CN203603930U - Device for preventing tunnel secondary lining vault from disengaging - Google Patents
Device for preventing tunnel secondary lining vault from disengaging Download PDFInfo
- Publication number
- CN203603930U CN203603930U CN201320808966.9U CN201320808966U CN203603930U CN 203603930 U CN203603930 U CN 203603930U CN 201320808966 U CN201320808966 U CN 201320808966U CN 203603930 U CN203603930 U CN 203603930U
- Authority
- CN
- China
- Prior art keywords
- vault
- pipe
- grouting
- secondary lining
- stack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a device for preventing a tunnel secondary lining vault from disengaging, and belongs to the technical field of tunnel construction. The device for preventing the tunnel secondary lining vault from disengaging comprises a grouting pipe and an exhaust pipe. The grouting pipe and the exhaust pipe are fixedly arranged on the vault in the longitudinal direction and are tightly attached to a water-proof layer, a plurality of small holes are arranged on the pipe walls of the grouting pipe and the pipe walls of the exhaust pipe respectively, the grouting pipe stretches out of a secondary lining end head, and the exhaust pipe extends to the secondary lining end head. The device for preventing the tunnel secondary lining vault from disengaging has the advantages that the structure is simple, air in the vault can be fully exhausted during grouting, a fully filled vault with grouting can be guaranteed, the vault can be prevented from disengaging effectively, the secondary lining grouting effect is more dense than a traditional secondary lining grouting, and construction quality is improved greatly.
Description
Technical field
The utility model relates to a kind of prevention tunnel double-lining vault device that comes to nothing, and belongs to tunnel construction technology field.
Background technology
It is the insoluble secondary lining quality common fault of constructing tunnel that vault comes to nothing always.Traditional construction method is that two lining Grouting Pipe are vertically buried underground, buries negligible amounts (only three) underground, and Grouting Pipe spacing is excessive, causes in concreting process, and vault air cannot be got rid of totally, and concrete can not enrich vault, and formation is come to nothing.
Summary of the invention
For the above-mentioned defect existing in prior art, the utility model provides a kind of prevention tunnel double-lining vault device that comes to nothing, and its easy construction, can effectively avoid vault to come to nothing.
The utility model is achieved by the following technical solution: a kind of prevention tunnel double-lining vault device that comes to nothing, it comprises Grouting Pipe and stack, described slurry pipe and stack are longitudinally fixedly installed on vault and are close to waterproofing course, on the tube wall of described Grouting Pipe and stack, all offer some apertures, described Grouting Pipe is stretched out two lining terminations, and described stack extends to two lining terminations.
In the utility model, the Grouting Pipe longitudinally arranging can be carried out abundant slip casting to the gap of arch crown, and the stack longitudinally arranging can fully be discharged the air of vault, and vault is enriched in assurance slip casting completely.
In order to guarantee slip casting and exhaust effect, the spacing between described Grouting Pipe and stack is 3~5cm.
Aperture on described Grouting Pipe and stack tube wall is quincunx distribution.
Described Grouting Pipe and stack are the pvc pipe of Φ 30mm, and the diameter of described aperture is 0.5cm, and the center to center distance of adjacent two apertures is 20cm.
The utility model is simple in structure, in slip casting process, the air of vault fully can be discharged, and guarantees the completely substantial vault of slip casting, effectively prevents that vault from coming to nothing, and more traditional two lining slip casting effects are more closely knit, greatly improved construction quality.In addition, while utilizing the utility model to carry out vault backfill grouting, can synchronize and carry out with lining construction, without setting up separately operation platform, more traditional mortar depositing construction be more convenient, timely, and save time, laborsaving.
Accompanying drawing explanation
Fig. 1 is the boring schematic diagram of the Grouting Pipe/stack in the utility model;
Fig. 2 is the longitudinal section schematic diagram in the utility model specific embodiment;
Fig. 3 is the schematic cross-sectional view in the utility model specific embodiment;
In figure, the 1st, aperture, the 2nd, waterproofing course, the 3rd, space, the 4th, Grouting Pipe, the 5th, cocycle secondary lining, the 6th, the lining cutting of this circulation secondary, the 7th, lining trolley template, the 8th, lining trolley end mould, the 9th, stack.
The specific embodiment
Also by reference to the accompanying drawings the utility model is further described below by embodiment:
As shown in drawings, a kind of prevention tunnel double-lining vault device that comes to nothing, it comprises Grouting Pipe 4 and stack 9, described slurry pipe 4 and stack 9 are all longitudinally fixedly installed on vault, and are close to waterproofing course 2.On the tube wall of described Grouting Pipe 4 and stack 9, all offer some apertures 1, described Grouting Pipe 4 is stretched out two lining terminations, and described stack 9 extends to two lining terminations.
In the present embodiment, described Grouting Pipe 4 and stack 9 are the pvc pipe of Φ 30mm, two tube pitch 3~5cm.Aperture 1 on two tube walls is all quincunx being uniformly distributed, and the diameter of the aperture 1 on tube wall is 0.5cm, and the center to center distance of adjacent two apertures 1 is 20cm.Grouting Pipe 4 and stack 9 are fixedly welded on vault by fixed strip, and fixed strip can adopt splash guard conventional on building site.
When the utility model uses, first make Grouting Pipe and stack, again Grouting Pipe and stack fixed strip are fixedly welded on to vault having hung after splash guard and nonwoven, then concrete is built in assembling reinforcement, after concrete initial set follower head template removing, carries out slip casting.In the time that grouting pressure reaches 0.2Mpa or stack pulp, represent that vault slip casting completes.Vault backfill grouting can be synchronizeed and carry out with lining construction, without setting up separately operation platform, more traditional grouting process is more timely and save time, laborsaving, and more traditional two lining slip casting effects more closely knit.
Other parts in the present embodiment adopt prior art, do not repeat them here.
Claims (4)
1. the prevention tunnel double-lining vault device that comes to nothing, it is characterized in that: comprise Grouting Pipe and stack, described slurry pipe and stack are longitudinally fixedly installed on vault and are close to waterproofing course, on the tube wall of described Grouting Pipe and stack, all offer some apertures, described Grouting Pipe is stretched out two lining terminations, and described stack extends to two lining terminations.
2. the prevention tunnel double-lining vault according to claim 1 device that comes to nothing, is characterized in that: the spacing between described Grouting Pipe and stack is 3~5cm.
3. the prevention tunnel double-lining vault according to claim 1 and 2 device that comes to nothing, is characterized in that: the aperture on described Grouting Pipe and stack tube wall is quincunx distribution.
4. the prevention tunnel double-lining vault according to claim 3 device that comes to nothing, is characterized in that: described Grouting Pipe and stack are the pvc pipe of Φ 30mm, and the diameter of described aperture is 0.5cm, and the center to center distance of adjacent two apertures is 20cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320808966.9U CN203603930U (en) | 2013-12-10 | 2013-12-10 | Device for preventing tunnel secondary lining vault from disengaging |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320808966.9U CN203603930U (en) | 2013-12-10 | 2013-12-10 | Device for preventing tunnel secondary lining vault from disengaging |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203603930U true CN203603930U (en) | 2014-05-21 |
Family
ID=50716607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320808966.9U Expired - Fee Related CN203603930U (en) | 2013-12-10 | 2013-12-10 | Device for preventing tunnel secondary lining vault from disengaging |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203603930U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285722A (en) * | 2016-08-30 | 2017-01-04 | 中铁十局集团第四工程有限公司 | A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof |
CN106522992A (en) * | 2016-11-24 | 2017-03-22 | 中铁隧道集团有限公司 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
CN108252726A (en) * | 2018-03-09 | 2018-07-06 | 中交第二航务工程局有限公司 | The device and its construction method that prevention Tunnel Second Lining vault comes to nothing |
CN108301846A (en) * | 2018-03-21 | 2018-07-20 | 长安大学 | Tunnel-liner vault band is molded into sizing device and its construction |
CN108506028A (en) * | 2018-05-30 | 2018-09-07 | 中铁十九局集团第六工程有限公司 | A kind of tunnel lining trolley vault comprehensive grouting pipe device and its application method |
CN109488337A (en) * | 2018-11-20 | 2019-03-19 | 中铁上海工程局集团有限公司 | A kind of anti-come to nothing of tunnel double-lining concrete visualizes casting method |
CN110359932A (en) * | 2019-08-07 | 2019-10-22 | 西南石油大学 | One kind two serves as a contrast vault slip casting tube assembly and its grouting construction method |
CN110805126A (en) * | 2019-11-20 | 2020-02-18 | 中建六局土木工程有限公司 | Basement exterior wall and waterproof integrated construction method |
CN110847933A (en) * | 2019-10-08 | 2020-02-28 | 中铁隧道局集团建设有限公司 | Method for preventing and controlling tunnel vault from being hollow |
CN112593978A (en) * | 2020-12-04 | 2021-04-02 | 浙大城市学院 | Secondary lining vault anti-disengaging device and construction method |
-
2013
- 2013-12-10 CN CN201320808966.9U patent/CN203603930U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285722A (en) * | 2016-08-30 | 2017-01-04 | 中铁十局集团第四工程有限公司 | A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof |
CN106522992A (en) * | 2016-11-24 | 2017-03-22 | 中铁隧道集团有限公司 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
CN108252726A (en) * | 2018-03-09 | 2018-07-06 | 中交第二航务工程局有限公司 | The device and its construction method that prevention Tunnel Second Lining vault comes to nothing |
CN108252726B (en) * | 2018-03-09 | 2024-03-08 | 中交第二航务工程局有限公司 | Device for preventing tunnel secondary lining vault from emptying and construction method thereof |
CN108301846A (en) * | 2018-03-21 | 2018-07-20 | 长安大学 | Tunnel-liner vault band is molded into sizing device and its construction |
CN108506028A (en) * | 2018-05-30 | 2018-09-07 | 中铁十九局集团第六工程有限公司 | A kind of tunnel lining trolley vault comprehensive grouting pipe device and its application method |
CN109488337A (en) * | 2018-11-20 | 2019-03-19 | 中铁上海工程局集团有限公司 | A kind of anti-come to nothing of tunnel double-lining concrete visualizes casting method |
CN110359932A (en) * | 2019-08-07 | 2019-10-22 | 西南石油大学 | One kind two serves as a contrast vault slip casting tube assembly and its grouting construction method |
CN110359932B (en) * | 2019-08-07 | 2022-07-19 | 西南石油大学 | Two-lining vault grouting pipe assembly and grouting construction method thereof |
CN110847933A (en) * | 2019-10-08 | 2020-02-28 | 中铁隧道局集团建设有限公司 | Method for preventing and controlling tunnel vault from being hollow |
CN110805126A (en) * | 2019-11-20 | 2020-02-18 | 中建六局土木工程有限公司 | Basement exterior wall and waterproof integrated construction method |
CN112593978A (en) * | 2020-12-04 | 2021-04-02 | 浙大城市学院 | Secondary lining vault anti-disengaging device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203603930U (en) | Device for preventing tunnel secondary lining vault from disengaging | |
CN203547773U (en) | Channel combined support structure suitable for slowly inclined stratified rock mass | |
CN103032080A (en) | Support method of weak and broken surrounding rock tunnel | |
CN105201001A (en) | Composite seepage preventing structure for large karst cave in karst region and construction method thereof | |
CN204001779U (en) | A kind of built with ribbed bricks wall construction reinforced bar guiding device | |
CN205062827U (en) | Compound seepage prevention structure of large -scale solution cavity in karst area | |
CN204436407U (en) | The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs | |
CN204492831U (en) | Metro built by mining method adit construction component | |
CN204326032U (en) | A kind of concrete dam internal drainage gallery structure | |
CN103437779A (en) | Construction method for renovating tunnel lining water seeping damage | |
CN203835403U (en) | Clearance strengthening system for serious cracking of existing tunnel lining arch | |
CN103061509A (en) | Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system | |
CN206360705U (en) | The major diameter New pipe curtain supporting construction constructed for underground digging in subway station | |
CN206071601U (en) | The device that a kind of prevention tunnel double-lining vault comes to nothing | |
CN105041348A (en) | Underground space subsurface excavation construction method adopting combined roof | |
CN104632228A (en) | Main track entering construction method for cross aisle and cross aisle | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN103680288B (en) | A kind of tunnel micro-benching tunnelling method technique teaching simulation body | |
CN204311457U (en) | A kind of Metro station excavation excavation construction composite retaining structure system | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN104131535B (en) | A kind of composite reinforced earth and rockfill dam earthquake resistant structure of high polymer and construction method thereof | |
CN103437349B (en) | The construction method of steel concrete perfusion shaped pile | |
CN209100054U (en) | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure | |
CN203866819U (en) | Steel pipe pile lock mouth structure | |
CN203625776U (en) | Arch spring anchoring structure for concrete-filled steel tube arch bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170614 Address after: 250001 No. 167 Station Street, Tianqiao District, Shandong, Ji'nan Patentee after: China Railway ten Bureau Group First Engineering Co., Ltd. Address before: 250101, 7, Shun Thai Plaza, hi tech Zone, Shandong, Ji'nan Patentee before: China Railway 10th Bureau Group Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140521 Termination date: 20191210 |