CN205204646U - Four bracket dollies on bank bridge - Google Patents

Four bracket dollies on bank bridge Download PDF

Info

Publication number
CN205204646U
CN205204646U CN201521078169.5U CN201521078169U CN205204646U CN 205204646 U CN205204646 U CN 205204646U CN 201521078169 U CN201521078169 U CN 201521078169U CN 205204646 U CN205204646 U CN 205204646U
Authority
CN
China
Prior art keywords
trolley
rope
sea
bracket dolly
lateral bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521078169.5U
Other languages
Chinese (zh)
Inventor
张明海
张砾
罗四
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN201521078169.5U priority Critical patent/CN205204646U/en
Application granted granted Critical
Publication of CN205204646U publication Critical patent/CN205204646U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a four bracket dollies on bank bridge, it includes first land side bracket dolly, second land side bracket dolly, the bracket dolly is surveyed in first sea, the bracket dolly is surveyed in the second sea, two sets of tensioning hydro -cylinders and two reels, be equipped with a wire rope and the 2nd wire rope on each reel, a wire rope changes backward through the head assembly pulley and surveys the bracket dolly with first sea and be connected, the 2nd wire rope changes to being connected with first land side bracket dolly through the afterbody assembly pulley, each tensioning hydro -cylinder is connected with the afterbody assembly pulley that corresponds, first land side bracket dolly inclines with the second land and is connected through the 3rd wire rope between the bracket dolly, first sea is surveyed the bracket dolly and is connected through fourth wire rope between the bracket dolly with extra large survey of second, second land side bracket dolly is connected through the 5th wire rope between the bracket dolly with extra large survey of second. The utility model discloses an application demand large -scale and even extra -large -size bank bridge has been satisfied in the winding innovative design of four bracket dollies on bank bridge.

