CN205242268U - Anchor triangular bracket - Google Patents
Anchor triangular bracket Download PDFInfo
- Publication number
- CN205242268U CN205242268U CN201521059426.0U CN201521059426U CN205242268U CN 205242268 U CN205242268 U CN 205242268U CN 201521059426 U CN201521059426 U CN 201521059426U CN 205242268 U CN205242268 U CN 205242268U
- Authority
- CN
- China
- Prior art keywords
- tripod
- bracket
- anchor rib
- pier shaft
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to an anchor triangular bracket, anchor triangular bracket include many tripods, a straight flange of tripod is used for through the anchor of anchor muscle in bridge owner mound pier shaft side, another straight flange of tripod is along keeping away from the direction level of main mound pier shaft side is extended forward, many tripods parallel the interval arrangement, still including being used for the setting to be in the tripod below is right the bottom of tripod forms the support bracket that asks the top to support, it connects through the anchor muscle to support the bracket on the bridge owner mound pier shaft, the bracket platform has been erect to many the tripod tops that parallel the interval arrangement, the bottom of bracket platform with another straight flange of tripod forms to be connected. Through the utility model provides an anchor triangular bracket construction convenience is quick, and the bracket atress is clear and definite, extensive applicability, and the material can have enough to meet the need, and less to pier shaft cross -section influence.
Description
Technical field
The utility model relates to a kind of load support, is specifically related to a kind of about the 0# piece of overbridge and the anchoring shelf bracket of 1# piece.
Background technology
It is larger that certain section of high speed roadbed is filled out amount of excavation, fills out that to deep-cut be main mainly with height. Fills embankment highest point reaches 36m, and excavation high slope is up to 63m, and the side slope that wherein exceedes 30m just has 21 places.
This project Bridge quantity is more, 5 leap national highways completely, and construction risk is larger. Have 2,000 multi-disc Precast T-Beams completely, point 3 precasting yards are prefabricated.
Wherein the main pier height of certain overbridge reaches 40m, and the construction of floor stand method is unsuitable for the construction of its 0# piece and 1# piece.
Utility model content
The technical problems to be solved in the utility model is: propose a kind of stress equalization and anchoring shelf bracket easy for installation.
The utility model is that the technical scheme that solves the problems of the technologies described above proposition is: a kind of anchoring shelf bracket, comprise many tripods, a straight flange of described tripod is for being anchored at Main Pier of Bridges pier shaft side by anchor rib, another of described tripod straight flange is along the horizontal forward extension of direction away from described main pier pier shaft side, and described many tripods interval arranged side by side is arranged;
Also comprise that described support bracket is connected on described Main Pier of Bridges pier shaft by anchor rib for being arranged on described tripod below and the bottom of described tripod being formed to the support bracket that jacking is supported;
At described many added platform brackets that are provided with of spaced apart tripod arranged side by side, the bottom of described platform bracket forms and is connected with another straight flange of described tripod.
Further, one end of described anchor rib is embedded in other end level in described Main Pier of Bridges pier shaft and stretches out, and also comprises the spacing pressing plate for matching with the external part of described anchor rib.
Further, described anchor rib is arranged to two rows at the pre-connection tripod place of Main Pier of Bridges pier shaft side respectively, described two row's anchor ribs lay respectively at the both sides of a straight flange of described tripod, the two ends of described spacing pressing plate are respectively arranged with through hole, and the end of described anchor rib external part passes and be connected with stop nut from described through hole.
Further, on described support bracket, offer a pair of through hole passing for anchor rib, one end of described anchor rib is embedded in other end level in described Main Pier of Bridges pier shaft and stretches out, and the horizontal external part of described anchor rib is connected with stop nut in its end from described through hole.
Further, the back side of described support bracket is formed with spacing block set, is reserved with the groove inserting for described spacing block set in Main Pier of Bridges pier shaft side, is all welded with cross spacing plate in the both sides of described support bracket.
The beneficial effects of the utility model are:
Quick by the anchoring shelf bracket easy construction in the utility model, bracket is stressed clear and definite, and applicability is wide, and material can have enough to meet the need, and less on the impact of pier shaft cross section.
By the bracket and the anchor rib that are anchored on pier shaft, tripod is anchored on pier shaft, forms freely supported structure, then on tripod, set up platform bracket, thereby realize 0, the building of 1# piece. Main bearing member is for supporting bracket, and tripod is Force transmission parts. 0# piece vertical load will produce vertical load and overturning moment after transmitting by tripod, vertical load is born by bracket, the lateral load that overturning moment produces is resisted by pier shaft and upper anchor rib, tripod lower limb leg withstands pier shaft, upper anchor rib tension, thereby formation freely supported structure, reaches whole system balance.
Brief description of the drawings
Below in conjunction with accompanying drawing, anchoring shelf bracket of the present utility model is described further.
Fig. 1 is the structural representation of anchoring shelf bracket in embodiment mono-;
Fig. 2 is the front view of anchoring shelf bracket in Fig. 1;
Fig. 3 is the vertical profile diagram of anchoring shelf bracket in Fig. 1;
Fig. 4 is the A portion enlarged drawing in Fig. 2;
Fig. 5 is the B portion enlarged drawing in Fig. 3.
In above-mentioned view: tripod 1, bracket 2, platform bracket 3, pier shaft 4, anchor rib 5, nut 6, groove 7, cross spacing plate 8, spacing pressing plate 9, laterally connect 10 and Bei Lei crossbeam 11.
Detailed description of the invention
Embodiment mono-
Shown in Fig. 1 and Fig. 2, the anchoring shelf bracket in the utility model, comprises many tripods 1, supports bracket 2 and platform bracket 3.
Wherein, a straight flange of tripod 1 is for being anchored at Main Pier of Bridges pier shaft 4 sides by anchor rib 5, and another straight flange of tripod 1 is along the horizontal forward extension of direction away from main pier pier shaft 4 sides, and many tripod 1 intervals arranged side by side are arranged. Can be used as preferably: between the tripod 1 on 4 of same pier shafts, can add horizontal connection 10, improve tripod 1 lateral stiffness, laterally connect 10 integral prefabricated installations, be connected on tripod 1.
Support bracket 2 and be arranged on tripod 1 below and the bottom of tripod 1 is formed to jacking support, support bracket 2 and be connected on Main Pier of Bridges pier shaft 4 by anchor rib 5. Support on bracket 2 and offer a pair of through hole passing for anchor rib 5, one end of described anchor rib 5 is embedded in other end level in described Main Pier of Bridges pier shaft 4 and stretches out, and the horizontal external part of described anchor rib 5 is connected with stop nut 6 in its end from described through hole.
Can be used as preferably: the back side of supporting bracket 2 is formed with spacing block set, be reserved with the groove 7 inserting for described spacing block set in Main Pier of Bridges pier shaft 4 sides, be all welded with cross spacing plate 8 in the both sides of described support bracket 2, improve bracket 2 lateral stabilities.
Above many spaced apart tripods 1 arranged side by side, set up platform bracket 3, the bottom of platform bracket 3 forms and is connected with another straight flange of tripod 1. Platform bracket 3 is to be made up of shellfish thunder crossbeam 11, longeron and side crossbeam, can certainly be other structure and the platform bracket 3 with supporting role.
Can be used as preferably: one end of described anchor rib 5 is embedded in other end level in described Main Pier of Bridges pier shaft 4 and stretches out, and also comprises the spacing pressing plate 9 for matching with the external part of described anchor rib 5. The two ends of described spacing pressing plate 9 are respectively arranged with through hole, and the end of described anchor rib 5 external parts passes and be connected with stop nut from described through hole.
Can be used as further preferably: aforementioned anchor rib 5 forms two rows at pre-connection tripod 1 place of Main Pier of Bridges pier shaft 4 sides respectively, two row's anchor ribs 5 lay respectively at the both sides of a straight flange of tripod 1, the two ends of spacing pressing plate 9 are respectively arranged with through hole, and the end of anchor rib 5 passes and be connected with stop nut from through hole. Certainly that, also can adopt other structures but tripod 1 can be anchored at equally to the anchor structure on Main Pier of Bridges pier shaft 4 sides.
When in embodiment mono-, anchoring shelf bracket is constructed, comprise the following steps:
Step 1: preburied component. In the time of the 4 final section construction of Main Pier of Bridges pier shaft, calculate the height of anchoring shelf bracket in the utility model according to design drawing, accurately orient the space pre-buried position of anchor rib 5 at pier shaft 4, and carry out pre-buried.
Be provided with pre-buried steel box at plan installation bracket 2 places and be used to form reserved groove 7, need to add inner support simultaneously, prevent steel box distortion in concreting process, steel box bottom needs to add bar-mat reinforcement, add the local compressive resistance of reinforced concrete, it is straight and perpendicular to pier shaft 4 that pre-buried anchor rib 5 ensures.
Step 2: bracket 2 is installed. In the end a joint pier shaft 4 is built complete form removal and is exposed after reserved groove 7, removes steel box inner support, and cleaning hole slot, then carries out bracket 2 and install, and offers through hole and its back side passed for anchor rib 5 and be formed with spacing block set on bracket 2. The single heavy about 60kg of bracket 2, can adopt the auxiliary installation of manual type or tower crane.
Bracket 2 is located on anchor rib 5 and by spacing block set and inserts reserved groove 7, then by anchor rib 5 stop nut anchoring. At the bottom of checking whether bracket 2 upper padding plates are adjacent to preformed groove, whether lower bolster is adjacent to 4 of pier shafts, if because pre-buried steel box and 4 out of plumb of pier shaft cause upper padding plate warpage or lower bolster cannot be adjacent to pier shaft 4, preferentially adjust upper padding plate and be adjacent to bottom land, lower bolster is by adding the forms such as pading plate and pier shaft 4 faces hold out against. After inspection adjustment is errorless, again tighten anchor rib 5.
After two bracket 2 installations, with reinforcing bar, two brackets 2 are connected to entirety side by side, simultaneously by the 2 top leveling of two brackets. After bracket 2 installations, be welded with cross spacing plate 8, improve bracket 2 lateral stabilities.
Step 3: tripod 1 is installed. Tripod 1 is processed by work steel assembly welding. The heavily about 2t of each tripod 1, be installed on 4 two broad side surfaces of pier shaft, each face is at least installed two tripods 1, can be according to adjustable tripod 1 quantity of load, when installation, ensure that symmetrical tripod 1 is force transferring structure, for 0#, 1# piece load are passed to bracket 2 and pier shaft 4. Coordinating anchor rib 5 to form anchoring and screw upper limit nut in the end of anchor rib 5 by spacing pressing plate 9 forms spacing. Between tripod 1 on 4 of same pier shafts, can add horizontal connection 10, improve tripod 1 lateral stiffness, laterally connect 10 integral prefabricated installations, be welded on tripod 1.
Step 4, platform bracket 3 is installed. After tripod 1 installs, on tripod 1, lift shellfish thunder crossbeam 11, lay longeron at cantilever segment, side crossbeam is laid in wing plate position. Shellfish thunder crossbeam arranges two 16 work bearing beams for 11 times, for striking. 0#, 1# piece two ends cantilever segment are respectively arranged one group three and are arranged individual layer shellfish thunder crossbeam 11 and one group of double individual layer shellfish thunder crossbeam 11, longeron adopts 10# channel-section steel assembly welding to form, at the bottom of being arranged in web and at the bottom of base plate, side crossbeam adopts 36b work steel, side crossbeam falls within on shellfish thunder crossbeam 11, and on position shellfish thunder crossbeam 11 at the bottom of wing plate, left-hand thread one saves 3 meters long 20b channel-section steels, and fixes with bolt, side beam welding, on channel-section steel, ensures that crossbeam is stable. Side form supporting leg falls within on side crossbeam, and side crossbeam level is adjusting tank beam longitudinal gradient, need adjust longitudinal gradient by cutting side form supporting leg mode, after having adjusted, supporting leg is welded on side crossbeam, ensures that side form is stable.
The above-described embodiment that is not limited to of the present utility model; the technical scheme of above-mentioned each embodiment of the present utility model can combined crosswise form new technical scheme each other; all employings are equal to the technical scheme of replacing formation in addition, all drop in the protection domain of the utility model requirement.
Claims (5)
1. an anchoring shelf bracket, it is characterized in that: comprise many tripods, a straight flange of described tripod is for being anchored at Main Pier of Bridges pier shaft side by anchor rib, another of described tripod straight flange is along the horizontal forward extension of direction away from described main pier pier shaft side, and described many tripods interval arranged side by side is arranged;
Also comprise that described support bracket is connected on described Main Pier of Bridges pier shaft by anchor rib for being arranged on described tripod below and the bottom of described tripod being formed to the support bracket that jacking is supported;
At described many added platform brackets that are provided with of spaced apart tripod arranged side by side, the bottom of described platform bracket forms and is connected with another straight flange of described tripod.
2. anchoring shelf bracket according to claim 1, is characterized in that: one end of described anchor rib is embedded in other end level in described Main Pier of Bridges pier shaft and stretches out, and also comprises the spacing pressing plate for matching with the external part of described anchor rib.
3. anchoring shelf bracket according to claim 2, it is characterized in that: described anchor rib is arranged to two rows at the pre-connection tripod place of Main Pier of Bridges pier shaft side respectively, described two row's anchor ribs lay respectively at the both sides of a straight flange of described tripod, the two ends of described spacing pressing plate are respectively arranged with through hole, and the end of described anchor rib external part passes and be connected with stop nut from described through hole.
4. anchoring shelf bracket according to claim 1, it is characterized in that: on described support bracket, offer a pair of through hole passing for anchor rib, one end of described anchor rib is embedded in other end level in described Main Pier of Bridges pier shaft and stretches out, and the horizontal external part of described anchor rib is connected with stop nut in its end from described through hole.
