CN100358795C - Steel cable winding system for container crane lifting and trolley compound motion - Google Patents

Steel cable winding system for container crane lifting and trolley compound motion Download PDF

Info

Publication number
CN100358795C
CN100358795C CNB2005100274430A CN200510027443A CN100358795C CN 100358795 C CN100358795 C CN 100358795C CN B2005100274430 A CNB2005100274430 A CN B2005100274430A CN 200510027443 A CN200510027443 A CN 200510027443A CN 100358795 C CN100358795 C CN 100358795C
Authority
CN
China
Prior art keywords
pulley
steel rope
suspender
shelf
wrapped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100274430A
Other languages
Chinese (zh)
Other versions
CN1785780A (en
Inventor
田洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenhua Port Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenhua Port Machinery Co Ltd filed Critical Shanghai Zhenhua Port Machinery Co Ltd
Priority to CNB2005100274430A priority Critical patent/CN100358795C/en
Publication of CN1785780A publication Critical patent/CN1785780A/en
Application granted granted Critical
Publication of CN100358795C publication Critical patent/CN100358795C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The present invention relates to a steel wire rope winding system for the lifting of a container crane and the compound motion of a trolley, which comprises two driving drums, a plurality of groups of tensioning mechanisms, trolley pulleys and a plurality of steel wire ropes, wherein the number of the trolley pulleys is even; the number of the steel wire ropes is identical to that of the trolley pulleys; a steel wire rope is respectively wound at the left side and the right side of each driving drum; one or two steel wire ropes are wound in the middle part of each driving drum. After each steel wire rope led out respectively and orderly penetrates through a direction change pulley and a trolley pulley, the steel wire ropes are respectively connected to the left side, the right side or the middle part of an upper hanger frame. Because the present invention integrates a traditional lifting steel wire rope winding system and a dragging steel wire rope winding system of a trolley, the steel wire rope winding system of the crane is greatly simplified. The present invention solves the problems of the lifting movement and the horizontal movement of the upper hanger frame and carried goods thereof, and the anti-swing problem of the upper hanger frame. Besides, the service life of the steel wire ropes is extended, so the present invention is economic and reliable.

Description

Container crane lifting and trolley compound motion steel cable winding system
Technical field
The present invention relates to a kind of container handling crane parts, particularly a kind of container crane lifting and trolley compound motion steel cable winding system.
Background technology
In the container handling crane of prior art, hoist motion and the moving of car of freight container generally overlap independently by two that drive system realizes.If dolly adopts the traction form, the steel cable winding system of then being used to realize to hoist motion and moving of car also is two separate covers.To the steel cable winding system of the motion that is used to realize to hoist, conventional winding form causes waving that suspender puts on the shelf easily, and hoist motion and moving of car adopt steel cable winding system respectively, make the layout and the complex structure of hoisting crane.
Summary of the invention
Purpose of the present invention is to solve the problems referred to above that prior art exists, and a kind of container crane lifting and trolley compound motion steel cable winding system are provided.
To achieve these goals, the present invention has adopted following technical scheme: a kind of container crane lifting and trolley compound motion steel cable winding system, described container handling crane comprises machine room, front and back crossbeam, suspender is put on the shelf and dolly, be characterized in that described steel cable winding system comprises:
Two drive reel, and its end that is parallel to hoisting crane front and back crossbeam is installed in respectively in the machine room of hoisting crane;
Many group stretching devices, every group of stretching device comprises a changed course pulley, organizes stretching device more and is divided equally into the corresponding end that is installed in forward and backward crossbeam of two big groups;
A plurality of little pulley sheaves become even number to be divided equally into the both sides that two groups of correspondences are arranged on dolly;
With the same number of many steel ropes of little pulley sheave, it is wrapped in left side, right side and the centre of two driving reels respectively, and the other end of every steel rope is connected left side, right side or the centre that suspender is put on the shelf after passing a changed course pulley and a dolly pulley respectively successively.
Above-mentioned container crane lifting and trolley compound motion steel cable winding system, wherein, described steel rope is the six roots of sensation, and described stretching device is six groups, and described little pulley sheave is six; Steel cable is respectively twined in left side, right side and the centre of each driving reel, and the other end of every steel rope is connected left side, right side or the centre that suspender is put on the shelf after passing a changed course pulley and a dolly pulley respectively successively.
Above-mentioned container crane lifting and trolley compound motion steel cable winding system, wherein, described steel rope is eight, and described stretching device is eight groups, and described little pulley sheave is eight; Steel cable is respectively twined on the left side and the right side of each driving reel, and two steel ropes are respectively twined in the centre, and the other end of every steel rope is connected left side, right side or the centre that suspender is put on the shelf after passing a changed course pulley and a dolly pulley respectively successively.
Above-mentioned container crane lifting and trolley compound motion steel cable winding system, wherein, the described suspender two ends of putting on the shelf are respectively equipped with a steel rope link span, and both sides were respectively equipped with one or two steel rope link span in the middle of suspender was put on the shelf; Described two steel ropes that drive the reel left and right sides that are wrapped in intersect at suspender after through the dolly pulley and put on the shelf on the steel rope link span at two ends, form del; Described be wrapped in two drive steel ropes in the middle of the reels through the dolly pulley after cross connection on suspender is put the steel rope link span of both sides on the shelf, its cross angle is identical with above-mentioned del angle.
Container crane lifting of the present invention and trolley compound motion steel cable winding system are owing to unite two into one traditional hoist rope winding system and dolly haulage cable winding system, the steel cable winding system of hoisting crane is simplified greatly, it both solved suspender put on the shelf (and entrained goods) hoist the motion and horizontal motion, solved the anti-problem of shaking that suspender is put on the shelf simultaneously, and improved the service life of steel rope, not only economy but also reliable.
Description of drawings
Fig. 1 is the structural principle scheme drawing (six rope forms) of container crane lifting of the present invention and trolley compound motion steel cable winding system one embodiment;
Fig. 2 is the structural principle scheme drawing (eight rope forms) of container crane lifting of the present invention and trolley compound motion steel cable winding system one embodiment.
The specific embodiment
See also Fig. 1, this is an embodiment of container crane lifting of the present invention and trolley compound motion steel cable winding system, is the steel cable winding system of six rope forms.Container handling crane among the present invention comprises that machine room (not shown), front and back crossbeam (not shown), suspender put 3 and dolly (only showing the pulley on the dolly) on the shelf.Suspender 3 two ends of putting on the shelf are respectively equipped with steel rope link span 31,32, and middle both sides are respectively equipped with steel rope link span 33,34.The present embodiment steel cable winding system comprises: two drive reel 11,21, it is parallel to the end of hoisting crane front and back crossbeam, be installed in respectively in the machine room of hoisting crane, wherein drive reel 11 and be arranged on, drive reel 21 and be arranged on towards back crossbeam one side towards preceding crossbeam one side.Six groups of stretching devices 121,122,123,221,222,223, every group of stretching device comprises a changed course pulley 1211,1221,1231,2211,2221,2231 respectively, the end of crossbeam before wherein three groups of stretching devices 121,122,123 are installed in, the end of crossbeam after three groups of stretching devices 221,222,223 are installed in addition.Six dolly pulleys 131,132,133,231,232,233 are divided into the both sides that two groups of correspondences are arranged on dolly, wherein dolly pulley 131,132,133 be arranged on the dolly towards preceding crossbeam one side, dolly pulley 231,232,233 be arranged on the dolly towards back crossbeam one side.One end of six roots of sensation steel rope 141,142,143,241,242,243 is wrapped in respectively on two driving reels 11,21, wherein steel rope 141 be wrapped in the left side that drives reel 11 and forward the crossbeam end direction draw, steel rope 142 be wrapped in the centre that drives reel 11 and forward the crossbeam end direction draw, steel rope 143 be wrapped in the right side that drives reel 11 and forward the crossbeam end direction draw; Steel rope 241 be wrapped in the left side that drives reel 21 and backward the crossbeam end direction draw, steel rope 242 be wrapped in the centre that drives reel 21 and backward the crossbeam end direction draw, steel rope 243 be wrapped in the right side that drives reel 21 and backward the crossbeam end direction draw.Pass successively after steel rope 141 is drawn and be connected suspender behind changed course pulley 1211 and the dolly pulley 131 and put on the shelf on the steel rope link span 31 in 3 left sides; Pass successively after steel rope 142 is drawn and be connected suspender behind changed course pulley 1221 and the dolly pulley 132 and put on the shelf on the steel rope link span 33 in the middle of 3; Pass successively after steel rope 143 is drawn and be connected suspender behind changed course pulley 1231 and the dolly pulley 133 and put on the shelf on the steel rope link span 32 on 3 right sides; Pass successively after steel rope 241 is drawn and be connected suspender behind changed course pulley 2211 and the dolly pulley 231 and put on the shelf on the steel rope link span 31 in 3 left sides; Pass successively after steel rope 242 is drawn and be connected suspender behind changed course pulley 2221 and the dolly pulley 232 and put on the shelf on the steel rope link span 34 in the middle of 3; Pass successively after steel rope 243 is drawn and be connected suspender behind changed course pulley 2231 and the dolly pulley 233 and put on the shelf on the steel rope link span 32 on 3 right sides.Wherein steel rope 141 and steel rope 241 intersect at suspender and put on the shelf on the steel rope link span 31 of left end, form del; Steel rope 143 and steel rope 243 intersect at suspender and put on the shelf on the steel rope link span 32 of right-hand member, form del; Steel rope 142 and steel rope 242 cross connections are on suspender is put the steel rope link span 33,34 of 3 both sides on the shelf, and its cross angle is identical with above-mentioned del angle.What this connection mode of steel rope can prevent well that suspender from putting on the shelf waves.
See also Fig. 2, this is another embodiment of container crane lifting of the present invention and trolley compound motion steel cable winding system.The basic structure of present embodiment is identical with embodiment 1, and different is, has adopted eight steel ropes, corresponding setting eight groups of stretching devices and eight little pulley sheaves, form the steel cable winding system of eight rope forms.Put on the shelf 6 two ends of suspender in the present embodiment are respectively equipped with steel rope link span 61,62, and middle both sides are respectively equipped with two steel rope link spans, and wherein a side is provided with two steel rope link spans 63,64, and opposite side is provided with two steel rope link spans 65,66.The present embodiment steel cable winding system comprises: two drive reel 41,51, it is parallel to the end of hoisting crane front and back crossbeam, be installed in respectively in the machine room of hoisting crane, wherein drive reel 41 and be arranged on, drive reel 51 and be arranged on towards back crossbeam one side towards preceding crossbeam one side.Eight groups of stretching devices 421,422,423,424,521,522,523,524, every group of stretching device comprises a changed course pulley 4211,4221,4231,4241,5211,5221,5231,5241 respectively, the end of crossbeam before wherein four groups of stretching devices 421,422,423,424 are installed in, the end of crossbeam after four groups of stretching devices 521,522,523,524 are installed in addition; Eight dolly pulleys 431,432,433,434,531,532,533,534 are divided into the both sides that two groups of correspondences are arranged on dolly; Wherein dolly pulley 431,432,433,434 be arranged on the dolly towards preceding crossbeam one side, dolly pulley 531,532,533,534 be arranged on the dolly towards back crossbeam one side.One end of eight steel ropes 441,442,443,444,541,542,543,544 is wrapped in respectively on two driving reels 41,51, wherein steel rope 441 be wrapped in the left side that drives reel 41 and forward the crossbeam end direction draw, steel rope 442,443 be wrapped in respectively the centre that drives reel 41 and forward the crossbeam end direction draw, steel rope 444 be wrapped in the right side that drives reel 41 and forward the crossbeam end direction draw; Steel rope 541 be wrapped in the left side that drives reel 51 and backward the crossbeam end direction draw, steel rope 542,543 be wrapped in respectively the centre that drives reel 51 and backward the crossbeam end direction draw, steel rope 544 be wrapped in the right side that drives reel 51 and backward the crossbeam end direction draw.Pass successively after steel rope 441 is drawn and be connected suspender behind changed course pulley 4211 and the dolly pulley 431 and put on the shelf on the steel rope link span 61 in 6 left sides; Pass successively after steel rope 442 is drawn and be connected suspender behind changed course pulley 4221 and the dolly pulley 432 and put on the shelf on the steel rope link span 63 in the middle of 6; Pass successively after steel rope 443 is drawn and be connected suspender behind changed course pulley 4231 and the dolly pulley 433 and put on the shelf on the steel rope link span 64 in the middle of 6; Pass successively after steel rope 444 is drawn and be connected suspender behind changed course pulley 4241 and the dolly pulley 434 and put on the shelf on the steel rope link span 62 on 6 right sides; Pass successively after steel rope 541 is drawn and be connected suspender behind changed course pulley 5211 and the dolly pulley 531 and put on the shelf on the steel rope link span 61 in 6 left sides; Pass successively after steel rope 542 is drawn and be connected suspender behind changed course pulley 5221 and the dolly pulley 532 and put on the shelf on the steel rope link span 65 in the middle of 6; Pass successively after steel rope 543 is drawn and be connected suspender behind changed course pulley 5231 and the dolly pulley 533 and put on the shelf on the steel rope link span 66 in the middle of 6; Pass successively after the drawing of steel rope 544 and be connected suspender behind changed course pulley 5241 and the dolly pulley 534 and put on the shelf on the steel rope link span 62 on 6 right sides.Wherein steel rope 441 and steel rope 541 intersect at suspender and put on the shelf on the steel rope link span 61 of left end, form del; Steel rope 444 and steel rope 544 intersect at suspender and put on the shelf on the steel rope link span 62 of right-hand member, form del; Steel rope 442 and steel rope 542 cross connections are on suspender is put the steel rope link span 63,65 of 6 both sides on the shelf, steel rope 443 and steel rope 543 cross connections are on suspender is put the steel rope link span 64,66 of 6 both sides on the shelf, and its cross angle is identical with above-mentioned del angle.
The principle of work of container crane lifting of the present invention and trolley compound motion steel cable winding system can be described as follows in conjunction with Fig. 1:
Hoist when motion at needs, drive reel 11,21 and receive rope simultaneously with identical rotating speed, then suspender 3 (and the goods sling) of putting on the shelf rise; Drive reel 11,21 and put rope simultaneously with identical rotating speed, then suspender 3 (and the goods sling) of putting on the shelf descend, and this moment, dolly was motionless.
When needs are made moving of car, drive reel 11,21 and receive rope with one of identical rotating speed, put rope for one, then suspender 3 (and the goods sling) of putting on the shelf do not move up and down, and dolly moves horizontally, and drives suspender and put on the shelf and follow dolly and move horizontally.
When needs hoist the motion and the Union Movement of moving of car, drive reel 11,21 with different rotating speeds and direction motion, just can realize existing suspender the hoisting or descending motion of 3 (and goods of being sling) of putting on the shelf, horizontal displacement is arranged again, thereby realize the motion of crane hoisting and the various operating modes of dolly.

Claims (4)

1, a kind of container crane lifting and trolley compound motion steel cable winding system, described container handling crane comprises machine room, front and back crossbeam, suspender is put on the shelf and dolly, it is characterized in that, described steel cable winding system comprises:
Two drive reel, and the end that it is parallel to hoisting crane front and back crossbeam is installed in respectively in the machine room of hoisting crane;
Many group stretching devices, every group of stretching device comprises a changed course pulley, organizes stretching device more and is divided equally into the corresponding end that is installed in forward and backward crossbeam of two big groups;
A plurality of little pulley sheaves are divided into two groups, and correspondence is arranged on the both sides of dolly;
With the same number of many steel ropes of little pulley sheave, it is wrapped in left side, right side and the centre of two driving reels respectively; The other end that is wrapped in the steel rope that drives the reel left side passes successively and is connected the suspender left side of putting on the shelf behind the pulley in changed course pulley of one in the stretching device and the little pulley sheave; Being wrapped in the steel rope other end that drives in the middle of the reel passes successively and is connected behind the pulley in changed course pulley of one in the stretching device and the little pulley sheave in the middle of suspender puts on the shelf; Be wrapped in and be connected the suspender right side of putting on the shelf behind the changed course pulley that passes successively after the steel rope that drives the reel right side is drawn in the stretching device and the pulley in the little pulley sheave;
Simultaneously, the steel rope on the same reel is cooresponding is same group little pulley sheave.
2, container crane lifting according to claim 1 and trolley compound motion steel cable winding system is characterized in that: described steel rope is the six roots of sensation, and the changed course pulley of described stretching device is six groups, and described little pulley sheave is six; Steel cable is respectively twined in left side, right side and the centre of each driving reel, wherein:
First steel rope is wrapped in and is connected the suspender left side of putting on the shelf behind the first changed course pulley that passes stretching device after draw in the left side that drives reel successively and first pulley in the little pulley sheave; Second steel rope is wrapped in and is connected behind the second changed course pulley that passes stretching device after draw the centre that drives reel successively and second pulley in the little pulley sheave in the middle of suspender puts on the shelf; The 3rd steel rope is wrapped in and is connected the suspender right side of putting on the shelf behind the 3rd changed course pulley that passes stretching device after draw on the right side that drives reel successively and the 3rd pulley in the little pulley sheave; The 4th steel rope is wrapped in and is connected the suspender left side of putting on the shelf behind the 4th changed course pulley that passes stretching device after draw in the left side that drives reel successively and the 4th pulley in the little pulley sheave; The 5th steel rope is wrapped in and is connected behind the 5th changed course pulley that passes stretching device after draw the centre that drives reel successively and the 5th pulley in the little pulley sheave in the middle of suspender puts on the shelf; The 6th steel rope is wrapped in and is connected the suspender right side of putting on the shelf behind the 6th changed course pulley that passes stretching device after draw on the right side that drives reel successively and the 6th pulley in the little pulley sheave.
3, container crane lifting according to claim 1 and trolley compound motion steel cable winding system is characterized in that: described steel rope is eight, and the changed course pulley of described stretching device is eight groups, and described little pulley sheave is eight; Steel cable is respectively twined on the left side and the right side of each driving reel, and two steel ropes are respectively twined in the centre, wherein:
First steel rope is wrapped in and is connected the suspender left side of putting on the shelf behind the first changed course pulley that passes stretching device after draw in the left side that drives reel successively and first pulley in the little pulley sheave; Second steel rope and the 3rd steel rope are wrapped in the centre that drives reel respectively, pass successively after second steel rope is drawn to be connected behind the second changed course pulley of stretching device and second pulley in the little pulley sheave in the middle of suspender puts on the shelf; Pass successively after the 3rd steel rope is drawn and be connected behind the 3rd pulley in the 3rd changed course pulley and the little pulley sheave of stretching device in the middle of suspender puts on the shelf; The 4th steel rope is wrapped in and is connected the suspender right side of putting on the shelf behind the 4th changed course pulley that passes stretching device after draw on the right side that drives reel successively and the 4th pulley in the little pulley sheave; The 5th steel rope is wrapped in and is connected the suspender left side of putting on the shelf behind the 5th changed course pulley that passes stretching device after draw in the left side that drives reel successively and the 5th pulley in the little pulley sheave; Six, the 7th steel rope is wrapped in the centre that drives reel respectively, passes successively after the 6th steel rope is drawn to be connected behind the 6th changed course pulley of stretching device and the 6th pulley in the little pulley sheave in the middle of suspender puts on the shelf; Pass successively after the 7th steel rope is drawn and be connected behind the 7th pulley in the 7th changed course pulley and the little pulley sheave of stretching device in the middle of suspender puts on the shelf; The 8th steel rope is wrapped in and is connected the suspender right side of putting on the shelf behind the 8th changed course pulley that passes stretching device after draw on the right side that drives reel successively and the 8th pulley in the little pulley sheave.
4, according to claim 1 or 2 or 3 described container crane liftings and trolley compound motion steel cable winding system, it is characterized in that: the described suspender two ends of putting on the shelf are respectively equipped with a steel rope link span, and both sides were respectively equipped with one or two steel rope link span in the middle of suspender was put on the shelf; Described two steel ropes that drive the reel left and right sides that are wrapped in intersect at suspender after through the dolly pulley and put on the shelf on the steel rope link span at two ends, form del; Described be wrapped in two drive steel ropes in the middle of the reels through the dolly pulley after cross connection on suspender is put the steel rope link span of both sides on the shelf, its cross angle is identical with above-mentioned del angle.
CNB2005100274430A 2005-07-01 2005-07-01 Steel cable winding system for container crane lifting and trolley compound motion Expired - Fee Related CN100358795C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100274430A CN100358795C (en) 2005-07-01 2005-07-01 Steel cable winding system for container crane lifting and trolley compound motion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100274430A CN100358795C (en) 2005-07-01 2005-07-01 Steel cable winding system for container crane lifting and trolley compound motion

Publications (2)

Publication Number Publication Date
CN1785780A CN1785780A (en) 2006-06-14
CN100358795C true CN100358795C (en) 2008-01-02

Family

ID=36783403

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100274430A Expired - Fee Related CN100358795C (en) 2005-07-01 2005-07-01 Steel cable winding system for container crane lifting and trolley compound motion

Country Status (1)

Country Link
CN (1) CN100358795C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287975B (en) * 2013-04-24 2015-09-23 交通运输部水运科学研究所 Hoisting crane compound motion control method
CN103332615B (en) * 2013-07-22 2015-06-03 中联重科股份有限公司 Tensioning device and crane with same
CN104249973B (en) * 2014-10-11 2016-08-24 华电重工股份有限公司 A kind of dolly winding system up and down
CN104477774A (en) * 2014-12-29 2015-04-01 大连华锐重工起重机有限公司 Crane steel wire rope anti-swing system
CN104925668A (en) * 2015-05-20 2015-09-23 河南省恒远起重机械集团有限公司 Anti-swing system for crane
CN105384079B (en) * 2015-11-13 2017-08-25 同济大学 Differential type track container crane
CN108581583B (en) * 2018-07-28 2019-08-20 重庆宏钢数控机床有限公司 Ball-screw pre-stretching amount controllable adjustment device
CN110027986B (en) * 2019-05-04 2024-05-14 华电蓝科科技股份有限公司 Walking wire rope winding system and walking mechanism of external lower trolley of traditional shore bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3874516A (en) * 1972-12-29 1975-04-01 Ishikawajima Harima Heavy Ind Device for preventing the swaying of the suspending means in a crane
JPH09142774A (en) * 1995-11-21 1997-06-03 Kawasaki Heavy Ind Ltd Method and device for preventing swing of lifted load for container crane
JP2001048473A (en) * 1999-08-05 2001-02-20 Sumitomo Heavy Ind Ltd Multipurpose crane
JP2003040575A (en) * 2001-07-24 2003-02-13 Ishikawajima Harima Heavy Ind Co Ltd Container crane
CN1448330A (en) * 2002-03-29 2003-10-15 上海振华港口机械(集团)股份有限公司 Differential trolley container crane
CN1521107A (en) * 2003-02-12 2004-08-18 上海振华港口机械(集团)股份有限公 Deviation correcting technology for a steel cable winding type sling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3874516A (en) * 1972-12-29 1975-04-01 Ishikawajima Harima Heavy Ind Device for preventing the swaying of the suspending means in a crane
JPH09142774A (en) * 1995-11-21 1997-06-03 Kawasaki Heavy Ind Ltd Method and device for preventing swing of lifted load for container crane
JP2001048473A (en) * 1999-08-05 2001-02-20 Sumitomo Heavy Ind Ltd Multipurpose crane
JP2003040575A (en) * 2001-07-24 2003-02-13 Ishikawajima Harima Heavy Ind Co Ltd Container crane
CN1448330A (en) * 2002-03-29 2003-10-15 上海振华港口机械(集团)股份有限公司 Differential trolley container crane
CN1521107A (en) * 2003-02-12 2004-08-18 上海振华港口机械(集团)股份有限公 Deviation correcting technology for a steel cable winding type sling

Also Published As

Publication number Publication date
CN1785780A (en) 2006-06-14

Similar Documents

Publication Publication Date Title
CN100358795C (en) Steel cable winding system for container crane lifting and trolley compound motion
CN1329274C (en) Machine-roomless elevator system with elevator machine mounted on elevator car
CN101070133B (en) Double 40-feet container yard gantry crane
CN101291867B (en) Elevator apparatus
CN104760870A (en) Double-host driving elevator
CN104261267B (en) Energy-saving quayside container crane system provided with crossing type double trolleys
CN205955757U (en) Section of jurisdiction overhead hoist
CN102992206A (en) Swing arm tower crane and mounting method of swing arm tower crane variable amplitude pull rod
CN107344697A (en) Cable boom hoisting
CN201183725Y (en) Crane rope winding system
US6651961B1 (en) Multiple load blocks for a crane
CN205011258U (en) A double small car actuating mechanism for passing through formula double small car bank bridge
CN107176548B (en) A kind of cable crane overhead traveling crane closed circulation trailer system and traction method
CN102795545A (en) Stabilizing device of tire-type crane lift
CN204802875U (en) Counter weight anti -swing device
CN208906979U (en) A kind of rope winding device of forcibly driving elevator
CN211521292U (en) Elevator structure without machine room
CN204057812U (en) The two reel wiring system of duplex
CN104176668B (en) Duplex two-fold cylinder wiring system
CN202429917U (en) Gantry crane and anti-rolling lifting device thereof
CN112158726B (en) Application method of parallel-rail double-bridge crane in shaft construction
CN212387527U (en) High traction ratio winding type elevator traction system
CN209259450U (en) A kind of device helping lift car lifting
CN107311048A (en) Cable crane
CN105480860A (en) Double-girder crane and hoisting trolley thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI ZHENHUA HEAVY INUDSTRY ( GROUP ) CO., LTD

Free format text: FORMER NAME: SHANGHAI ZHENHUA HARBOUR MACHINERY (GROUP) CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: No. 3470 South Pudong Road, Shanghai

Patentee after: Shanghai Zhenhua Heavy Industries (Group) Co., Ltd.

Address before: No. 3470 South Pudong Road, Shanghai

Patentee before: Shanghai Zhenhua Port Machinery (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080102

Termination date: 20210701