Description

Bank bridge four trolley
Technical field
The utility model relates to bank abutment bracket dolly, in particular to a kind of bank bridge four trolley, be applicable to trolley carry drive system energy independent operating, crossbeam kick up tail-bracket dolly without the need to or run in limited range, the super-huge bank bridge of front backreach overlength.
Background technology
In bank abutment bracket dolly field, for the forward and backward super-huge bank bridge stretched apart from overlength, steel rope outstanding swings, spring problem adopts conventional mode usually, and such as, in the sea of bank bridge, side, land respectively arranges the method for a trolley.This mode cannot solve above-mentioned existing problem, especially when castor is grown especially time, adopts and uses three trolleys winding schemes of a trolley to be also difficult to tackle this chronic disease in side, land with two trolleys, extra large side.
The spring of steel rope seems minor issue, in fact directly has influence on operation stability, the operating efficiency of the large and small car of bank bridge.It can increase the weight of the vibration of bank bridge, affects overall performance, and sometimes even directly can become bank bridge can not one of major reason handing over machine smoothly.Further, the steel rope that span is large also needs to overcome scratches the required tensile force that hangs down under its Gravitative Loads, tensile force significantly improve the cost that not only can improve tightening device, also can reduce the life-span of steel rope.
In addition, trolley continues to use the scheme of main carriage running under power always, and the trolley adopting flexible steel rope to connect each other and main carriage motion do not have independence, mutually disturb, cause the actual aircraft gate of dolly and its theoretical position to have dislocation.
Therefore, based on above-mentioned situation, those skilled in the art urgently control the outstanding of steel rope from the source of problem and swing, can the problem such as independent operating to solving trolley.
Utility model content
The technical problems to be solved in the utility model cannot be applicable to the defect of super-huge bank bridge to overcome bank abutment bracket dolly in prior art, provides a kind of bank bridge four trolley.
The utility model solves above-mentioned technical matters by following technical proposals: a kind of bank bridge four trolley, its feature is, described bank bridge four trolley comprises the first land lateral bracket dolly, second land lateral bracket dolly, trolley is surveyed in first sea, trolley is surveyed in second sea, two cover tensioning hydro-cylinder and two reels, reel described in each is provided with the first steel rope and the second steel rope, described first steel rope is connected by surveying trolley with described first sea after the changed course of head assembly pulley, described second steel rope is connected with described first land lateral bracket dolly by the changed course of afterbody assembly pulley, tensioning hydro-cylinder described in each connects with corresponding described afterbody assembly pulley,
Be connected by the 3rd steel rope between described first land lateral bracket dolly with described second land lateral bracket dolly;
Described first sea is surveyed trolley and is connected by the 4th steel rope with the described second extra large survey between trolley;
Described second land lateral bracket dolly is surveyed between trolley with described second sea and is connected by the 5th steel rope.
Preferably, described first extra large lateral bracket dolly is provided with the first pulley assembling, one end of described first steel rope connects corresponding described reel, the other end is fixed to head wire rope rope solid point place through after described head assembly pulley and described first pulley assembling successively, and described head wire rope rope solid point is positioned at described first sea and surveys on the object outside trolley.
Preferably, described first land lateral bracket dolly is provided with the second pulley assembling, one end of described second steel rope connects corresponding described reel, the other end is fixed to afterbody wire rope rope solid point place through after described afterbody assembly pulley and described second pulley assembling successively, and described afterbody wire rope rope solid point is positioned on the object outside described first land lateral bracket dolly.
Preferably, the two ends of described first land lateral bracket dolly arrange a set of 3rd pulley assembling respectively, one end of described 3rd steel rope is fixed to the first wire rope rope solid point place be positioned on described second land lateral bracket dolly, the other end is fixed to the second wire rope rope solid point place through after described 3rd pulley assembling, and described second wire rope rope solid point is positioned on the object outside described second land lateral bracket dolly.
Preferably, the two ends that trolley is surveyed in described first sea arrange a set of 4th pulley assembling respectively, one end of described 4th steel rope is fixed to the 3rd wire rope rope solid point place be positioned on described second sea survey trolley, the other end is fixed to the 4th wire rope rope solid point place through after described 4th pulley assembling, and described 4th wire rope rope solid point is positioned on the object outside described second extra large lateral bracket dolly.
Preferably, described second sea is surveyed on trolley and is also provided with the assembling of two covers the 5th pulley, one end of described 5th steel rope is fixed to the 5th wire rope rope solid point place be positioned on described second land lateral bracket dolly, and the other end is fixed to through after the described 5th pulley assembling of two covers the 6th wire rope rope solid point place be positioned on described second land lateral bracket dolly.
Preferably, the speed that trolley is surveyed in described first sea is the half of the speed of described first steel rope, and the speed of described first land lateral bracket dolly is the half of the speed of described second steel rope.
Preferably, the speed of described first land lateral bracket dolly is the half of described second land lateral bracket dolly.
Preferably, the speed that trolley is surveyed in described first sea is the half that trolley is surveyed in described second sea.
Preferably, the speed of described second land lateral bracket dolly is equal with the speed that trolley is surveyed in described second sea.
Positive progressive effect of the present utility model is:
The utility model bank bridge four trolley by sea, side, the land trolley such as respectively adopt two speed not holds up the lifting and winding of bank bridge, dolly is wound around and the lay winding wire ropes of self, shortened the span of steel rope by the quantity increasing trolley, thus reduction the outstanding of steel rope swings.In bank bridge machine room, increase a set of independently drive system simultaneously, make trolley that main carriage can not be needed to draw and independent operating.It, by reasonable Arrangement assembly pulley and steel rope, the speed effectively controlling trolley, sets up independently drive system, achieves the innovative design that bank bridge four trolley is wound around, meets application demand that is large-scale and even ultra-large type bank bridge.
Accompanying drawing explanation
The above and other feature of the utility model, character and advantage are by more obvious by what become below in conjunction with the description of drawings and Examples, and Reference numeral identical in the accompanying drawings represents identical feature all the time, wherein:
Fig. 1 is the winding arrangement plan of the utility model bank bridge four trolley.
Fig. 2 is the fundamental diagram of head assembly pulley in the utility model bank bridge four trolley.
Fig. 3 is the fundamental diagram of the utility model bank bridge four trolley middle pulley assembling.
Detailed description of the invention
For above-mentioned purpose of the present utility model, feature and advantage can be become apparent, below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated.
