CN203238657U - Tool type anchor bolt mounting positioner - Google Patents
Tool type anchor bolt mounting positioner Download PDFInfo
- Publication number
- CN203238657U CN203238657U CN 201320148225 CN201320148225U CN203238657U CN 203238657 U CN203238657 U CN 203238657U CN 201320148225 CN201320148225 CN 201320148225 CN 201320148225 U CN201320148225 U CN 201320148225U CN 203238657 U CN203238657 U CN 203238657U
- Authority
- CN
- China
- Prior art keywords
- positioning
- anchor bolt
- location
- bolt mounting
- tool type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a steel tool type anchor bolt mounting positioner, which is provided with four positioning plates, wherein the positioning plates are combined into a rectangle through four positioning rods, and can slide along the positioning rods; five positioning holes with different diameters are formed in each positioning plate; and when each group comprises more than 4 bolts, the number of the positioning plates on the positioning rods can be increased. The steel tool type anchor bolt mounting positioner has the advantages that the steel tool type anchor bolt mounting positioner is simple and light in structure, can be used for a long time after being manufactured once, and is applied to accurate positioning for the mounting of anchor bolts with various diameters and at various intervals, and the construction cost can be reduced by over twice.
Description
Technical field
The utility model relates to building engineering equipment basis and steel the member fundamentally precision control device of foot bolt installation site, specifically a kind of steel tool formula stone bolt installation positioner.
Background technology
In building engineering construction, often run into equipment Foundations and the fundamentally foot bolt installation work of steel member, the technology of using at present has following three kinds: the one, adopt monoblock plank or steel plate, and boring is made into bulk control position template in the above, and the stone bolt position is controlled; The 2nd, bore single hole thereon with little block plate, connect into shaped as frame with reinforcing bar again bolt is positioned; The 3rd, install first the screw bolt-type steel bracket, again with measuring apparatus with every Bolt to position on support.Above-mentioned technology has the following disadvantages: the one, and control position template is now with now being the lost labor; The 2nd, control position template can not be had enough to meet the need use, the waste material; The 3rd, control position template area is large, and mounting process is complicated, increases labor strength and operating efficiency low; The 4th, control position low precision.
Summary of the invention
The utility model provides a kind of simple in structure, light, once long-term use of preparation for above deficiency, and is applicable to the tool-type stone bolt installation positioner of various diameters, spacing.
The technical scheme that the utility model adopts is:
A kind of tool-type stone bolt installation positioner has 4 location-plates, and location-plate is combined into rectangle by 4 backstays, and location-plate can slide along backstay;
Location-plate is provided with the locating hole of five different-diameters.
When every group of bolt during more than 4, on backstay, can increase the quantity of location-plate.
The beneficial effects of the utility model: have simple in structure, light, the once long-term use of preparation, and be applicable to the advantage of various diameters, spacing stone bolt installation precise positioning, can save more than the construction cost twice.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the front view of the utility model location-plate;
Fig. 3 is the left view of the utility model location-plate.
Among the figure 1, location-plate, 2, backstay, 3, steel plate, 4, one of steel pipe, 5, steel pipe two, 6, solid bar bolt, 7, locating hole, 8, centerline hole.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.
Embodiment 1 will organize inner bolt with this locator and be combined into one for diameter and the less stone bolt of spacing, be transported to on-the-spot the installation again.Concrete operation method is, location-plate 1 and backstay 2 are assembled into shaped as frame, selects the locating hole 7 that is fit in location-plate 1, measures each centerline hole 8 spacing with steel ruler, confirm that each meets design size to spacing after, will consolidate bar bolt 6 and tighten.Then every bolt is passed locating hole 7 on the location-plate 1, again that it is integrally welded, be transported to the position of design and installation, be installed on the bolt support and get final product.
Embodiment 2 is when the diameter of stone bolt and spacing are larger, and the method that adopts this locator directly to install is at the scene carried out.Concrete operation method is, the step of pressing first embodiment 1 is good with positioner control, be placed on the bolt design position, hang in length and breadth axis of bolt, when locator two to mid point and bolt in length and breadth after the dead in line, the installation site of stone bolt has just obtained the location, this moment is temporary fixed locator, then every bolt is put on along locating hole 7 on the location-plate 1, after adjusting verticality and the absolute altitude of bolt and confirming to meet the requirements, will be bolted on the support again and get final product.After above-mentioned work is finished, remove the installation that locator carries out next group bolt.
If the radical of embodiment 3 stone bolt surpasses 4, and diameter, spacing can get final product in the quantity that backstay 2 increases location-plates 1 when larger again.Other implementation method is with embodiment 2.
Claims (3)
1. tool-type stone bolt installation positioner, it is characterized in that: 4 location-plates are arranged, and location-plate is combined into rectangle by 4 backstays, and location-plate can slide along backstay.
2. a kind of tool-type stone bolt installation positioner according to claim 1, it is characterized in that: location-plate is provided with the locating hole of five different-diameters.
3. a kind of tool-type stone bolt installation positioner according to claim 1 is characterized in that: the quantity that can increase location-plate on backstay.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320148225 CN203238657U (en) | 2013-03-29 | 2013-03-29 | Tool type anchor bolt mounting positioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320148225 CN203238657U (en) | 2013-03-29 | 2013-03-29 | Tool type anchor bolt mounting positioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203238657U true CN203238657U (en) | 2013-10-16 |
Family
ID=49315971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320148225 Expired - Fee Related CN203238657U (en) | 2013-03-29 | 2013-03-29 | Tool type anchor bolt mounting positioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203238657U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9909329B2 (en) | 2015-09-10 | 2018-03-06 | Gerald A. LaLiberte, JR. | Anchor device positioning and plumbing tool and methods related thereto |
CN111561164A (en) * | 2020-04-27 | 2020-08-21 | 北京送变电有限公司 | Universal foundation bolt sample plate |
CN114876073A (en) * | 2022-05-09 | 2022-08-09 | 中国铁建港航局集团有限公司 | Bolt group pre-embedding method |
-
2013
- 2013-03-29 CN CN 201320148225 patent/CN203238657U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9909329B2 (en) | 2015-09-10 | 2018-03-06 | Gerald A. LaLiberte, JR. | Anchor device positioning and plumbing tool and methods related thereto |
CN111561164A (en) * | 2020-04-27 | 2020-08-21 | 北京送变电有限公司 | Universal foundation bolt sample plate |
CN111561164B (en) * | 2020-04-27 | 2021-09-21 | 北京送变电有限公司 | Universal foundation bolt sample plate |
CN114876073A (en) * | 2022-05-09 | 2022-08-09 | 中国铁建港航局集团有限公司 | Bolt group pre-embedding method |
CN114876073B (en) * | 2022-05-09 | 2024-01-30 | 中国铁建港航局集团有限公司 | Bolt group embedding method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN201981670U (en) | Connection piece for composite prefabricated concrete wallboard | |
CN204139623U (en) | A kind of new device about stretch-draw prestressing force carbon fiber board | |
CN203256760U (en) | Formwork for quickly installing and positioning foundation bolt | |
CN203238657U (en) | Tool type anchor bolt mounting positioner | |
CN203270599U (en) | Foundation bolt pre-buried die | |
CN202117341U (en) | Template for embedding foundation bolts of steel structures of buildings | |
CN206408951U (en) | A kind of architectural industrialization project conversion layer position level ladder muscle | |
CN201137216Y (en) | Steel element and concrete element connection anchor bolt connected long joint | |
CN204825945U (en) | A fixture for fixing buried bolt in advance | |
CN201753482U (en) | Embedded part in cast-in-place concrete member | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN104805910A (en) | Embedded part for cast-in-place concrete component and construction method of embedded part | |
CN201730330U (en) | Beam formwork for building | |
CN210190135U (en) | Prefabricated plate hoist and mount built-in fitting positioner | |
CN103510521A (en) | Connecting component | |
CN203383331U (en) | Steel mold used for simply and conveniently positioning section steel column embedded bolt | |
CN102287050B (en) | Construction method for long-span steel reinforced concrete roof truss | |
CN214615043U (en) | Prefabricated component reserved steel bar positioning and correcting device | |
CN207878663U (en) | Pre-embedded bolt | |
CN211973855U (en) | Pipe gallery embedded part | |
CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
CN204899034U (en) | Prefabricated wall post | |
CN204898704U (en) | Tower machine rag bolt mounting bracket with adjustable | |
CN219528173U (en) | Construction reinforcing bar location structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131016 Termination date: 20160329 |