CN201474307U - Water-drenching device on exterior wall of high-rise building - Google Patents

Water-drenching device on exterior wall of high-rise building Download PDF

Info

Publication number
CN201474307U
CN201474307U CN2009203053151U CN200920305315U CN201474307U CN 201474307 U CN201474307 U CN 201474307U CN 2009203053151 U CN2009203053151 U CN 2009203053151U CN 200920305315 U CN200920305315 U CN 200920305315U CN 201474307 U CN201474307 U CN 201474307U
Authority
CN
China
Prior art keywords
water
drenching
pipe
rise building
exterior wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203053151U
Other languages
Chinese (zh)
Inventor
王成武
雷入云
黄毫春
苏赐丛
周涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch filed Critical China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Priority to CN2009203053151U priority Critical patent/CN201474307U/en
Application granted granted Critical
Publication of CN201474307U publication Critical patent/CN201474307U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

A water-drenching device on the exterior wall of a high-rise building belongs to the field of water-drenching devices on the exterior walls of high-rise buildings. The exterior wall of the prior high-rise building without a water-drenching device can not be inspected on the leakage after construction. The water-drenching device comprises a water inlet pipe, choke plugs and a three-way valve, and further comprises a connecting pipe and a water-drenching pipe; the connecting pipe and the water inlet pipe are assembled with the water-drenching pipe together through the three-way valve; two choke plugs are assembled with two ends of the water-drenching pipe together respectively; a plurality of spout holes are distributed on the water-drenching pipe; the water inlet pipe is connected with a tap water pipe through a hose; and the connecting pipe and the water inlet pipe are fixed on the exterior wall or on the outer side of an aluminum window of the high-rise building through a wire or a rope respectively. The utility model can simulate rainfall and water-drenching time with various strength in the local place according to the local actual conditions, can comprehensively inspect the leakage conditions of the exterior wall and the aluminum window, and reduces the repair after the completion and handover of the building, thereby reducing the economic loss caused by repair of the building; moreover, the water-drenching device has the advantages of reasonable design, simple structure and convenient use, thereby facilitating popularization and application in the building engineering.

Description

The external wall of high-rise building liquid distribution
Technical field
The utility model relates to external wall of high-rise building trickle apparatus field, particularly relates to a kind of external wall of high-rise building liquid distribution.
Background technology
In building construction process, exterior wall leakage (particularly external wall of high-rise building seepage) is a common quality defect that is difficult to discovery, and exterior wall leakage has a strong impact on the use of owner to the house, and reprocessing also of causing thus will produce bigger economic loss.Therefore before checking and accepting, the completion of works of building just need carry out comprehensive lysimetric test to exterior wall.
In order to guarantee the quality of external wall of high-rise building, external wall of high-rise building must carry out lysimetric test after construction.The exterior wall leakage inspection is normally carried out after rainfall, but at southern area, autumn, rainfall in winter are less, and natural precipitation can't meet the demands on time and rainfall intensity, at this moment just need to adopt the mode of artificial trickle to check the seepage situation of external wall of high-rise building.Artificial trickle need continue trickle 12 to 24 hours, just can be checked through the seepage situation of external wall of high-rise building.External wall of high-rise building is being carried out in the actual mechanical process of artificial trickle, normally carry out trickle facing to metope or forms by construction worker's water holding pipe, this trickle mode often can not meet the demands on the time at lasting trickle, and the rainfall that can not form continuous water curtain on tested exterior wall or forms, can not simulate various intensity does not reach the target of lysimetric test.In order to address this problem, be necessary to invent a kind of external wall of high-rise building liquid distribution.
The utility model content
Technical problem to be solved in the utility model is, after construction, can't carry out the present situation of lysimetric test because of no liquid distribution at present external wall of high-rise building, a kind of external wall of high-rise building liquid distribution is provided, this liquid distribution can be according to the actual conditions of locality, simulate the rainfall and the trickle time of local various intensity, can comprehensively check the seepage situation of exterior wall and aluminum window, reprocessing behind the minimizing building completion friendship building.
The technical scheme that its technical problem that solves the utility model adopts is: the external wall of high-rise building liquid distribution, comprise water inlet pipe, plug and threeway, also comprise tube connector and spray pipe, tube connector and water inlet pipe are assembled together through threeway and spray pipe respectively, two plugs are assembled together with the two ends of spray pipe respectively, on spray pipe, be laid with a plurality of hole for water sprayings, water inlet pipe connects running water pipe through flexible pipe, tube connector and water inlet pipe respectively through iron wire or lanyard in the external wall of high-rise building or the aluminum window outside.
In technique scheme, on spray pipe, be laid with 2~5 cushion blocks.
A plurality of hole for water sprayings are arranged by one and are located on the spray pipe, and the spacing between hole for water spraying and the hole for water spraying is 80~150mm; The angle of hole for water spraying and horizontal direction is 10~60 °.
The beneficial effects of the utility model are: the external wall of high-rise building liquid distribution of said structure can be according to the actual conditions of locality, simulate the rainfall and the trickle time of local various intensity, can comprehensively check the seepage situation of exterior wall and aluminum window, reprocessing behind the minimizing building completion friendship building, thus minimizing is reprocessed the economic loss that causes because of building; This external wall of high-rise building liquid distribution is reasonable in design, simple in structure, easy to use, and is accurate to the lysimetric test result of exterior wall and aluminum window, helps promoting the use of in construction work.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the sectional view along A-A line among Fig. 1.
Among the figure, 1, spray pipe; 2, hole for water spraying; 3, water inlet pipe; 4, tube connector; 5, plug; 6, threeway; 7, cushion block.
The specific embodiment
Referring to Fig. 1 and Fig. 2, the described a kind of external wall of high-rise building liquid distribution of present embodiment, comprise water inlet pipe 3, plug 5 and threeway 6, also comprise tube connector 4 and spray pipe 1, tube connector 4 and water inlet pipe 3 are assembled together through threeway 6 and spray pipe 1 respectively, two plugs 5 are assembled together with the two ends of spray pipe 1 respectively, on spray pipe 1, be laid with a plurality of hole for water sprayings 2, water inlet pipe 3 connects running water pipe through flexible pipe, tube connector 4 and water inlet pipe 3 respectively through iron wire or lanyard in the external wall of high-rise building or the aluminum window outside; On spray pipe 1, be laid with 3 cushion blocks 7, described cushion block 7 is foam cushion block (also can adopt the cushion block of other material), the thick 50mm of foam cushion block has the spacing of 50mm at least so that guarantee spray pipe 1 and the external wall of high-rise building or the aluminum window outside, realizes trickle expeditiously; A plurality of hole for water sprayings 2 are arranged by one and are located on the spray pipe 1, and the spacing between hole for water spraying 2 and the hole for water spraying 2 is 100mm (can adopt 80mm~150mm spacing according to actual conditions); The aperture of hole for water spraying 2 is 3mm (diameter); Hole for water spraying 2 is 45 ° (can adopt 10~60 ° according to actual conditions) with the angle of horizontal direction.The material that manufacturing spray pipe 1, water inlet pipe 3, plug 5, threeway 6 and tube connector 4 are selected for use can be PVC.Supply water and control mode: use the tap water or the construction water of floor, adopt the mode of Artificial Control water supply total valve to regulate pressure of supply water and trickle time.Fixing means: spray pipe 1, supplies water and is responsible for positions such as can temporarily being strapped in balcony balustrade on exterior wall or forms by lanyard.
The above only is a preferred embodiment of the present utility model; be not to be used for limiting the utility model; all its similar embodiment and approximate structure; for example: on spray pipe 1, be laid with a plurality of hole for water sprayings 2; spacing between hole for water spraying 2 and the hole for water spraying 2 is 80~150mm; hole for water spraying 2 is 10~60 ° with the angle of horizontal direction, is laid with 2~5 cushion blocks 7 or the like on spray pipe 1, and these features all should be covered by the protection domain of the utility model patent.

Claims (4)

1. external wall of high-rise building liquid distribution, comprise water inlet pipe (3), plug (5) and threeway (6), it is characterized in that: also comprise tube connector (4) and spray pipe (1), tube connector (4) and water inlet pipe (3) are assembled together through threeway (6) and spray pipe (1) respectively, two plugs (5) are assembled together with the two ends of spray pipe (1) respectively, are laid with a plurality of hole for water sprayings (2) on spray pipe (1).
2. external wall of high-rise building liquid distribution according to claim 1 is characterized in that: be laid with 2~5 cushion blocks (7) on spray pipe (1).
3. external wall of high-rise building liquid distribution according to claim 1 is characterized in that: a plurality of hole for water sprayings (2) are arranged by one and are located on the spray pipe (1), and the spacing between hole for water spraying (2) and the hole for water spraying (2) is 80~150mm.
4. external wall of high-rise building liquid distribution according to claim 3 is characterized in that: hole for water spraying (2) is 10~60 ° with the angle of horizontal direction.
CN2009203053151U 2009-06-30 2009-06-30 Water-drenching device on exterior wall of high-rise building Expired - Fee Related CN201474307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203053151U CN201474307U (en) 2009-06-30 2009-06-30 Water-drenching device on exterior wall of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203053151U CN201474307U (en) 2009-06-30 2009-06-30 Water-drenching device on exterior wall of high-rise building

Publications (1)

Publication Number Publication Date
CN201474307U true CN201474307U (en) 2010-05-19

Family

ID=42410553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203053151U Expired - Fee Related CN201474307U (en) 2009-06-30 2009-06-30 Water-drenching device on exterior wall of high-rise building

Country Status (1)

Country Link
CN (1) CN201474307U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486461A (en) * 2016-01-04 2016-04-13 宁波建工工程集团有限公司 Exterior wall water spray test system and test method thereof
CN114623980A (en) * 2022-04-01 2022-06-14 中建四局第一建设有限公司 Simple and green construction method for water spraying test of external wall and external window

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486461A (en) * 2016-01-04 2016-04-13 宁波建工工程集团有限公司 Exterior wall water spray test system and test method thereof
CN114623980A (en) * 2022-04-01 2022-06-14 中建四局第一建设有限公司 Simple and green construction method for water spraying test of external wall and external window

Similar Documents

Publication Publication Date Title
CN203551213U (en) Water seepage test apparatus for optical cables
CN204689452U (en) Multipurpose tower machine
CN207472508U (en) Project supervision external wall and window side water test device
CN201474307U (en) Water-drenching device on exterior wall of high-rise building
CN113006353A (en) Construction method of prefabricated hanging plate curtain wall
CN210969332U (en) Bridge construction is with spraying maintenance system
CN104328898A (en) Rendering maintenance device for building external wall
CN105486461A (en) Exterior wall water spray test system and test method thereof
CN104134959B (en) The installation method of full mould casted middle voltage bus rod
CN204401651U (en) Abnormity resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery
CN203100983U (en) Full-weather building water pouring test instrument
CN205373968U (en) Outer wall water pouring test system
CN215168249U (en) Outer wall automatic spray maintenance system
CN101352603B (en) Automatic spray conduit system and installation method thereof
CN204212380U (en) A kind of external wall whitewashes curing means
CN204982647U (en) Water -seepage prevention water drain pipe fitting for bridge
CN218444308U (en) High-rise building exterior window water spraying detection device
CN203349994U (en) External wall window body leakage detection test device
CN103711119A (en) Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof
CN204459502U (en) Prestress steel cylinder concrete electric power piping lane
CN204266404U (en) A kind of outer-wall crack-resisting anti-leakage structure
CN205206337U (en) Top module system core section of thick bamboo wall body spraying system all
CN104314311B (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN203082365U (en) Matched pipe mounting bracket of civil architecture
CN208996184U (en) A kind of outdoor rain dirt pipe inspection tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20160630

CF01 Termination of patent right due to non-payment of annual fee