Set forth a lot of detail in the following description so that fully understand the utility model, but the utility model can also adopt other to be different from alternate manner described here to implement, therefore the utility model is not by the restriction of following public specific embodiment.
Fig. 1 is the winding arrangement plan of the utility model bank bridge four trolley.Fig. 2 is the fundamental diagram of head assembly pulley in the utility model bank bridge four trolley.Fig. 3 is the fundamental diagram of the utility model bank bridge four trolley middle pulley assembling.
As shown in Figure 1 to Figure 3, a kind of bank bridge four trolley is disclosed in an embodiment of the present utility model, it comprises the first lateral bracket dolly 20, first sea, land lateral bracket dolly 10, second land and surveys trolley 30, second sea survey trolley 40, two cover tensioning hydro-cylinder 60 and two reels 50, and reel 50 is placed in machine house.Wherein, each reel 50 is provided with the first steel rope 51 and the second steel rope 52, survey trolley 30 with the first sea after first steel rope 51 is altered course by head assembly pulley 70 to be connected, second steel rope 52 is connected with the first land lateral bracket dolly 10 by afterbody assembly pulley 71 changed course, and each tensioning hydro-cylinder 60 connects with corresponding afterbody assembly pulley 71.
The first land lateral bracket dolly 10 is herein connected by the 3rd steel rope 53 with between the second land lateral bracket dolly 20.First sea is surveyed trolley 30 and is connected by the 4th steel rope 54 with the second extra large survey between trolley 40.Second land lateral bracket dolly 20 is surveyed between trolley 40 with the second sea and is connected by the 5th steel rope 55.
Further preferably, first extra large lateral bracket dolly 30 is provided with the first pulley assembling 72, one end of first steel rope 51 connects corresponding reel 50, the other end is fixed to head wire rope rope solid point place 80 through after head assembly pulley 70 and the first pulley assembling 72 successively, and head wire rope rope solid point 80 described here is positioned at the first sea and surveys on the object outside trolley 30.In like manner, first land lateral bracket dolly 10 is provided with the second pulley assembling 73, one end of second steel rope 52 connects corresponding reel 50, the other end is fixed to afterbody wire rope rope solid point 81 place through after afterbody assembly pulley 71 and the second pulley assembling 73 successively, and afterbody wire rope rope solid point 81 described here is positioned on the object outside the first land lateral bracket dolly 10.
In addition, a set of 3rd pulley assembling 74 is set respectively at the two ends of the first land lateral bracket dolly 10, one end of 3rd steel rope 53 is fixed to the first wire rope rope solid point place 82 be positioned on the second land lateral bracket dolly 20, the other end is fixed to the second wire rope rope solid point 83 place through after the 3rd pulley assembling 74, and the second wire rope rope solid point 83 described here is positioned on the object outside the second land lateral bracket dolly 20.
In like manner, the two ends surveying trolley 30 in the first sea arrange a set of 4th pulley assembling 75 respectively, one end of 4th steel rope 54 is fixed to the 3rd wire rope rope solid point 84 place be positioned on the second sea survey trolley 40, the other end is fixed to the 4th wire rope rope solid point 85 place through after the 4th pulley assembling 75, and the 4th wire rope rope solid point 85 described here is positioned on the object outside the second extra large lateral bracket dolly 40.
Further, survey in the second sea on trolley 40 and be also provided with two covers the 5th pulley assembling 76, one end of 5th steel rope 55 is fixed to the 5th wire rope rope solid point 86 place be positioned on the second land lateral bracket dolly 20, the other end is fixed to through after two cover the 5th pulley assemblings 76 the 6th wire rope rope solid point 87 place be positioned on the second land lateral bracket dolly 20.
The winding system of the utility model bank bridge four trolley described above is arranged symmetrically with relative to crossbeam line of centers.It utilizes duplex assembly pulley deceleration principle as shown in Figure 2, and the speed making the first sea survey trolley 30 is the half of the speed of the first steel rope 51.The speed of the first land lateral bracket dolly 10 is half of the speed of the second steel rope 52.Simply connected assembly pulley deceleration principle as shown in Figure 3, makes the speed of the first land lateral bracket dolly 10 be the half of the second land lateral bracket dolly 20.The speed that trolley 30 is surveyed in first sea is the half that trolley 40 is surveyed in the second sea.And the speed of the second land lateral bracket dolly 20 is equal with the speed that trolley 40 is surveyed in the second sea.
The object of the utility model bank bridge four trolley is the winding scheme providing a kind of novel bank abutment bracket, it holds up the lifting and winding of bank bridge at the trolley (four trolleys namely mentioned) that sea, side, land respectively adopt two speed not etc. herein, dolly is wound around and the lay winding wire ropes of self, shortened the span of steel rope by the quantity increasing trolley, thus reduction the outstanding of steel rope swings.Meanwhile, in bank bridge machine room, increase a set of independently drive system, make trolley that main carriage can not be needed to draw and independent operating.
The feature of the utility model bank bridge four trolley is:
One, be different from the winding form of general main carriage traction, this four trolley is wound around and carries independently drive system, makes trolley have more alerting ability in the adjustment of running velocity.Four trolleys as shown in drawings are wound around, and the first steel rope 51 be connected with the reel 50 of drive system and the speed of the second steel rope 52 just can directly be set by the drive motor rotating speed of reel 50.
Two, used pulley block ratio change to reach increasing, subtract the object of rope speed dexterously, made the rope speed of steel wire controlled, also just can run in an orderly manner between trolley and dolly.After setting the speed V of the first steel rope 51 and second steel rope 52 of drawing from drive system, other rope speed can be controlled by the change of pulley block ratio.As in the winding scheme in accompanying drawing, the speed of the extra large lateral bracket dolly 30 of the first land lateral bracket dolly 10, first is just reduced to 1/2V, the second extra large lateral bracket dolly 40 and the second land lateral bracket dolly 20 and the corresponding first sea are surveyed and are then realized speed by movable pulley between trolley 30, first land lateral bracket dolly 10 and be doubled to V.
Three, four trolleys are just wound around self steel rope number a lot, as there being 9 steel ropes in accompanying drawing altogether, add that there is the lifting and winding steel rope of bank bridge in outside, there is main carriage lay winding wire ropes inner side, it takes the modes such as space is longitudinal layered, horizontal stepping and arranges, to avoid mutually tangling between steel rope, interfering and hook.
In sum, more than the utility model bank bridge four trolley by reasonably arranging assembly pulley and steel rope, effectively controlling the speed of trolley, set up independently drive system, achieve the innovative design that bank bridge four trolley is wound around, meet application demand that is large-scale and even ultra-large type bank bridge.
Although the foregoing describe detailed description of the invention of the present utility model, it will be understood by those of skill in the art that these are only casehistorys, protection domain of the present utility model is defined by the appended claims.Those skilled in the art, under the prerequisite not deviating from principle of the present utility model and essence, can make various changes or modifications to these embodiments, but these change and amendment all falls into protection domain of the present utility model.

