CN204000885U - Metro Deep Excavation concrete support hangs mould mould - Google Patents
Metro Deep Excavation concrete support hangs mould mould Download PDFInfo
- Publication number
- CN204000885U CN204000885U CN201420455392.6U CN201420455392U CN204000885U CN 204000885 U CN204000885 U CN 204000885U CN 201420455392 U CN201420455392 U CN 201420455392U CN 204000885 U CN204000885 U CN 204000885U
- Authority
- CN
- China
- Prior art keywords
- steel tubing
- temporary steel
- tubing string
- transverse strut
- temporary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of Metro Deep Excavation concrete support and hang mould mould, comprise two groups of temporary steel tubing string groups that lateral separation is oppositely arranged, every group of temporary steel tubing string group includes two vertical temporary steel tubing strings that longitudinal separation is oppositely arranged and is installed in the horizontally extending longitude strut between described two temporary steel tubing strings middle parts, the bottom of four temporary steel tubing strings is all inserted in the subsoil cubic meter of stone of subway foundation pit hole, between two longitude struts, be fixedly connected with transverse strut, transverse strut upside is equipped with the horizontally extending lumps of wood, lumps of wood upside is equipped with veneer, between every temporary steel tubing string and transverse strut, be equipped with the bearing diagonal that is positioned at transverse strut downside, between every temporary steel tubing string and transverse strut, be equipped with the lacing wire that is positioned at transverse strut upside.The utility model be a kind ofly can effectively save the construction period, and the Metro Deep Excavation concrete support that carries out under the premise that security is guaranteed deep pit digging and concrete support synchronous construction hang mould mould.
Description
Technical field
The utility model relates to civil engineering concrete prefabricated element manufacturing installation, and especially a kind of Metro Deep Excavation concrete support hangs mould mould.
Background technology
Along with the development of each metropolis subway engineering of the whole nation, highrise building, deep foundation pit construction progress becomes the critical process of restriction subway station and high-building construction progress.In order to guarantee that deep pit digging and concrete support synchronous construction, save the duration, the concrete support construction design of coupler scaffolds that adopt as support more at home, the construction although scaffold also can circulate, but scaffold building is had relatively high expectations to basis, construction period is longer, affects excavation of foundation pit, and the construction period is longer.
Utility model content
The purpose of this utility model is to provide a kind of Metro Deep Excavation concrete support that can effectively save the construction period and carry out under the premise that security is guaranteed deep pit digging and concrete support synchronous construction and hangs mould mould.
For achieving the above object, the utility model adopts following technical scheme: Metro Deep Excavation concrete support hangs mould mould, comprise two groups of temporary steel tubing string groups that lateral separation is oppositely arranged, every group of temporary steel tubing string group includes two vertical temporary steel tubing strings that longitudinal separation is oppositely arranged and is installed in the horizontally extending longitude strut between described two temporary steel tubing strings middle parts, the bottom of four temporary steel tubing strings is all inserted in the subsoil cubic meter of stone of subway foundation pit hole, described longitudinal linking beam comprises the batten plate setting firmly between two longerons of spaced and parallel setting and two longerons, on each temporary steel tubing string, be all installed with steel corbel, the end of longitude strut is fixedly connected with the steel corbel on corresponding temporary steel tubing string, between two longitude struts, be fixedly connected with transverse strut, transverse strut upside is equipped with the horizontally extending lumps of wood, the upside of the lumps of wood is equipped with veneer, between every temporary steel tubing string and transverse strut, be equipped with the bearing diagonal that is positioned at transverse strut downside, between every temporary steel tubing string and transverse strut, be equipped with the lacing wire that is positioned at transverse strut upside.
Described transverse strut comprises longitudinally spaced crossbeam successively.
Between the top of every group of temporary steel tubing string, be equipped with temporary concrete longeron, between two temporary concrete longerons, be provided with temporary concrete crossbeam.
Described longitudinal and cross beam is i iron.
Metro Deep Excavation concrete support described in the utility model hangs mould mould, there is construction simple, with low cost, supporting structure is firm, save the beneficial effect of engineering time, and can effectively solve the problem that the deep foundation ditch scope of operation is narrow and small, excavation of foundation pit conflicts with concrete Construction of Supporting, guarantee that deep foundation ditch and concrete support synchronous construction, have improved foundation pit construction effect.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A place enlarged drawing in Fig. 1;
Fig. 3 is that B in Fig. 1 is to view;
Fig. 4 is the structural representation of longitude strut.
The specific embodiment
By the Metro Deep Excavation concrete support shown in Fig. 1-Fig. 4, hang mould mould, comprise two groups of temporary steel tubing string groups that lateral separation is oppositely arranged, every group of temporary steel tubing string group includes two vertical temporary steel tubing strings 8 and the longitude strut 5 that the vertical equity being installed between described two temporary steel tubing string 8 middle parts extends that longitudinal separation is oppositely arranged.Temporary steel tubing string 8 has four, and four temporary steel tubing strings 8 lay respectively at four corner points of rectangle, and four temporary steel tubing strings 8 are for be arrangeding in parallel between two, and the bottom of four temporary steel tubing strings 8 is all inserted in the subway foundation pit 10 hole subsoil cubic meters of stone.
Described longitudinal linking beam comprises the batten plate 16 being fixedly connected by welding between two longerons 15 of spaced and parallel setting and two longerons 15, on each temporary steel tubing string 8, be all installed with steel corbel 13, the end of longitude strut 5 is fixedly connected with the steel corbel 13 on corresponding temporary steel tubing string 8, and the steel corbel 13 on a temporary steel tubing string 8 is welded to connect in longitude strut 5 one end and temporary steel tubing string group, the other end is welded to connect with the steel corbel 13 on interior another temporary steel tubing string 8 of temporary steel tubing string group.
Two groups of temporary steel tubing string groups have two longitude struts 5, between two longitude struts 5, be fixedly connected with transverse strut 6, transverse strut 6 is positioned at the upside of two longitude struts 5, described transverse strut 6 comprises longitudinally several crossbeams 14 that spaced and parallel arranges successively, crossbeam 14 extends for transverse horizontal, and crossbeam 14 one end are welded on a longitude strut 5, the other end is welded on another root longitude strut 5.14 3, crossbeam is one group and between three crossbeams 14, by organizing batten plate separately, is fixedly connected with on the same group.Described longeron 15 and crossbeam 14 are Two bors d's oeuveres 20a i iron.
Transverse strut 6 upsides are equipped with the horizontally extending lumps of wood 11, the lumps of wood 11 arranges several, and several lumps of wood 11 are that the every lumps of wood 11 is longitudinal extension along laterally spaced and parallel setting successively, the upside of the lumps of wood 11 is equipped with veneer 12, and this veneer 12 is the thick template of 15mm.
Between every temporary steel tubing string 8 and transverse strut 6, be equipped with the bearing diagonal 7 that is positioned at transverse strut 6 downsides, bearing diagonal 7 is Two bors d's oeuveres 20a i iron, bearing diagonal 7 tops and transverse strut 6 welding, bottom and 8 welding of temporary steel tubing string, between every temporary steel tubing string 8 and transverse strut 6, be equipped with the lacing wire 4 that is positioned at transverse strut 6 upsides, lacing wire 4 is plain bar, lacing wire 4 bottoms and transverse strut 6 middle part welding, top and 8 welding of temporary steel tubing string.
The temporary concrete longeron 2 that the vertical equity that is all fixedly connected by welding between two temporary steel tubing string 8 tops in every group of temporary steel tubing string group extends, two groups of temporary steel tubing string groups have two temporary concrete longerons 2, the temporary concrete crossbeam 3 that has been fixedly connected by welding between two temporary concrete longerons 2, temporary concrete crossbeam 3 is that transverse horizontal is extended.
Metro Deep Excavation concrete support described in the utility model hangs mould mould, in practice of construction, outside the both sides of subway foundation pit 10, be equipped with hand excavated pile 9, in the cubic metre of earth and stone of the equal transplanting of hand excavated pile 9 outside subway foundation pit 10 both sides, between hand excavated pile 9 and contiguous temporary concrete longeron 2, be fixedly connected with intermediate transverse girder 1, to play the effect of reinforcing, and concrete also can be set between hand excavated pile 9 and adjacent temporary steel tubing string group support.
Metro Deep Excavation concrete support described in the utility model hangs mould mould, described longitude strut 5, transverse strut 6 and bearing diagonal 7 form bed die bracket component, transverse strut 6 on longitude strut 5 is wherein also that concrete support shaped steel master is stupefied, transverse strut 6 and longitude strut 5 support load stress system as concrete, and by steel corbel 13, concrete support, bed die bracket component and template load are delivered on column; Lacing wire 4 is equivalent to hang membrane module, and lacing wire 4, except the auxiliary primary structure member as load, also guarantees the camber of concrete support, prevents that bed die deformation of timbering from affecting the camber of concrete support.Described veneer 12 is bed die template, carries out the colligation of concrete bearing bar after all templates install, and side form is installed, and carries out concrete and builds.Because concrete supports span, can be greater than 8m, therefore, Metro Deep Excavation concrete support hangs mould mould need wait for that concrete support strength reaches 100% design strength and could remove.In this period, below lid shoveling rock excavation and transportation all can be supported by concrete, do not affect and cover digging structure construction.
Claims (4)
1. Metro Deep Excavation concrete support hangs mould mould, it is characterized in that: comprise two groups of temporary steel tubing string groups that lateral separation is oppositely arranged, every group of temporary steel tubing string group includes two vertical temporary steel tubing strings that longitudinal separation is oppositely arranged and is installed in the horizontally extending longitude strut between described two temporary steel tubing strings middle parts, the bottom of four temporary steel tubing strings is all inserted in the subsoil cubic meter of stone of subway foundation pit hole, described longitudinal linking beam comprises the batten plate setting firmly between two longerons of spaced and parallel setting and two longerons, on each temporary steel tubing string, be all installed with steel corbel, the end of longitude strut is fixedly connected with the steel corbel on corresponding temporary steel tubing string, between two longitude struts, be fixedly connected with transverse strut, transverse strut upside is equipped with the horizontally extending lumps of wood, the upside of the lumps of wood is equipped with veneer, between every temporary steel tubing string and transverse strut, be equipped with the bearing diagonal that is positioned at transverse strut downside, between every temporary steel tubing string and transverse strut, be equipped with the lacing wire that is positioned at transverse strut upside.
2. Metro Deep Excavation concrete support as claimed in claim 1 hangs mould mould, it is characterized in that: described transverse strut comprises longitudinally spaced crossbeam successively.
3. Metro Deep Excavation concrete support as claimed in claim 1 hangs mould mould, it is characterized in that: between the top of every group of temporary steel tubing string, be equipped with temporary concrete longeron, between two temporary concrete longerons, be provided with temporary concrete crossbeam.
4. Metro Deep Excavation concrete support as claimed in claim 2 hangs mould mould, it is characterized in that: described longitudinal and cross beam is i iron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420455392.6U CN204000885U (en) | 2014-08-13 | 2014-08-13 | Metro Deep Excavation concrete support hangs mould mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420455392.6U CN204000885U (en) | 2014-08-13 | 2014-08-13 | Metro Deep Excavation concrete support hangs mould mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204000885U true CN204000885U (en) | 2014-12-10 |
Family
ID=52040910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420455392.6U Active CN204000885U (en) | 2014-08-13 | 2014-08-13 | Metro Deep Excavation concrete support hangs mould mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204000885U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019645A (en) * | 2015-07-28 | 2015-11-04 | 上海建工二建集团有限公司 | Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method |
CN105525629A (en) * | 2016-01-20 | 2016-04-27 | 中铁上海工程局集团有限公司 | Construction method and device of subway station |
CN109457972A (en) * | 2018-12-26 | 2019-03-12 | 上海建工七建集团有限公司 | Steel platform and its application construction method for the construction of subway entrance upper cover |
-
2014
- 2014-08-13 CN CN201420455392.6U patent/CN204000885U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019645A (en) * | 2015-07-28 | 2015-11-04 | 上海建工二建集团有限公司 | Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method |
CN105525629A (en) * | 2016-01-20 | 2016-04-27 | 中铁上海工程局集团有限公司 | Construction method and device of subway station |
CN109457972A (en) * | 2018-12-26 | 2019-03-12 | 上海建工七建集团有限公司 | Steel platform and its application construction method for the construction of subway entrance upper cover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205205635U (en) | Stride footpath bailey frame steel suspension bridge structure greatly | |
CN105568866A (en) | Incremental launching construction method for large-span steel box girder spanning constructed road | |
CN204343301U (en) | A kind of Metro station excavation excavation supporting structure | |
CN204298826U (en) | Deep foundation ditch concrete bottom slab concreting branch elephant trunk structure | |
CN204019724U (en) | Make the mold of prefabricated case beam framework of steel reinforcement | |
CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
CN105972313B (en) | One kind is across base pit engineering conduit wiring suspension method and overhung construction | |
CN106193589B (en) | Concrete superelevation heavy type beam and overlapping board combining structure method for supporting | |
CN204001701U (en) | Be applicable to the construction formwork system of multilayer rammed earth wall | |
CN205806684U (en) | A kind of across base pit engineering conduit wiring suspension structure | |
CN103410102A (en) | H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof | |
CN204000885U (en) | Metro Deep Excavation concrete support hangs mould mould | |
CN205062832U (en) | Different bottom width of non - equal span is adjustable, and T type roof beam prefabricates pedestal | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
CN203808249U (en) | Column stirrup cage assembly for beam-column joint core region | |
CN203238950U (en) | Concrete beam formwork supported by trusses suspended in air | |
CN205100527U (en) | A cantilever construction platform for surmounting retaining wall | |
CN202369930U (en) | Door opening type bearing framed bent device for multiplayer concrete box girder | |
CN205134664U (en) | A upper and lower double -deck concrete slab structure for girder steel | |
CN204001705U (en) | Outer wall of basement single surface formwork constructing structure based on earth anchor truss | |
CN203080955U (en) | Structure for adding corbels on reinforced concrete column | |
CN203961092U (en) | The anti-braced structures of a kind of suspension rod | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN204199691U (en) | A kind of handrail formwork for placing structure of spiral stairs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |