CN205025493U - Full tailings paste filling dewatering system - Google Patents

Full tailings paste filling dewatering system Download PDF

Info

Publication number
CN205025493U
CN205025493U CN201520777843.2U CN201520777843U CN205025493U CN 205025493 U CN205025493 U CN 205025493U CN 201520777843 U CN201520777843 U CN 201520777843U CN 205025493 U CN205025493 U CN 205025493U
Authority
CN
China
Prior art keywords
goaf
filter pipe
pipe
dewatering system
fire dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520777843.2U
Other languages
Chinese (zh)
Inventor
李业辉
李雁翎
李镇瀚
冯连喜
秦健春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lame Zinc Mine Of Guangxi Jin He Mining Co Ltd
LIUZHOU CHINA TIN COLORED AND DESIGN INSTITUTE Co Ltd
Original Assignee
Lame Zinc Mine Of Guangxi Jin He Mining Co Ltd
LIUZHOU CHINA TIN COLORED AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lame Zinc Mine Of Guangxi Jin He Mining Co Ltd, LIUZHOU CHINA TIN COLORED AND DESIGN INSTITUTE Co Ltd filed Critical Lame Zinc Mine Of Guangxi Jin He Mining Co Ltd
Priority to CN201520777843.2U priority Critical patent/CN205025493U/en
Application granted granted Critical
Publication of CN205025493U publication Critical patent/CN205025493U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Materials (AREA)

Abstract

The utility model discloses a full tailings paste filling dewatering system, this system include the collecting space area in mine and set up the fire dam in collecting space area bottom passway department that the strainer arranges to extend along the collecting space area inclined bottom plate in the collecting space area bottom and lay to the collecting space area top that the strainer is arranged in inside " well " the type that adopts in collecting space area to the intercommunication constitutes netted dehydration structure each other, is being close to fire dam department, and the strainer converges into several main strainers and passes the fire dam and insert the sedimentation tank. This technique has been solved current tailings and has been filled dehydration inefficiency that dehydration techniques exists, the scheduling problem that blocks up easily, and it is fast to have a dehydration, the advantage of stable performance.

