CN205259622U - A operation platform for installing rack - Google Patents

A operation platform for installing rack Download PDF

Info

Publication number
CN205259622U
CN205259622U CN201521083299.8U CN201521083299U CN205259622U CN 205259622 U CN205259622 U CN 205259622U CN 201521083299 U CN201521083299 U CN 201521083299U CN 205259622 U CN205259622 U CN 205259622U
Authority
CN
China
Prior art keywords
operating platform
track
rack
brace
bracing piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521083299.8U
Other languages
Chinese (zh)
Inventor
雷雄武
刘文添
原冠初
周杰英
刘标斌
林永浩
蔡国海
李悦
张姗姗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority to CN201521083299.8U priority Critical patent/CN205259622U/en
Application granted granted Critical
Publication of CN205259622U publication Critical patent/CN205259622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an operation platform for installing rack, includes support frame, a plurality of bracing piece and track, is enclosed jointly by two first supporting beam and two a seconds supporting beam on the support frame, is connected with a plurality of crossbeams between two first supporting beam, be connected with a plurality of longerons between the two seconds supporting beam, top rigid coupling in the nodical department of crossbeam with the longeron of bracing piece, the bottom of bracing piece is equipped with the gyro wheel, and this gyro wheel rolls with the track and cooperates. The utility model discloses an operation platform, the support frame is propped through the bracing piece for constructor can install the rack aloft, and the support frame has a plurality of crossbeams and longeron, and stable in structure makes work progress safety. In addition, the bottom of bracing piece be equipped with the gyro wheel and with gyro wheel sliding fit's track, the continuity of the scope of operation can be guaranteed in convenient whole operation platform's removal, the efficiency of construction is high.

Description

It is a kind of for the operating platform of rack is installed
Technical field
The utility model relates to construction implement technical field, is specifically related to a kind of for installingThe operating platform of rack.
Background technology
In recent years, China's industrialization, sports etc. obtain develop rapidly, lift throughout the countryPlay the construction upsurge of manufacturer, gymnasium, cultural center. And at the work progress of these heavy constructionsIn, large span grid be installed as work high above the ground, its relate to measure expense economy, site influence,Many-sided requirements such as contract duration, security, because the installation of grid structure is also construction projectDifficult point and emphasis.
The method of existing installation rack has full hall scaffold method, high altitude bulk method, itemize piecemealThe installation methods such as Method for Installation, high-altitude sliding method, assembling support sliding method and whole hanging method,But in existing construction method, general inconvenience is mobile, need to repeat to build, and has operating expensesHigh, the slow problem of construction speed, and there is certain potential safety hazard; Simultaneously different installation sidesMethod also can be subject to the restriction of construction site and construction equipment.
Utility model content
For the deficiencies in the prior art, it is a kind of for installing that the purpose of this utility model is to provideThe operating platform of rack, can move in real time, and security is good, highly versatile.
For achieving the above object, the utility model adopts following technical scheme:
For an operating platform for rack is installed, comprise bracing frame, multiple support bar and railRoad, is surrounded jointly by two first brace summers and two second brace summers on bracing frame, and two first supportBetween beam, be connected with multiple crossbeams, the plurality of crossbeam is along the length direction interval row of the first brace summerRow; Between two second brace summers, be connected with multiple longerons, the plurality of longeron is along the second brace summerLength direction is spaced; The top of support bar is fixed in the intersection point place of crossbeam and longeron; SupportThe bottom of bar is provided with roller, and this roller rolls and coordinates with track.
Preferably, this operating platform also comprises head rod and the second connecting rod, and this is first years oldConnecting rod is fixedly connected with for multiple support bars of arranging with the length direction along the second brace summer,The second connecting rod is for fixing with multiple support bars of the length direction arrangement along the first brace summerConnect.
Preferably, on bracing frame, be equipped with safety net.
Preferably, on safety net, be equipped with bamboo plate layer.
Preferably, the edge of bracing frame is provided with guard rail.
Preferably, this operating platform also comprises the moulding bed for supporting track, and track is fixed in tireThe top of frame.
The beneficial effects of the utility model are:
Compared to prior art, operating platform of the present utility model, bracing frame props up by support barRise, workmen be may stand on bracing frame and at high-altitude installation rack, and bracing frame hasMultiple crossbeams and longeron, Stability Analysis of Structures, makes work progress safety. In addition, at support barBottom be provided with roller and with the track that roller is slidably matched, facilitate moving of whole operating platformMove, can ensure the continuity of the scope of operation, efficiency of construction is high.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the fit structure schematic diagram of roller of the present utility model and track.
Wherein, 10, bracing frame; 11, the first brace summer; 12, the second brace summer; 13, horizontal strokeBeam; 14, longeron; 20, support bar; 30, track; 40, connecting rod; 50, roller.
Detailed description of the invention
Below, by reference to the accompanying drawings and detailed description of the invention, the utility model is described further:
As shown in Figure 1 and Figure 2 a kind of for the operating platform of rack is installed, comprises supportFrame 10, multiple support bar 20 and track 30, concrete bracing frame 10 is by two first brace summers11 and two second brace summer 12 jointly surround, and be connected with between two first brace summers 11Multiple crossbeams 13, make the length direction interval of the plurality of crossbeam 13 along the first brace summer 11Arrange; Same, between two second brace summers 12, be connected with multiple longerons 14, make these manyIndividual longeron 14 is spaced along the length direction of the second brace summer 12; On the basis of said structureUpper, the stabilized structure of bracing frame 10, can be used for the workmen that stands, and places construction tool.
In addition, the top of above-mentioned support bar 20 is fixed in the intersection point place of crossbeam 13 and longeron 14,So whole bracing frame 10 can be placed in to height aerial, the convenient rack of installing; Simultaneously at support bar20 bottom is provided with roller 50, makes roller 50 roll and coordinate with track 30, realizes whole behaviourDo the real-time movement of platform, can ensure the continuity of the scope of operation, efficiency of construction is high.
Certainly, above-mentioned rollers 50 coordinates with the rolling of track 30, can be specifically at track30 offer chute, and roller 50 is embedded in chute, and the two rolls and coordinates (referring to Fig. 2).In other cases, can, at roller 50 bottom flutings, on track 30, arrange and be embedded at grooveThe interior portion that sets, rolls the two and coordinates.
Preferably, in the present embodiment, this operating platform also comprise head rod 40 andThe second connecting rod 41, this head rod 40 for length side along the second brace summer 12To arrange multiple support bars 20 be fixedly connected with, the second connecting rod 41 for along the first supportMultiple support bars 20 that the length direction of beam 11 is arranged are fixedly connected with, and so can make whole operationThe structure of platform is more firm, constructs safer.
Preferably, on bracing frame 10, be equipped with safety net, for the end face of capping bracing frame 10,The workpiece that prevents from constructing drops. Further, on safety net, also can be equipped with mao bamboon lamella, makeObtain more comfortable the standing on bracing frame 10 of constructor.
In addition, also can be provided with guard rail at the edge of bracing frame 10, equally also can be and prevent netFrame member and erecting tools landing, workmen is safer simultaneously.
Preferably, while being provided with foundation ditch in construction site, in order to facilitate the installation of track 30, canMoulding bed is set in foundation ditch, makes track 30 be fixed in the top of moulding bed, for supporting track 30Moulding bed. And can all lay steel plate with top in moulding bed bottom, make moulding bed top and terrace simultaneouslyAbsolute altitude is consistent, and makes the laying of track 30 more stable.
Certainly,, in the situation that construction site area is larger, multiple institutes can be set in construction siteThe operating platform of stating.
To one skilled in the art, can be according to technical scheme described above and structureThink, make other various corresponding changes and deformation, and all these changes and deformationWithin all should belonging to the protection domain of the utility model claim.

Claims (6)

1. for an operating platform for rack is installed, it is characterized in that, comprise bracing frame,Multiple support bars and track, common by two first brace summers and two second brace summers on bracing frameSurround, between two first brace summers, be connected with multiple crossbeams, the plurality of crossbeam is along the first brace summerLength direction be spaced; Between two second brace summers, be connected with multiple longerons, the plurality of verticalBeam is spaced along the length direction of the second brace summer; The top of support bar is fixed in crossbeam with verticalThe intersection point place of beam; The bottom of support bar is provided with roller, and this roller rolls and coordinates with track.
2. as claimed in claim 1ly for being installed, the operating platform of rack it is characterized in that,This operating platform also comprises head rod and the second connecting rod, this head rod forMultiple support bars of arranging along the length direction of the second brace summer are fixedly connected with, and the second connecting rod is usedBe fixedly connected with in multiple support bars of arranging with the length direction along the first brace summer.
3. as claimed in claim 1ly for being installed, the operating platform of rack it is characterized in that,On bracing frame, be equipped with safety net.
4. as claimed in claim 3ly for being installed, the operating platform of rack it is characterized in that,On safety net, be equipped with bamboo plate layer.
5. as claimed in claim 1ly for being installed, the operating platform of rack it is characterized in that,The edge of bracing frame is provided with guard rail.
6. as claimed in claim 1ly for being installed, the operating platform of rack it is characterized in that,This operating platform also comprises the moulding bed for supporting track, and track is fixed in the top of moulding bed.
CN201521083299.8U 2015-12-21 2015-12-21 A operation platform for installing rack Active CN205259622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521083299.8U CN205259622U (en) 2015-12-21 2015-12-21 A operation platform for installing rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521083299.8U CN205259622U (en) 2015-12-21 2015-12-21 A operation platform for installing rack

Publications (1)

Publication Number Publication Date
CN205259622U true CN205259622U (en) 2016-05-25

Family

ID=56001155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521083299.8U Active CN205259622U (en) 2015-12-21 2015-12-21 A operation platform for installing rack

Country Status (1)

Country Link
CN (1) CN205259622U (en)

Similar Documents

Publication Publication Date Title
CN203961992U (en) Portable full framing chassis
CN204126230U (en) Assembly scaffold unit
CN106638299A (en) Multifunctional operation platform and construction method
CN217175586U (en) Operating platform for slope construction
CN204139569U (en) Sliding scaffold
CN205100119U (en) Steel form device in self -propelled
CN107035156A (en) Core Walls Structure horizontal structure self-crawling type protective platform
CN204199651U (en) Foldable mobile scaffold
CN109594759B (en) Height-adjustable assembled double-layer outer protection frame device and using method thereof
CN104790644B (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN207194419U (en) It may span across the aerial work platform of landing beam
CN205116749U (en) A track strutting arrangement that is used for large -span steel construction wholly to slide
CN205259622U (en) A operation platform for installing rack
CN204662929U (en) A kind of cross-line walking fence operation device
CN204059901U (en) A kind of high-altitude construction operation platform
CN201722937U (en) Sliding platform for installation of net rack
CN209874433U (en) Assembly type integral moving operation frame
CN204781872U (en) Regularization post reinforcement operation platform
CN204826727U (en) Reinforcing bar processing protection canopy that can dismantle, has enough to meet need
CN203257080U (en) Adjustable overhang supporting device for building construction
CN204754150U (en) Dish -type node formula scaffold
CN204645572U (en) A kind of Rotary Scaffold
CN203321528U (en) Operation platform for mine shaft heading face
CN203440913U (en) Supporting structure for reinforced concrete corridor construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant