CN204201279U - Pipeline suspension rod between a kind of rack and steel grating - Google Patents
Pipeline suspension rod between a kind of rack and steel grating Download PDFInfo
- Publication number
- CN204201279U CN204201279U CN201420540015.2U CN201420540015U CN204201279U CN 204201279 U CN204201279 U CN 204201279U CN 201420540015 U CN201420540015 U CN 201420540015U CN 204201279 U CN204201279 U CN 204201279U
- Authority
- CN
- China
- Prior art keywords
- suspension rod
- rack
- steel grating
- pipeline
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
A pipeline suspension rod between rack and steel grating, comprise the vertical left and right suspension rod arranged, the upper end of left and right suspension rod is provided with link, and the lower end of left and right suspension rod is inserted in sleeve pipe, sleeve pipe and Interal fixation, and steel plate is connected with steel grating keel by screw; Be provided with the crossbeam of level between left and right suspension rod, crossbeam two ends and left and right suspension rod are fixed by anchor ear, and crossbeam arranges pipeline; Link is connection-peg; Link is holding card; Link comprises the connecting plate be connected with left and right suspension rod top, and connecting plate left and right side arranges a holding card respectively.The utility model suspension rod is easy to make, between rack and steel grating, pipe laying suspension rod is more flexible, and need not be welded to connect with rack and steel grating in installation process, the load of suspension rod and fixed performance are all better, cost is also low as suspension rod cost than the original-pack pull bar increased under rack, for the Pipe installing under rack and between steel grating offers convenience.
Description
Technical field
The utility model relates to the pipeline suspension rod between a kind of rack and steel grating.
Background technique
A lot of cigarette factory Primary processing shop space is larger, roof supports by rack, and rack is connected ball by rack connecting rod with rack and combines, and is steel grating below rack, steel grating is fixed on top, workshop by the pull bar under rack, and the other end of pull bar is connected on the spheroid of rack.The main pipeline of the steam line, condensing water conduit, compressed air line, fire water pipeline, softened water pipeline, water supply pipe, exhausting moisture pipeline, cable testing bridge etc. of Primary processing shop is all laid between rack and steel grating, just must lay a large amount of pipelines like this between rack and steel grating.When pipe laying, the suspension and support of pipeline does not generally allow to weld on rack and steel grating, avoids producing destruction to rack and steel grating, can reduce the support force of rack and steel grating.When pipe laying, generally using the suspension rod of the pull bar under rack as piping support and hanger, the cross-arm two ends anchor ear of supporting pipeline embraces the pull bar under rack, then by Pipe installing on cross-arm, particularly some distance racks are comparatively near, and the pipeline that distance steel grid is higher adopts this installation method mostly.But, meet rack to the pulling tension requirements of steel grating after, the clearance between tiebars under some rack is comparatively large, and under some rack, respective location does not install pull bar, and such as, rack and steel grating are by wall side, and the beam generally examined on body of wall supports, and does not just install pull bar.When these places need tubing, because the cross-arm two ends of supporting pipeline cannot be fixed, and body of wall is generally aerated blocks brick, can not load-bearing, so should the place of tubing just cannot tubing, pipeline has the place of pull bar under must being laid on rack, bring difficulty to pipeline construction.
Model utility content
The utility model provides the suspension rod of the pipeline between a kind of rack and steel grating, and between rack and steel grating, pipe laying suspension rod is more flexible, and need not be welded to connect with rack and steel grating in installation process, and the load of suspension rod and fixed performance are all better.
In order to solve the problems of the technologies described above, the utility model adopts following technological scheme: the pipeline suspension rod between a kind of rack and steel grating, comprise the vertical left and right suspension rod arranged, the upper end of left and right suspension rod is provided with link, the lower end of left and right suspension rod is inserted in sleeve pipe, sleeve pipe and Interal fixation, steel plate is connected with steel grating keel by screw; Be provided with the crossbeam of level between left and right suspension rod, crossbeam two ends and left and right suspension rod are fixed by anchor ear, and crossbeam arranges pipeline.
Link is connection-peg.
Link is holding card.
Link comprises the connecting plate be connected with left and right suspension rod top, and connecting plate left and right side arranges a holding card respectively.
The utility model suspension rod is easy to make, the amount length of boom that suspension rod puts in sleeve pipe can regulate, between rack and steel grating, pipe laying suspension rod is more flexible, and need not be welded to connect with rack and steel grating in installation process, the load of suspension rod and fixed performance are all better, cost is also low as suspension rod cost than the original-pack pull bar increased under rack, for the Pipe installing under rack and between steel grating offers convenience.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment 1;
Fig. 2 is the structural representation of the utility model embodiment 2.
Embodiment
Embodiment 1: as shown in Figure 1, pipeline suspension rod between a kind of rack and steel grating, comprise the vertical suspension rod 1 arranged, suspension rod 1 comprises left and right suspension rod, the upper end of suspension rod 1 is provided with link, the lower end of suspension rod 1 is inserted in sleeve pipe 3, and sleeve pipe 3 is fixed with steel plate 5, and steel plate 5 is connected with steel grating keel 6 by screw 4; Be provided with the crossbeam 7 of level between left and right suspension rod, crossbeam 7 two ends and left and right suspension rod are fixed by anchor ear 2, crossbeam 7 are arranged pipeline 8.Link is connection-peg, is connected ball 9 fixes with rack.
During concrete enforcement, the place of pull bar is not installed under rack, a kind of suspension rod of piping support and hanger is made according to field condition, suspension rod is by suspension rod 1, sleeve pipe 3, screw 4, composition such as steel plate 5 grade, suspension rod 1 is by reinforcement fabrication, when rack connection ball 9 there being tapped hole, suspension rod 1 one end die head threading machine is made into screw thread, the internal diameter of suspension rod 1 external diameter and sleeve pipe 3 is basically identical, length of boom puts in end after sleeve pipe 3 be advisable in sleeve pipe neutral position to install rear suspension bar, during such intercepting suspension rod, length can have a little error also can not affect installation, when installing suspension rod 1, suspension rod 1 end is grown a little in sleeve pipe or short point all can have surplus, install more flexible.Intercept a bit of steel pipe as sleeve pipe 3, internal diameter and suspension rod 1 external diameter of sleeve pipe 3 are basically identical, and suspension rod 1 can just pierce in sleeve pipe 3.Intercept a block plate 5, sleeve pipe 3 one end is welded on steel plate 5 neutral position, bore two apertures at the two ends of steel plate 5, such sleeve pipe 3 and steel plate 5 are just made into the base of suspension rod.
When installing suspension rod, be placed on by suspension rod base on the keel of steel grating under rack, the keel of steel grating are generally channel-section steel or square steel, with the aperture of screw 4 through steel plate 5 two ends of base, tightened by screw 4 with keel by the steel plate 5 of base, such suspension rod base is just fixed on the keel of steel grating.Threaded one end is not had by suspension rod 1 to inject in the sleeve pipe 3 of base, boom foot can not be swung to surrounding, threaded for the suspension rod bar the other end is screwed into rack to connect in the tapped hole of ball 9, is connected ball 9 with rack and is threaded, make suspension rod can bear the power of Vertical direction.After hanger erection completes, just with anchor ear 2, crossbeam 7 can be fixed on two suspension rods, then on crossbeam 7 pipe laying 8.Because pipeline suspension rod mainly bears vertical force, base prevents again suspension rod from swinging, and such suspension rod just serves good load and fixation.
Embodiment 2: as shown in Figure 2, are with the difference part of embodiment 1, and link is holding card 11, and link comprises the connecting plate be connected with left and right suspension rod top, and connecting plate left and right side arranges a holding card 11 respectively, fix with rack connecting rod 10.
If the tie bar space under rack is far away, the pipeline that same crossbeam 7 is laid is few again, or rack connection ball 9 does not have tapped hole, suspension rod is needed to be connected with rack connecting rod 10, can in making holding card 11, welded with holding card 11 suspension rod 1 one end or alternate manner is connected, tightly embrace rack connecting rod 10 by holding card 11, such suspension rod is just fixed on rack connecting rod 10.
Claims (4)
1. the pipeline suspension rod between rack and steel grating, it is characterized in that: comprise the vertical left and right suspension rod arranged, the upper end of left and right suspension rod is provided with link, the lower end of left and right suspension rod is inserted in sleeve pipe, sleeve pipe and Interal fixation, steel plate is connected with steel grating keel by screw; Be provided with the crossbeam of level between left and right suspension rod, crossbeam two ends and left and right suspension rod are fixed by anchor ear, and crossbeam arranges pipeline.
2. the pipeline suspension rod between rack according to claim 1 and steel grating, is characterized in that: link is connection-peg.
3. the pipeline suspension rod between rack according to claim 1 and steel grating, is characterized in that: link is holding card.
4. the pipeline suspension rod between rack according to claim 3 and steel grating, is characterized in that: link comprises the connecting plate be connected with left and right suspension rod top, and connecting plate left and right side arranges a holding card respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420540015.2U CN204201279U (en) | 2014-09-19 | 2014-09-19 | Pipeline suspension rod between a kind of rack and steel grating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420540015.2U CN204201279U (en) | 2014-09-19 | 2014-09-19 | Pipeline suspension rod between a kind of rack and steel grating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204201279U true CN204201279U (en) | 2015-03-11 |
Family
ID=52659241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420540015.2U Active CN204201279U (en) | 2014-09-19 | 2014-09-19 | Pipeline suspension rod between a kind of rack and steel grating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204201279U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107575647A (en) * | 2016-07-04 | 2018-01-12 | 江苏奇佩建筑装配科技有限公司 | A kind of round steel switching suspension and support connecting seat |
CN108413130A (en) * | 2018-03-16 | 2018-08-17 | 中国冶集团有限公司 | Air hose mounting device and method in spherical net brace |
CN111809786A (en) * | 2020-08-04 | 2020-10-23 | 陕西建工装饰集团有限公司 | Suspended ceiling switching structure of large-span spherical net rack |
CN112647718A (en) * | 2020-12-22 | 2021-04-13 | 中国建筑第八工程局有限公司 | Siphon pipeline suspension joint structure of steel structure roof and construction method thereof |
-
2014
- 2014-09-19 CN CN201420540015.2U patent/CN204201279U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107575647A (en) * | 2016-07-04 | 2018-01-12 | 江苏奇佩建筑装配科技有限公司 | A kind of round steel switching suspension and support connecting seat |
CN108413130A (en) * | 2018-03-16 | 2018-08-17 | 中国冶集团有限公司 | Air hose mounting device and method in spherical net brace |
CN111809786A (en) * | 2020-08-04 | 2020-10-23 | 陕西建工装饰集团有限公司 | Suspended ceiling switching structure of large-span spherical net rack |
CN112647718A (en) * | 2020-12-22 | 2021-04-13 | 中国建筑第八工程局有限公司 | Siphon pipeline suspension joint structure of steel structure roof and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204201279U (en) | Pipeline suspension rod between a kind of rack and steel grating | |
CN105972313B (en) | One kind is across base pit engineering conduit wiring suspension method and overhung construction | |
CN105762728A (en) | Method for pre-burying of strong and weak electricity box and electrical tubing | |
CN210920331U (en) | Concatenation formula pipeline gallows | |
CN104390862A (en) | Nonmetal pipeline pressure test device and method | |
CN209398933U (en) | Pipeline load-bearing connector and bracket | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN204314153U (en) | Nonmetal pipeline pressure testing device | |
CN205100443U (en) | Be used for overlength industry factory building siphon drainage system | |
CN204692772U (en) | A kind of combination type supporting device for petroleum pipeline | |
CN202769052U (en) | Pipeline movable cradle | |
CN202513536U (en) | Cable support for power tunnel | |
CN204756170U (en) | Pre -buried formula mechanical connection pipeline support | |
CN209925777U (en) | Pipeline support for municipal construction | |
CN203308073U (en) | Adjustable wall connecting piece | |
CN206608210U (en) | Geomantic omen line securement device in a kind of tunnel | |
CN203660445U (en) | Cable bridge | |
CN204464920U (en) | PCCP electric power piping lane inwall swelled ring support base | |
CN204986023U (en) | Pipeline fix the support frame for building | |
CN205479753U (en) | Pipeline combination gallows | |
CN208347838U (en) | A kind of pipeline bracket of mine down-hole | |
CN104390102A (en) | Heat insulation lifting bracket device applied to refrigerant pipe and method for mounting refrigerant pipe | |
CN204213557U (en) | Be applied to the heat insulation hanger device of refrigerant pipe | |
CN219755572U (en) | Combined water pipe side longitudinal anti-seismic support and hanger capable of being supported by multiple pipes | |
CN220539258U (en) | Positioning and reinforcing device for embedded pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 450000 Yulin South Road, Henan, Zheng Dong, No. 16 South Road, Zhengzhou Patentee after: China Tobacco Henan Industrial Co., Ltd. Address before: 450000 Zhengzhou agricultural road, Henan, No. 29 Patentee before: China Tobacco Henan Industrial Co., Ltd. |