CN207878663U CN201820149372.4U CN201820149372U CN207878663U CN 207878663 U CN207878663 U CN 207878663U CN 201820149372 U CN201820149372 U CN 201820149372U CN 207878663 U CN207878663 U CN 207878663U
Authority
CN
China
Prior art keywords
embedded bolt
main body
utility
positioning plate
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820149372.4U
Other languages
Chinese (zh)
Inventor
魏存乐
曾高
陈其恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HENGJI STEEL STRUCTURE Co Ltd
Original Assignee
ZHEJIANG HENGJI STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HENGJI STEEL STRUCTURE Co Ltd filed Critical ZHEJIANG HENGJI STEEL STRUCTURE Co Ltd
Priority to CN201820149372.4U priority Critical patent/CN207878663U/en
Application granted granted Critical
Publication of CN207878663U publication Critical patent/CN207878663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to built-in fitting field more particularly to a kind of pre-embedded bolt.A kind of pre-embedded bolt, including pre-embedded bolt main body, one end bending of the pre-embedded bolt main body is in 90 °, and the other end installation of pre-embedded bolt main body is also equipped with adjusting nut there are two the positioning plate being separated at intervals in the pre-embedded bolt main body of the opposite side of positioning plate.The utility model is simple in structure, and operation is easy for installation;The pre-embedded bolt of the utility model is used in the single making in workshop, Assembling, is greatly improved work efficiency and practical;The pre-embedded bolt of the utility model increases on the basis of existing adjusts backing plate (i.e. positioning plate) and adjusting nut, more can accurately and easily adjust steel column height mark and verticality;The utility model product can effectively connect basis and steel column, and stress is reliable, and using modular in design, all, using machining cutting, can flexibly use.

Description

Pre-embedded bolt
Technical field
The utility model belongs to built-in fitting field more particularly to a kind of pre-embedded bolt.
Background technology
Pre-embedded bolt also becomes foundation bolt, pre-buried, and is solid with cement in advance for fixed equipment in equipment installation Fixed steel part.So pre-embedded bolt is pre-buried one kind, is exactly in advance that foundation bolt is prefabricated in cement base in Equipment Foundations Among plinth, it is used for fixed equipment after solidification.Foundation bolt generally uses Q235 steel, as light to justify.Steel (Q345) intensity is big.It is right For light circularly foot bolt, buried depth is generally 25 times of its diameter, then makees 90 degree of long crotches of 120mm or so.Such as If very big (such as 45mm) buried depth too depth of the fruit diameter of bolt, square plate can be welded in bolt end, with such as withdrawal resistance by force effect.It buries Deep and crotch is provided to ensure the frictional force of bolt and basis, and being unlikely to, which makes bolt generation extract, destroys.It adopts in the prior art Used in workshop that pre-embedded bolt processed in batches is assembled, pre-embedded bolt is in Specific construction in application, being all first that building foundation is bold It binds, is implementing pre-embedded bolt construction, but if in groups or when many bolts installation can mutually rush with field basic reinforcing bar It is prominent, it can not construct;All it is at the construction field (site) separately with liner adjustable column furthermore when adjusting steel column height mark and verticality Height, but difficulty of construction can be increased in this way, time-consuming and laborious, accuracy is not also high.
Utility model content
For the problems of the prior art, the utility model provides a kind of pre-embedded bolt.
One end of a kind of pre-embedded bolt, including pre-embedded bolt main body, the pre-embedded bolt main body is bent in 90 °, pre-buried spiral shell There are two the positioning plates (adjusting backing plate) being separated at intervals for the other end installation of bolt main body, in the pre-buried of the opposite side of positioning plate Adjusting nut is also equipped in bolt body.
Preferably, the adjusting nut is M24 fixing nuts.
Preferably, there are two the M24 fixing nuts are set in the other end close to pre-embedded bolt main body, far from pre-buried The other end of bolt body is arranged one.
Preferably, the pre-embedded bolt main body is process using a diameter of 20mm~60mm round steel (according to different works Journey is designed with different size requirement).
Preferably, the round steel material makes for Q235B or Q345B or specified materials.
Preferably, size length × width x thickness of the positioning plate is 80 × 80 × 20mm;The positioning plate distance is pre- The minimum distance for burying the other end of bolt body is 60mm;The pre-buried main body is bent a length of 100mm in one end in 90 °.Institute The distance between positioning plate stated by design requirement subject to.
Material is used to specify material to make for Q345B or Q235B or design;Single pre-buried bar is made of 1#2#3#, jointly Effect.
Installation method:
Surveying setting-out stub reinforcing bar is bound;Stub template is installed;Positioning plate (steel plate) installation, the installation review of fixing bolt group Bolt welding is fixed;Concrete placings, bolt review;Finished product protection
(1) axis, absolute altitude determine
(2) making of positioning plate
(3) locating template is in place
(4) installation bolt group
(5) concreting
The utility model product 1) modular in design is used, all are cut using machining, and geometric dimension is accurate, and product can Flexibly to use;2) assembling is assembled using fixed mould bases, ensures component overall dimensions standard;3) there is particular/special requirement that entirety can be used Galvanizing, can better corrosion resistance weather.
Pre-embedded bolt, material (q235b or q345b) is that diameter 20mm~60mm round steel is process, according to design requirement It determines length and round steel size, effectively connection basis and steel column, both can hingedly can also be used and just connect type of attachment, there is installation Convenient, stress is reliable, processes efficiently a variety of advantages.
Always used workshop that pre embedded bolt processed in batches is assembled in the past, engineering site is all first actually building foundation steel Muscle is bound, then implements pre-embedded bolt construction, if installed in groups, four, and even more 90 degree of hook screw rods and live base Plinth reinforcing bar mutually conflicts, and can not construct, and hereby, we use the single making in workshop, Assembling to greatly improve working efficiency and reality Use feasibility.Furthermore backing plate is not adjusted with front lower place, adjusts pillar height and verticality with liner when construction, it is time-consuming and laborious, now Increase backing plate and adjusting nut below steel column footing piece, in order to accurate, facilitate and adjust steel column height mark and verticality, change in this way Into it is convenient accurate that construction is got up, can faster more standard reaches construction requirement.
The utility model has the beneficial effects that:The utility model is simple in structure, and operation is easy for installation;The utility model it is pre- It buries bolt to use in the single making in workshop, Assembling, greatly improve work efficiency and practical;The utility model Pre-embedded bolt increases on the basis of existing adjusts backing plate (i.e. positioning plate) and adjusting nut, more can accurately and easily adjust Steel column height mark and verticality;The utility model product can effectively connect basis and steel column, and stress is reliable, using modular in design, All, using machining cutting, can flexibly use.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model embodiment.
Fig. 2 is the dimension mark figure of Fig. 1.
Specific implementation mode
As shown, a kind of pre-embedded bolt, including pre-embedded bolt main body 1, the pre-embedded bolt main material are diameter One end bending of the round steel of 24mm, the pre-embedded bolt main body 1 is in 90 °, and the other end installation of pre-embedded bolt main body 1 is there are two between Positioning plate 2 at a certain distance, the distance between described positioning plate 2 are being pressed subject to design requirement when specific operation.It is positioning M24 fixing nuts 3 are also equipped in the pre-embedded bolt main body 1 of 2 opposite side of plate, specifically, close to pre-embedded bolt main body 1 The M24 fixing nuts of the other end be arranged two, in the setting of M24 fixing nuts 3 one of the other end far from pre-embedded bolt main body 1 It is a.The size length × width × height of the positioning plate 2 is 80 × 80 × 20mm, described apart from the another of pre-embedded bolt main body 1 It is 60mm to hold the distance of the other end of the nearest positioning plate 2 apart from pre-embedded bolt main body 1;The bending of the pre-buried main body 1 is in 90 ° The a length of 100mm in that one end.The round steel material makes for Q235B or Q345B or specified materials.
Pre-embedded bolt, material (q235b or q345b) is that diameter 20mm~60mm round steel is process, according to design requirement It determines length and round steel size, effectively connection basis and steel column, both can hingedly can also be used and just connect type of attachment, there is installation Convenient, stress is reliable, processes efficiently a variety of advantages.

Claims (6)

1. a kind of pre-embedded bolt, including pre-embedded bolt main body, it is characterised in that:One end of the pre-embedded bolt main body is bent to 90°;The other end installation of pre-embedded bolt main body is there are two positioning plate separately, the pre-embedded bolt in the opposite side of positioning plate Adjusting nut is also equipped in main body.
2. a kind of pre-embedded bolt according to claim 1, it is characterised in that:The adjusting nut is M24 fixing nuts.
3. a kind of pre-embedded bolt according to claim 2, it is characterised in that:The M24 fixing nuts are close to pre-buried There are two the other end of bolt body is set, it is arranged one in the other end far from pre-embedded bolt main body.
4. a kind of pre-embedded bolt according to claim 3, it is characterised in that:The pre-embedded bolt main body is using a diameter of 20mm~60mm round steel is process.
5. a kind of pre-embedded bolt according to claim 4, it is characterised in that:The round steel material be Q235B or Q345B。
6. according to a kind of any pre-embedded bolts of claim 1-5, it is characterised in that:The size length of the positioning plate × Width x thickness is 80 × 80 × 20mm;The minimum distance of the other end of the positioning plate apart from pre-embedded bolt main body is 60mm.
CN201820149372.4U 2018-01-29 2018-01-29 Pre-embedded bolt Expired - Fee Related CN207878663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820149372.4U CN207878663U (en) 2018-01-29 2018-01-29 Pre-embedded bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820149372.4U CN207878663U (en) 2018-01-29 2018-01-29 Pre-embedded bolt

Publications (1)

Publication Number Publication Date
CN207878663U true CN207878663U (en) 2018-09-18

Family

ID=63509063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820149372.4U Expired - Fee Related CN207878663U (en) 2018-01-29 2018-01-29 Pre-embedded bolt

Country Status (1)

Country Link
CN (1) CN207878663U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130531A (en) * 2019-06-06 2019-08-16 深汕特别合作区盛腾科技工业园有限公司 A kind of fabricated shear wall and ground beam connection structure and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130531A (en) * 2019-06-06 2019-08-16 深汕特别合作区盛腾科技工业园有限公司 A kind of fabricated shear wall and ground beam connection structure and method

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN105350654B (en) A kind of construction method for adjusting pre-embedded steel slab and reaching design and construction precision
CN203270599U (en) Foundation bolt pre-buried die
CN200985564Y (en) TT-type built-in autospasy type anchorage
CN205776795U (en) Rectangular column foundation bolt batch positioner
CN207878663U (en) Pre-embedded bolt
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN201753482U (en) Embedded part in cast-in-place concrete member
CN203238657U (en) Tool type anchor bolt mounting positioner
CN204825945U (en) A fixture for fixing buried bolt in advance
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN104805910A (en) Embedded part for cast-in-place concrete component and construction method of embedded part
CN203383331U (en) Steel mold used for simply and conveniently positioning section steel column embedded bolt
CN106758663A (en) Buried rubber fastening band installs positioning construction method in one kind
CN201221448Y (en) Tridimensional adjustable combined type prestress anchor bolt
CN206205012U (en) A kind of SMW engineering methods stake inclinometer pipe installation aiding device
CN105422140A (en) Template supporting device for concrete supporting construction of shaft and lane engineering
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
CN204782001U (en) Regulation formula post rebar positioning appearance
CN107386457A (en) A kind of built-in fitting in cast-in-situ concrete member
CN203821871U (en) Safe enclosing handrail for construction
CN204199323U (en) For the positioning screw hole mould of pre-embedded bolt quick position
CN203848836U (en) Column type marking pier
CN210067407U (en) Scaffold wall connecting piece
CN209760607U (en) steel bar lapping connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Embedded bolt

Effective date of registration: 20201126

Granted publication date: 20180918

Pledgee: Taizhou Branch of Jinhua Bank Co.,Ltd.

Pledgor: ZHEJIANG HENGJI STEEL STRUCTURE Co.,Ltd.

Registration number: Y2020330001042

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180918