CN203783066U - Indoor pipeline integrated mounting structure - Google Patents
Indoor pipeline integrated mounting structure Download PDFInfo
- Publication number
- CN203783066U CN203783066U CN201420043925.XU CN201420043925U CN203783066U CN 203783066 U CN203783066 U CN 203783066U CN 201420043925 U CN201420043925 U CN 201420043925U CN 203783066 U CN203783066 U CN 203783066U
- Authority
- CN
- China
- Prior art keywords
- tubing string
- overcoat
- mounting structure
- overcoat tubing
- otic placode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model provides an indoor pipeline integrated mounting structure, which comprises two sections of jacket pipe columns, wherein the jacket pipe columns are respectively and internally provided with pipelines to be abutted, and are provided with pipe column abutting ends, and connecting lug plates are arranged at the outer sides of the pipe walls of the pipe column abutting ends; the two sections of jacket pipe columns are vertically abutted across the air through each connecting lug plate matched with double-welding channel steel, so that an abutting operation space for pipeline communication is formed between the first jacket pipe column and the second jacket pipe column. The indoor pipeline integrated mounting structure provided by the utility model solves the problem that water pipes and electric pipes occupy the indoor space to affect the indoor decoration effect, and the quick and uniform mounting of siphons or cable pipes is further realized.
Description
Technical field
The utility model relates to a kind of pipe mounting technique, is specifically related to the comprehensive mounting structure of a kind of interior conduit.
Background technology
For many years, China is devoted to interior conduit always and arranges the innovation of layout, still, has often increased the difficulty of pipeline mounting design due to some objective factor.For example, the fluidised form of rainwater has limited the discharge setting of rain pipe, or adopts larger-diameter gutter, or increases the quantity of rain pipe, has so just occupied building area, and installation and repairing also rather bothers.
Ordinary circumstance: conventional siphon rain pipe, fulgurite is generally to install and fix in the outside of column, reaches the object of draining, and this method is simple, but this method takies certain interior space, affects decorative effect.
Another situation a: siphon rainwater pipes is installed to carry out draining in steel pipe column.But this mode generally can cause restriction to the quantity of rain siphon water pipe, and its specific practice is to offer passway at the sidewall of steel pipe column, after steel pipe column has lifted, workman is crept in post and just can be installed by passway, with this, strengthen rain pipe, fulgurite installation difficulty, quality is difficult to ensure card.After opening, need steel pipe column to carry out repair welding simultaneously, larger to the quality influence of steel pipe column own.
Therefore, we need a kind of comprehensive mounting structure of interior conduit, with at indoor syphon or the fulgurite fast installed uniformly.
Utility model content
For overcoming the existing defect of prior art, now provide a kind of pipeline comprehensive mounting structure, thereby take the interior space and affect the problem of indoor decorative effect to solve water pipe fulgurite, and further realize quick unified installation of syphon or cable pipe.
For achieving the above object, the comprehensive mounting structure of a kind of interior conduit, comprising:
The first overcoat tubing string and the second overcoat tubing string, the built-in pipeline that needs docking have tubing string butt end respectively, is provided with connection otic placode in the tube wall outside of tubing string butt end;
The first overcoat tubing string is coordinated two welding channel-section steels and up and down every sky docking, is formed for the docking operation space that the pipeline in the first overcoat tubing string is communicated with the pipeline in the second overcoat tubing string with this between the first overcoat tubing string and the second overcoat tubing string by the otic placode that is connected separately with the second overcoat tubing string.
The further improvement of the comprehensive mounting structure of the utility model is, tubing string butt end is also provided with toroidal membrane, and pipeline is arranged in the first overcoat tubing string and the second overcoat tubing string by toroidal membrane.
The further improvement of the comprehensive mounting structure of the utility model is, also comprises: be arranged at the stay pipe between the first overcoat tubing string and the second overcoat tubing string; Docking operation space is supported by stay pipe; Stay pipe comprises the support backing plate that supports pipe and be fixed in pipe two ends.
The further improvement of the comprehensive mounting structure of the utility model is, the tube wall outside of the first overcoat tubing string and the second overcoat tubing string is all uniformly distributed eight and connects otic placodes, the connection corresponding to each connection otic placode of two welding channel-section steels.
The further improvement of the comprehensive mounting structure of the utility model is, connects otic placode and is provided with otic placode connecting hole, and the two ends of two welding channel-section steels are provided with channel-section steel connecting hole, the connection corresponding to channel-section steel connecting hole of otic placode connecting hole.
The further improvement of the comprehensive mounting structure of the utility model is, pipeline comprises syphon or the cable pipe that need be welded to connect.
The beneficial effects of the utility model are, solve the installation question of indoor location pipeline by overcoat tubing string centrality, and realize docking every sky of pipeline by two welding channel-section steels otic placode that is connected.
Brief description of the drawings
Fig. 1 is the schematic perspective view of the comprehensive mounting structure of the utility model interior conduit;
Fig. 2 is the cross section schematic top plan view in docking operation space in the comprehensive mounting structure of the utility model;
Fig. 3 is the schematic diagram that stay pipe is set in the utility model mounting structure in docking operation space.
Detailed description of the invention
For the benefit of the understanding to structure of the present utility model, describes below in conjunction with drawings and Examples.
Shown in Fig. 1, the utility model discloses a kind of comprehensive mounting structure of interior conduit, comprising: two overcoat tubing strings 1.In the present embodiment, the tube wall outside at overcoat tubing string 1 two ends is equipped with eight and connects otic placode 10, wherein, just arranges one connect otic placode 10 at interval of 45 °.By upper and lower correspondence accommodate respectively i iron to connecting the two sides of otic placode 10, and form two welding channel-section steels 14 and the solid form that is connected otic placode 10 and connects.With this, coordinate respectively corresponding connection otic placode 10 to realize every sky docking by eight two welding channel-section steels 14 respectively every two overcoat tubing strings 1 of sky, and between upper and lower two overcoat tubing strings 1, form the docking operation space 16 of high about 500mm.
Shown in Fig. 2, the tube wall inner side at overcoat tubing string 1 two ends arranges a toroidal membrane 12, and this toroidal membrane 12 is provided with multiple dividing plate connecting holes 120.With this, syphon 2 or cable conduit are passed toroidal membrane 12 and are fixed in overcoat tubing string 1.
Shown in Fig. 3, on each connection otic placode 10, be equipped with otic placode connecting hole 100, the two ends of each two welding channel-section steels 14 are equipped with channel-section steel connecting hole 140, and channel-section steel connecting hole 140 bolt corresponding to otic placode connecting hole 100 connects.Meanwhile, four pipes 18 can be set on toroidal membrane 12, the two ends of pipe 18 are all provided with supports backing plate 180, and when making docking operation space 16 that pipe 18 formed being supported in, pipe 18 is stressed can be more even.In addition, for better guaranteeing the stable of docking operation space 16, also casing string 1 top is drawn and is established four cable wind ropes outside.
In conjunction with Fig. 1 to Fig. 3, in actual docking operation process, first, on the ground, syphon 2 or cable conduit are passed to toroidal membrane 12 and be temporarily fixed in two sections of overcoat tubing strings 1 of sky.Then, an overcoat tubing string 1 that is fixed with syphon 2 is wherein erected on ground, adopts crane that the overcoat tubing string 1 that is fixed with equally syphon 2 of another root is vertically sling, and coaxially aim at and stand on ground that root overcoat tubing string 1 every sky.After slinging and aiming at, by two welding channel-section steels 14 otic placode 10 that is connected, two corresponding upper and lower sides of overcoat tubing string 1 are carried out every sky docking, and between upper and lower side, form docking operation space 16.Then,, in this docking operation space 16, syphon 2 or cable conduit are carried out to upper and lower side and be welded to connect, until the syphon 2 in upper and lower correspondence position or the pipeline connection of cable conduit.
In addition, during welding procedure, for ensureing the stable of docking operation space 16, can on toroidal membrane 12 is even, arrange four with the pipes 18 that support backing plate 180, better to support docking operation space 16; Meanwhile, can also draw and establish four cable wind ropes on casing string 1 top outside.
After the pipeline connection of syphon 2 or cable conduit, by two welding channel-section steels 14 and pipe 18 or cable wind rope dismounting, can complete the docking of upper and lower two overcoat tubing strings 1.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thereby some details in embodiment should not form restriction of the present utility model, the utility model by the scope defining using appended claims as protection domain.
Claims (6)
1. a comprehensive mounting structure for interior conduit, is characterized in that,
Comprise: the first overcoat tubing string and the second overcoat tubing string, the built-in pipeline that needs docking have tubing string butt end respectively, is provided with connection otic placode in the tube wall outside of described tubing string butt end;
Described the first overcoat tubing string is coordinated two welding channel-section steels and up and down every sky docking, is formed for the docking operation space that the pipeline in described the first overcoat tubing string is communicated with the pipeline in described the second overcoat tubing string with this between described the first overcoat tubing string and described the second overcoat tubing string by the described otic placode that is connected separately with described the second overcoat tubing string.
2. comprehensive mounting structure according to claim 1, is characterized in that,
Described tubing string butt end is also provided with toroidal membrane, and described pipeline is arranged in described the first overcoat tubing string and described the second overcoat tubing string by described toroidal membrane.
3. comprehensive mounting structure according to claim 2, is characterized in that,
Also comprise: be arranged at the stay pipe between described the first overcoat tubing string and described the second overcoat tubing string; Described docking operation space is supported by described stay pipe; Described stay pipe comprises the support backing plate that supports pipe and be fixed in described pipe two ends.
4. comprehensive mounting structure according to claim 1, is characterized in that,
The tube wall outside of described the first overcoat tubing string and described the second overcoat tubing string is all uniformly distributed eight described connection otic placodes, described two welding channel-section steels and the corresponding connection of each described connection otic placode.
5. according to the comprehensive mounting structure described in claim 1 or 4, it is characterized in that,
Described connection otic placode is provided with otic placode connecting hole, and the two ends of described two welding channel-section steels are provided with channel-section steel connecting hole, the connection corresponding to described channel-section steel connecting hole of described otic placode connecting hole.
6. comprehensive mounting structure according to claim 1, is characterized in that,
Described pipeline comprises syphon or the cable pipe that need be welded to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420043925.XU CN203783066U (en) | 2014-01-23 | 2014-01-23 | Indoor pipeline integrated mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420043925.XU CN203783066U (en) | 2014-01-23 | 2014-01-23 | Indoor pipeline integrated mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203783066U true CN203783066U (en) | 2014-08-20 |
Family
ID=51319267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420043925.XU Expired - Fee Related CN203783066U (en) | 2014-01-23 | 2014-01-23 | Indoor pipeline integrated mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203783066U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758330A (en) * | 2014-01-23 | 2014-04-30 | 中国建筑第八工程局有限公司 | Synthetic installation structure and method for indoor pipelines |
-
2014
- 2014-01-23 CN CN201420043925.XU patent/CN203783066U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758330A (en) * | 2014-01-23 | 2014-04-30 | 中国建筑第八工程局有限公司 | Synthetic installation structure and method for indoor pipelines |
CN103758330B (en) * | 2014-01-23 | 2016-08-17 | 中国建筑第八工程局有限公司 | Interior conduit synthetic assembly structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204024676U (en) | A kind of novel tunnel concrete steel form carrier | |
CN210424152U (en) | Air pipe convenient to install | |
CN204898706U (en) | Steel pipe pile foundation communication tower structure | |
CN203783066U (en) | Indoor pipeline integrated mounting structure | |
CN205369954U (en) | Positioner is assembled to truss steel pipe | |
CN204151824U (en) | A kind of glass reinforced plastic underground comprehensive pipe network common trench | |
CN204201279U (en) | Pipeline suspension rod between a kind of rack and steel grating | |
CN201610978U (en) | Pipe rack convenient for installing and repairing multilayer pipeline | |
CN206458091U (en) | A kind of constructional form fixing apparatus | |
CN205954678U (en) | Prefabricated utility tunnel hoisting point structure of assembled | |
CN204938800U (en) | Tower crane rood beam basis | |
CN203656365U (en) | Combination-type transition cable leading cage based on cable leading towards lower bridge surface | |
CN103758330A (en) | Synthetic installation structure and method for indoor pipelines | |
CN205479755U (en) | A synthesize integrated suspension system of pipe support that is used for motor car application storehouse of inspecting | |
CN204826625U (en) | Special template for small-diameter circular column | |
CN204668762U (en) | A kind of mounting bracket of distribution box | |
CN204899374U (en) | Low -cost television tower | |
CN204008015U (en) | A kind of optical cable infiltration pick-up unit | |
CN207739276U (en) | A kind of photovoltaic bracket auxiliary foundation | |
CN202165696U (en) | Cable bridge fixing support clamping device of joist steel | |
CN203867182U (en) | Steady tubular well shaftway blocking construction formwork | |
CN206608210U (en) | Geomantic omen line securement device in a kind of tunnel | |
CN206683821U (en) | A kind of adjustable exterior window water pouring test device of nozzle angle | |
CN201474307U (en) | Water-drenching device on exterior wall of high-rise building | |
CN201474192U (en) | Water flanged board joint structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140820 Termination date: 20220123 |