CN205296100U - Husky equipment is arranged in reservoir segmentation - Google Patents

Husky equipment is arranged in reservoir segmentation Download PDF

Info

Publication number
CN205296100U
CN205296100U CN201520907571.3U CN201520907571U CN205296100U CN 205296100 U CN205296100 U CN 205296100U CN 201520907571 U CN201520907571 U CN 201520907571U CN 205296100 U CN205296100 U CN 205296100U
Authority
CN
China
Prior art keywords
sand
sand discharge
pier
reservoir
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520907571.3U
Other languages
Chinese (zh)
Inventor
单郑洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520907571.3U priority Critical patent/CN205296100U/en
Application granted granted Critical
Publication of CN205296100U publication Critical patent/CN205296100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a husky equipment is arranged in reservoir segmentation, including one row of sand tube, arranging sand tube one end and setting up in dam upper reaches silt department, the other end sets up in the dam low reaches, set up to be provided with a plurality of sha koudun of inhaling in row's sand tube interval of dam upper reaches silt department, inhale husky mouthful of mound cavity setting, inhale husky mouthful of mound with it communicates with each other to arrange the sand tube, it is equipped with sand inlet on the husky mouthful of mound to inhale. Owing to will arrange the sand tube and bury underground in reservoir bottom, and arranging of sand tube and being inclination, the high low reaches in the upper reaches are low, utilize water gravity to arrange the dam low reaches with silt from sand outlet so that silt gets into and arranges the sand tube, discharge with the water reserve lane, need not to consume the energy, and the environmental protection, to arrange husky time sustainability strong, unnecessaryly disposable arrange huskyly in a large number, can keep the permanent water demand of reservoir, the reservoir can hold arrange clearly muddy.

Description

A kind of reservoir segmentation sand discharge equipment
Technical field
This utility model relates to hydraulic engineering sand discharge apparatus field, is specifically related to a kind of reservoir segmentation sand discharge equipment.
Background technology
The dam built on river at present gets more and more, in dam flood retention water-retention simultaneously as the destruction of upstream vegetation, substantial amounts of silt is rushed to dam place, and long-term accumulation can cause reservoir silting, and the water-holding capacity of reservoir declines. Now commonly used sand discharge way is that the clear row of storage is muddy, namely sand discharge is carried out in flood season, or water transfer sand discharge, or reduce storage capacity sand discharge, above is all discontinuity sand discharge, and such way alleviates the mud harm to reservoir to a certain extent, but sand amount is huge during uniform effluent, downstream ecology is caused destructive destruction, fish and shrimp is caused mass extinction, and can not tackle the problem at its root; Or carrying out sand discharge by pipeline or sand discharge ship etc., these sand-flash effect are bad, and cannot repair after Pipeline damage.
Utility model content
In view of problems of the prior art, a kind of reservoir segmentation sand discharge equipment that this utility model provides, including a sand discharge pipe, described sand discharge pipe one end is arranged at mud place, dam upstream, the other end is arranged at dam downstream, and the sand discharge pipe being arranged at mud place, dam upstream is arranged at intervals with multiple husky mouth pier of inhaling, the setting of described suction sand mouth pier hollow, described sand mouth pier of inhaling communicates with described sand discharge pipe, and described sand mouth pier of inhaling is provided with sand inlet.
Owing to sand discharge pipe is embedded in bottom reservoir, and the inclined angle of arrangement of sand discharge pipe, height downstream, upstream is low, utilize gravity so that silt enters in sand discharge pipe, from sand outlet, silt can be discharged to dam downstream, it is not necessary to consume the energy, environmental protection, sustainability are strong, it is not necessary to disposable a large amount of sand discharges.
In some embodiments, described sand inlet place is provided with drainage screen, and described drainage screen is double-layer filtering net, and described drainage screen is provided with sand inlet closed shutter. Being provided with drainage screen is possible to prevent large-sized object to enter sand discharge pipe, thus destroying sand discharge inside pipe wall, bringing inconvenience to maintenance, also can block sand discharge pipe simultaneously.
In some embodiments, the wire side of drainage screen is welded by steel bar. Big part thing in reservoir can be discharged by the netted filtering net being welded into by steel bar, it is to avoid enters sand discharge pipe, thus destroying the inwall of sand discharge pipe.
In some embodiments, described sand mouth pier internal perisporium of inhaling is provided with People's Bank of China's cat ladder, and described People's Bank of China cat ladder is provided with luminaire, and described suction sand mouth pier is installed with driving along place. This design convenient for maintaining personnel are lowered in pipeline and keep in repair, and maintenance tool can be sent in well and keep in repair by driving.
In some embodiments, described sand mouth pier outer peripheral wall of inhaling also is provided with People's Bank of China's cat ladder. This design convenient for maintaining personnel climbing is keeped in repair to the husky mouth pier of suction.
In some embodiments, described sand mouth pier of inhaling is provided with by-path closed shutter with the described sand discharge pipe place of communicating, and two sand discharge pipes inhaled between husky mouth piers are provided with main stem closed shutter. By the closedown of the gate more convenient maintenance of energy, and can opening and closing shutter as required, for sand discharge, when needs upstream sand discharge, turn on the by-path closed shutter of upstream, close the by-path closed shutter in downstream, it is prevented that downstream by-path silt pours in down a chimney, and plays desilting, when needs downstream sand discharge, it is shut off the by-path closed shutter of upstream, opens the by-path closed shutter in downstream, complete sand discharge.
A kind of reservoir segmentation sand discharge equipment that this utility model adopts, sand discharge is lasting, it is not necessary to consumed energy, and Environmental Safety is easy to maintenance.
Accompanying drawing explanation
Fig. 1 is the side-looking structural representation of a kind of reservoir segmentation sand discharge equipment of a kind of embodiment of this utility model;
Fig. 2 is the plan structure schematic diagram of a kind of reservoir segmentation sand discharge equipment of a kind of embodiment of this utility model;
Fig. 3 is the structural representation inhaling husky mouth pier of a kind of reservoir segmentation sand discharge equipment of a kind of embodiment of this utility model.
Detailed description of the invention
Below in conjunction with Figure of description, a kind of reservoir segmentation sand discharge equipment that this utility model is provided is described in more detail.
As depicted in figs. 1 and 2, a kind of reservoir segmentation sand discharge equipment, including being located at bottom reservoir riverbed or the sand discharge pipe 1 of limit, riverbed massif, the pipeline of sand discharge pipe 1 can be concrete duct, pipeline that concrete duct can be connected one by one for more piece or the pipeline directly built; Or employing tunnel form, the pipeline of sand discharge pipe 1 can also be plastic conduit or large-scale steel pipe, can select the pipeline of unlike material type according to the size of dam and concrete practical situation. The sand discharge pipe 1 being arranged at mud place, dam upstream is arranged at intervals with the husky mouth pier 3 of multiple suction, as shown in Figure 3, inhale the large-scale cement Dun Jing that husky mouth pier 3 is arranged for hollow, it can be circular or square for inhaling husky mouth pier 3, inhale husky mouth pier 3 to communicate with sand discharge pipe 1, being provided with sand inlet 2 inhaling on husky mouth pier 3 sidewall, sand inlet 2 is towards upstream end.
Husky mouth pier 3 internal perisporium of suction builds fixed form or bolt is fixed with People's Bank of China's cat ladder 31, People's Bank of China's cat ladder 31 can convenient for maintaining personnel be gone into the well work, People's Bank of China's cat ladder 31 is provided with luminaire 32, inhaling and be installed with driving 33 on husky mouth pier 3 along place, major repair instrument can be sent in well and keep in repair by driving 33.
Embodiment 1, inhales the cross structure being connected to bank on husky mouth pier 3, and this design convenient for maintaining personnel go to from bank and keep in repair the husky mouth pier 3 of suction.
Embodiment 2, inhales husky mouth pier 3 outer peripheral wall and is also installed with People's Bank of China's cat ladder 31, and this design convenient for maintaining personnel climbing is extremely inhaled and keeped in repair on husky mouth pier 3.
Inhaling husky mouth pier 3 and be provided with by-path closed shutter 6 with sand discharge pipe 1 place of communicating, two sand discharge pipes 1 inhaled between husky mouth pier 3 are provided with main stem closed shutter 7, can be drained the water in pipeline, more convenient maintenance by the control of gate; Inhale in husky mouth pier 3 and be provided with sand suction pump machine, when closed shutter, in sand discharge pipe 1, there is no flow rate of water flow, then can carry out external sand discharge by sand suction pump machine; Inhale to be bolted outside husky mouth pier 3 and strand suction pipe interface is installed, at ordinary times not used time, close strand suction pipe interface, when river course does not have flow velocity, and in river course during silt silting, it is possible to open strand suction pipe interface and carry out sand discharge.
Owing to sand discharge pipe 1 is embedded in bottom reservoir, and the inclined angle of arrangement of sand discharge pipe 1, height downstream, upstream is low, utilize gravity so that silt enters in sand discharge pipe 1, from sand outlet, silt can be discharged to dam downstream, it is not necessary to consume the energy, environmental protection, sustainability are strong, it is not necessary to disposable a large amount of sand discharges.
Sand inlet 2 place is provided with drainage screen, and drainage screen is provided with sand inlet closed shutter, is provided with drainage screen and is possible to prevent large-sized object to enter sand discharge pipe, thus destroying sand discharge pipe 1 inwall, bringing inconvenience to maintenance, also can block sand discharge pipe 1 simultaneously; The wire side of drainage screen is welded by steel bar. Big part thing in reservoir can be discharged by the netted filtering net being welded into by steel bar, it is to avoid enters sand discharge pipe 1, thus destroying the inwall of sand discharge pipe 1.
During normal operation, opening sand inlet closed shutter, silt enters in sand discharge pipe 1 by inhaling the sand inlet 2 on husky mouth pier 3, utilizes gravity factor, and silt tumbles naturally, by sand discharge pipe 1, silt is drained into downstream part. A kind of reservoir segmentation sand discharge equipment that this utility model adopts, sand discharge is lasting, it is not necessary to consumed energy, and Environmental Safety is easy to maintenance.
The above is only optimal way of the present utility model; it should be pointed out that, to those skilled in the art, under the premise creating design without departing from this utility model; can also making some similar deformation and improvement, these also should be regarded as within protection domain of the present utility model.

Claims (6)

1. a reservoir segmentation sand discharge equipment, it is characterized in that: include a sand discharge pipe (1), described sand discharge pipe (1) one end is arranged at mud place, dam upstream, the other end is arranged at dam downstream, the sand discharge pipe (1) being arranged at mud place, dam upstream is arranged at intervals with the husky mouth pier (3) of multiple suction, described sand mouth pier (3) hollow of inhaling is arranged, described sand mouth pier (3) of inhaling communicates with described sand discharge pipe (1), and described sand mouth pier (3) of inhaling is provided with sand inlet (2).
2. a kind of reservoir segmentation sand discharge equipment according to claim 1, it is characterised in that: described sand inlet (2) place is provided with drainage screen, and described drainage screen is double-layer filtering net, and described drainage screen is provided with sand inlet closed shutter.
3. a kind of reservoir segmentation sand discharge equipment according to claim 2, it is characterised in that: the wire side of described drainage screen is welded by seamless steel bar.
4. a kind of reservoir segmentation sand discharge equipment according to claim 1, it is characterized in that: described sand mouth pier (3) internal perisporium of inhaling is provided with People's Bank of China's cat ladder (31), described People's Bank of China cat ladder (31) is provided with luminaire (32), and described sand mouth pier (3) Shang Yanchu that inhales is installed with driving (33).
5. a kind of reservoir segmentation sand discharge equipment according to claim 4, it is characterised in that: described sand mouth pier (3) outer peripheral wall of inhaling also is provided with People's Bank of China's cat ladder (31).
6. a kind of reservoir segmentation sand discharge equipment according to claim 1, it is characterized in that: described sand mouth pier (3) of inhaling is provided with by-path closed shutter (6) with described sand discharge pipe (1) place of communicating, two sand discharge pipes (1) inhaled between husky mouth piers (3) are provided with main stem closed shutter (7).
CN201520907571.3U 2015-11-13 2015-11-13 Husky equipment is arranged in reservoir segmentation Expired - Fee Related CN205296100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520907571.3U CN205296100U (en) 2015-11-13 2015-11-13 Husky equipment is arranged in reservoir segmentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520907571.3U CN205296100U (en) 2015-11-13 2015-11-13 Husky equipment is arranged in reservoir segmentation

Publications (1)

Publication Number Publication Date
CN205296100U true CN205296100U (en) 2016-06-08

Family

ID=56438432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520907571.3U Expired - Fee Related CN205296100U (en) 2015-11-13 2015-11-13 Husky equipment is arranged in reservoir segmentation

Country Status (1)

Country Link
CN (1) CN205296100U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013005A (en) * 2016-07-13 2016-10-12 长江水利委员会长江科学院 Variable cross section desilting gallery system suitable for high-water-depth reservoir
US10233602B2 (en) * 2017-02-17 2019-03-19 Kuo-Chang Huang Resevoir dredging assembly
CN109577268A (en) * 2018-11-08 2019-04-05 孟现坤 Do not deposit reservoir
CN113005983A (en) * 2021-02-01 2021-06-22 浙江大学 Sand discharging device for normal curved surface funnel reservoir

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013005A (en) * 2016-07-13 2016-10-12 长江水利委员会长江科学院 Variable cross section desilting gallery system suitable for high-water-depth reservoir
US10233602B2 (en) * 2017-02-17 2019-03-19 Kuo-Chang Huang Resevoir dredging assembly
CN109577268A (en) * 2018-11-08 2019-04-05 孟现坤 Do not deposit reservoir
CN113005983A (en) * 2021-02-01 2021-06-22 浙江大学 Sand discharging device for normal curved surface funnel reservoir

Similar Documents

Publication Publication Date Title
CN205296100U (en) Husky equipment is arranged in reservoir segmentation
CN104963322B (en) A kind of key water control project facility
CN101713178B (en) Method for creating three-stage flow passage of meandering riverway in lower Yellow River
CN107740389A (en) A kind of diversion tunnel structure and its plugging construction method
CN104250960A (en) Reservoir silt-preventing laying method
CN103741642B (en) River course littoral zone water demand for natural service in dry season regulation device and method under dam
CN203429606U (en) Sediment retaining bank reconstructed from temporary cofferdam
CN105386426B (en) The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape
CN207392122U (en) It is a kind of that there is the key water control project of desilting
CN206529750U (en) A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel
CN107620345A (en) Irrigate by lifting water to a higher level with a water pump, etc. silt filtering apparatus in a kind of river course
CN209277275U (en) A kind of administration structure of soil erosion
CN1438388A (en) Water-pressure pipe sand-discharging apparatus
CN203716104U (en) Reservoir branch course desilting equipment
CN215926014U (en) Dykes and dams slope protection structure for design based on hydraulic and hydroelectric engineering
CN205557473U (en) Remote control type floodwall dam gate
CN103114565B (en) River-closure water-diversion system suitable for slope torrent watercourse water-diversion generation and hydropower stations
CN103614986A (en) Free surface flow water inflow method suitable for draining off floodwaters of tailing pond
CN103741644A (en) Separation desilting device for reservoir
CN204715310U (en) A kind of reservoir desilting system
CN104895019B (en) Reservoir desilting system
CN207680113U (en) One kind disappears power setting pot
CN111305172A (en) Diversion and drainage bidirectional pressure tunnel
CN113756257A (en) Soil and water conservation bank protection structure
CN112982319A (en) Structure and method for conducting diversion, emptying and water taking through dam foundation culvert

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20161113