CN203603930U - 预防隧道二衬拱顶脱空装置 - Google Patents

预防隧道二衬拱顶脱空装置 Download PDF

Info

Publication number
CN203603930U
CN203603930U CN201320808966.9U CN201320808966U CN203603930U CN 203603930 U CN203603930 U CN 203603930U CN 201320808966 U CN201320808966 U CN 201320808966U CN 203603930 U CN203603930 U CN 203603930U
Authority
CN
China
Prior art keywords
vault
pipe
grouting
secondary lining
stack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320808966.9U
Other languages
English (en)
Inventor
汪勇
杜玉强
邬海波
陈春
吴建春
林定权
郭玉鹏
黄峻峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201320808966.9U priority Critical patent/CN203603930U/zh
Application granted granted Critical
Publication of CN203603930U publication Critical patent/CN203603930U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型公开了一种预防隧道二衬拱顶脱空装置,属于隧道施工技术领域。其包括注浆管和排气管,所述浆管和排气管沿纵向固定设置在拱顶并紧贴防水层,所述注浆管和排气管的管壁上均开设有若干小孔,所述注浆管伸出二衬端头,所述排气管延伸至二衬端头。本实用新型结构简单,注浆过程中能够将拱顶的空气充分排出,保证注浆完全充实拱顶,有效防止拱顶脱空,较传统二衬注浆效果更密实,大大提高了施工质量。

Description

预防隧道二衬拱顶脱空装置
技术领域
本实用新型涉及一种预防隧道二衬拱顶脱空装置,属于隧道施工技术领域。
背景技术
拱顶脱空一直是隧道施工难以解决的二衬质量通病。传统的施工方法是二衬注浆管竖向埋设,埋设数量较少(仅三根),注浆管间距过大,导致在混凝土浇筑过程中,拱顶空气无法排除干净,混凝土不能充实拱顶,形成脱空。
发明内容
针对现有技术中存在的上述缺陷,本实用新型提供了一种预防隧道二衬拱顶脱空装置,其施工方便,能够有效避免拱顶脱空。
本实用新型是通过如下技术方案来实现的:一种预防隧道二衬拱顶脱空装置,其包括注浆管和排气管,所述浆管和排气管沿纵向固定设置在拱顶并紧贴防水层,所述注浆管和排气管的管壁上均开设有若干小孔,所述注浆管伸出二衬端头,所述排气管延伸至二衬端头。
本实用新型中,纵向设置的注浆管可以对拱顶空隙进行充分注浆,而纵向设置的排气管可以将拱顶的空气充分排出,保证注浆完全充实拱顶。
为了保证注浆及排气效果,所述注浆管和排气管之间的间距为3~5cm。
所述的注浆管和排气管管壁上的小孔呈梅花形分布。
所述的注浆管和排气管为Φ30mm的PVC管,所述小孔的直径为0.5cm,相邻两个小孔的中心距为20cm。
本实用新型结构简单,注浆过程中能够将拱顶的空气充分排出,保证注浆完全充实拱顶,有效防止拱顶脱空,较传统二衬注浆效果更密实,大大提高了施工质量。此外,利用本实用新型进行拱顶回填注浆时可与衬砌施工同步进行,无需单独搭设作业台架,较传统注浆施工更为方便、及时,且省时、省力。
附图说明
图1是本实用新型中的注浆管/排气管的钻孔示意图;
图2是本实用新型具体实施方式中的纵断面示意图;
图3是本实用新型具体实施方式中的横断面示意图;
图中,1是小孔,2是防水层,3是空隙,4是注浆管,5是上循环二次衬砌,6是本循环二次衬砌,7是衬砌台车模板,8是衬砌台车端模,9是排气管。
具体实施方式
下面通过实施例并结合附图对本实用新型作进一步的说明:
如附图所示,一种预防隧道二衬拱顶脱空装置,其包括注浆管4和排气管9,所述浆管4和排气管9均沿纵向固定设置在拱顶,并紧贴防水层2。所述注浆管4和排气管9的管壁上均开设有若干小孔1,所述注浆管4伸出二衬端头,所述排气管9延伸至二衬端头。
本实施例中,所述的注浆管4和排气管9均为Φ30mm的PVC管,两管间距3~5cm。两管管壁上的小孔1均呈梅花形均匀分布,管壁上的小孔1的直径为0.5cm,相邻两个小孔1的中心距为20cm。注浆管4和排气管9通过固定条焊接固定于拱顶,固定条可采用工地上常用的防水板。
本实用新型使用时,先制作好注浆管和排气管,在挂设完防水板和无纺布后再将注浆管和排气管用固定条焊接固定于拱顶,然后绑扎钢筋浇筑砼,混凝土初凝后端头模板拆模后进行注浆。当注浆压力达到0.2Mpa或排气管出浆时,表示拱顶注浆完成。拱顶回填注浆可与衬砌施工同步进行,无需单独搭设作业台架,较传统注浆工艺更为及时、且省时、省力,且较传统二衬注浆效果更密实。
本实施例中的其他部分采用现有技术,在此不再赘述。

Claims (4)

1.一种预防隧道二衬拱顶脱空装置,其特征是:包括注浆管和排气管,所述浆管和排气管沿纵向固定设置在拱顶并紧贴防水层,所述注浆管和排气管的管壁上均开设有若干小孔,所述注浆管伸出二衬端头,所述排气管延伸至二衬端头。
2.根据权利要求1所述的预防隧道二衬拱顶脱空装置,其特征是:所述注浆管和排气管之间的间距为3~5cm。
3.根据权利要求1或2所述的预防隧道二衬拱顶脱空装置,其特征是:所述的注浆管和排气管管壁上的小孔呈梅花形分布。
4.根据权利要求3所述的预防隧道二衬拱顶脱空装置,其特征是:所述的注浆管和排气管为Φ30mm的PVC管,所述小孔的直径为0.5cm,相邻两个小孔的中心距为20cm。
CN201320808966.9U 2013-12-10 2013-12-10 预防隧道二衬拱顶脱空装置 Expired - Fee Related CN203603930U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320808966.9U CN203603930U (zh) 2013-12-10 2013-12-10 预防隧道二衬拱顶脱空装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320808966.9U CN203603930U (zh) 2013-12-10 2013-12-10 预防隧道二衬拱顶脱空装置

Publications (1)

Publication Number Publication Date
CN203603930U true CN203603930U (zh) 2014-05-21

Family

ID=50716607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320808966.9U Expired - Fee Related CN203603930U (zh) 2013-12-10 2013-12-10 预防隧道二衬拱顶脱空装置

Country Status (1)

Country Link
CN (1) CN203603930U (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285722A (zh) * 2016-08-30 2017-01-04 中铁十局集团第四工程有限公司 一种预防隧道二衬拱顶脱空的装置及其施工方法
CN106522992A (zh) * 2016-11-24 2017-03-22 中铁隧道集团有限公司 一种混凝土衬砌模板台车***式混凝土灌注施工方法
CN108252726A (zh) * 2018-03-09 2018-07-06 中交第二航务工程局有限公司 预防隧道二次衬砌拱顶脱空的装置及其施工方法
CN108301846A (zh) * 2018-03-21 2018-07-20 长安大学 隧道衬砌拱顶带模注浆装置及其施工工法
CN108506028A (zh) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 一种隧道衬砌台车拱顶综合注浆管装置及其使用方法
CN109488337A (zh) * 2018-11-20 2019-03-19 中铁上海工程局集团有限公司 一种隧道二衬砼防脱空可视化浇筑方法
CN110359932A (zh) * 2019-08-07 2019-10-22 西南石油大学 一种二衬拱顶注浆管组件及其注浆施工方法
CN110805126A (zh) * 2019-11-20 2020-02-18 中建六局土木工程有限公司 一种地下室外墙与防水一体化施工方法
CN110847933A (zh) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 防治隧道拱顶脱空的方法
CN112593978A (zh) * 2020-12-04 2021-04-02 浙大城市学院 一种二次衬砌拱顶防脱空装置及施工方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285722A (zh) * 2016-08-30 2017-01-04 中铁十局集团第四工程有限公司 一种预防隧道二衬拱顶脱空的装置及其施工方法
CN106522992A (zh) * 2016-11-24 2017-03-22 中铁隧道集团有限公司 一种混凝土衬砌模板台车***式混凝土灌注施工方法
CN108252726A (zh) * 2018-03-09 2018-07-06 中交第二航务工程局有限公司 预防隧道二次衬砌拱顶脱空的装置及其施工方法
CN108252726B (zh) * 2018-03-09 2024-03-08 中交第二航务工程局有限公司 预防隧道二次衬砌拱顶脱空的装置及其施工方法
CN108301846A (zh) * 2018-03-21 2018-07-20 长安大学 隧道衬砌拱顶带模注浆装置及其施工工法
CN108506028A (zh) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 一种隧道衬砌台车拱顶综合注浆管装置及其使用方法
CN109488337A (zh) * 2018-11-20 2019-03-19 中铁上海工程局集团有限公司 一种隧道二衬砼防脱空可视化浇筑方法
CN110359932A (zh) * 2019-08-07 2019-10-22 西南石油大学 一种二衬拱顶注浆管组件及其注浆施工方法
CN110359932B (zh) * 2019-08-07 2022-07-19 西南石油大学 一种二衬拱顶注浆管组件及其注浆施工方法
CN110847933A (zh) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 防治隧道拱顶脱空的方法
CN110805126A (zh) * 2019-11-20 2020-02-18 中建六局土木工程有限公司 一种地下室外墙与防水一体化施工方法
CN112593978A (zh) * 2020-12-04 2021-04-02 浙大城市学院 一种二次衬砌拱顶防脱空装置及施工方法

Similar Documents

Publication Publication Date Title
CN203603930U (zh) 预防隧道二衬拱顶脱空装置
CN203547773U (zh) 适用于缓倾层状岩体的隧道组合支护结构
CN103032080A (zh) 软弱破碎围岩隧道的支护方法
CN204001779U (zh) 一种配筋砌块砌体墙施工钢筋引导装置
CN205062827U (zh) 一种岩溶地区大型溶洞的复合防渗结构
CN204436407U (zh) 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的结构
CN204492831U (zh) 地铁暗挖隧道横通道施工构件
CN103437779A (zh) 整治隧道衬砌渗水病害的施工方法
CN203835403U (zh) 一种既有隧道拱部衬砌严重开裂有净空加固体系
CN103061509A (zh) 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺
CN206360705U (zh) 用于地铁车站暗挖施工的大直径新型管幕支护结构
CN206071601U (zh) 一种预防隧道二衬拱顶脱空的装置
CN105041348A (zh) 一种采用复合顶板的地下空间暗挖构筑方法
CN104632228A (zh) 横通道进入正线施工方法及横通道
CN204715764U (zh) 一种构造柱与主体结构同时施工的结构
CN103680288B (zh) 一种隧道微台阶法工艺教学仿真体
CN204311457U (zh) 一种地铁车站基坑开挖施工用组合式支护体系
CN204252119U (zh) X异型支护桩结构
CN204000874U (zh) 一种混凝土堵头回填灌浆的结构
CN104131535B (zh) 一种高聚物复合加筋土石坝抗震结构及其施工方法
CN103437349B (zh) 钢筋混凝土灌注异形桩的施工方法
CN205954632U (zh) 富水砂层中管线横穿基坑处支护结构
CN204343297U (zh) 一种大体积混凝土中后浇筑梁预留孔洞处理的结构
CN209100054U (zh) 一种回填及固结灌浆用钢模台车预埋灌浆管结构
CN114215546A (zh) 软岩隧道的初期支护方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170614

Address after: 250001 No. 167 Station Street, Tianqiao District, Shandong, Ji'nan

Patentee after: China Railway ten Bureau Group First Engineering Co., Ltd.

Address before: 250101, 7, Shun Thai Plaza, hi tech Zone, Shandong, Ji'nan

Patentee before: China Railway 10th Bureau Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20191210