CN204825919U - Strut foundation ditch and enclose purlin structure of shearing - Google Patents

Strut foundation ditch and enclose purlin structure of shearing Download PDF

Info

Publication number
CN204825919U
CN204825919U CN201520446254.6U CN201520446254U CN204825919U CN 204825919 U CN204825919 U CN 204825919U CN 201520446254 U CN201520446254 U CN 201520446254U CN 204825919 U CN204825919 U CN 204825919U
Authority
CN
China
Prior art keywords
purlin
steel pipe
enclose
dowel
encloses
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520446254.6U
Other languages
Chinese (zh)
Inventor
沈正春
高涛
杨捷
孟旭央
杨旭升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201520446254.6U priority Critical patent/CN204825919U/en
Application granted granted Critical
Publication of CN204825919U publication Critical patent/CN204825919U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a strut foundation ditch and enclose purlin structure of shearing, including and surrounding the perpendicular retaining pile who sets up of foundation ditch lateral wall and level setting at the inboard purlin that encloses of retaining pile, be provided with horizontal supports steel pipe and diagonal bracing steel pipe on enclosing the purlin, be close to on the retaining pile of diagonal bracing steel pipe both ends department respectively the dowels that even interval was provided with a plurality of big or small unanimities, the one end and the retaining pile of dowel link firmly mutually, and the other end runs through and encloses purlin and the nut through the tip setting and enclose the purlin fastening connection. The utility model has the advantage of simple structure, simple to operate. Through the dowel that sets up on the retaining pile being close to diagonal bracing steel pipe both ends department with enclose the purlin fastening connection, it is even as an organic whole with retaining pile that the messenger encloses the purlin, ensures to enclose the purlin and undertake the horizontal shear that the diagonal bracing steel pipe brought jointly with retaining pile, improves the steadiness that encloses the purlin, simultaneously, it is even as an organic whole to enclose purlin and retaining pile through the dowel, has not only reduced the construction degree of difficulty but also reduced the fracture probability, guarantees the safety of job site.

Description

Supporting foundation pit encloses purlin shear structure
Technical field
The utility model relates to supporting foundation pit, especially relates to a kind of supporting foundation pit and encloses purlin shear structure.
Background technology
Foundation ditch is by the heatable adobe sleeping platform that substrate absolute altitude and basic plane size are excavated in basic engineering position.Foundation ditch is divided into non-support foundation ditch and has supporting foundation pit.When foundation pit walls soil property is unstable, and when having underground water mitigation; It is excessive that slope mode earth excavation engineering quantity is put in employing, time uneconomical; Being subject to construction plant or adjacent structure restriction, when can not adopt the mode of putting slope excavation, for ensureing that caving in does not appear in foundation ditch, need supporting foundation pit having been adopted.
There is the supporting and protection structure of supporting foundation pit to comprise to be close to the vertically disposed fender post of foundation pit side-wall and be horizontally set on and enclose purlin inside fender post, had the supporting steel pipe of reinforcement effect enclosing erection between purlin; According to the difference of foundation pit structure, supporting steel pipe has perpendicular to enclosing that purlin arranges, also has oblique layout.When the oblique layout of supporting steel pipe, supporting steel pipe with enclose purlin junction along enclosing on purlin length direction and can be subject to very huge horizontal shear, now just easily there is supporting steel pipe fracture or enclose the phenomenons such as purlin distortion; For the generation of anti-phenomenon here, existing is all arrange between adjacent two fender posts and enclose fixture block that purlin is connected and offset horizontal shear along enclosing on purlin length direction; Be connected together between fixture block and fender post in this kind of method, through after a while, the soil property around fixture block is under the effect being subject to horizontal shear for a long time, and what can slowly become is loose; Now, enclosing the horizontal shear that purlin is subject to cannot pass to fender post completely, supporting steel pipe still can be caused to rupture or enclose the phenomenon of purlin distortion; Meanwhile, fixture block is connected by welding with enclosing between purlin, is subject to horizontal shear for a long time and also easily makes it disconnect, affect the transmission of horizontal shear.
Summary of the invention
The utility model object is to provide a kind of structure simple and the supporting foundation pit that effectively can improve supporting effect encloses purlin shear structure.
For achieving the above object, the utility model can take following technical proposals:
Supporting foundation pit described in the utility model encloses purlin shear structure, comprise around the vertically disposed fender post of foundation pit side-wall and be horizontally set on and enclose purlin inside described fender post, described enclosing on purlin is provided with cross binding steel pipe and skewed horizontal load steel pipe, on the described fender post at described skewed horizontal load steel pipe two ends place, uniform intervals is provided with multiple dowel of the same size respectively, one end of described dowel is connected mutually with described fender post, enclose purlin described in the other end runs through and the nut arranged by end with enclose purlin and be fastenedly connected.
Described dowel extension is arranged in described fender post, and its development length is more than or equal to 400mm.
described in eachdowel number on fender post is 9, by three row three row uniform intervals arrangements.
Spacing in described vertical direction or horizontal direction between adjacent two dowels is 150mm.
The diameter of described dowel is 22mm.
The utility model advantage is that structure is simple, easy for installation.By arranging on the fender post near skewed horizontal load steel pipe two ends place and enclosing the dowel that purlin is fastenedly connected, make to enclose purlin with fender post is connected as a single entity, guarantee to enclose the horizontal shear that purlin and fender post shared skewed horizontal load steel pipe bring, the steadiness of purlin is enclosed in raising; Meanwhile, will purlin be enclosed by dowel and fender post is connected as a single entity, and both reduce difficulty of construction and turn reduced fracture probability, ensure the safety of job site.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the connection diagram of enclosing purlin and fender post in the utility model.
Detailed description of the invention
As shown in Figure 1, 2, supporting foundation pit described in the utility model encloses purlin shear structure, comprises around the vertically disposed fender post of foundation pit side-wall 1 and is horizontally set on and encloses purlin 2 inside fender post, encloses purlin 2 and is close to fender post 1 and arranges; According to the difference of foundation ditch situation, be provided with cross binding steel pipe 3 and skewed horizontal load steel pipe 4 enclosing on purlin 2, on the fender post 1 near skewed horizontal load steel pipe 4 two ends place, uniform intervals is provided with multiple dowel 5(dowel 5 model of the same size is respectively HRB400, and its diameter is 22mm); One end extension of dowel 5 is arranged in fender post 1, is connected mutually with fender post 1, and its development length is more than or equal to 400mm for the most beneficial; The other end run through enclose purlin 2 and the nut 6 arranged by end with enclose purlin 2 and be fastenedly connected, make to enclose purlin 2 and fender post 1 is connected as a single entity, jointly bear the horizontal shear force from skewed horizontal load steel pipe 4, increase its steadiness.
Learn through repeatedly calculating and testing, when the dowel 5 on each fender post 1 arranges 9 by three row's three row uniform intervals, and the spacing in vertical direction or horizontal direction between adjacent two dowels 5 is when being 150mm, the shearing force that can bear is maximum, and foundation pit supporting construction is the most firm.

Claims (5)

1. a supporting foundation pit encloses purlin shear structure, comprise around the vertically disposed fender post of foundation pit side-wall (1) and be horizontally set on and enclose purlin (2) inside described fender post, described enclosing on purlin (2) is provided with cross binding steel pipe (3) and skewed horizontal load steel pipe (4), it is characterized in that: on the described fender post (1) at described skewed horizontal load steel pipe (4) two ends place, uniform intervals is provided with multiple dowel of the same size (5) respectively, one end of described dowel (5) is connected mutually with described fender post (1), enclose purlin (2) described in the other end runs through and the nut (6) arranged by end with enclose purlin (2) and be fastenedly connected.
2. supporting foundation pit according to claim 1 encloses purlin shear structure, it is characterized in that: described dowel (5) extension is arranged in described fender post (1), and its development length is more than or equal to 400mm.
3. supporting foundation pit according to claim 1 encloses purlin shear structure, it is characterized in that: dowel (5) number on each described fender post (1) is 9, by three row three row uniform intervals arrangements.
4. supporting foundation pit according to claim 3 encloses purlin shear structure, it is characterized in that: the spacing in described vertical direction or horizontal direction between adjacent two dowels (5) is 150mm.
5. the supporting foundation pit according to claim 3 or 4 encloses purlin shear structure, it is characterized in that: the diameter of described dowel (5) is 22mm.
CN201520446254.6U 2015-06-26 2015-06-26 Strut foundation ditch and enclose purlin structure of shearing Active CN204825919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520446254.6U CN204825919U (en) 2015-06-26 2015-06-26 Strut foundation ditch and enclose purlin structure of shearing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520446254.6U CN204825919U (en) 2015-06-26 2015-06-26 Strut foundation ditch and enclose purlin structure of shearing

Publications (1)

Publication Number Publication Date
CN204825919U true CN204825919U (en) 2015-12-02

Family

ID=54683535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520446254.6U Active CN204825919U (en) 2015-06-26 2015-06-26 Strut foundation ditch and enclose purlin structure of shearing

Country Status (1)

Country Link
CN (1) CN204825919U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780782A (en) * 2016-05-18 2016-07-20 中铁第四勘察设计院集团有限公司 Oblique support and steel retaining purlin slip preventing device with piles constructed by SMW construction process
CN107806102A (en) * 2017-11-20 2018-03-16 中建局集团建设发展有限公司 A kind of horizontal inner support part shearing resistance construction of ultra-deep foundation pit and its construction method
CN108824452A (en) * 2018-08-29 2018-11-16 广东工业大学 A kind of foundation pit enclosure support system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780782A (en) * 2016-05-18 2016-07-20 中铁第四勘察设计院集团有限公司 Oblique support and steel retaining purlin slip preventing device with piles constructed by SMW construction process
CN105780782B (en) * 2016-05-18 2018-05-22 中铁第四勘察设计院集团有限公司 A kind of SMW engineering methods stake bearing diagonal steel purlin antiskid moving device
CN107806102A (en) * 2017-11-20 2018-03-16 中建局集团建设发展有限公司 A kind of horizontal inner support part shearing resistance construction of ultra-deep foundation pit and its construction method
CN108824452A (en) * 2018-08-29 2018-11-16 广东工业大学 A kind of foundation pit enclosure support system

Similar Documents

Publication Publication Date Title
CN103469802A (en) Combined lattice steel frame spray anchoring supporting method and combined lattice steel frame spray anchoring supporting structure
CN204825919U (en) Strut foundation ditch and enclose purlin structure of shearing
CN202627000U (en) Anchor-pulling type foundation pit supporting structure with double rows of piles
US20140083097A1 (en) Concentrated solar tower assembly and method
CN103628572A (en) Project beam-column joint for reverse building method
CN104518473A (en) Suspension protection structure and method of cable box culvert pipeline
CN203583493U (en) Combined lattice steel frame spray anchoring foundation pit supporting structure
CN203741996U (en) Beam column node for foundation pit project adopting top-down excavation method
CN105386455A (en) Frozen earth foundation for power transmission tower
CN205036384U (en) Bias voltage dissolves tunnel supporting construction under environment of chamber
CN107476316B (en) Building foundation pit internal and external support structure and construction method
CN204591306U (en) A kind of combined steel pipe concrete bow member for supporting
CN204919627U (en) Frame -type insulation blocking system
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN203795435U (en) Diagonal bracing reinforcing structure
CN207553137U (en) Low-angle dip rock stratum long-span underground power house crown anchor structure
CN202788126U (en) Anchor bolt type column foot herringbone framework
CN105064357A (en) Embedding type anchoring device and anchoring method for pre-stressed anchor cable
CN203145025U (en) Soft soil deep foundation pit supporting cat anchor structure
CN105133664B (en) Combined frame type isolation protection system and construction method thereof
CN204676569U (en) The Anchor Care of the larger Dangerous Rock Body of a kind of rock side slope combines process structure
CN204252565U (en) One faces frontier defense protection unit
CN103485350B (en) The method of attachment of the steel supporting system raised and the collar tie beam that bears down on one
CN203308109U (en) External carrying net device
CN105200996A (en) Cast-in-place pile on strong leakage layer and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder