CN203486787U - 一种维金斯式煤气柜柜顶的整体提升装置 - Google Patents
一种维金斯式煤气柜柜顶的整体提升装置 Download PDFInfo
- Publication number
- CN203486787U CN203486787U CN201320493415.8U CN201320493415U CN203486787U CN 203486787 U CN203486787 U CN 203486787U CN 201320493415 U CN201320493415 U CN 201320493415U CN 203486787 U CN203486787 U CN 203486787U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- lifting device
- integral lifting
- column
- wiggins
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开一种维金斯式煤气柜柜顶的整体提升装置,属于煤气柜安装技术领域。该提升装置包括塔吊、立柱、吊耳及手摇绞车;塔吊位于提升装置的顶部,手摇绞车设置在立柱的一侧,吊耳设置在柜顶上,立柱上设有滑轮组。本实用新型是通过地面预制构件、逐层或逐段向上安装侧板、立柱、斜梯及抗风梁、平台梁、平台等,然后采用本新型装置将柜顶吊装就位并封顶。本实用新型具有使用安全可靠、节省工期以及施工质量高的优点。
Description
技术领域
本实用新型属于煤气柜安装技术领域,尤其涉及一种维金斯式煤气柜柜顶的整体提升装置。
背景技术
冶金行业炼钢***煤气回收储存***通常采用维金斯式煤气柜进行储存。该类煤气柜侧板厚度通常较薄,柜体体积大,顺装法安装,吊装时易发生变形,将影响气柜正常使用,其修复工作极其困难,影响安装质量和安装进度。
发明内容
本实用新型针对现有维金斯式煤气柜柜顶安装技术中存在的问题,提供一种维金斯式煤气柜柜顶的整体提升装置。
本实用新型所提供的一种维金斯式煤气柜柜顶的整体提升装置包括塔吊1、立柱3、吊耳5及手摇绞车6;所述塔吊1位于所述提升装置的顶部,所述手摇绞车6设置在所述立柱3的一侧,所述吊耳5设置在柜顶2上,所述立柱3上设有滑轮组。
本实用新型是通过地面预制构件、逐层或逐段向上安装侧板、立柱、斜梯及抗风梁、平台梁、平台等,然后采用本新型装置将柜顶吊装就位并封顶。本实用新型能有效地解决因在施工过程中产生塔式收缩、倾斜、扭曲等影响气柜正常使用的技术问题,而这些技术问题的修复工作极其困难。该装置具有使用安全可靠、节省工期以及施工质量高的优点。
附图说明
图1 本实用新型用于柜顶提升及封顶的结构示意图。
图中:1、塔吊;2、柜顶;3、立柱;4、侧板;5、吊耳;6、手摇绞车。
具体实施方式
本实用新型所提供的一种维金斯式煤气柜柜顶的整体提升装置包括塔吊1、立柱3、吊耳5及手摇绞车6;所述塔吊1位于所述提升装置的顶部,所述手摇绞车6设置在所述立柱3的一侧,所述吊耳5设置在柜顶2上,所述立柱3上设有滑轮组。
本实用新型具体使用时的具体步骤如下:
一、安装立柱:
(1)立柱下料时,要有不大于1mm的负偏差不允许正偏差。按图纸要求进行钻孔、剖口。
(2)作为支撑坑风梁用的三角支撑和大型角钢先行和立柱焊接定位。把提升脚手架用的角钢和手拉葫芦固定在立柱上的三角支撑上。
(3)用塔吊将立柱吊装就位,控制立柱外倾为H/1500。(H为立柱长度,本值应含预留变形量)
(4)按从里到外的焊接顺序焊接立柱,并检查立柱的垂直度。
(5)立柱防腐时距焊缝50mm内暂不刷漆,待焊后补刷,以免影响焊接质量。
二、壁板安装:
(1)把经过弯制的角钢和侧板在专用模具上组对施焊。
(2)每安装一带检查一次壁板周长,同时安装下一带板的定位板。
(3)安装第n带板,焊接第n-2带板。
(4)焊接壁板内侧焊缝。
(5)第1~11带板须进行煤油渗透试验。
(6)和皮膜接触部位的壁板内侧焊缝(第4~18带)要打磨光滑。
(7)上述底(3)~(6)项工作待柜顶提升后进行。
二、柜顶提升:
1、提升准备:
(1)精确计算柜顶重量及每个吊点所应承受的重量,确保吊装机具完全能承受相应的载荷。
(2)检查吊装立柱的垂直度及起吊杆重心位置,并确保起吊受力中心在立柱中心上。
(3)设置吊点及制动点。吊点的位置应在柜顶支座板上,并使吊起钢丝绳保持垂直,制动点位置正好使顶板支座与立柱的连接处于安装位置。
(4)彻底检查钢丝绳的运行方向是否有阻碍构件。
(5)柜内外、柜顶之间人员的联络设备要齐全。
、提升注意事项:
(1)气柜顶重达约150吨,依据均布的20台手摇绞车将顶盖水平提升到设计高度的位置。
(2)柜顶提升前,应检查顶盖构件是否与气柜底板、活塞板完全脱离、顶盖运行轨道中是否有阻碍物,若有异常予以排除。
(3)天气情况正常、无大风、下雨等现象。
、提升步骤:
(1)起吊开始前,通过手摇绞车把柜顶均匀提升100mm,进行安全确认。
(2)在操作绞车作业时,绞车作业人员应按统一口令用一致速度摇动绞车。
(4)柜顶提升20米后,操作人员重新检查一次绞车各部件,防治绞车出现倒车现象,确保安全操作。柜顶指挥人员负责指挥内外人员,将手摇绞车圈筒上的钢丝绳抽除。并重紧、锁紧各部分夹具。全部结束后,绞车操作人员转动手摇车,把钢丝绳拉紧到后来位置。全部结束后,再统一起吊柜顶至设计高度。
(5)柜顶提升到设计高度后,平台上人员立即将停止器安装好,并将停止器牢固地锁定在H型钢上的厚钢板,防治顶盖出现下滑现象。
(6)用千斤顶调整顶梁支座板与立柱、侧板的间距后,10名焊工用E4315焊条同时进行与顶梁连接板的焊接。
(7)用螺栓紧固两块连接板后,先焊与立柱的连接板。再焊与侧板的连接板,最后焊连接板之间的焊缝。
(8)所有焊缝焊接完成后,稍微松动手摇绞车,确认安全可靠后,才可以完全松动手摇绞车。
Claims (1)
1.一种维金斯式煤气柜柜顶的整体提升装置,其特征在于该整体提升装置包括塔吊(1)、立柱(3)、吊耳(5)及手摇绞车(6);所述塔吊(1)位于所述提升装置的顶部,所述手摇绞车(6)设置在所述立柱(3)的一侧,所述吊耳(5)设置在柜顶(2)上,所述立柱(3)上设有滑轮组。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320493415.8U CN203486787U (zh) | 2013-08-14 | 2013-08-14 | 一种维金斯式煤气柜柜顶的整体提升装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320493415.8U CN203486787U (zh) | 2013-08-14 | 2013-08-14 | 一种维金斯式煤气柜柜顶的整体提升装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203486787U true CN203486787U (zh) | 2014-03-19 |
Family
ID=50257632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320493415.8U Expired - Lifetime CN203486787U (zh) | 2013-08-14 | 2013-08-14 | 一种维金斯式煤气柜柜顶的整体提升装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203486787U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775625A (zh) * | 2015-03-31 | 2015-07-15 | 天津二十冶建设有限公司 | 一种双排柜顶梁同时吊装的施工方法 |
CN106481967A (zh) * | 2015-08-24 | 2017-03-08 | 华北冶建工程建设有限公司 | 一种橡胶膜煤气柜的安装方法 |
CN108545592A (zh) * | 2018-03-27 | 2018-09-18 | 安徽盛美金属科技有限公司 | 一种气柜用密封膜吊装装置 |
-
2013
- 2013-08-14 CN CN201320493415.8U patent/CN203486787U/zh not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775625A (zh) * | 2015-03-31 | 2015-07-15 | 天津二十冶建设有限公司 | 一种双排柜顶梁同时吊装的施工方法 |
CN104775625B (zh) * | 2015-03-31 | 2017-01-18 | 中冶天工集团天津有限公司 | 一种双排柜顶梁同时吊装的施工方法 |
CN106481967A (zh) * | 2015-08-24 | 2017-03-08 | 华北冶建工程建设有限公司 | 一种橡胶膜煤气柜的安装方法 |
CN106481967B (zh) * | 2015-08-24 | 2019-01-11 | 华北冶建工程建设有限公司 | 一种橡胶膜煤气柜的安装方法 |
CN108545592A (zh) * | 2018-03-27 | 2018-09-18 | 安徽盛美金属科技有限公司 | 一种气柜用密封膜吊装装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425530B (zh) | 一种海上风力发电机组分体高空对接安装方法 | |
CN112938774B (zh) | 一种装配式构件的整体吊装***及吊装方法 | |
CN205772984U (zh) | 一种单片钢桁架的吊装装置 | |
CN102650261A (zh) | 大功率风力发电机叶轮分片吊装方法 | |
CN105692470A (zh) | 内爬式塔吊及其操作方法 | |
CN108678388B (zh) | 大容量圆形储罐短桅杆多点整体提升施工工法 | |
CN207294093U (zh) | 一种大跨度钢桁架整体提升装置 | |
CN110562868B (zh) | 超高层建筑单元式玻璃幕墙吊装施工方法 | |
CN102121273A (zh) | 一种钢筋混凝土烟囱钢内筒液压提升倒装方法 | |
CN203654702U (zh) | 一种钢筋混凝土烟囱施工操作平台 | |
CN107142954B (zh) | 一种整体吊装的钢吊箱吊装***及其吊装方法 | |
CN203486787U (zh) | 一种维金斯式煤气柜柜顶的整体提升装置 | |
CN210460016U (zh) | 一种集成式单动力升降料台 | |
CN104989111A (zh) | 钢结构高层吊装施工方法 | |
CN102720386A (zh) | 立式储罐内边群抱倒装方法 | |
CN102226497B (zh) | 大型橡胶卷帘密封干式气柜的制作方法 | |
CN107419907B (zh) | 一种炼钢塔楼钢结构平台的交错安装焊接方法 | |
CN101818563B (zh) | 自升式整体提升移动平台及使用方法 | |
CN107487724B (zh) | 一种非吊机辅助的大型浮吊臂架安装装置及安装方法 | |
CN107010551B (zh) | 一种受限空间吊装施工方法 | |
CN206680096U (zh) | 一种用于受限空间吊装装置 | |
CN110077963B (zh) | 一种大型罐体的安装方法 | |
CN103979442A (zh) | 6400吨液压复式起重机吊装费托反应器的方法 | |
CN207227959U (zh) | 整体安拆式放射型轮状钢护筒内置接高施工平台 | |
CN106320525B (zh) | 采光井顶棚大跨度圆钢管桁架旋转滑移施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140319 |
|
CX01 | Expiry of patent term |