有限公司 Transport robot, transport system, and transport robot connection control method

Similar Documents

Publication Publication Date Title
CN105645057A (en) Prefabricated part production and transportation system
CN105501872A (en) Prefabricated part production and conveying system
CN105668163A (en) Prefabricated part production and transportation system
CN113636464B (en) Loading and unloading overhead hoist, shore bridge and rail bridge integrated shortcut system and dam turning transportation system
CN111502293B (en) Method and system for hoisting single peripheral component of assembly type building
CN205574936U (en) Prefab conveyer
CN106744244B (en) More lifting component machines
CN205526359U (en) Prefab conveyer
CN205739198U (en) A kind of preform production transportation system
CN205418901U (en) Prefab conveyer
CN108545594B (en) Mortar tank overhead hoist
CN109112963B (en) Bridge hoisting equipment
CN205574940U (en) Prefab conveyer
CN205526360U (en) Prefab conveyer
CN205526357U (en) Prefab production conveyor system
KR101373098B1 (en) Construction appratus for composit truss free cantilever bridge and construction method of composit truss free cantilever bridge using the same
CN105480662A (en) Fabricated part production and transport system
CN205574937U (en) Prefab production conveyor system
CN205344658U (en) Prefab travelling bogie
CN205574938U (en) Prefab production conveyor system
CN111661768B (en) Method and system for hoisting multiple peripheral components of assembly type building
CN105692093A (en) Fabricated part production and conveying system
CN205346673U (en) Prefab hoisting trolley
CN205471273U (en) Prefab production conveyor system
CN205526358U (en) Prefab production conveyor system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Denomination of utility model: Prefab conveyer

Granted publication date: 20160914

License type: Exclusive License

Record date: 20171222

EE01 Entry into force of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Date of cancellation: 20180801

EC01 Cancellation of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co.,Ltd.

Assignor: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Contract record no.: 2018430000023

Denomination of utility model: Prefab conveyer

Granted publication date: 20160914

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914