Description

Crude tailings paste body filling dewatering system
Technical field
The utility model relates to mine worked-out section filling technique, refers to the system utilizing crude tailings lotion to carry out filling dehydration especially.
Background technology
Mining activity often causes massif inside built on stilts, and in order to prevent subsidence, need to carry out filling process to mine worked-out section, crude tailings paste body filling is conventional filling way.Crude tailings paste body filling is filled in mine worked-out section by plant equipment by lotion or Paste-like body tailings, supports mine massif conversely, thus reach the object preventing subsidence after its dehydration, sclerosis.The lotion that stowing operation is used or Paste-like body tailings are the high concentration last mortars that concentration is greater than 70%, its water content about 30%, and lotion tailings could be pressed after only having fully dehydration stable with effectively controlling dead zone, and therefore the dehydration of crude tailings lotion is very important link.
Non cemented filling technology is the one in crude tailings paste body filling technology, namely adopts crude tailings lotion (or approximate lotion) bashing, does not add cementitious materials, rely on natural drainage of tailings deposition dehydrating, Non cemented filling technical operation is simple, with low cost, by many mining areas are favored.But often there is potential safety hazard in Non cemented filling, because natural subsidence dewatering time is longer, tailings water can not be discharged in time, obturation is made to be in High water cut state for a long time, fire dam bottom goaf can be caused to bear pressure larger, affect the stable of fire dam, personnel and device security are constituted a threat to, increase underground work risk.How being leached as early as possible by the gravity water in lotion or Paste-like body tailings slurry, make obturation reach stable, is a difficult problem of mine down-hole tailings Non cemented filling.
Domestic patent database also have some about mine goaf tailing fill dehydration technique open source literature report:
Such as: [application number] CN201210565190.2, [applying date] 2012.12.24, [title] one goaf group method for filling and treating on a large scale, its technical scheme is: divide filling unit, selects filler, arranges filling pipeline; Determine filling counterfort thickness according to calculating and carry out site operation, filling counterfort internal reservation drain hole and treatment hole, and hillock loaded filter of banking up after filling counterfort; Arrange filter pipe, and stretch out outside wall by the treatment hole of filling counterfort; At peak place construction filling borehole, diameter 133mm-150mm, as high-order tapping point, guarantees to connect top, the filling borehole of respective numbers of simultaneously should constructing according to actual conditions, carries out alternately filling.But this invention is not suitable for Non cemented filling, because a limited number of filter pipe does not reach the object of fast dewatering, the long dehydration phase, increase subsidence risk.
Such as: [application number] CN201420161397.8, [applying date] 2014.04.04, [title] tailing cemented filling dewatering and drainage device, disclose a kind of tailing cemented filling dewatering and drainage device, it comprises some gutters of filling partition wall and setting parallel to each other, and one end of gutter passes from filling partition wall; Each root gutter is connected with some filter pipes respectively by threeway; Described filter pipe trend is all vertical with gutter.Ensure that drainage pipeline and obturation can uniform contact, and contact area is comparatively large, ensure that obturation has good water permeability.Direct UNICOM bottom gutter and filter pipe, drainage better effects if.Same, some filter pipes of this utility model do not reach the object of fast dewatering yet, and bending, tediously long drainage channel very easily blocks.
Such as: [application number] CN201320446777.1, [applying date] 2013.07.25, [title] a kind of tailing-filled mould bag damming out device, this device comprises tailing-filled mould bag and builds a dam, tailing-filled mould bag is built a dam the multilayer film bag dam comprising and forming with tailing-filled geotechnical fabric bag, establishes flexible porous tube at upper surface interval, every layer of mould bag dam.Described flexible porous tube curves outsourcing one deck water permeability earth working material after helical form by elastomeric material.Tailing-filled mould bag built a dam in process by flexible porous tube and terminate to discharge in the timely ordered set of infiltration of rear mold bag dam body inside.It is to be filled in the geotechnical fabric bag that is laid on the dam foundation by Hydraulic transportation after utilizing tailings pulping and to form the novel damming method of one of dam body that described tailing-filled mould bag is built a dam.This utility model can play dehydration, but complex operation, and drainage efficiency is not high.
Therefore, it is low to there is dewatering efficiency in existing tailings filling dehydration technique, and the problem of easily blocking up, does not reach the object of fast dewatering, require further improvement.
Summary of the invention
The purpose of this utility model fills for existing tailings the problem that the dewatering efficiency of dehydration technique is low, easily block up, and provides a kind of quick, stable crude tailings paste body filling dewatering system.
Crude tailings paste body filling dewatering system of the present utility model, comprise the goaf in mine and be arranged on the fire dam at foot passage mouth place, goaf, filter pipe to be arranged in bottom goaf and to extend along goaf inclined bottom plate and lays to top, goaf, filter pipe adopts " well " type to arrange in inside, goaf, and the netted dehydrated structure of formation that is interconnected, at close fire dam place, filter pipe merges into several main filter pipe, main filter pipe picks out bottom goaf, through fire dam access sedimentation basin, filter pipe is combined by the pressure-bearing pipe with drain hole and the filter cloth being wrapped in pressure-bearing pipe outer wall.
Perpendicular tee joint pipe is adopted to be communicated with between the filter pipe crossed between two forming netted dehydrated structure, filter pipe adopts polyvinyl chloride pressure-bearing pipe (can select PE100(SDR11) polyvinyl chloride pressure-bearing pipe), the diameter of pressure-bearing pipe is 50mm, and thickness is 4.6mm, and pressure-bearing value is 1.6MPa.
Described drain hole diameter is 15-20mm, adopts blossom type to arrange, interval 30mm between drain hole.Described filter cloth order number is 60-80 orders, its objective is and only allows water to pass through, and stops tailings to enter filter pipe, thus realizes tailings dehydration.The filter pipe be laid in bottom goaf adopts barren rock extruding fixing, adopts anchorage style to fix at the filter pipe of inclined floor.
The body of wall of described fire dam embeds rock mass, is combined as a whole with rock mass, improves the intensity of fire dam, prevents tailings tail water seepage.Body of wall adopts the concrete wall of more than C20 intensity, barren rock, fine sand and palm fibre pad to form, and fire dam thickness calculates according to goaf height, lotion tailings character and port section size etc. to be determined.
Crude tailings paste body filling dewatering system of the present utility model allows the water in tailings dewater in the mode of infiltration, two main process are divided to discharge goafs, one is when last mortar enters goaf, there is pressure reduction when tailings contacts with filter pipe net, tailings water discharges goaf enter filter pipe from last mortar after; Two when being natural drainage of tailings sedimentations, and tailings water enters filter pipe net and discharges goaf from the top in obturation.
The construction method of crude tailings paste body filling dewatering system of the present utility model, adopt because the pipe network of filter pipe, fire dam and sedimentation basin entirety are combined into filling dewatering system, step is as follows:
(1) before bashing, in goaf, tunnel fire dam is constructed at foot passage mouth place.
(2) adopt polyvinyl chloride pressure-bearing pipe and filter cloth to make filter pipe, evenly offer drain hole in pressure-bearing tube wall surrounding, at filter pipe outer wrapping filter cloth.
(3) being arranged in by filter pipe bottom goaf and extending along goaf inclined bottom plate lays to top, goaf, and described filter pipe adopts " well " type to arrange, interval 15-20m, and is interconnected and forms netted dehydrated structure.
(4) outside goaf, suitable location establishes sedimentation basin, is picked out by main filter pipe bottom goaf, then through fire dam access sedimentation basin.
Described fire dam is made up of the concrete wall of more than C20 intensity, barren rock, fine sand and palm fibre pad, and in building course, fire dam thickness calculates according to goaf height, lotion tailings character and port section size etc. to be determined.
The utility model compared with prior art has following progress:
1, crude tailings paste body filling dewatering system of the present utility model, filter pipe is combined into net, the contact area increasing filter pipe and tailings on the one hand improves dewatering efficiency, on the other hand, even if part filter pipe gets congestion, because pipeline is numerous, still do not affect native system proper drainage, stability is stronger.
2, make bashing tailings rapid subsidence, greatly shorten tailings and reach the stable time, and the tailings water leached is clear water, without the need to process, recyclable recycling.
3, crude tailings paste body filling dewatering system, be applied to the goaf filter draining of crude tailings lotion or paste-like backfill, solve a non-cementing tailing-filled dehydration difficult problem, and technology investment cost is low, processing ease, dehydrating effect is good.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is filter pipe structural representation of the present utility model.
Fig. 2 is filter pipe net system schematic of the present utility model.
Fig. 3 A is goaf of the present utility model fire dam structural representation; Fig. 3 B is the C-C generalized section in Fig. 3 A.
Fig. 4 is crude tailings paste body filling screening system schematic diagram of the present utility model.
In figure, 1-drain hole; 2-filter pipe; 3-filter cloth; 4-perpendicular tee joint pipe; 5-fire dam; 6-goaf; 7-sedimentation basin.
Detailed description of the invention
As shown in figures 1-4, crude tailings paste body filling dewatering system of the present utility model comprises the goaf 6 in mine and is arranged on the fire dam 5 at foot passage mouth place, goaf, filter pipe 2 to be arranged in bottom goaf and to extend along goaf inclined bottom plate and lays to top, goaf (as shown in Figure 4), described filter pipe adopts # type to arrange in inside, goaf, and the netted dehydrated structure of the formation (as shown in Figure 2) that is interconnected, at close fire dam 5 place, filter pipe merges into several main filter pipe, main filter pipe picks out bottom goaf, through fire dam (as Fig. 3 A, shown in Fig. 3 B) access sedimentation basin 7.Described filter pipe is combined (as shown in Figure 1) by the pressure-bearing pipe with drain hole 1 and the filter cloth 3 being wrapped in pressure-bearing pipe outer wall.
Perpendicular tee joint pipe 4 is adopted to be communicated with between the filter pipe 2 crossed between two.Described filter pipe adopts polyvinyl chloride pressure-bearing pipe, and the diameter of pressure-bearing pipe is 50mm, and thickness is 4.6mm, and pressure-bearing value is 1.6MPa.Described drain hole 1 diameter is 15-20mm, adopts blossom type to arrange, interval 30mm between drain hole.Described filter cloth 3 order number is 60-80 orders.It is fixing that the filter pipe 2 be laid in bottom goaf adopts barren rock to extrude, and adopts anchorage style to fix at the filter pipe of inclined floor.
In fire dam build process, choose comparatively firm, that section the is less position of country rock and construct fire dam, need to country rock surrounding excavation foundation at constructing concrete wall displacement, the body of wall of fire dam 5 embeds rock mass, be combined as a whole with rock mass, improve the intensity of fire dam, prevent tailings tail water seepage.Barren rock fine sand wall should be piled up before concrete.Should pile up barren rock fine sand wall before building concrete, these engineerings can play the effect of buffering and drainage.
Pressure-bearing pipe surrounding is first offered drain hole (as shown in Figure 1) by the construction method of crude tailings paste body filling dewatering system of the present utility model, aperture 15-20mm, spacing 30mm, after offering drain hole, is wrapped in pressure-bearing pipe with industrial filter cloth outer and be sewn into an entirety and form filter pipe.According to the situation in goaf, filter pipe be arranged in bottom goaf and lay to top, goaf along inclined bottom plate, the webbed filter structure of shape (as shown in Figure 2).
Choose comparatively firm, that section the is less position of country rock and construct fire dam, to country rock surrounding excavation foundation, body of wall need be allowed to embed rock mass, fire dam and rock mass are combined as a whole, improve the intensity of fire dam, prevent tailings tail water seepage at constructing concrete wall displacement.Should pile up barren rock fine sand wall before concrete, these engineerings can play the effect of buffering and drainage.When constructing goaf fire dam, arrange 6-8 filter pipes (as shown in Fig. 3 A, Fig. 3 B) by design in fire dam, filter pipe collects access sedimentation basin (as shown in Figure 4) after fire dam picks out, and the tail water that goaf is discharged directly enters sedimentation basin.

Claims (7)

1. a crude tailings paste body filling dewatering system, comprise the goaf (6) in mine and be arranged on the fire dam (5) at foot passage mouth place, goaf, filter pipe (2) to be arranged in bottom goaf and to extend along goaf inclined bottom plate and lays to top, goaf, it is characterized in that: described filter pipe adopts " well " type to arrange in inside, goaf, and the netted dehydrated structure of formation that is interconnected, at close fire dam (5) place, filter pipe merges into several main filter pipe, main filter pipe picks out bottom goaf, through fire dam access sedimentation basin (7), described filter pipe is combined by the pressure-bearing pipe with drain hole (1) and the filter cloth (3) being wrapped in pressure-bearing pipe outer wall.
2. crude tailings paste body filling dewatering system according to claim 1, is characterized in that: adopt perpendicular tee joint pipe (4) to be communicated with between the filter pipe (2) crossed between two.
3. crude tailings paste body filling dewatering system according to claim 1, is characterized in that: described filter pipe adopts polyvinyl chloride pressure-bearing pipe, and the diameter of pressure-bearing pipe is 50mm, and thickness is 4.6mm, and pressure-bearing value is 1.6MPa.
4. crude tailings paste body filling dewatering system according to claim 1, is characterized in that: described drain hole (1) diameter is 15-20mm, adopts blossom type to arrange, interval 30mm between drain hole.
5. crude tailings paste body filling dewatering system according to claim 1, is characterized in that: described filter cloth (3) order number is 60-80 orders.
6. crude tailings paste body filling dewatering system according to claim 1, is characterized in that: the filter pipe (2) bottom the goaf that is laid in adopts barren rock extruding fixing, adopts anchorage style to fix at the filter pipe of inclined floor.
7. crude tailings paste body filling dewatering system according to claim 1, is characterized in that: the body of wall of described fire dam (5) embeds rock mass, is combined as a whole with rock mass.
CN201520777843.2U 2015-10-09 2015-10-09 Full tailings paste filling dewatering system Expired - Fee Related CN205025493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520777843.2U CN205025493U (en) 2015-10-09 2015-10-09 Full tailings paste filling dewatering system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520777843.2U CN205025493U (en) 2015-10-09 2015-10-09 Full tailings paste filling dewatering system

Publications (1)

Publication Number Publication Date
CN205025493U true CN205025493U (en) 2016-02-10

Family

ID=55258034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520777843.2U Expired - Fee Related CN205025493U (en) 2015-10-09 2015-10-09 Full tailings paste filling dewatering system

Country Status (1)

Country Link
CN (1) CN205025493U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165668A (en) * 2017-05-05 2017-09-15 长春黄金研究院 A kind of forced dehydration device and method of tailing filling stope
CN114165279A (en) * 2021-01-22 2022-03-11 贵州开磷集团股份有限公司 Underground wet-type filling rapid water filtering device and water filtering construction method
CN114294051A (en) * 2021-12-29 2022-04-08 临沂会宝岭铁矿有限公司 Mine goaf cemented filling method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165668A (en) * 2017-05-05 2017-09-15 长春黄金研究院 A kind of forced dehydration device and method of tailing filling stope
CN114165279A (en) * 2021-01-22 2022-03-11 贵州开磷集团股份有限公司 Underground wet-type filling rapid water filtering device and water filtering construction method
CN114294051A (en) * 2021-12-29 2022-04-08 临沂会宝岭铁矿有限公司 Mine goaf cemented filling method
CN114294051B (en) * 2021-12-29 2023-08-18 临沂会宝岭铁矿有限公司 Mine goaf cemented filling method

Similar Documents

Publication Publication Date Title
CN105179008A (en) Full tailings paste filling and dehydrating system and constructing method thereof
CN107035401B (en) A kind of abandoned mine fire damp administers new technology
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN101581088B (en) Construction method for filling mortar combined stone dam
CN103046955A (en) Large-range goaf group filling method
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN102041845A (en) United draining system for effectively lowering seepage lines in fill dam of tailing reservoir
CN101892862B (en) Full tailing filling method in large goafs
CN102644288B (en) A kind of construction method saving the anhydrous Tailings Dam of clean and safe
CN101270672A (en) Artificial ore pillar construction method
CN205025493U (en) Full tailings paste filling dewatering system
CN105926576B (en) A method of it builds a dam for upper reaches method tailings alluviation and accelerates Tailings Slurry dewatering and coagulating
CN104405436A (en) Method for improving orebody rate of supporting pit roof
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
CN102817354A (en) Method for dredging soft foundation by dredger fill and reinforcement
CN107059523A (en) A kind of construction method that road is built on reclaimed ground and the subgrade strengthening structure of construction method formation
CN108842724B (en) A kind of fine tailings and high concentration do not sort the quick damming method of tailing
CN106870001A (en) Tunnel is layered pocket type self-support filling counterfort construction method
CN105696543B (en) A kind of method that dam front row is seeped when red mud dump constructs sub- dam
CN205591201U (en) Water treatment system is gushed to interior refuse dump
CN209340000U (en) A kind of mineral building Dewatering of fills structure
CN107268364A (en) The construction method that mud bag builds road is filled on reclaimed ground
CN104594369B (en) Karst region high-pressure group hole replacement grouting method and structure thereof
CN109339095A (en) Retaining wall drainage system and its wall carry on the back loaded filter construction method
CN114483170A (en) Stope filling roof connecting structure and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210