Claims (10)

1. bank bridge four trolley, it is characterized in that, described bank bridge four trolley comprises the first land lateral bracket dolly, second land lateral bracket dolly, trolley is surveyed in first sea, trolley is surveyed in second sea, two cover tensioning hydro-cylinder and two reels, reel described in each is provided with the first steel rope and the second steel rope, described first steel rope is connected by surveying trolley with described first sea after the changed course of head assembly pulley, described second steel rope is connected with described first land lateral bracket dolly by the changed course of afterbody assembly pulley, tensioning hydro-cylinder described in each connects with corresponding described afterbody assembly pulley,
Be connected by the 3rd steel rope between described first land lateral bracket dolly with described second land lateral bracket dolly;
Described first sea is surveyed trolley and is connected by the 4th steel rope with the described second extra large survey between trolley;
Described second land lateral bracket dolly is surveyed between trolley with described second sea and is connected by the 5th steel rope.
2. bank bridge four trolley as claimed in claim 1, it is characterized in that, described first extra large lateral bracket dolly is provided with the first pulley assembling, one end of described first steel rope connects corresponding described reel, the other end is fixed to head wire rope rope solid point place through after described head assembly pulley and described first pulley assembling successively, and described head wire rope rope solid point is positioned at described first sea and surveys on the object outside trolley.
3. bank bridge four trolley as claimed in claim 2, it is characterized in that, described first land lateral bracket dolly is provided with the second pulley assembling, one end of described second steel rope connects corresponding described reel, the other end is fixed to afterbody wire rope rope solid point place through after described afterbody assembly pulley and described second pulley assembling successively, and described afterbody wire rope rope solid point is positioned on the object outside described first land lateral bracket dolly.
4. bank bridge four trolley as claimed in claim 1, it is characterized in that, the two ends of described first land lateral bracket dolly arrange a set of 3rd pulley assembling respectively, one end of described 3rd steel rope is fixed to the first wire rope rope solid point place be positioned on described second land lateral bracket dolly, the other end is fixed to the second wire rope rope solid point place through after described 3rd pulley assembling, and described second wire rope rope solid point is positioned on the object outside described second land lateral bracket dolly.
5. bank bridge four trolley as claimed in claim 1, it is characterized in that, the two ends that trolley is surveyed in described first sea arrange a set of 4th pulley assembling respectively, one end of described 4th steel rope is fixed to the 3rd wire rope rope solid point place be positioned on described second sea survey trolley, the other end is fixed to the 4th wire rope rope solid point place through after described 4th pulley assembling, and described 4th wire rope rope solid point is positioned on the object outside described second extra large lateral bracket dolly.
6. bank bridge four trolley as claimed in claim 1, it is characterized in that, described second sea is surveyed on trolley and is also provided with the assembling of two covers the 5th pulley, one end of described 5th steel rope is fixed to the 5th wire rope rope solid point place be positioned on described second land lateral bracket dolly, and the other end is fixed to through after the described 5th pulley assembling of two covers the 6th wire rope rope solid point place be positioned on described second land lateral bracket dolly.
7. bank bridge four trolley as claimed in claim 3, is characterized in that, the speed that trolley is surveyed in described first sea is the half of the speed of described first steel rope, and the speed of described first land lateral bracket dolly is the half of the speed of described second steel rope.
8. bank bridge four trolley as claimed in claim 4, it is characterized in that, the speed of described first land lateral bracket dolly is the half of described second land lateral bracket dolly.
9. bank bridge four trolley as claimed in claim 5, is characterized in that, the speed that trolley is surveyed in described first sea is the half that trolley is surveyed in described second sea.
10. bank bridge four trolley as described in claim 1-9 any one, is characterized in that, the speed of described second land lateral bracket dolly is equal with the speed that trolley is surveyed in described second sea.
CN201521078169.5U 2015-12-22 2015-12-22 Four bracket dollies on bank bridge Active CN205204646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521078169.5U CN205204646U (en) 2015-12-22 2015-12-22 Four bracket dollies on bank bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521078169.5U CN205204646U (en) 2015-12-22 2015-12-22 Four bracket dollies on bank bridge

