Bow -shaped steel pipe back up support Download PDFInfo
- Publication number
- CN204899949U CN204899949U CN201520640253.5U CN201520640253U CN204899949U CN 204899949 U CN204899949 U CN 204899949U CN 201520640253 U CN201520640253 U CN 201520640253U CN 204899949 U CN204899949 U CN 204899949U
- Authority
- CN
- China
- Prior art keywords
- vault
- arch wall
- support
- steel pipe
- arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility mode relates to a bow -shaped steel pipe back up support has solved current template and has strutted the problem that has the big just installation back adjustment of longer, the safe degree of difficulty consuming time and waste time and energy. The support body that distributes around a plurality of pin, every support body includes vault back up and arch wall back up, vault back up and the tangent concatenation of arch wall back up, and the arch wall back up supports on interim inverted arch, the vault back up comprises the back up body that two sections length are different, and two sections back up bodies staggered arrangement in each pin support body, constituteing by at least two sections back up body I of arch wall back up, between vault back up and the interim inverted arch, all prop up between the two arch wall back ups and be equipped with the support steel pipe of connecting through steel tubes clamps. The utility model discloses not only having shortened the scattered mould of two linings and having strutted the time, improved the efficiency of construction, improved the reinforced (rfd) quality of two lining templates moreover effectively, saved a large amount of manpower and materials simultaneously, the cost reduces by a wide margin.
Description
Technical field
The utility model relates to the loose mould suspension device of construction two lining, is specially a kind of arc steel pipe back up support.
Background technology
Tunnel double-lining construction in, template support be two linings construction extremely important be also a very crucial procedure, template support quality directly has influence on concreting safe mass, finally has influence on the quality of whole constructing tunnel.
Conventional template supporting generally adopts the way of i iron bow member supporting, and the method is consuming time longer, and fabrication and installation difficulty is comparatively large, and after installing, adjustment often needs waste for a long time.
Summary of the invention
To there is longer, safe difficulty consuming time large and install and adjust the problem wasted time and energy afterwards in order to solve existing template support for the utility model, provides a kind of arc steel pipe back up support.
The utility model adopts following technical scheme to realize: arc steel pipe back up support, comprise the rack body distributed before and after some Pin, each rack body comprises the vault back up that coordinates with vault inner arc wall and is positioned at the vault back up left and right sides and the arch wall back up coordinated with arch wall inner arc wall, vault back up and the tangent splicing of arch wall back up, and arch wall back up is supported on Temporary invert, vault back up is made up of the back up body that two joint length are different, and two joint back up bodies interlaced arrangement in each Pin rack body, being made up of at least two joint back up body I of arch wall back up, between vault back up and Temporary invert, the supporting steel pipe connected by steel tube fastener is all installed between two arch wall back ups.
When carrying out back up installation exercise, cleaning basal plane, after substantially levelling, starts to set up arch wall scaffold, according to surveying and locating point, determines arch wall back up backing positions and fixes, assembled steel form, can carry out arch wall and build after reinforcing end-blocking; Vertically set up scaffold, 12 × 12cm lumps of wood is utilized to set up platform, fixing vault back up, assembled steel form, can carry out vault concreting after end-blocking, two joint back up body interlaced arrangement of vault back up, make the assembled seam of bow member not point-blank simultaneously, ensure that the resistance to overturning of bow member, overcoming existing template support, to there is longer, safe difficulty consuming time large and install and adjust the problem wasted time and energy afterwards.
The utility model reasonable in design is reliable, not only shortens two linings and to fall apart mould support time, improve efficiency of construction, and effectively improve the quality of two lining formwork reinforcements, save a large amount of manpower and materials, cost significantly reduces simultaneously, has the advantage that structure is simple, easy to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-vault back up, 2-arch wall back up, 3-Temporary invert, 4-back up body I, 5-supporting steel pipe.
Detailed description of the invention
Arc steel pipe back up support, comprise the rack body distributed before and after some Pin, each rack body comprises the vault back up 1 that coordinates with vault inner arc wall and is positioned at vault back up 1 left and right sides and the arch wall back up 2 coordinated with arch wall inner arc wall, vault back up 1 and the tangent splicing of arch wall back up 2, and arch wall back up 2 is supported on Temporary invert 3, vault back up 1 is made up of the back up body that two joint length are different, and two joint back up bodies interlaced arrangement in each Pin rack body, being made up of at least two joint back up body I4 of arch wall back up 2, between vault back up 1 and Temporary invert 3, the supporting steel pipe 5 connected by steel tube fastener is all installed between two arch wall back ups 2.
In specific implementation process, bottom arch wall back up 2 and between Temporary invert, be provided with adjustment bottom bracing, be convenient to control the template radian between back up body I; Examination should be carried out before using spell, ensure the accuracy of arc steel pipe back up support entirety; Arc steel pipe back up support integral installation is carried out template compound, is guaranteed two lining concrete surface non-intrusion edge of workplace after reinforcing; During stripping, from one end, first tear back up open, then form removal, the back up classification after using is put well, uses in order to next time again.
Claims (1)
1. an arc steel pipe back up support, it is characterized in that: comprise the rack body distributed before and after some Pin, each rack body comprises the vault back up (1) that coordinates with vault inner arc wall and is positioned at vault back up (1) left and right sides and the arch wall back up (2) coordinated with arch wall inner arc wall, vault back up (1) and arch wall back up (2) tangent splicing, and arch wall back up (2) is supported on Temporary invert (3), vault back up (1) is made up of the back up body that two joint length are different, and two joint back up bodies interlaced arrangement in each Pin rack body, arch wall back up (2) by least two joint back up body I(4) form, between vault back up (1) and Temporary invert (3), the supporting steel pipe (5) connected by steel tube fastener is all installed between two arch wall back ups (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520640253.5U CN204899949U (en) | 2015-08-24 | 2015-08-24 | Bow -shaped steel pipe back up support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520640253.5U CN204899949U (en) | 2015-08-24 | 2015-08-24 | Bow -shaped steel pipe back up support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204899949U true CN204899949U (en) | 2015-12-23 |
Family
ID=54922135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520640253.5U Expired - Fee Related CN204899949U (en) | 2015-08-24 | 2015-08-24 | Bow -shaped steel pipe back up support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204899949U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108145683A (en) * | 2018-01-08 | 2018-06-12 | 江阴新长机械配件有限公司 | A kind of provisional protection structure welded when axial fan hub casts sandbox |
CN109538242A (en) * | 2018-10-23 | 2019-03-29 | 中建局集团第建筑有限公司 | A kind of building method of constructing tunnel falsework |
-
2015
- 2015-08-24 CN CN201520640253.5U patent/CN204899949U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108145683A (en) * | 2018-01-08 | 2018-06-12 | 江阴新长机械配件有限公司 | A kind of provisional protection structure welded when axial fan hub casts sandbox |
CN109538242A (en) * | 2018-10-23 | 2019-03-29 | 中建局集团第建筑有限公司 | A kind of building method of constructing tunnel falsework |
CN109538242B (en) * | 2018-10-23 | 2020-09-29 | 中建一局集团第一建筑有限公司 | Building method of tunnel construction formwork support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN103195450B (en) | Hydraulic pressure tunnel invert operation trolley and inverted arch construction method | |
CN109505609B (en) | Bracket-free construction method for underground comprehensive pipe rack of shallow-buried underground excavation city and comprehensive pipe rack | |
CN107965065B (en) | Buckling support Combined type pre-embedded member construction method | |
CN104131704A (en) | Steel pipe column concrete lateral pouring method and steel pipe column structure used in method | |
CN103375171A (en) | Counterforce frame in shield hole | |
CN104533450A (en) | One-time-concreting construction method of inverted arch low wall of single-track tunnel | |
CN104131700B (en) | A kind of door and window Cast-in-situ Beam casting method and mould | |
CN204899949U (en) | Bow -shaped steel pipe back up support | |
CN204386608U (en) | A kind of tunnel invert construction tool | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN204590584U (en) | Architectural template structure | |
CN204590782U (en) | A kind of industrialization Prefabricated enclosure wall | |
CN203834809U (en) | Steel pipe column structure for steel pipe column concrete side pouring method | |
CN204552774U (en) | A kind of monolithic inverted arch mould bases of locating longitudinal waterstop | |
CN204679074U (en) | A kind of novel surface observation pier structure | |
CN203905461U (en) | Adjustable inhaul cable reinforcing device for thin-wall round concrete formwork reinforcing | |
CN204080820U (en) | A kind of concrete structure foundation ditch support replacement device | |
CN207808036U (en) | Trapezoidal special prefabricated board makes shaping equipment | |
CN204225491U (en) | The support chock of formwork keel | |
CN206625850U (en) | Tunnel concrete liner Simple steel scaffold | |
CN207031958U (en) | A kind of cement concrete paving seam transmission rod locating support | |
CN105317216A (en) | Wall body reversed construction method and wall body and concrete framework casting structure | |
CN204738430U (en) | Concrete precast slab grade beam fetal membrane supports and positioning tool | |
CN204344136U (en) | A kind of inverted arch short abutment wall Combined type sizing punching block and screw mandrel location reinforcement system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151223 Termination date: 20210824 |