CN204825969U - 检查井沉降防治结构 - Google Patents

检查井沉降防治结构 Download PDF

Info

Publication number
CN204825969U
CN204825969U CN201520500490.1U CN201520500490U CN204825969U CN 204825969 U CN204825969 U CN 204825969U CN 201520500490 U CN201520500490 U CN 201520500490U CN 204825969 U CN204825969 U CN 204825969U
Authority
CN
China
Prior art keywords
well base
inspection shaft
walling crib
concrete
subsides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520500490.1U
Other languages
English (en)
Inventor
张永军
张怀斌
郭瑞
邵启磊
张晶晶
郝志
杨巧玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
He'nan Lujia Road & Bridge Co Ltd
Original Assignee
He'nan Lujia Road & Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by He'nan Lujia Road & Bridge Co Ltd filed Critical He'nan Lujia Road & Bridge Co Ltd
Priority to CN201520500490.1U priority Critical patent/CN204825969U/zh
Application granted granted Critical
Publication of CN204825969U publication Critical patent/CN204825969U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

检查井沉降防治结构,它为在原有挖好的井基上方开口处有预留台阶状的井基,所述的井圈置于原有的井基内,并在井圈与井基之间填充填料;所述的台阶状的井基内铺设钢筋笼并填充混凝土。本实用新型在城市道路建设中具有很强的实用性,它不仅在水泥混凝土路面和沥青路面以及新修建的路基上加铺沥青混凝土时适用,而且在城市道路上安装其它管线设施的检查井加铺沥青混凝土路面时同样能适用;采用本结构能够有效的防止检查井在使用的过程中发生沉降。

Description

检查井沉降防治结构
技术领域
本实用新型属于城市公路中的基础设施,具体来说是用于防止检查井在使用中发生沉陷的检查井沉陷防治结构。
背景技术
近几年来,城市规模不断扩大,基础设施建设前移质量控制不严以及由于车流量加大等原因,城市道路出现了大量的检查井沉陷以及井周路面破损,影响道路使用效果,平顺度和美观差,尤其影响乘车舒适性。
现有的检查井施工基本是道路路基或基层成形后,在反向开挖后安装施工,然后回填,由于开挖对原来已经密实的路基和基层造成扰动,加之回填时工作面狭窄,回填质量控制不严,尤其是原来的设计标准,井圈往往小于开挖扰动的范围,且基本是素混凝土,造成了整个检查井的沉陷,路面破坏,进而发展到检查井和管道的破坏。
发明内容
本实用新型为用于对城市道路中应对检查井沉陷状况的检查井沉陷防治结构。,它结构简单,在原有的井圈的基础上增设一圈混凝土圈,防止沉陷效果良好。
本实用新型实现上述目的采用以下技术方案:
检查井沉降防治结构,它为在原有挖好的井基上方开口处有预留台阶状的井基,所述的井圈置于原有的井基内,并在井圈与井基之间填充填料;所述的台阶状的井基内铺设钢筋笼并填充混凝土。
优选的,所述的钢筋笼与井圈的顶部连接在一起,在浇筑混凝土的过程中可以更好保证混凝土外圈和井圈的连接性。
本实用新型采用上述技术方案具有以下有益效果:
本实用新型虽然技术难度不大,但在城市道路建设中具有很强的实用性,它不仅在水泥混凝土路面和沥青路面以及新修建的路基上加铺沥青混凝土时适用,而且在城市道路上安装其它管线设施的检查井加铺沥青混凝土路面时同样能适用;采用本结构能够有效的防止检查井在使用的过程中发生沉降。
附图说明
图1为本实用新型的示意图。
图2为另一实施例的示意图。
具体实施方式
下面结合附图和实施例对本实用新型做进一步说明。
实施例1
如图1所示的为本实用新型的一种实施方式。
检查井沉降防治结构,它为在原有挖好的第一井基11上方开口处有预留台阶状的第二井基12;将井圈2放置于第一井基11内,并在井圈2与第一井基11之间填充填料3。
钢筋笼4设在第二井基12内,以钢筋笼4为骨架浇筑混凝土5即可。
实施例2
如图2所示的本实用新型的另一实施例。
检查井沉降防治结构,它为在原有挖好的第一井基11上方开口处有预留台阶状的第二井基12;将井圈2放置于第一井基11内,并在井圈2与第一井基11之间填充填料3。
钢筋笼4连接在井圈2的顶部,当井圈2放入第一井基11内时,钢筋笼4与第二井基12相配合,以钢筋笼4为骨架浇筑混凝土5即可。

Claims (1)

1.检查井沉降防治结构,它为在原有挖好的第一井基(11)上方开口处有预留台阶状的第二井基(12);将井圈(2)放置于第一井基(11)内,并在井圈(2)与第一井基(11)之间填充填料(3),钢筋笼(4)设在第二井基(12)内,其特征是:所述的钢筋笼(4)连接在井圈(2)的顶部,当井圈(2)放入第一井基(11)内时,钢筋笼(4)与第二井基(12)相配合,以钢筋笼(4)为骨架浇筑混凝土(5)。
CN201520500490.1U 2015-07-06 2015-07-06 检查井沉降防治结构 Active CN204825969U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520500490.1U CN204825969U (zh) 2015-07-06 2015-07-06 检查井沉降防治结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520500490.1U CN204825969U (zh) 2015-07-06 2015-07-06 检查井沉降防治结构

Publications (1)

Publication Number Publication Date
CN204825969U true CN204825969U (zh) 2015-12-02

Family

ID=54683585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520500490.1U Active CN204825969U (zh) 2015-07-06 2015-07-06 检查井沉降防治结构

Country Status (1)

Country Link
CN (1) CN204825969U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567410A (zh) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 市政道路检查井的新建施工方法
CN110295628A (zh) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 一种带有检查井的路面施工方法
CN111321793A (zh) * 2020-02-26 2020-06-23 中铁二院工程集团有限责任公司 一种无砟轨道铁路路基集水井的施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567410A (zh) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 市政道路检查井的新建施工方法
CN110295628A (zh) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 一种带有检查井的路面施工方法
CN111321793A (zh) * 2020-02-26 2020-06-23 中铁二院工程集团有限责任公司 一种无砟轨道铁路路基集水井的施工方法

Similar Documents

Publication Publication Date Title
CN101368383B (zh) 一种人造复合硬壳层处理软土路基的方法
CN102433876B (zh) 多隔室套管复合桩及其施工方法
CN205443840U (zh) 一种机动车道透水路面结构
CN105714759B (zh) 城市渣土场防范液化崩溃的排渗和加固方法
CN203393530U (zh) 一种抗浮轻质高路堤结构
CN106049379B (zh) 溢洪道下游施工滞后时的临时发电方法及堆石自溃坝
CN204825969U (zh) 检查井沉降防治结构
CN103147614A (zh) 多层结构水池及其构建方法
CN105926393A (zh) 一种利用气泡混合轻质土进行路堤填筑的方法
CN105421571A (zh) 下水井及雨水井施工工艺
CN104652495A (zh) 基坑内支撑立柱与底板节点防水施工工艺
CN202830673U (zh) 用地受限区既有路堤增高构造
CN107642109A (zh) 一种市政道路重型井盖井圈加固结构及其施工方法
CN208884292U (zh) 软土路基与正常路基交界处防沉降结构
CN204491320U (zh) 填土地基上既有铁路车站路基轻型支挡结构
CN204174496U (zh) 一种新型市政道路结构
CN207469190U (zh) 一种高效排水的渗渠结构
CN215758302U (zh) 一种高液限土路基结构
CN212128696U (zh) 一种路桥衔接段气泡混合轻质土路基结构
CN204940330U (zh) 一种管道基础
CN204385575U (zh) 土工格栅加筋粘土包边尾矿砂路基
CN205000290U (zh) 库底沥青混凝面板和库坡混凝土面板连接结构
CN114293430A (zh) 一种与防洪墙及后戗台合建式城市道路改造方法及结构
CN207228166U (zh) 一种市政道路重型井盖井圈加固结构
CN210049276U (zh) 一种土质边坡挡土墙***结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model