Publications (1)

Publication Number Publication Date
CN205204646U true CN205204646U (en) 2016-05-04

Family

ID=55842376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521078169.5U Active CN205204646U (en) 2015-12-22 2015-12-22 Four bracket dollies on bank bridge

Country Status (1)

Country Link
CN (1) CN205204646U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105384068A (en) * 2015-12-22 2016-03-09 上海振华重工(集团)股份有限公司 Four-bracket trolley for quayside container crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105384068A (en) * 2015-12-22 2016-03-09 上海振华重工(集团)股份有限公司 Four-bracket trolley for quayside container crane

Similar Documents

Publication Publication Date Title
CN105417418B (en) A kind of reel and its hoisting mechanism
CN202208605U (en) High-positioning-accuracy hoisting mechanism of crane
CN102718165B (en) Winding plant and rotary drilling rig with same
CN205709636U (en) Loop wheel machine winch
CN100358795C (en) Steel cable winding system for container crane lifting and trolley compound motion
CN204958233U (en) Tower crane plays to rise wire rope and holds in palm rope device
CN205204646U (en) Four bracket dollies on bank bridge
CN102381627B (en) Hoisting mechanism
CN204727421U (en) A kind of metal pipe material hanging device
CN104016255A (en) Double-direction turning and lifting device
CN202687795U (en) Bracket and trolley combination winding device
CN208560632U (en) A kind of vehicle type counterweighted take-up
CN103640959A (en) Swaying preventing rope winding device and rope winding method of bridge type double-beam electromagnetic crane
CN202245772U (en) Gantry crane and cable drum mechanism thereof
WO2020125089A1 (en) Ultra-deep underground traction system having horizontal driving layout and method of use
CN105384068A (en) Four-bracket trolley for quayside container crane
CN205204647U (en) Three bracket dollies on bank bridge
CN102963832A (en) Steel wire rope winding system for four-point lifting and three-point balancing anti-swing hoisting mechanism
CN202247093U (en) Lifting mechanism for creel
CN202415043U (en) Double-winding-drum hoisting mechanism
CN206051390U (en) Loop winding machine
CN207498807U (en) The automatic drive device of sloping quay steel drawn bridge
CN203767902U (en) Hoisting crane structure of folding block of steel box girder of cable-stayed bridge
CN206720597U (en) A kind of electric single beam crane of anti-knotting
CN106882709A (en) A kind of electric single beam crane of anti-knotting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant