Device for preventing tunnel secondary lining vault from disengaging Download PDF

Info

Publication number
CN203603930U
CN203603930U CN201320808966.9U CN201320808966U CN203603930U CN 203603930 U CN203603930 U CN 203603930U CN 201320808966 U CN201320808966 U CN 201320808966U CN 203603930 U CN203603930 U CN 203603930U
Authority
CN
China
Prior art keywords
vault
pipe
grouting
secondary lining
stack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320808966.9U
Other languages
Chinese (zh)
Inventor
汪勇
杜玉强
邬海波
陈春
吴建春
林定权
郭玉鹏
黄峻峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201320808966.9U priority Critical patent/CN203603930U/en
Application granted granted Critical
Publication of CN203603930U publication Critical patent/CN203603930U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a device for preventing a tunnel secondary lining vault from disengaging, and belongs to the technical field of tunnel construction. The device for preventing the tunnel secondary lining vault from disengaging comprises a grouting pipe and an exhaust pipe. The grouting pipe and the exhaust pipe are fixedly arranged on the vault in the longitudinal direction and are tightly attached to a water-proof layer, a plurality of small holes are arranged on the pipe walls of the grouting pipe and the pipe walls of the exhaust pipe respectively, the grouting pipe stretches out of a secondary lining end head, and the exhaust pipe extends to the secondary lining end head. The device for preventing the tunnel secondary lining vault from disengaging has the advantages that the structure is simple, air in the vault can be fully exhausted during grouting, a fully filled vault with grouting can be guaranteed, the vault can be prevented from disengaging effectively, the secondary lining grouting effect is more dense than a traditional secondary lining grouting, and construction quality is improved greatly.

Description

The prevention tunnel double-lining vault device that comes to nothing
Technical field
The utility model relates to a kind of prevention tunnel double-lining vault device that comes to nothing, and belongs to tunnel construction technology field.
Background technology
It is the insoluble secondary lining quality common fault of constructing tunnel that vault comes to nothing always.Traditional construction method is that two lining Grouting Pipe are vertically buried underground, buries negligible amounts (only three) underground, and Grouting Pipe spacing is excessive, causes in concreting process, and vault air cannot be got rid of totally, and concrete can not enrich vault, and formation is come to nothing.
Summary of the invention
For the above-mentioned defect existing in prior art, the utility model provides a kind of prevention tunnel double-lining vault device that comes to nothing, and its easy construction, can effectively avoid vault to come to nothing.
The utility model is achieved by the following technical solution: a kind of prevention tunnel double-lining vault device that comes to nothing, it comprises Grouting Pipe and stack, described slurry pipe and stack are longitudinally fixedly installed on vault and are close to waterproofing course, on the tube wall of described Grouting Pipe and stack, all offer some apertures, described Grouting Pipe is stretched out two lining terminations, and described stack extends to two lining terminations.
In the utility model, the Grouting Pipe longitudinally arranging can be carried out abundant slip casting to the gap of arch crown, and the stack longitudinally arranging can fully be discharged the air of vault, and vault is enriched in assurance slip casting completely.
In order to guarantee slip casting and exhaust effect, the spacing between described Grouting Pipe and stack is 3~5cm.
Aperture on described Grouting Pipe and stack tube wall is quincunx distribution.
Described Grouting Pipe and stack are the pvc pipe of Φ 30mm, and the diameter of described aperture is 0.5cm, and the center to center distance of adjacent two apertures is 20cm.
The utility model is simple in structure, in slip casting process, the air of vault fully can be discharged, and guarantees the completely substantial vault of slip casting, effectively prevents that vault from coming to nothing, and more traditional two lining slip casting effects are more closely knit, greatly improved construction quality.In addition, while utilizing the utility model to carry out vault backfill grouting, can synchronize and carry out with lining construction, without setting up separately operation platform, more traditional mortar depositing construction be more convenient, timely, and save time, laborsaving.
Accompanying drawing explanation
Fig. 1 is the boring schematic diagram of the Grouting Pipe/stack in the utility model;
Fig. 2 is the longitudinal section schematic diagram in the utility model specific embodiment;
Fig. 3 is the schematic cross-sectional view in the utility model specific embodiment;
In figure, the 1st, aperture, the 2nd, waterproofing course, the 3rd, space, the 4th, Grouting Pipe, the 5th, cocycle secondary lining, the 6th, the lining cutting of this circulation secondary, the 7th, lining trolley template, the 8th, lining trolley end mould, the 9th, stack.
The specific embodiment
Also by reference to the accompanying drawings the utility model is further described below by embodiment:
As shown in drawings, a kind of prevention tunnel double-lining vault device that comes to nothing, it comprises Grouting Pipe 4 and stack 9, described slurry pipe 4 and stack 9 are all longitudinally fixedly installed on vault, and are close to waterproofing course 2.On the tube wall of described Grouting Pipe 4 and stack 9, all offer some apertures 1, described Grouting Pipe 4 is stretched out two lining terminations, and described stack 9 extends to two lining terminations.
In the present embodiment, described Grouting Pipe 4 and stack 9 are the pvc pipe of Φ 30mm, two tube pitch 3~5cm.Aperture 1 on two tube walls is all quincunx being uniformly distributed, and the diameter of the aperture 1 on tube wall is 0.5cm, and the center to center distance of adjacent two apertures 1 is 20cm.Grouting Pipe 4 and stack 9 are fixedly welded on vault by fixed strip, and fixed strip can adopt splash guard conventional on building site.
When the utility model uses, first make Grouting Pipe and stack, again Grouting Pipe and stack fixed strip are fixedly welded on to vault having hung after splash guard and nonwoven, then concrete is built in assembling reinforcement, after concrete initial set follower head template removing, carries out slip casting.In the time that grouting pressure reaches 0.2Mpa or stack pulp, represent that vault slip casting completes.Vault backfill grouting can be synchronizeed and carry out with lining construction, without setting up separately operation platform, more traditional grouting process is more timely and save time, laborsaving, and more traditional two lining slip casting effects more closely knit.
Other parts in the present embodiment adopt prior art, do not repeat them here.

Claims (4)

1. the prevention tunnel double-lining vault device that comes to nothing, it is characterized in that: comprise Grouting Pipe and stack, described slurry pipe and stack are longitudinally fixedly installed on vault and are close to waterproofing course, on the tube wall of described Grouting Pipe and stack, all offer some apertures, described Grouting Pipe is stretched out two lining terminations, and described stack extends to two lining terminations.
2. the prevention tunnel double-lining vault according to claim 1 device that comes to nothing, is characterized in that: the spacing between described Grouting Pipe and stack is 3~5cm.
3. the prevention tunnel double-lining vault according to claim 1 and 2 device that comes to nothing, is characterized in that: the aperture on described Grouting Pipe and stack tube wall is quincunx distribution.
4. the prevention tunnel double-lining vault according to claim 3 device that comes to nothing, is characterized in that: described Grouting Pipe and stack are the pvc pipe of Φ 30mm, and the diameter of described aperture is 0.5cm, and the center to center distance of adjacent two apertures is 20cm.
CN201320808966.9U 2013-12-10 2013-12-10 Device for preventing tunnel secondary lining vault from disengaging Expired - Fee Related CN203603930U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320808966.9U CN203603930U (en) 2013-12-10 2013-12-10 Device for preventing tunnel secondary lining vault from disengaging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320808966.9U CN203603930U (en) 2013-12-10 2013-12-10 Device for preventing tunnel secondary lining vault from disengaging

Publications (1)

Publication Number Publication Date
CN203603930U true CN203603930U (en) 2014-05-21

Family

ID=50716607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320808966.9U Expired - Fee Related CN203603930U (en) 2013-12-10 2013-12-10 Device for preventing tunnel secondary lining vault from disengaging

Country Status (1)

Country Link
CN (1) CN203603930U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285722A (en) * 2016-08-30 2017-01-04 中铁十局集团第四工程有限公司 A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof
CN106522992A (en) * 2016-11-24 2017-03-22 中铁隧道集团有限公司 Concrete lining formwork trolley insertion-type concrete grouting construction method
CN108252726A (en) * 2018-03-09 2018-07-06 中交第二航务工程局有限公司 The device and its construction method that prevention Tunnel Second Lining vault comes to nothing
CN108301846A (en) * 2018-03-21 2018-07-20 长安大学 Tunnel-liner vault band is molded into sizing device and its construction
CN108506028A (en) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 A kind of tunnel lining trolley vault comprehensive grouting pipe device and its application method
CN109488337A (en) * 2018-11-20 2019-03-19 中铁上海工程局集团有限公司 A kind of anti-come to nothing of tunnel double-lining concrete visualizes casting method
CN110359932A (en) * 2019-08-07 2019-10-22 西南石油大学 One kind two serves as a contrast vault slip casting tube assembly and its grouting construction method
CN110805126A (en) * 2019-11-20 2020-02-18 中建六局土木工程有限公司 Basement exterior wall and waterproof integrated construction method
CN110847933A (en) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 Method for preventing and controlling tunnel vault from being hollow
CN112593978A (en) * 2020-12-04 2021-04-02 浙大城市学院 Secondary lining vault anti-disengaging device and construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285722A (en) * 2016-08-30 2017-01-04 中铁十局集团第四工程有限公司 A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof
CN106522992A (en) * 2016-11-24 2017-03-22 中铁隧道集团有限公司 Concrete lining formwork trolley insertion-type concrete grouting construction method
CN108252726A (en) * 2018-03-09 2018-07-06 中交第二航务工程局有限公司 The device and its construction method that prevention Tunnel Second Lining vault comes to nothing
CN108252726B (en) * 2018-03-09 2024-03-08 中交第二航务工程局有限公司 Device for preventing tunnel secondary lining vault from emptying and construction method thereof
CN108301846A (en) * 2018-03-21 2018-07-20 长安大学 Tunnel-liner vault band is molded into sizing device and its construction
CN108506028A (en) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 A kind of tunnel lining trolley vault comprehensive grouting pipe device and its application method
CN109488337A (en) * 2018-11-20 2019-03-19 中铁上海工程局集团有限公司 A kind of anti-come to nothing of tunnel double-lining concrete visualizes casting method
CN110359932A (en) * 2019-08-07 2019-10-22 西南石油大学 One kind two serves as a contrast vault slip casting tube assembly and its grouting construction method
CN110359932B (en) * 2019-08-07 2022-07-19 西南石油大学 Two-lining vault grouting pipe assembly and grouting construction method thereof
CN110847933A (en) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 Method for preventing and controlling tunnel vault from being hollow
CN110805126A (en) * 2019-11-20 2020-02-18 中建六局土木工程有限公司 Basement exterior wall and waterproof integrated construction method
CN112593978A (en) * 2020-12-04 2021-04-02 浙大城市学院 Secondary lining vault anti-disengaging device and construction method

Similar Documents

Publication Publication Date Title
CN203603930U (en) Device for preventing tunnel secondary lining vault from disengaging
CN203547773U (en) Channel combined support structure suitable for slowly inclined stratified rock mass
CN103032080A (en) Support method of weak and broken surrounding rock tunnel
CN105201001A (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN204001779U (en) A kind of built with ribbed bricks wall construction reinforced bar guiding device
CN205062827U (en) Compound seepage prevention structure of large -scale solution cavity in karst area
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN204492831U (en) Metro built by mining method adit construction component
CN204326032U (en) A kind of concrete dam internal drainage gallery structure
CN103437779A (en) Construction method for renovating tunnel lining water seeping damage
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN103061509A (en) Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system
CN206360705U (en) The major diameter New pipe curtain supporting construction constructed for underground digging in subway station
CN206071601U (en) The device that a kind of prevention tunnel double-lining vault comes to nothing
CN105041348A (en) Underground space subsurface excavation construction method adopting combined roof
CN104632228A (en) Main track entering construction method for cross aisle and cross aisle
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN103680288B (en) A kind of tunnel micro-benching tunnelling method technique teaching simulation body
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN204252119U (en) The special-shaped supporting pile structure of X
CN104131535B (en) A kind of composite reinforced earth and rockfill dam earthquake resistant structure of high polymer and construction method thereof
CN103437349B (en) The construction method of steel concrete perfusion shaped pile
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure
CN203866819U (en) Steel pipe pile lock mouth structure
CN203625776U (en) Arch spring anchoring structure for concrete-filled steel tube arch bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170614

Address after: 250001 No. 167 Station Street, Tianqiao District, Shandong, Ji'nan

Patentee after: China Railway ten Bureau Group First Engineering Co., Ltd.

Address before: 250101, 7, Shun Thai Plaza, hi tech Zone, Shandong, Ji'nan

Patentee before: China Railway 10th Bureau Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20191210