5. anchoring shelf bracket according to claim 4, it is characterized in that: the back side of described support bracket is formed with spacing block set, be reserved with the groove inserting for described spacing block set in Main Pier of Bridges pier shaft side, be all welded with cross spacing plate in the both sides of described support bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521059426.0U CN205242268U (en) | 2015-12-18 | 2015-12-18 | Anchor triangular bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521059426.0U CN205242268U (en) | 2015-12-18 | 2015-12-18 | Anchor triangular bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205242268U true CN205242268U (en) | 2016-05-18 |
Family
ID=55941348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521059426.0U Active CN205242268U (en) | 2015-12-18 | 2015-12-18 | Anchor triangular bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205242268U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758823A (en) * | 2016-11-23 | 2017-05-31 | 中铁五局集团有限公司 | The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0 |
CN108660913A (en) * | 2018-05-23 | 2018-10-16 | 中建隧道建设有限公司 | Calf support supporting structure and construction method |
CN110438902A (en) * | 2019-07-16 | 2019-11-12 | 中交一公局第二工程有限公司 | A kind of assembled load-bearing bracket |
CN112538822A (en) * | 2020-11-30 | 2021-03-23 | 中建五局第三建设有限公司 | Bridge rectangular high-pier single-pier capping beam triangular bracket system and construction method |
-
2015
- 2015-12-18 CN CN201521059426.0U patent/CN205242268U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758823A (en) * | 2016-11-23 | 2017-05-31 | 中铁五局集团有限公司 | The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0 |
CN108660913A (en) * | 2018-05-23 | 2018-10-16 | 中建隧道建设有限公司 | Calf support supporting structure and construction method |
CN110438902A (en) * | 2019-07-16 | 2019-11-12 | 中交一公局第二工程有限公司 | A kind of assembled load-bearing bracket |
CN112538822A (en) * | 2020-11-30 | 2021-03-23 | 中建五局第三建设有限公司 | Bridge rectangular high-pier single-pier capping beam triangular bracket system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103614970B (en) | Steel truss girder assembling construction longitudinal pull and lateral pushing sliding system | |
CN103614969B (en) | Steel truss girder assembling, erecting and construction process | |
CA2841100C (en) | Foundation system for bridges and other structures | |
CN205242268U (en) | Anchor triangular bracket | |
CN108004928B (en) | A kind of asymmetric rigid frame-continuous girder construction technology | |
CN102888815B (en) | The pouring construction method of a kind of wide-angle V-type pier and 0# block case beam | |
CN109853381B (en) | Transitional structure for preventing bridge head from jumping and construction method thereof | |
CN105568870A (en) | Triangle hanging basket suspended casting device used for overpass bridge construction and construction method thereof | |
CN203904851U (en) | Continuous beam side span straight section hanger support system | |
CN107841953B (en) | High-altitude oblique crossing Liang Doupo side span cast-in-situ section construction support and construction method | |
CN105350458B (en) | Construction method of composite structure platform for construction of Y-shaped pier of bridge | |
CN107974942B (en) | A kind of abrupt slope side rigid frame-continuous girder end bay construction method | |
CN107524096A (en) | A kind of continuous girders by suspension grouting 0# blocks cast-in-place support and erection method | |
CN205242278U (en) | A triangle string basket method is hanged and is watered device for deck bridge construction | |
CN102797223B (en) | Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method | |
CN110792028B (en) | Construction method of cable-stayed bridge without back cables | |
CN107905124A (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
KR101527782B1 (en) | Management and reverse displacement of composite bridge composite inclined support installation method | |
CN110847010B (en) | Construction and construction method suitable for large-span abutment rigid frame bridge | |
CN219793664U (en) | V-shaped pier construction bent frame system | |
CN103835238B (en) | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing | |
CN110424243A (en) | A kind of Long span Tied-Arch Bridge Main Bridge jack-up system and jack-up construction method | |
CN115059026A (en) | Construction method for reversely hoisting cast-in-place bridge deck slab by supporting steel beam on top of sluice pier | |
CN205242263U (en) | Integrated configuration platform is used in construction of bridge Y type mound | |
CN103437252B (en) | A kind of track bed structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201022 Address after: 501-2, 1261 Panyu Avenue North, Dalong street, Panyu District, Guangzhou City, Guangdong Province Patentee after: Guangdong Guandi Construction Co., Ltd Address before: 511450, 1261, Panyu Avenue, Guangdong, Guangzhou, 4 Patentee before: GUANGDONG GUANYUE HIGHWAY & BRIDGE Co.,Ltd. |
|
TR01 | Transfer of patent right |